HomeMy WebLinkAbout1987-07-14; City Council; 8592-4; APPROVE CONSTRUCTION CHANGE ORDER NO. 5 FOR THE CALAVERA HILLS COMMUNITY PARK, PHASE I, PROJECT NO.* I D w s os. a 4: P, z .. 0 5 a I g 2 3 0 0 CIT~F CARLSBAD - AGEND-ILL d *,> .~ .- L9 AB# ffi2-4 CITY MC PHASE I, PROJECT NO. 3173 DEPT. MP CITYAT' FOR THE CALAVERA HILLS COMMUNITY PARK, MTG,O~/I 4/87 DEPT. H TITLE: APPROVE CONSTRUCTION CHANGE ORDER NO. 5 RECOMMENDED ACTION: Adopt Resolution No. 9/53 approving construction Change Or No. 5 for the Calavera Hills Community Park, Phase I, Project I 3173. ITEM.EXPtANATIBN: Phase I construction of the Calavera Hills Community Park proceeding on schedule. To date, four (4) minor change ord required by changed field conditions totalling $8,767 have b previously executed in accordance with Administrative Order 7. Proposed additive Change Order No. 5 includes the followin Item 1: Installation of telephone conduit from Glasgow to the exterior wall of the restroom building. $ 3,482. Item 2: Phase I1 perimeter fencing 13,607. Item 3: Contractor purchase and installation of playground equipment 42,694. I Total Cost of additive Change Order No. 5 $59,784. The plans for Phase I of the park do not include a service PO for the installation of a public pay telephone anywhere on site. Staff recommends the installation of a public telephone on the east wall of the restroom facility whicb currently under construction. The conduit and wire specified been sized to provide additional public pay telephone service the future Community Center building to be constructed in PI- install the telephone instrument itself prior to Phase opening to the general public. The plans for Phase I of the park include perimeter fen( around the ballfields fronting Glasgow and Tamarack solely wi' the Phase I site. This contract, however, includes the grac and installation of drainage structures on the adjacent fui Phase I1 park site, as well as the future Fire Station sit1 the corner of Elm and Glasgow. Staff strongly recommends continuation of fencing around the entire perimeter of the fui I I. Parks personnel will make arrangements to purchase Phase I1 site at this time, Installation of perimeter ftnl will discourage individuals from riding or walking across steep, planted slopes, thereby reducing erosion problems minimizing the potential for personal injury. This item includes the installation of a concrete mow strip w' I facilitates drainage and controls erosion in this area of , park. 0 0 L Page Two of Agenda Bill No. 9/53 "- The two (2) large pieces of playground equipment were rem0 from the Phase I plans by the park architect, Recreation Syste Inc., prior to bidding the project due to the fact that specified equipment at that time was thought to be unavaila through existing manufacturers. Consequently, this contract d not include the installation of this playground equipment. k the approval of the Parks Department, the park architect specified new playground equipment to be installed in Phase Staff has negotiated a price with the Phase I contractor purchase, deliver and install the new playground equipment E part of this contract. The contractor has indicated a tirr order of the playground equipment will ensure its installat within the existing contract period. This approach will res in delivery of a complete Phase I park within the prescribed t period and minimize equipment ordering delays and installat costs by the City. Staff recommends approval of Additive Change Order No. 5. The City's soils engineering consultant for this proj~ Leighton and Associates, Inc., was directed to perform n additional soils sampling and testing during the grac operations of this project to ensure compaction strengths certification of building pads for the future Phase I1 Commur Center and Fire Station. This additional soils analysis performed due to the timing of the grading of the entire 18-: site and because of the uncertainties and inconsistencies subsurface conditions encountered throughout the project. increase in Purchase Order No. 3084 to Leighton and Associate: the amount of $10,500 is recommended for the additional sc investigative and testing work. detailed soils investigative work prior to construction FISCAL-IMPACT: The City Council has previously appropriated $1,656,767 frc combination of Park-in-Lieu and Public Facilities Fee funds Phase I of this project. There is a current available balanct additional soils engineering work without requiring additic project appropriations. EXHIBITS: the project account of $195,842 for this change order and 1. Location flap. 2. Resolution No. 9/53 approving Change Order No. 5 for Calavera Hills Community Park, Phase I, Project No. 3173. 3. Change Order No. 5. m CITY OF CARLSBAD 0 PUBLIC WORKS PROJECT CHANGE ORDER NO. 5 CONTRACT NO. 3173 PURCHASE ORDER NO. 3143 ACCOUNT NO. 320-820-1810-31 CONTRACTOR'S NAME . -William J. Kirchnavy Construction, Inc. CONTRACTOR'S ADDRESS 1010-Linda Vista Drive;-San-Marcos, California, 92069- " The contractor is directed to make the following changes. Changes shall include I material and equipment; payment stated on this change order includes all charges dirt indirect arising out of this additional work. The requirements of the specificat where pertinent and not in conflict with this order shall apply to these changes. This change order is not effective unless signed by the Mayor. CHANGE : 1. Telephone conduit 2. Galvanized perimeter fencing 3. Playground equipment REASON FOR CHANGE: 1. Required for installation 2. To protect Phase I1 slope areas 3. Omitted from original contract COST : TIME CHAN.GE : - Lump sum Unit prices- Both X Add days -0- ' Deduct days ' - Total thiGtra 7 59,784.16 Add/deducrd-his change Previous net changes $ . 8,767.00 Previous add/deduct days Original contract amount $1,176,767.00 Original contract days New contract total $1,245,318.16 New contract time "1 " - - .. - , - CITY OF CARLSBAD .. &ye/ Cons ruction * "" Inspector AY Da 7~b7 e WW!. . 3-2-g -L"" ProjecW Manager Date CONTRACTOR i* 1 2 3 4 5 6 7 a 9 1.0 11 12 13 14 15 16 17 18 19 /I 20 21 22 23 24 25 26 27 I1 28 ~ I 0 a RESOLUTION NO. 9153 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING CHANGE ORDER NO. 5 FOR THE CALAVERA HILLS COMMUNITY PARK, PHASE l,-PROJEET-N0:3173 " WHEREAS, the City Council of the City of Carlsb California, has determined it is necessary and in the pub interest to construct Calavera Hills Community Park; and WHEREAS, it is desirable to include additional it within the scope of the above construction project; and WHEREAS, a current appropriation in the amount $1,656,767 exists for this project; NOW, THEREFORE, BE IT RESOLVED by the City Council of City of Carlsbad, California, as follows! 1. That the above recitations are true and correct. 2. That the City Council approves the execution authorizes the Mayor to sign a change order in the amount $59,784.16 to the project contractor, William J. Kirchn Construction, Inc., for telephone conduit, additional perime fencing, and playground play equipment. 3. That the City Council of the City of Carlsb California, authorizes an increase in Purchase Order No. 3 to William J. Kirchnavy Construction, Inc., by an additic $59,784.16. 4. That the City Council further authorizes an incre in Purchase Order No. 3084 to Leighton and Associates, Inc., /// I i /I/ /// I '. 1 2 3 4 5 6 7 8 9 PO 11 II I 12 13 14 15 16 17 18 19 I 20 i' I W e an additional $10,500. PASSED, APPROVED, AND ADOPTED at a regular rneeting of Carlsbad City Council held on the 14th day of July 1987 by the following vote, to wit: " " "" AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Lax NOES: None ABSENT: None ATTEST: .!/A.;/ f/ /';/ ,. ,/' ,' f-. / / . CLAUDE A. LEWIS, Mayor )JL"yjLw .: AL THA I, R .TmK&mierr ( SEAL) 21 22 23 24 25 26 27 28