ACCEPTANCE OF PUBLIC IMPROVEMENTS OF RELIEF SEWER IN EL CAMINO REAL
PRIVATE DEVELOPMENT 279 AND 297
RECOMMENDED ACTION:
Accept improvements for the relief sewer in El Camino Real between Tamarack Avenue and Kelly Drive. Authorize the City Clerk to record the Notice of Completion, release bonds, and direct the Utilities and Maintenance Department to commence maintaining the relief sewer.
ITEM EXPLANATION
The Developer has constructed all improvements required of this project and
has requested the City to accept the Public Improvements itemized in Exhibit 3.
City forces have inspected the public improvements and found them to be
satisfactory.
FISCAL IMPACT
The Utilities and Maintenance Department will be required to maintain the
public relief sewer. The value of the improvement is estimated at $66,020.
EXHIBITS
1. Location Map.
2. Letter requesting acceptance, dated May 6, 1988.
3. Itemization of Public Improvements.
- LOCATION MAP
I
12’ RELIEF SEWER
c
E&l I IMPROVEMENTS TO BE ACCEPTED I
PROJECT NAME:
FOOTE DEVELOPMENT PD 279 6 PD 297 :.l .
4
52115 h!h II\
’ z \‘lli.l c .I\
-I hII\ ?I I
.hl I )I, )‘L’ - c’
-iA.-....*_-.
Llyod Hubbs, City Engineer
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92008
RE: Irrevocable Letter of Credit No. 123
First La Mesa Bank
Dear LI yod:
On July 29, 1987 a letter of credit was issued to the City of
Carlsbad for $75,000.00 to cover Subdivision Improvement/
Faithful Performance relating to the offsite site sewer on El
Camino Real. Since this work has been completed, I am
respectfully requesting that this letter of credit be released
prior to the May 29th automatic renewal date. A copy of this
letter is enclosed for your information.
I appreciate your help in taking care of this matter.
Sincerely,
Allen L. West
Senior Vice president
ALW/lz
enclosure
-. -.
EXHIBIT 3
ITEMIZATION OF PUBLIC IMPROVEMENTS
RELIEF SEWER AT EL CAMINO REAL FROM TAMARACK AVE TO KELLY DR. (PD 279)
936
hF*
12" V.C. Sewer Pipe $31,810.00
2 Access Hole 3,040.oo
2 EA. Access Hole (Reconstruction) 1,400.00
4980 S.F. A.C. Pavement Repair 13,700.00
950 L.F. Shoring 9,500.oo
Subtotal $59,450.00
12" RELIEF SEWER CONNECTION: EL CAMINO REAL & KELLY DR. (PD 297)
67 L.F.
: E*
320 S.i. 80 L.F.
12" V.C. Sewer Pipe
Access Hole
Access Hole (Reconstr.)
A.C. Pavement Repair
Shoring
Subtotal
$ 2,270.OO 1,920.oo 700.00 880.00 800.00
$ 6,570.OO
TOTAL VALUE OF IMPROVEMENTS $66,020.00
Recording Requested By and Return To:
City Clerk . 1200 Elm Ave.
Carlsbad, CA 92008
NOTICE OF COMPLETION
FOR PROJECT IMPROVEMENTS
ENGINEERING
To all Laborers and Material Men and to Every Other Person Interested:
YOU WILL PLEASE TAKE NOTICE that on b g? , 198b, the Engineering Project consisting of 12" relief sewer in El Camino Real on which
Foote Development Company was the Contractor, and First La Mesa Bank was the
surety, was completed. (Private Development 279 and 297).
CITY OF CARLSBADA
City Ngineer
VERIFICATION OF CITY CLFRl(
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City Council of said City
202 1988 , accepted the above described work as ed and ordered that a Ndtice of Completion be filed.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on fie S9 , 19wat Carlsbad, California.
CITY OF CARLSBAD