Loading...
HomeMy WebLinkAbout1988-09-06; City Council; 9632; APPROVAL OF CHANGE ORDER NO. 4 FOR PHASE II OF THE CALAVERA HILLS PARK, PROJECT NO. 3245I 0 !i 5 2 0 I- 4 .. 2 $ z 3 0 0 Cl-YgOF CARLSBAD - AGEN-BILL .” LlJ ~~#4k3;t TITLE: MTG. 9/6/88 APPROVAL OF CHANGE ORDER NO. 4 FOR PHASE I1 OF THE CALAVERA HILLS DEPT. MP PARK, PROJECT NO. 3245 DEPT, H CITY AT CITY MC RECOMMENDED ACTION: Adopt Resolution No. 6f-328 approving construction Change Ordc No. 4 for the Calavera Hills Park project Phase 11, Project Nc 3245. ITEM EXPLANATION: Phase I1 construction of the Calavera Hills Community Park : proceeding on schedule. To date, three (3) minor change ordel required by changed field conditions totalling $10,245 have bet previously executed in accordance with Administrative Order Nc 7. This change order No. 4 adds the construction of a six (6) foc wide concrete stairway from the park’s southern entrance to a nc picnic area now under construction, The proposed picnic area adjacent to Glasgow Drive near Woodstock Street. Presently, pa: users traverse the landscaped slope between the ballfields a: Glasgow Drive. The construction of the new picnic area with i. grass and picnic tables will attract additional users. TI proposed stairway will provide safe access between the pa: ballfields, restroom facilities, and the picnic area. The ni stairway is approximately 32’ high and will have handrails 1 both sides for improved safety. This change order also includes the construction of approximate 230 feet of anodized aluminum handrail on the down-slope side the existing sidewalk running between the ballfields and Glasg Drive. Staff recommends construction of this handrail discourage foot traffic and bicycles over the landscaped area The handrails to be installed will be three and one-half fe high and have top and bottom runners. Staff recommends approval of Change Order No. 4. FISCAL IMPACT: In the 1986-87 Capital Improvement Program budget, the Ci Council appropriated $2,500,000 in account number 320-820-182 3245 for the construction of this project. Sufficient fun remain in this account for the $25,788 cost of this chan order. e 0 Page 2 of Agenda Bill No. 763a EXHIBITS : 1. Location map. 2. Resolution No. ffi32 8 approving Change Order No. 4 for tt Calavera Hills Community Park, Phase 11, Project No. 3245. 3. Change Order No. 4. ~ 0 . CITY OF CARLSBAD 0 PUBLIC WORKS PROJECT CHANGE ORDER NO. 4 (More than $5,000) 0 . CITY OF CARLSBAD 0 PUBLIC WORKS PROJECT CHANGE ORDER NO. 4 (More than $5,000) CONTRACT NO. 3245 PURCHASE ORDER NO. 5 172 ACCOUNT NO. 320 820 1822 321 CONTRACTOR’S NAME WE’jTFRN SUMMIT CONSTRUCTORS CaNTRACTOR’S AODRESS 5353 FI CAMIN() RFAl . S[JITF K. CARl’JjJn. CA 93009 - ED7 The contractor is directed to make the following changes. Changes shall include 11 material and equipment; payment stated on this change order includes all charges dire1 indirect arising out of this additional work, The requirements of the specificat. where pertinent and not in conflict with this order shall apply to these changes. This change order is not effective unless signed by the Mayor. CHANGE: Construct six foot wide concrete stairs with handrails approximately 32 feet f park’s south entrance to the picnic area at Glasgow Drive near Woodstock Stree Construct approximately 230 feet of anodized- aluminum double rail hand railin5 the existing sidewalk at the landscaped slope. REASON FOR CHANGE: The public is presently cutting across a landscaped slope at the south end of park. Anticipated foot traffic to Glasgow Drive will increase because the Phi contractor is obligated to install a grass picnic area at this location. The proposed stairs and pedistrain railing will keep traffic off the slope and prc access between the ballfields and picnic area. COST : L ump Previ Origi New c Tot a1 sum th ous nal ont X Unit prices Both is extra -rc net changes k”lLai contract amount $ 2.- ract tot a1 LzaiuuL TIME CHANGE: Add days Previous add/deduct days 7r Original contract days 3 New contract time 2 Add/deducrdays a_T his Deduct change days - - ;+Yf,l,l.y flp&!!!pL:~.-,/ 8- z 5- f5g Project‘-Manager, City Date Date ,- / I ,. White - Job File Pink - Project Inspector Yellow - Contractor Gold - Purchasing with P.O. Ch 8 '. 0 e RESOLUTION NO. 88-328 1 2 3 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING CHANGE ORDER NO. 4 FOR THE CALAVERA HILLS COMMUNITY PARK, PHASE 11, PROJECT NO. 3245 WHEREAS, the City Council of the City of Carls 5 interest to construct Calavera Hills Community Park; and 6 California, has determined it is necessary and in the pl: 7 8 within the scope of the above construction project; and WHEREAS, it is desirable to include additional j 9 WHEREAS, a current unencumbered appropriation in lo amount of $370,000 exists in the project account. 11 NOW, THEREFORE, BE IT RESOLVED by the City Council of l2 13 City of Carlsbad, California, as follows: 14 1. That the above recitations are true and correct. 2. That the City Council approves Change Order No. f l5 authorizes the Mayor to sign a change order in the amour l6 $25,788 to the project contractor, Western Summit Construcl I? Incorporated, for concrete stairs and handrailing. Follc I8 i authorized and directed to return said change order tc 19 1 the Mayor's signature of this change order, the City C1e1 I 20 21 22 23 24 25 26 2v 1 Municipal /// /// /// /// /// /// /// Projects Department for processing. 2a /// 1 I I/ 0 m 1 3. That the City Council of the City of Carlsl California, authorizes an increase in Purchase Order No. 517: Western Summit Contractors, Incorporated, by an additic 2 3 4 $25,788. 5 PASSED, APPROVED, AND ADOPTED at a regular meeting of 6 NOES: None 9 AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Lar 8 1988, by the following vote, to wit: 7 Carlsbad City Council held on the 6th day of September 10 11 ABSENT : None 12 ATTEST: , City Clerk City Clerk 15 (SEAL) 16 17 18 19 !I 20 21 22 23 11 24 25 26 27 28