Loading...
HomeMy WebLinkAbout1987-09-22; City Council; 9167; Upgrade Fox's Landing sewer pump stationCIT~ OF CARLSBAD — AGENDA BILL occQ_ 0. O 8 AR* 9y& 7 MTG 9/22/87 DEPT. U/M TITLE: UPGRADE FOX'S LANDING SEWER PUMP STATION DEPT. HD CITY ATT1 CITY MGF r-'fA RECOMMENDED ACTION: Adopt Resolution No. Cf33c) approving the competitively solicited bids and authorizing the expenditure of funds to upgrade Fox's Landing Sewer Lift Station. ITEM EXPLANATION: Fox's Landing pump station, which is located on the northwest shore of the inner Agua Hedionda Lagoon, has experienced five (5) major interruptions in service in the past twelve (12) months. The most recent occurred in July of this year. The station is old and operating at near capacity. In the event one o-f the two existing pumps becomes non-operational, there is the possibility of a sewer spill into the Agua Hedionda Lagoon. With the forthcoming winter rains, a health hazard could result if there is an overflow spill into the lagoon. A new third pump was acquired in fiscal 86-87 and it is necessary to contract for the installation of the pump and related control panel modifications to avoid a failure. If the normal competitive bidding process was used, work would start around December 9, 1987 and be completed about January 8, 1988. Utilizing the proposed procedure, the work can start around October 16, 1987 and be completed about November 13, 1987. The emergency procedure is authorized by the California Public Construction Act, 20168 if approved by a 4/5 vote of the Council. Bids to do the required work have been received from two qualified companies who responded to the request for quotations: Gierlich-Mitchell, Inc. - $7,836.00 Blackhawk Industries, Inc. - $10,951.00 Purchase Order has been prepared and is ready for signature. FISCAL IMPACT: The fiscal impact is approximately $7,900.00 according to the estimate. Funds are available in account number 511-840-6110- 2479. EXHIBITS: 1. Resolution No. 2. Location Map. 3. Bids (2). LOCATION MAP r NO SCALE SITE. PROJECT NAME: UPGRADE. FOX'S LANDING PUMP STATION H TO GIERLICH-MITCHELL, INC. 227 W. Grand Avenue P.O. Box 933 El Segundo.CA 90245-0933 (213)414-0150 Wilson Engineering Attn: Kevin Schmidt 3138 Roosevelt Street, Ste. M Carlsbad, CA 92008 No. Date QUOTATIO^I LA-1427 April 15, 1987 Page 1 of Job Name Carlsbad - Fox's Landing Autocon Panel Modifications Engineers or Architects Bids Due We are pleased to offer our quotation on the equipment listed below for the above projects. Unless noted to the contrary all items conform to Plans and Specifications. ITEM QUANTITY DESCRIPTION NET PRICE B Gentlemen: We are pleased to confirm our telephone quotation for modifying existing Autocon panel to include the following: Furnish and install a new size 4 combination motor starter and JA frame 200 amp, 3 pole curcuit breaker with heaters sized' for the new 40 HP, 240 VAC sewage Pump No. 3. Unit to be complete with control relay, door interlock, and all mounted and wired on a plug-in shelf assembly to match the existing Autocon vertical buss configuration. New circuit breaker door operator handle hardware and bracket materials will be furnished and installed in the existing door for Compartment IE. Modifications to existing bubbler autosensory section Compartment 3A to include new Pump No. 3 HOA selector switch, new elapsed time running meter and providing manual alternation selector switch to allow operator to manually alternate the pumps in sequence of 1-2-3, 2-3-1, or 3-1-2 sequence as desired. Total Price $6,416.0C Option 1; To rewire lead-lag selector switch such that the two existing pumps will always operate through the two circuit automatic alternator allowing the operator to select the new pump as Step No. 1 and the two existing pumps will alternate in Steps 2 and 3 in one mode or the existing two pumps will operate as Lead 1, Lag 2 with the new 40 HP pump operating as Lag No. 1 (second step) mode. Terms: 30 days net, f.o.b. Factory D f.o.b. Destination D with freight allowed D. TAXES NOT INCLUDED Drawings: days after receipt of order with complete information. Shipment: days after receipt of approved drawings. Quotation expires 15 days from above date. Stenographic and clerical errors subject to correction. This quotation and any resulting order will be subject to our standard terms of sale. GIERLICH-MITCHELL, INC. 227 W. Grand Avenue P.O. Box 933 El Segundo,CA 90245-0933 (213)414-0150 QUOTATION NO. PAGE 2 OF LA-1427 ITEM QUANTITY DESCRIPTION .NET PRICE Total price adder including additional relays and field wiring modifications Option 2; $770.00 Provide additional relay and transfer logic to operate the existing two pen