Loading...
HomeMy WebLinkAbout1987-03-10; City Council; 8850-3; Accept Bids, Award Contractn a u 1 0 Q Q < .. z 0 4 d 0 z 3 0 0 5 CIT” OF CARLSBAD - AGENU- BILL ACCEPT BIDS, AWARD CONTRACT, AND FUNDS FOR THE CONSTRUCTION IEPT. MP I OF THE RANCHO SANTA FE ROAD TRUCK BYPASS CITY MGR.* RECOMMENDED ACTION: Adopt Resolution No. f7/3 accepting bids, appropriating funds, and awarding Contract No. 3261 for the construction of the Rancho Santa Fe Road Truck Bypass. ITEM EXPLANATION: On January 27, 1987, the City Council approved plans and specifications and appropriated $200,000 as interim financing subject to reimbursement from the County of San Diego, for the construction of the Rancho Santa Fe Road Truck Bypass. The approved plans and specifications include design features necessary for traffic safety and weight limit enforcement for trucks. Additional consultant design costs supplemental to the scope of the original design contract include: 1. 330’ automobile merge lane at bypass entrance $2,000 2. 525’ of additional truck merge lane at bypass exit 3,300 3. Truck inspection lane design 1,500 Total $6,800 Construction costs and contingency for the design of the truck inspection lane are $5,000. Total costs, including design, will not exceed $6,500. Staff believes construction of a vehicle inspection lane would provide the Police Department the level area necessary to stop and weigh trucks for compliance with State weight limits. On January 27, 1987, the San Diego County Board of Supervisors approved a Memorandum of Agreement with the City of Carlsbad and the City of San Marcos. The Memorandum included additional County funding of up to $15,000 for an early completion incentive for the contractor. Staff recommends the City Council appropriate an additional $21,500 at this time representing the potential $15,000 incentive payment, as well as the $6,500 for the design and construction of the inspection lane. The County included in the Memorandum of Agreement a requirement that the City of Carlsbad adopt a policy consistent with County of San Diego standards to encourage minority business enterprise participation in the truck bypass construction. The approved construction specifications included the minority business enterprise requirements as required by the County Public Works Department. Staff recommends the Council approve the attach agreement affirming the minority business enterprise policy. A Page Two of Agenda Bill No. ppTd-3 On February 25, 1987, four (4) sealed bids were received for the project as follows: 1. Southland Paving 2. South Coast Asphalt 3. ABC Construction 4. Kirchnavy Construction $1 64,583 166,758 176,430 184,546 Staff recommends the City Council award the lowest responsive bid in the amount of $164,583 to Southland Paving. FISCAL IMPACT: A summary of the revised estimated project budget .is as follows: Project Design Project Administration and Inspection Soils and Compaction Testing Construct ion Construction Contingency and Potential Bonus Total Project Costs Current Appropriation $ 16,800 15,000 164,600 23,100 $221,500 2,000 200,000 Required Additional Funding $ 21,500 It is recommended that a funds transfer in the amount of $21,500 from the unappropriated balance of the General Capital Construction Fund to the project account No. 300-820-1840-3261 be approved for project construction. The City would be eligible for County of San Diego reimbursement following construction completion. amount of unobligated funds ava.ilable for the purchase of Hosp Grove. The appropriation of $21,500 for this project will reduce the EXHIBITS: 1 .w’ Location Map. 2a/ Resolution No. py& accepting bids, appropriating funds, authorizing additional engineering design, adopting Minority Business Enterprise policy for the project, and awarding Contract No. 3261 for the contruction of the Rancho Santa Fe Road Truck Bypass. .. I EXHIBIT I’ RANCHO SANTA FE ROAD TRUCK BYPASS I I 3 1 2 3 4 5 6 7 8 RESOLUTION NO. 8983 California, has determined it is necessary and in the public interest to construct the Rancho Santa Fe Road Truck Bypass; A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS, APPROPRIATING FUNDS, AUTHORIZING ADDITIONAL DESIGN, ADOPTING MINORITY BUSINESS ENTERPRISE POLICY FOR THE PROJECT, AND AWARDING CONTRACT NO. 3261 FOR THE CONSTRUCTION OF THE RANCHO SANTA FE ROAD TRUCK BYPASS 9 10 WHEREAS, the City Council of the City of Carlsbad, and WHEREAS, bids for the construction of said project have 13 14 15 16 17 18 19 20 21 z2 23 24 25 26 27 28 WHEREAS, the San Diego County Board of Supervisors has authorized additional reimbursement to the City of Carlsbad of funds in the amount not to exceed $15,000 as contractor incentive payments for early completion of the project; and WHEREAS, the City Council wishes to include in the bypass construction a truck inspection lane at a cost not to exceed I $6,500; and WHEREAS, additional work in the amount of $6,800 by the engineering consulting firm of Keltner and Associates, Inc. is necessary for the design of the truck inspection lane and additional lengths of a merging lane for traffic safety; and WHEREAS, the San Diego County Board of Supervisors has stipulated that reimbursement of City expenses for the construction of the truck bypass is contingent upon the City Council of the City of Carlsbad adopting a policy to encourage the participation of minority business enterprises in the 1111 been received and are on file in the office of the Purchasing 1211 Department; and ll .. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 le 19 20 21 22 22 24 25 26 27 2e construction of the truck bypass; and WHEREAS, the project specifications incorporate City of 1. 2. in the Truck 8: 3. design Inc. 4. p rogr am requirements for minority business enterprise participation identical in language to that currently being used by the County Department of Public Works; and WHEREAS, the low bid received for the construction of said project was submitted by Southland Paving, Inc. in the amount of $164,583.25; and WHEREAS, a current appropriation exists in the amount of $200,000 for this project; and WHEREAS, an additional appropriation in the amount of $21,500 is required to construct the project; NOW, THEREFORE, BE IT RESOLVED by the City Council of the Carlsbad, California, as follows: That the above recitations are true and correct. That the City Council has determined it necessary and public interest to construct the Rancho Santa Fe Road pass. That the City Council approves additional engineering work in the amount of $6,800 by Keltner and Associates, That the City Council adopts for this project a to encourage minority business enterprise participation and directs staff to implement said program through the language contained in the project specifications. 5. That the City Council determines that the bid submitted by Southland Paving, Inc. in the amount of $164,583.25 for the construction of said project is hereby .. 1 2 3 4 5 6 7 a 9 io 11 12 13 14 12 1E 17 I.€ 1Q 2c 23 22 2: 24 22 26 27 2e accepted and the Mayor and City Clerk are hereby authorized to execute a contract thereafter. 6. That an appropriation of funds in the amount of $21,500 from the unappropriated balance of the General Capital Construction Fund to the project account No. 300-820-1840-3261 is hereby authorized and approved. 7. That the City Council of the City of Carlsbad h.ereby authorizes the increase of purchase order number 3010 an additional $6,800 for additional project engineering design. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 10th day of March 9 1987 by the following vote, to wit: AYES: Council Members Lewis, Pettine, Mamaux and Larson NOES: None A 6s E N T : Council Member <." ,"f Lc -7 ATTEST: 'CiAUDE A.L LEWIS, Mayor \ ALETHA L. RAUTENKRANZ, City Cl'erk (SEAL)