HomeMy WebLinkAbout1988-06-21; City Council; 9495; 1988-89 Budget Encina WPCFCITJKOF CARLSBAD - AGEN
^•F
TITLE:
MTQ. fi-71-«8
DEPT._EML 1988-89 BUDGET - ENCINA WPCF
O
Oo
RECOMMENDED ACTION:
Council adopt Resolution No. Y%''*<3>6<S approving in the total amount of
$10,090,957, of which the City of Carlsbad's share is $1,961,317, to operate
the facility to provide full secondary treatment of sewage effluent.
ITEM EXPLANATION:
Attached for Council approval is a summary of the 1987-88 Encina WPCF budget.
The proposed total budget of $10,090,957 represents a 29.8% increase over the
current year's budget. This increase reflects the combined effects of
secondary treatment, rising sludge disposal costs, inflation, and the capital
improvements associated with the plant expansion and solids management project.
FISCAL IMPACT:
The proposed budget increases Carlsbad's annual contribution from $1,357,731
to $1,961,317. Of the $603,586 increase, $350,000 is related to operational
increases and the remainder to the Phase IV expansion and solids management
program.
EXHIBITS:
1.
2.
Memorandum from Encina WPCF to Board and Councils of the Member Agencies
dated May 17, 1988 with three-page attachment.
Resolution No. a 6 *J0 & approving in the total amount of
$10,090,957 to operate the facility to provide full secondary treatment
of sewage effluent.
,-*•»,,
WATER
POLLUTION
CONTROL
FACILITY
ENCINA WATER POLLUTION CONTROL FACILITY
To:
Subject:
May 27, 1988
Beard and Councils of the Member Agencies
of the Encina Water Pollution Control Facility
Fiscal Year 1988/89 Budget Recommendations
6200 Avenida Encinas
Carlsbad, CA 92009-0171
Telephone (619) 438-3941
Ref: 2M.4586
Attached are the budget recommendations for the various programs which are per-
formed, and/or maintained by Encina. This budget, which provides funding for
secondary treatment, is recommended for approval by a majority of the Joint
Advisory Committee (JAC). The JAC recommendation approving secondary level
funding included the condition that advanced primary (waiver) level treatment
continue until the JAC evaluates the reliability of a contract hauler (Piira Gro,
Inc.) to dispose of the increased sludges. The recommendation for budget appro-
val was passed by a 10 to 2 (82.22% to 17.78% Unit I) vote, with San Marcos
County Water District voting no.
The recommended 1988/89 Budget totals $10,090,959 compared to last year's total
of $7,776,575. The major components of the budget and how they compare to last
year's are shown below:
PROGRAM
Plant (Unit I)
Outfall (Unit J)
Capital Improvement Prog.
Vista Trust Fund
Source Control
Pump Stations
1987/88
BUDGET WAIVER
RECOMMENDED
1988/89
BUDGET
$3,980,073
20,000
3,210,000
155,000
27,202
384,300
$4,621,069
28,000
3,507,200
833,000
99,503
472,298
16.1
40.0
9.3
435.0
266.2
22.9
$5,153,856
28,000
3,507,200
833,000
9.9,603
472,298
29.5
40.0
9.3
435.0
226.2
22.9
$7,776,575 $9,558,170 22.9 $10,090,957 29.8
In summary, the overall recommended budget represents a 29.8% increase over
fiscal year 87/88. The 29.8% increase reflects the combined effects of secon-
dary treatment, rising sludge disposal costs, increased flows, inflation,
expanded programs and the capital improvements associated with the plant expan-
sion and solids management.
The following is a discussion of each of the components listed above.
PLANT
The recommended plant (Unit I) budget is based on the assumption that a secon-
dary level of treatment may be implemented when the JAC determines reliable
sludge disposal exists. It is also assumed contract sludge hauling and disposal
is implemented. While the recommended budget is at secondary treatment level,
the budget for waiver treatment are also for information.
