HomeMy WebLinkAbout1988-11-01; City Council; 9708; Approval of Design of Vista/Carsbad SewerCIT* OF CARLSBAD — AGENDA BILL
MTG. H/1/88
PEPT
TITLE: APPROVAL OF A CONSULTANT AGREEMENT
FOR THE DESIGN OF THE VISTA/CARLSBAD
INTERCEPTOR SEWER, PROJECT NO. 3182
DEPT. H
CITY ATTY
CITY
O
QCa.
RECOMMENDED ACTION:
Adopt Resolution No.8.&_l2£LJ approving a consultant agreement with
Wilson Engineering, Incorporated, for the design of the Vista/
Carlsbad Interceptor Sewer, Project No. 3182.
ITEM EXPLANATION;
Sewage from the City of Vista and the northern portion of the
City of Carlsbad flows through a large interceptor sewer to the
Agua Hedionda Pump Station and then to the Encinas Water
Pollution Control Facility. In downtown Carlsbad, the sewer
follows Jefferson Street south to Grand Avenue, then turns west
to the AT&SF Railroad right-of-way, and turns south again along
the railroad tracks.
According to the December, 1987 City of Carlsbad Sewer Master
Plan, anticipated growth demand for capacity in this major
interceptor will require expansion of the line by 1990. The
lengths of the sewer to be upsized run from Jefferson Street at
1-5 to a point along the railroad tracks south of Tamarack
Avenue. The City of Carlsbad currently owns from 27% to 37% of
the line's capacity; Vista owns the remainder. The variation of
percentages of ownership between the two (2) agencies depends
upon the location and flow within each individual reach of the
interceptor system. The ownership percentages of the interceptor
sewer after construction will reflect the relative capacity
demand of the two cities.
An investigation of alternative sewer routes will be made to
determine the best course for the new sewer. Routes that avoid
the village area of downtown Carlsbad will be given a strong
preference. Construction will be coordinated with the
Streetscape program so that new improvements are not affected.
Four (4) proposals from qualified engineering consultants were
reviewed by staff from the Cities of Vista and Carlsbad. Wilson
Engineering, Incorporated, was identified as the firm considered
most qualified for this project. The design proposal includes
preparation of design plans and specifications. Construction
inspection is also provided for the lump sum price of $139,600.
Staff recommends approval of the attached consultant agreement.
FISCAL IMPACT;
The City Council has previously appropriated a total of
$2,520,000 in the 1985-86 and 1986-87 Capital Improvement Program
budgets for the Vista/Carlsbad Interceptor Sewer replacement
_ project. Of that amount, $200,000 was subsequently transferred
O from the project account for the design of the upgrade of the
3 Agua Hedionda Pump Station which is nearing completion.
OO
Page Two of Agenda Bill No.
Design costs of $139,600 will be paid directly by the City of
Carlsbad subject to reimbursement by the City of Vista upon
execution of a formal agreement specifying each City's usage and
cost share in the system. An estimate of construction costs will
be available when the preliminary design and route study is
completed. Construction and design costs will be paid by the
City of Vista in proportion to the capacity rights required for
their current and future development.
EXHIBITS:
1. Location map.
2. Resolution No. 8f-3&3 approving a consultant agreement for
the design of the Vista/Carlsbad Interceptor.
3. Letter from Dennis Zeugin, City Sanitation Engineer, City of
Vista.
4. Consultant Agreement.
LOCATION MAP
HIGHWAY 78
HEDIOND
AGOON
AGUA HEDIONDA LIFT STATION
LEGEND
SEWER LINE TO BE IMPROVED
EXISTING SEWER LINE
PALOMAR AIRPORT ROAD
ENCINA WATER POLLUTION
CONTROL FACILITY
PROJECT WA*E EXPANSION OF
VISTA/CARLSBAD INTERCEPTOR SEWER
PROJ. NO.
3182
EXHIBIT
1
City of Vista
OCT 1
October 14, 1988
DIVISION
Community Development Department
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92008
Attn: Gary Callison
RE: Vista Carlsbad Interceptor
Dear Gary;
Confirming our telephone conversation of October 14, 1988, I
approve of the selection of Wilson Engineering as consultant for
the preparation of plans and specifications for the subject
project.
Sincerely,
)ennis
Sanitat
DLZ/lmm
Xl -S
600 EUCALYPTUS AVENUE P.O. BOX 1988 • VISTA, CALIFORNIA 92083 • 619/726-1340
1 RESOLUTION NO. 88-383
2 A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING
3 A CONSULTANT AGREEMENT FOR THE DESIGN OF
THE VISTA/CARLSBAD INTERCEPTOR
4
5 WHEREAS, the City Council of the City of Carlsbad,
6 California, has determined it necessary, desirable, and in the
7 public interest to upgrade the sewage flow of the Vista/Carlsbad
8 Interceptor; and
9 WHEREAS, adequate funding for design is available in the
10 project account; and
11 WHEREAS, the firm of Wilson Engineering, Incorporated was
12 determined to be the most qualified provider of professional
13 engineering design, inspection, and construction management
14 services for the Vista/Carlsbad Interceptor sewer expansion.
15 NOW, THEREFORE, BE IT RESOLVED by the City Council of the
16 City of Carlsbad, California, as follows:
17 1. That the above recitations are true and correct.
18 2. That the Mayor and City Clerk are authorized and
19 directed to execute a consultant agreement on behalf of the
20 City and the City Clerk is thereafter directed to forward a copy
21 of said executed agreement to Wilson Engineering, Incorporated
22 at 2185 Faraday Avenue, Suite 140, Carlsbad, CA 92008 and the
23 Municipal Projects Department.
24 ///
25 ///
26 ///
27 ///
28 ///
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That the Purchasing Officer is hereby authorized to
approve a Purchase Order in the amount of $139,600 to Wilson
Engineering, Incorporated, for professional engineering
services.
PASSED, APPROVED AND ADOPTED at a regular meeting of the
Carlsbad City Council held on the 1st day of November ,
1988,. by the following vote, to wit:
AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson
NOES: None
ABSENT: None
:LAUDE A. tEwis, Mayor
ATTEST: