TITLE: APPROVAL OF CHANGE ORDER NOS. 7 AND 8 DEPT. H FOR THE COLLEGE BOULEVARD ASSESSMENT ClTYA DISTRICT, PROJECT NO. 3188
Adopt Resolution No. pR-73 approving Change Order Nos. 7 and 8
for the College Boulevard Assessment District, Project No. 3188.
ITEM EXPLANATION:
Construction of College Boulevard from El Camino Real to Palomar Airport Road is 98% percent complete. All major construction items within the assessment district have been completed; minor punchlist and clean-up items remain to be addressed by the contractor. Portions of College Boulevard southerly from El Camino Real are scheduled to be open to traffic in late March.
Change Order No. 7 in the amount of $7,935 involves the addition of the traffic signal control opticon system to the El Camino
Real and College Boulevard traffic signal. The opticon feature was inadvertently not included by the design engineers on the traffic signal plans for this intersection. The opticon system is standard equipment for all Carlsbad traffic signal systems and allows the Fire Department's emergency vehicles to control intersection movements during emergency responses. The traffic signal, including the addition of the opticon system, at El Camino Real and College Boulevard is funded in full by the City contribution to the assessment district as previously budgeted in
the 1986-87 Capital Improvement Program from Public Facility Fee Funds.
Change Order No. 8 involves a request by the Carlsbad Research Center, the Koll Company, to include the addition of landscape median lights to the tree wells on a portion of College Boulevard fronting the CRC property. The cost of this addition is $78,685 and is to be totally assessed to the CRC ownership within the assessment district. The median lighting will enhance the aesthetics of both the property and the roadway at night. In the
attached letter dated February 18, 1988, the Koll Company will be responsible for all costs associated with maintenance and monthly energy charges for the median lights.
Staff recommends approval of Change Order Nos. 7 and 8 for the College Boulevard Assessment District project.
FISCAL IMPACT:
Bond financing in the amount of $9,570,250 has been previously
secured for the College Boulevard Assessment District.
Contingency funds within the project account in the estimated
amount of $362,000 are currently available to enable the approval
of Change Order Nos. 7 and 8.
Page Two of Agenda Bill No. 932 3
EXHIBITS :
1. Location Map.
2. Letter dated February 18, 1988 from the Koll Company to the
City of Carlsbad concerning maintenance and energy costs for the median lights.
3. Resolution No. 88- 73 approving Change Order Nos. 7 and 8
for the College Boulevard Assessment District, Project No.
3188.
4. Change Order Nos. 7 and 8.
- -
LOCATION MAP
'RoJECr SOUTH COLLEGE BLVD.
ASSESSMENT DISTRICT
....
paoJ. NO. EXHIBIT
31 88 I
SI . . . . . . . . ASSESSMENT DISTRICT
BOUNDARY
VlcPltTv MAP
N. T. s.
KOLL
7330 Engineer Road
San Diego
California ?2m
The Koll Company 1619) 292-5550
February 18, 1988
Pat Entezari City of Carlsbad
2075 Las Palmas
Carlsbad, CA 92008
Re: College Boulevard Assessment District
KCC Job No. 16220
Dear Sir:
Please let it be known that we the Koll Company will bear the cost of maintenance on the median lights and also be
responsible for installation of its meters and monthly utility
charges.
Respectfully,
Pro j ectpanager
WM/dW
cc: Mike Dunigan
Mick Kubota
, 4
1
I
I
I
1
!
