Loading...
HomeMy WebLinkAbout1988-03-01; City Council; 9278-1; Additional Repairs to 18" sewer lineCIT OF CARLSBAD - AGENC~ BILL °AR* 9278-1 MTG. 3-1-88 DEPT. U/M TITLE: ADDITIONAL REPAIRS TO 18" SEWER LINE RUNNING UNDER 1-5 SOUTH OF POINSETTIA OPPT. HD.^^ CITY ATTY ViS^S CITY MGR. "^M a1a. J O OO RECOMMENDED ACTION: Adopt Resolution No. &"%"- b ¥ approving additional emergency repairs to 18" sewer line running under 1-5 south of Poinsettia. ITEM EXPLANATION: On January 26, 1988 the City Council awarded a contract to Hubbard Construction Company in the sum of $39,795.00 to complete the emergency replacement of 112' of 18" badly corroded ductile iron pipe on the east side of 1-5 south of Poinsettia. Council was also informed that the section of pipe running under 1-5 was suspected of being similarly damaged. Hubbard Construction Co. began work on Tuesday, February 16, 1988. With completion anticipated on Thursday, February 18, 1988. During the course of completing the repair the contractor discovered that the pipe under 1-5 was so badly damaged by corrosion that a sealed joint could not be made between the repair and the existing pipe. It was apparent that the pipe under 1-5 would require immediate replacement to avoid damage to the freeway. The pipe is in a 36 inch casing under the freeway. The casing is in good condition. Accordingly, the Utilities and Maintenance Department requested and received a quote of $109,550.00 from Hubbard Construction Co. to remove and replace a sewer manhole structure and replace 230 feet of ductile iron pipe. The sewer line will be shut down for at least five work days which will require the use of a pump unit and one or possibly two tank trucks to transport sewage around the repair. Hubbard Construction is on the job and has the equipment and the expertise to complete this job. Approval of this would assure the expedient replacement of this 18" sewer line and insure the integrity of the 1-5 road bed. PAGE 2 OF AB # 9278-1 FISCAL IMPACT: The fiscal impact is approximately $109,550 according to the estimate. Utilities & Maintenance Department requests an appropriation from the unappropriated Fund Balance (511-961) to account number 511-840-6110-2940 to cover the cost of this repair. The unappropriated Fund Balance will be approximately $1.5 million after this appropriation. EXHIBITS: 1. Resolution No. 2. Location map 3. Report to City Manager from Utilities & Maintenance Director RESOLUTION NO. 88-64 1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, 2 CALIFORNIA, AUTHORIZING THE EXPENDITURE OF FUNDS TO MAKE ADDITIONAL EMERGENCY REPAIRS TO AN 18" SEWER MAIN 3 4 WHEREAS, on January 26, 1988, the City Council authorized 5 the expenditure of 539,795.00 for emergency repair of the 13" 6 sewer main on the east side of 1-5 south of Poinsettia by Hubbard Construction Company of Encinitas, and; 8 WHEREAS, the contiguous portion of the 18" sewer line which runs under 1-5 is corroded, prevents the sealing of a joint to the repaired line and requires replacement, and; 11 WHEREAS, Hubbard Construction Company worked on the 12 repaired portion of the pipe, is prepared to do the additional work expeditiously for $109,550, and; WHEREAS, the work is determined to be an emergency, and; WHEREAS, the emergency procedure is authorized by the California Public Contract Code, Section 2018. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. The above recitations are true and correct. 2. An appropriation of 3109,550 to make the additional 21 repairs by Hubbard Construction Company is approved and 22 execution of work is to proceed as authorized. 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED by the City Council of the City of Carlsbad at a regular meeting held the 1st day of March 1988, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None DE A. UEWIS, Mayor ATTEST: — ^-«-e-orwt*-^ en i \. i^i*->^~*-*-^wvc»*—, ALETHA L. RAUTENKRANZ, City^Clerk February 18, 1988 TO: CITY MANAGER VIA: Assistant City Manager FROM: Director, Utilities & Maintenance ADDITIONAL REPAIRS TO 18" SEWER MAIN In early January, Caltrans workers reported a leak on the 18" gravity sewer main running from the east side of 1-5 to the west side of 1-5. The City Council authorized utilities & Maintenance to accept two (2) informal bids at the council meeting of January 26, 1988 to replace 112' of that 18" sewer main. The Utilities & Maintenance Department entered into a contract with Hubbard Construction to replace that section of line at a cost of $40,000. Hubbard Construction started work on February 16, 1988. They proceeded to replace that portion of line located on the east side of 1-5 to the manhole located at the top of the embankment on the east side of 1-5. As they prepared to uncover that portion of the pipe running under 1-5 through a 36" conduit, to connect the new line, they found the pipe badly deteriorated by the highly corrosive, sulfide gases in the line. I have attached some pictures showing the line's deteriorated condition. Our worry all along was that we would find this section of pipe in poor condition. Because of grease build-up lining the walls of the pipe, it was impossible to determine this damage at the time the line was examined in January. The only damage that was apparent was to that portion of the pipe which was immediately east of 1-5. Accordingly staff recommended replacement of that section only. Staff did advise the City Council that the portion of the pipe under 1-5 might also require replacement. We now find that replacement is urgently necessary. We need your authorization to continue the replacement of this 18" sewer main running under 1-5 west to a manhole, on the west side of 1-5. Hubbard has given us a price of $109,550 to replace all of the 18" pipe running from the angle point on the east side of 1-5 to the existing manhole on the west side of 1-5, Included in the price would be the replacement of the manhole on the west side of 1-5 as it will have to be completely removed in order to pull the 18" pipe, that is now in the 36" sleeve, out of the sleeve. The pictures show the pipe is completely deteriorated and if not replaced, could cause serious damage to 1-5. CITY MANAGER Page 2 February 18, 1988 Hubbard Construction has completed the first phase of repairs. They have laid a new 18" PVC line replacing all of the pipe located on the east side of 1-5. We would like to continue through the 36" conduit to the west side of 1-5 with PVC and eliminate any future problems with corrosion due to gas build-up. If you have any questions, please call me at x4105. X7 RWA:mew