Loading...
HomeMy WebLinkAbout1989-01-24; City Council; 9826; NOTICE OF COMPLETION FOR THE BEACH ACCESS STAIRWAY AT OCEAN STREET, PROJECT NO. 3263- AB# 98ab TITLE: MTG. 1/24/89 DEPT. MP OCEAN STREET, PROJECT NO. 3263 NOTICE OF COMPLETION FOR THE BEACH ACCESS STAIRWAY AT DEPT. H CITY AT CITY M( & ciz al 3 .. Z 0 5 1 3 0 C2 a g CIS OF CARLSBAD - AGENm BILL RECOMMENDED ACTION: Adopt Resolution No. 89+\9 accepting the construction of t beach access stairway at 2701 Ocean Street, Project No. 3263, complete, and directing the City Clerk to record the Notice Completion. ITEM EXPLANATION: The construction of retaining walls, sidewalks, stairs, a handrailing for a beach access stairway on Ocean Street nc Beech Avenue has been satisfactorily completed. The new stain replaces an eroded dirt path that was blocked at its base large boulders. This project was constructed in cooperation w: the California Coastal Conservancy with a grant in the amount $52,050. One (1) change order in accordance with the provisions Administrative Policy number 7 in the amount of $4,999 executed with the contractor to add additional concr structures. These included a pad for a trash can, a stem wall protect an adjacent property owner's rock rip-rap, and additio steps to reach the sand during its seasonally low level. Some of the handrailing was eliminated by the additional s wall and less imported fill was used than originally anticipa resulting in a savings of $1,142 from the awarded bid on th items. Thus, the net increase in construction costs was $3,85 All City costs for this project are reimbursable under the tc of an agreement with the California Costal Conservancy up to maximum grant amount of $52,050. City staff is preparing documentation required by the Coastal Conservancy reimbursement to the City. Staff recommends acceptance of the public improvements authorization to record the Notice of Completion. FISCAL IMPACT: The City Council has previously appropriated $30,000 of Gen Capital Construction Funds and $52,050 of California Coa Conservancy Grant Funds to the respective project account nun 300-820-1840-3263 and 180-820-8122-3263. A summary of the project cost are as follows: Design $ 4,8; Construction 41,7r Inspection and Construction Administration 4,6' Surveying 1,o: Blueprints and Document Reproduction 11 Project and Grant Administration 11,2 I 0 0 Page Two of Agenda Bill No. 9836 TOTAL PROJECT COSTS $58,972 TOTAL PROJECT APPROPRIATIONS $82,050 - Coastal Conservancy Grant: $52,050 City of Carlsbad: $30,000 - PROJECT FUND BALANCE $23,078 NET CITY PROJECT COST $ 6,922 EXHIBITS : 1. Location Map 2. Resolution No. %?-\q accepting the construction of a be access stairway at 2701 Ocean Street, Project No. 3253, complete, and directing the City Clerk to record the Not of Completion. 3. Notice of Completion ACCESS STAIRWAY TO BE LOCATED AT VCINITY MA N T.S. __ 0 0 Recording Requested By and Return To: City Clerk 1200 Elm Avenue Carlsbad, CA 92008 NOTICE OF COMPLETION MUNICIPAL PROJECTS DEPARTMENT To All Laborers and Material Men and to Every Other Interested: YOU WILL PLEASE TAKE NOTICE that on January 6, 198 engineering project consisting of the construction of a access stairway at 2701 Ocean Street, on which Manuel Construction, Incorporated was the Contractor and Amwest Insurance Company was the surety, was completed. CITY OF CARLSBAD VERIFICATION OF CITY CLERK I, the undersigned, say: I am the City Clerk of the City of Carlsbad; tk above described work as cofnpleted'an o'rdered that a Not Completion be filed. Council of said City on daccu.*^y 2y I%?? accepi I declare under penalty of perjury that the foregc Executed on 25 19Q at Carlsbad, Calif true and correct. CITY OF CARLSBA City clerk a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 I) 0 RESOLUTION NO. 89-1 9 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING THE CONSTRUCTION OF A BEACH ACCESS STAIRWAY AT OCEAN STREET, PROJECT NO. 3263, AS COMPLETE WHEREAS, the construction of the beach access stairw: 2701 Ocean Street has been satisfactorily completed: and WHEREAS, all project costs are established. NOW, THEREFORE, BE IT RESOLVED by the City Council o City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the construction of a beach access stai specifically identified as Project No. 3263, is deemed cor and hereby accepted. 3. That the City Clerk of the City of Carl California, is hereby authorized to execute the Notic Completion and have same recorded. /// /// I /// /// /// /// /// /// /// /// /// /// t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e m 4. That the Finance Director is hereby authorize close project numbers 300-820-1840-3263 and 180-820-8122 upon payment of all final costs and claims. 5. That preparaticn of a final reimbursement billi the California Coastal Conservancy for the grant amour hereby authorized and directed. PASSED, APPROVED AND ADOPTED at a regular meeting c Carlsbad City Council held on the 24th day of January 1989 by the following vote, to wit: AYES: NOES: None ABSENT: None Council Members Lewis, Kulchin, Pettine, Mamaux and Lz ATTEST: ALETHA L. RAUTENKRANZ, City Cl&k (SEAL) LikZL- $ /&-A i