recorder on the first two level steps of operation, whichever is selected through the manual selector switch in base proposal or Option No. 1. Total price adder, labor and materials $650.00 All pricing above is F.O.B. point of shipment with freight allowed to Carlsbad. No taxes included in above pricing. Above pricing includes documentation and updating of wiring modifications. Delivery of equipment approximately four weeks after receipt of order or notice to proceed. Terms: 30 days net, f.o.b. Factory Q f.o.b. Destination Q with freight allowed D. TAXES NOT INCLUDED Drawings: days after receipt of order with complete information. Shipment: days after receipt of approved drawings. Quotation expires 15 days from above date. Stenographic and clerical errors subject to correction. This quotation and any resulting order will be subject to our standard terms of sale. James O. Gierlich - . 10 h RECEIVED MAY 1 9 1987 UPGRADE FOXES LANDING SEWAGE PUMP STATION ITEM QUANTITY DESCRIPTION NET PRICE B Furnish and install a new size 4 combination motor starter and JA frame 200 amp, 3 pole curcuit breaker with heaters sized for the new 40 HP, 240 VAC sewage Pump No. 3. Unit to be complete with control relay, door interlock, and all mounted and wired on a plug-in shelf assembly to match the existing Autocon vertical buss configuration. New circuit breaker door operator handle hardware and bracket material will be furnished and installed in the existing door for Compartment IE. Modifications to existing bubbler autosensory section Compartment 3A to include new Pump No. 3 HOA selector switch, new elapsed time running meter and providing manual alternation selector switch to allow operator to manually alternate the pumps in sequence of 1-2-3, 2-3-1, or 3-1-2 sequence as desired. Total Price $9161.00 Option 1; To rewire lead-lag selector switch such that the two existing pumps will always operate through the two circuit automatic alternator allowing the operator to select the new pump as Step No. 1 and the two existing pumps will alternate in Steps 2 and 3 in one mode or the existing two pumps will operate as Lead 1, Lag 2 with the new 40 HP pump operating as Lag No. 1 (second step) mode. 7 Upgrade Foxes Landing Sewage Pump Station QUANTITY DESCRIPTION NET PRICE Total price adder including additional relays and -field wiring modifications ..... Option 2: $1206.00 Provide additional relay and transfer logic to operate the existing two pen recorder on the first two level steps of operation, whichever is selected through the manual selecto switch in base proposal or Option No. 1. Total price adder, labor and materials . . . _. _ ._ __ Base Bid Adder; Supply all labor, material and equipment necessary to add run light and LOS control station for new pump *3. Total price adder, labor and materials ..... Option *3; $584.00 Supply all labor, material and equipment necessary to add run light and LOS control station for existing pumps *1 and *2. Total price adder, labor and materials ..... All pricing above is F.O.B. point of shipment with freight allowed to Carlsbad. No taxes included in above pricing. Above pricing includes documentation and updating of wiringmodifications. 33 Delivery of equipment approximately four weeks after receipt or order or notice to proceed. Blackhowk Industries Incorporated Contractor Signature Title Date $518.00 $1015.00 1 2 3 4 5 6 7 8 10 11 POfcw 21 22 23 24 26 26 27 28 RESOLUTION NO. 9239 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AUTHORIZING THE EXPENDITURE OF FUNDS TO UPGRADE FOX'S LANDING SEWER LIFT STATION _ WHEREAS, bids have been received by the City of Carlsbad, California to upgrade Fox's Landing sewer lift station; and WHEREAS, the lowest responsive bid received for the project was submitted by Gierlich-Mitchell , Inc. of El Segundo, California in the amount of $7,836.00; and WHEREAS, funds are available in account number 511-840-6110-2479 for the project. WHEREAS, the work is determined to be of an emergency nature; and WHEREAS, the emergency procedure is authorized by the California Public Construction Act, 20168. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. The above recitations are true and correct. 2. The bid of $7,836.00 by Gierlich-Mitchell, Inc. to upgrade Fox's Landing sewer lift station is hereby accepted and execution of a purchase order is authorized. /// /// /// /// 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED by the City Council of the City of Carlsbad, California, at a regular meeting held on the 22nd day of September 1987, by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None OLAUDE A. TLEVIS, Mayor ATTEST: A K/ ALETHA L. RAUTENKRANZ, City CISerk - 2 -