1(
1:
1;
1:
1L
If
1(
. 1s
I€
1s
2c
21
22
22
24
25
26
27
28
RESOLUTION NO. 88-73
A RESOLUTION OF THE CITY COUNCIL OF THE CIT! COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PROJECT CHANGE ORDER NOS. 7 AND 8 FOR THE COLLEGE BOULEVARD ASSESSMENT DISTRICT, PROJECT NO. 3188
WHEREAS, the construction of the College Bou,evarc
Assessment District, Project No. 3188, is proceeding according
to schedule; and
WHEREAS, an opticon system is necessary for the emergency
vehicles to safely control intersection movements; and
WHEREAS, installation of median island lighting has heen
(1) of the participants of requested by the Koll Company as one
the assessment district ; and
WHEREAS, the Koll Company will be assessed for 100% of the
costs of the median lighting in the amount of $78,685; and
WHEREAS, sufficient contingency funds exist within the
assessment district project account to enable the approval of
the aforementioned Change Orders;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That project Change Order Nos. 7 and 8 in the total
amount of $86,620 are hereby approved and the Mayor and City
Clerk are authorized to execute said Change Orders. Following
execution of Change Order Nos. 7 and 8 by the Mayor, the City
Clerk is authorized and directed to return copies of said
executed Change Orders to Municipal Projects for processing.
3. That the Purchasing Officer of the City of Carlsbad,
I
.:
c
1:
14
17
le
19
20
21
22
23
24
25
26
27
28
California, is hereby authorized to increase the existing
Purchase Order No. 2277 in the amount of $86,620 in accordance
with approved Change Order Nos. 7 and 8.
PASSED, APPROVED AND ADOPTED at a regular meeting of the
Carlsbad City Council held on the 8th day of March
1988, by the following vote, to wit:
I
AYES: Council Members Kulchin, Pettine and Larson
NOES : None
ABSENT: Council Members Lewis and
ATTEST:
ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)
. 7 t' : I .'
CHANGE ORDER
E68-015.019/21
Order No. 7 Date January 27, 1988 Agreement Date Sheet 1 of 3
Owner: City of Carlsbad
Project : Assessment District 85-2, Schedules I E, I1
Contractor': Koll/Hubbard, a Joint Venture
The following changes are hereby made to the Contract Documents:
ITEM 1 MODIFICATION TO TRAFFIC SIGNAL AT EL CAMINO REAL
Justification: The City requested the addition of an OPTICON system
to the traffic signal at College Blvd. and El Camino
Real and also to upgrade the controller to operate using a 176 controller chip.
OPTICON System $7,403.00
176 Chip 532.00
TOTAL $7,935.00
See Attachment No. 1 .for.details
NOTE: DUE TO DIFFICULTY IN OBTAINING THE OPTICON SYSTEM ON SHORT NOTICE, THE
CONTRACTOR MAY NOT BE ABLE TO COMPLETE THE 'INSTALLATION OF THE SIGNAL
WITHIN THE CONTRACT COMPLETION DATE. - AN ADJUSTKZKT 6iLi KEE3 TG BE Wi3E
TO THE CONTRACT COMPLETION DATE WHEN THE DELIVERY DATE OF THE OPTICON
COMPONENTS IS KNOWN.
E68-015.019
Change Order No. 7
Sheet 2 of 3
DATE January 27, 1988
CHANGE TO CONTRACT PRICE
Schedule I Schedule I1
$6,801,836.31 $255,200.00
$ 189,386.05 $ -0-
Orig. Contract Price
Previous Change Orders
Contract Price Increase
This Change Order:
Item 1: $ 7,935.00 $ -0-
TOTAL THIS CHANGE ORDER $ 7 , 935.00 $ -0-
New Contract Price including this Change Order $6,999,157.36 $255,200.00
CHANGE TO CONTRACT TIME
Contract Time - 0- -0-
Date for Completion of all work January 21, 1988 January 21, 1988
I. -.
” -
E68-015.019/21
Change Order No. 7
DATE January 27, 1988
Sheet 3 of 3
APPROVALS REQUIRED
To be effective, this Order must be approved by the Federal Agency
if it changes the scope or objective of the Project, or as may
otherwise be required by the Supplemental General Conditions.
Recommended by: DATE dC/-m NBS/LOWRY, INCORPORATED
Approved by:
.