SERVING THE CITY OF VISTA. CITY OF CARLSBAD. BOENA SANITATION DISTRICT. SAN MARCOS COUNTY WATER DISTRICT,
LEUCADIA COUNTY WATER DISTRICTING ENCINITAS SANITARY DISTRICT
f**\ •
Board and Councils of the mdber Agencies of Encina
Subject: FY 1988/89 Budget Recommendations
May 27, 1988
Page Two
Other assumptions used in the plant budget include a 4% inflation factor for FY
88/89 where firm prices could not be obtained. Also, a 10% annual flow increase
from 19.8 MGD to 21.8 M3D was assumed.
The following major categories are discussed because they contribute a signifi-
cant portion of the 29.5% overall plant budget increase or they are particularly
noteworthy. The category is followed by a percentage which relates the category
to the total plant budget.
Salaries and Benefits (+6.5%): This reflects the 4i additional positions to
staff the Resource Reclamation (solids) program (li), Administrative Entity
(li), clerical (3/4) support to existing programs and increased maintenance
(1) resulting from secondary level of treatment. Other increasing labor
requirements are met by the contracting of the sludge hauling and the
reassignment of Encina staff now assigned to sludge hauling. In the event
contract hauling is not implemented, additional staff (+2) would be required
at the secondary level of treatment to handle existing and increasing sludge
hauling duties. Funds would be transfered from the Contractural Services
Accounts to fund the positions and associated expenses (fuel, tires, etc).
The figures do not reflect COLA, range adjustments or increased benefit
costs yet to be negotiated.
Contractural Services (+12.8%): The increase reflects the contracting out of
sludge hauling which was done by Encina staff and the increased sludge
resulting from increased flow and treatment level requiring hauling and
disposal. In the event a contract is not awarded, funds from this account
would be transfered to salaries and benefits account to provide additional
permanent staff and other accounts i.e. fuel, etc.
Utilities (+10.5%): Three factors affect this account. The "unbundling"
of rates by SDG&E has resulted in projected increases; second, the increased
flows result in additional natural gas purchases from SDG&E and third, the
secondary level of treatment consumes more energy.
Chemicals (+2.5%): Three factors also influence this increase. The unit
cost of chemicals has increased, the increased flow requires more chemicals
and, secondary treatment requires more chemicals.
Capital Acquisitions (+1%): New office equipment associated with the addi-
tional staff along with various other replacements and new equipment account
for this increase.
Miscellaneous (-3.8%): Reductions in various categories result from 1)
contract hauling i.e. less insurance, tractor repairs, etc; 2) formation of
the Encina Administrative Agency, i.e. LCWD administration expense elimi-
nated, and 3) overall reduction in maintenance and repair.
ENCINA WATER POLLUTION CONTROL FACILITY
6200 Avenida Encinas, Carlsbad, CA 92009-0171 (619)438-3941
J J
*o County
Boards and Councils of the jtember Agencies of Encina
Subject: FY 1988/89 BudgetCfecommendations
May 27, 1988
Page Three
OCEAN OUTFALL
The recommended outfall budget of $28,000 includes inspection and kelp control
elements. This fiscal year's inspection indicated a need for cathodic protec-
tion and accounts for the majority of the 40% budget increase.
CAPITAL IMPROVEMENT PROGRAM (CIP)
FY88/89 Budget of $3,507,200 will provide funding for: 1) Phase IV - Engineering
and Construction Management services in addition to prepurchase of sludge belt
filter presses; and 2) North County Sewage Solids Management Project (NCSSMP) -
services through the site acquisition stage and up to $1,000,000 for actual land
costs.
VISTA TRUST FUND
The $830,000 budget is to provide funding for three remaining Phase III contract
items: 1) $5,000 allowance for possible ineligible grant costs for Contract 3/4;
2) contingency amount ($650,000) pending EPA audit of CCS which was half of the
construction management joint venture; and 3) $175,000 for the purchase of the
railway right-of-way presently occupied by Avendia Encinas.
SOURCE CONTROL PROGRAM
This budget consists of industrial waste control support to the six agencies
($99,603) and participation in the Household Hazardous Materials Management
Program (HHMMP) run by the County Department of Health Services ($6,400). The
increase ($72,400) in this program over FY87/88 results from capital purchases
for new and replacement equipment, increased labor (field and lab) effort
required in part by the recent EPA audit and improved cost accounting.
