7 OyCI? "OF CARLSBC*�AD -- AGENBILL f�p
AB# Blo.P9—/ ITLE: CITYWIDE TRAFFIC IMPACT STUDY DEPT. HD.
NITG. S / 2 6 /-S 7
DEPT. PLN CITY ATTY
CITY MGR. " �
RECOMMENDED ACTION:
Review and discuss study. `"�� Direct staff to proceed with the
recommendations contained in the attached staff report and
executive summary dated May 19, 1987.
ITEM EXPLANATION
As a result of the City's new Growth Management Program, the City
Council on Duly 8, 1986 authorized the preparation of a Citywide
Traffic Impact Study. The consulting firm of Barton-Aschman
Associates, Inc. was selected to prepare the study.
The primary purpose of the study was twofold:
1) To analyze whether our existing and planned future
circulation improvements would comply with the
circulation performance standard adopted as part of the
Growth Management Plan.
2) To determine a funding source to provide the improvements
required to comply with the performance standard.
The analysis provided in the study was broken down into three
parts; existing conditions, conditions with all the previously
approved but unbuilt development projects and buildout
conditions.
Staff will make a presentation on the study at the City Council
meeting of May 26, 1987. The Planning Commis n will also
attend the meeting. The presentation will start with an
informational overview to familiarize the Council and the
Commission with some basic concepts and terms relating to
transportation planning and traffic studies. The presentation
will consist of three parts:
1) Overview of the Transportation Planning Process - Marty
Bouman, City Transportation Planning Consultant
2) Overview and Summary of the Study's Findings - Michael
Holzmiller, Planning Director
3) Financing - Phil Carter, Senior Management Analyst
Attached is,a memorandum to the City Manager, dated May 19, 1987
which contains a more detailed Staff Report and Executive Summary
of the study.
Page Two of Agenda Bill No.
ATTACHMENTS
1) Staff Report and Executive Summary, dated May 19, 1987
2) Citywide Traffic Impact Mitigation Study and Technical
i Appendices prepared by Barton-Aschman Associates (previously
distributed)