Approved by: -4 & DATE ,$! -6 €36 Ff KO L/HUBBAR A JO NT VENTURE
_--
CHANGE ORDER
E68-015.019/21
Order No. 8 Date January 29, 1988 Agreement Date Sheet 1 of 3
Owner: City of Carlsbad -
Project : Assessment District 85-2, schedules I & I1
Contractor: Koll/Hubbard, a Joint Venture
The following changes are hereby made to the Contract Documents:
ITEM 1 MEDIAN LIGHTING
Justification: The Ownership of the Carlsbad Research Center has
requested that median lights be added to the tree
wells of the portion of College Blvd. abutting the
Carlsbad Research Center property. The cost of the
lighting system is to be assessed directly to the CRC ownership. The Assessment Engineer has determined that ample funds are available in the remaining continsency fund to cover the cost of this item.
Attachment No. 1 for more details. See
COST: $78,685.00
There is no time extension for this item. However,
due to the late date of this change, the lights will
be installed after the contract completion date but
before March 1, 1988.
ITEM 2 TIME EXTENSION
Due to rain and adverse weather, the contractor was delayed 14 working days.
completion date from January 21, 1988 to February 10, 1988. See Attachment No. 2 for details. The days are as follows:
Nov. 2, 1987 - 1 day Dec. 16, 1987 - 1 day Nov. 5, 1987 - 1 day Dec. 17, 1987 - 1 day Nov. 6, 1987 - 1 day Dec. 18, 1987 - 1 day Nov. 9, 1987 - 1 day Dec. 29, 1987 - 1/2 day Nov. 10, 1987 - 1 day Dec. 30, 1987 - 1 day Dec. 4, 1987 - 1/2 day Jan. 18, 1988 - 1 day Dec. 7, 1987 - 1 day Feb. 2, 1988 - 1 day Feb. 3, 1988 - 1 day
The addition of the delay changes the contract
E68-015.019
Change Order No. 8 DATE Januarv 29, 1988 Sheet 2 of 3
ITEM 3 TRAFFIC SIGNAL
Justification: At the request of the City of Carlsbad, the traffic
signal at Palomar Airport Road and College has been deleted from the contract due to traffic safety considerations.
COST : $(53,000.00)
There is no time extension for this item.
CHANGE TO CONTRACT PRICE
Schedule I Schedule I1
$6,801,836.31 $255,200.00
$ 197,321.05 $ -0-
Orig. Contract Price
Previous Change Orders
Contract Price Increase
This Change Order:
Item 1: Median Lights
Item 2: Time Extension
Item 3: Traffic Signal
TOTAL THIS CHANGE ORDER
Total Cost of Change Orders
New Contract Price including this Change Order
$ 78,685.00 $ -0-
+14 working days
$ (53,000.00)
$ 25,685.00
$ 223,006.05
$ -0-
$7,024,842.36
CHANGE TO CONTRACT TIME
Contract Time +14 working days
Date for Completion of all work February 10, 1988
.$
$255,200.00
-0-
E68-015.019/21
Change Order No. 8 DATE January 29, 1988
Sheet 3 of 3
APPROVALS REQUIRED
TO be effective, this Order must be approved by the Federal Agency
if it changes the scope or objective of the Project, or as may
otherwise be required by the Supplemental General Conditions.
Recommended by: - DATE 2 -7-gg'
NCORPORATED
Approved by: DATE 3 ++
CITY OF LSBAD
Approved by: DATE 2-6-88 @
NOTE: DUE TO DIFFICULTIES IN OBTAINING THE MEDIAN LIGHTING SYSTEM ON SHORT NOTICE,
THE CONTRACTOR MAY NOT BE ABLE TO COMPLETE INSTALLATION OF THE MEDIAN
LIGHTING WITHIN THE CONTRACT COMPLETION DATE. AN ADJUSTMENT WILL NEED TO BE
MADE TO THE CONTRACT COMPLETION DATE WHEN THE DELIVERY DATE OF THE MEDIAN