PUMP STATIONS
The Buena Vista and Agua Hedionda Pump Stations are operated and maintained by
Encina staff for the cities of Carlsbad and Vista. The combined budgets for
these pump stations reflect a $87,498 increase. The major factors affecting
this increase are increased labor costs associated with construction contractor
assistance and major repair items at the Buena Vista Pump Station.
The following graphs have been prepared at the request of the BAG, and represent
historical and projected costs and other parameters for various aspects of the
Budget.
Very truly yours,
Richard W. Gr;
General
RV
shinents
ENCINA WATER POLLUTION CONTROL FACILITY
6200 Avenida Encinas, Carlsbad. CA 92009-0171 (619)438-3941
•erwnt \orfh III
•>jn D'eKO County
CITY OF CARLSBAD
AND REVENUE RECOMMENDATI
1988/89 FISCAL YEAR
(IWs
DESCRIPTION OR ACCOUNT TITLE
DIRECTOR'S FEES
UNIT I (PLANT)
UNIT A
UNIT B
UNIT C (BUENA VISTA PUMP STATION)
UNIT D
UNIT E
UNIT F
UNIT G (AGUA HEDIONDA PUMP STATION)
UNIT H
UNIT J (OCEAN OUTFALL)
CAPITAL IMPROVEMENT PROGRAM (CIP)
SOURCE CONTROL PROGRAM
SUBTOTAL
APPROVEI
1987/88
BUDGET
1,200
1,003,320
-0-
-0-
35,269
-0-
-0-
-0-
46,530
-0-
4,716
257,810
8,886
$1,357,731
ESTIMATED
ACTUAL
EXPENDITURES
1987/88
1,200
1,003,320
-0-
-0-
35,269
-0-
-0-
-0-
46,530
-0-
4,716
257,810
8,886
$1,357,731
DUE TO
(FROM)
AGENCY
RECOMMENDED
BUDGET
1988/89
1,200
1,291,696
-0-
-0-
48,650
-0-
-0-
-0-
60,996
-0-
7,109
509,830*
41,837
$1,961,317
TOTAL $1,961,317
CONTRIBUTION SCHEDULE
1. Operating Fund Payable to Eneina WPCF
- Leucadia CWD
2. CORF (Non-Grant Funded) Payable to
Eneina WPCF - Leucadia CWD
TOTAL
1ST QUART.
$362,872
127,456
$490,328
2ND QUART.
$362,872
127,458
$490,330
3RD QUART.
$362,872
127,458
$490,330
4TH QUART.
$362,871
127,458
$490,329
TOTAL
CONTRIBUTIONS
$1,451,487
509,830
$1,961,317
* Calculated using present Unit I ownerships.
Ref: 6I.BUDGET19.1
-5-
aiTY OF CARLSBAD
ID REVENUE RECOMMENDATIONS
1988/89 FISCAL YEAR
COST TREND COMPARISONS
OF OPERATING FUND
REPORTED
EDU'S
June 1980
12,824
June 1981
13,620
June 1982
14,200
June 1983
14,667
June 1984
16,205
June 1985
18,390
June 1986
19,599
June 1987
21,723
June 1988
25,800
(est.)
APPROVED AND RECOMMENDED
BUDGETS
1980/81
$247,313
1981/82
$288,110
1982/83
$388,322
1983/84
$669,018
1984/85
$764,364
1985/86
838,825
1986/87
893,155
1987/88
1,003,320
1988/89
1,291,696
COST PER EDU
PER YEAR
$19.29
$21.15
$27.00
$45.61
$47.17
$45.61
$45.57
$46.19
$50.07
PER MONTH
$1.61
$1.76
$2.25
$3.80
$3.93
$3.80
$3.80
$3.85
$4.17
%
CHANGE
9.3
27.8
68.9
3.4
(3.3)
(.13)
1
7.72
Ref: 6I.BUDGET29.1
-6-
REVISED ENC1NA CAPITAL IMPROVEMENT PROGRAMFY 1988/89
Ref: 6G.42S1.1
PROJECT
Enema WPCF (Unit I)
Facility Planning and EIR Effort2
Phase IV3
Design
Existing Contract
Contingencies
Construction
Construction
Administration, CM, Contingen
Plant Rehabilitation4
Capital Acquisitions
Solids Management
Regional Solution*
PIO, financial & institution
arrangements, etc.
Composting Pilot Project
Site acquisition & purchase
Phase I Design
Construction
Phase Q Design/Construction
Encina-only solution8
EIR, financial arrangements,
etc.
Site acquisition & purchase
Phase I (Design)
Construction
Phase II Design 4 Construction
Ocean Outfall (Unit J)
Effluent Pump No. 3
EIR8
Design
Construction
Efiluent Pump No. 4 and
Surge Tower;3 Planning?,
Design8 , Construction
Interim Flow Equal. Const.7-8
Parallel Outfall9
Planning, Design, Construct.
rOTAL - With Reg. Solids Manage.
-FOTAL - With Encina-Only Solution*
FACILITY REPLACEMENT10
1988-89
240.000
1,040,000
500,000
48,300
178,900
1,000,000
1,500,0006
3,007,200
3,507,2006
865,000
1989-90
12,506.000
3.811.000
50,000
200,000
1,800.0006
206,000
1,925,000
18,698,000
20. 498, 0006
865,000
1990-91
14.211,000
4.157,000
60.000
200,000
1.460.000
5.100,0006
225.000
2.100,000
22,413,000
26,053,0006
865,000
1991-92
1.184.000
346.000
75,000
200.000
4.145,000
5,100,0006
19,000
175.000
6.144.000
7,099.0006
865,000
1992-93
100,000
200,000
4,145.000
4.445.000
300,0006
865,000
1993-08
2.250,000
3,000.000
3,250,000
4.000.0006
32,730.000
41,230,000
41.980.0006
12,975,000
Tola!
1988 - ?(10 =
240,000
28,941.000
8,814,000
2.583.300
3,978,900
1,000,000
1.460,000
8,290,000
3,250,000
1.500,0006
1,800, 0006
10. 200,0006
4,000,0006
450,000
4,200,000
32,730.000
95.937,000
99. 437, 200s
17,300,000
Footnotes:
1. All costs expressed at ENRLA=5500.
Does not include Units B through H. Those units' CIP is prepared and administered by the Cities of Carlsbad and Vista.
2. Scheduled for completion in FY 1987/88.
3. Pending results of Facility Plan and EIR.
4. Major capital outlays toward plant rehabilitation from annual budget.
5. Based on Phase U NCSSMS Project Report and January 1988 Updated Project Report. All estimates will be refined later in
FY 1987/88.
6. These expenses would be incurred only if a regional solution is not implemented.
7. Planning and EIR efforts for 3rd and 4th effluent pumps, surge tower extension and interim flow equalization were
included under Unit I.
8. Design of 4th effluent pump, surge tower extension and interim flow equalization were included under Unit I.
9. May be permanent flow equalization or partial parallel.
10. These funds accumulated and held by individual agencies.
-41-
1 RESOLUTION NO. 88-203
A RESOLUTION OF THE CITY OF CARLSBAD, CALIFORNIA,
* APPROVING THE 1988-89 ENCINA WATER POLLUTION CONTROL
FACILITY BUDGET.
4"
5
WHEREAS, the Encina Water Pollution Control Facility Joint Advisory
6 'Committee has voted to recommend the proposed 1988-89 Budget for approval; and
7 WHEREAS, the City Manager recommends and the City Council concurs, that the
Q
proposed 1988-89 Encina Water Pollution Control Facility Budget should be
9 approved.
10 NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
12 1. That the above recitations are true and correct.
13 2. That the 1988-89 Encina Water Pollution Control Facility Budget is
14 approved.
15 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City
Council held on the 21st day of June , 1988 by the16
17 following vote, to wit:
18
19
AYES: Council Members Lewis, Kulchin, Mamaux, Pettine & Larson
20
NOES: None
21
ABSENT: None
22
23
ATTEST:
24
25
26
27
28
CLAUDE A. LEWIS,"Mayor
j. a^^
ALETHA L . RAUTENKRANZ, Ci ty Cl e*k