HomeMy WebLinkAbout1989-02-07; City Council; 9843; CAPITAL IMPROVEMENT PROGRAM - PUBLIC HEARINGRECOMMENDED ACTION: Adopt Resolution No. fTQ34 adopting the Capital Improvement Progran appropri sting funds 9 including Federal Revenue Sharing Funds. ITEM EXPLANATION: The City of Carlsbad's Capital Improvement Program (CIP) is one of the important planning tools available to the City. The CIP provides a long picture of how the City will allocate available resources to a variei projects that will affect the safety, environment and quality of lifc Carlsbad residents. This year's CIP continues with the same format established in 1987-88 includes these features: - Complete lists of all capital projects needed through buildout - Project descriptions and location maps - Use of growth management standards in CIP planning and scheduli The proposed CIP includes 158 projects totaling $322 mill ion spannin! years between 1988-89 and buildout. The entire program is funded fi combination of sources depending heavily on development-re1 ated fees. City Library, Las Palmas acquisition, development of Macario Canyon Park the ultimate construction of a City Hall facility have been funded using Some projects will benefit from developer assisted financing. All projects are included in the program on a pay-as-you-go basis. Growth management standards have been used as the driving force ir development of a phasing plan for this CIP. Each project included in th was weighted against the Growth Management Program standards to dete approximate timing. 0 a PAGE 2 OF AGENDA BILL # Tf4-3 The operating costs of projects shown in the CIP have been projected compared with available operating revenue. Starting in 1987-88, Council some actions in order to insure fund availability in future years. Fun new operating costs will force the City into a conservative operating mod( the next couple of years. The CIP being presented to Council is intended to be a working document k can be modified or adjusted as the Council sees fit. The final CIP wil brought back to Council in two to three weeks (depending on the exten changes made during the workshop meeting) for a public hearing and adopt FISCAL IMPACT: The fiscal impact ofthe CIP is very broad and pervasive. The funding foi majority of projects depends on development revenue. If, however, develor does not occur, the City may defer projects. There are several cases \r the City has committed to the construction of a project, such as the lit and some park projects. For these projects to proceed, a flow of funds be necessary. Some development activity will be necessary to support 1 committed projects. The sewer construction fund appears to have some funding problems later it CIP. The City Engineer has completed the Sewer Master Plan which call: debt financing the Encina Treatment Plant. This has created CIP def- which will need to be corrected with fee increases. The PFF has a shorl of funds in 1991-92 and 1992-93. This may be corrected in future CIP’ more current development activity can be used in projecting revenues. EXHIBITS : 1. Capital Improvement Program Summary 2. Resol uti on No. f7434 adopting the Capital Improvement Program and appropriating funds. 3. Memo from Senior Management Analyst dated January 26, 1989. e a EXHIBIT CITY OF CARLSBAD EXHIBIT I CAPITAL IMPROVEMENT PROGRAM SUMMARY Goals The 1988-89 Capital Improvement Program has been built around four basic ( that set the tone for prioritizing projects, sequencing funding and alloci resources. 1. Growth Management Program - Projects required to meet service level stanc set by the Growth Management Program should be included in the CIP bas1 the timing of projected demand. The order of importance is: A) city. needs, B) quadrant-wide needs, and C) zone needs. Community Needs - Projects required to satisfy a general community need are not covered as part of the Growth Management Program should be inc' in the CIP and ranked according to the relative importance of each faci' 3. Opportunity - When possible, the City should take advantage of fun( timing or other opportunities related to the construction of cal projects. Total Program - The CIP should provide information on the total City prc from the present to buildout, showing the phasing and funding of projects to allow the Council to understand the relationship betweer projects with the CIP. CIP Proqram - Years 1 to 5 The CIP covers a period of thirty or more years (through buildout) in ' blocks of time: Years 1 to 5, Years 6 to 10, and Years 11 to buildout. projects scheduled in Years 1 to 5 have been broken down into a year-by phasing plan which details the progress and funding of each project. The highlights of the first five years of the CIP are summarized in the folli pages grouped by project type. Issues 1. These goals are as follows: 2. 4. Project Priority and Phasing - The scheduling of capital projects has based on the priorities and demands outlined in the goals listed above. City Council may find that projects should be scheduled differently to various needs that may not have been considered. As this resched occurs, consideration must be given to the City's funding capabilities some projects are moved forward, other projects must be moved back in to allow proper use of existing resources. e e -. Recommended Action - Council should review project timing for consist with existing needs and demands. 2. Fundinq - With the exception of the General Capital Construction and Drainage fund, the first year of the CIP is fully funded. During the fo and fifth years, 1991-92 and 1992-93, of the CIP, the PFF shows a nega ending balance. Beginning in the 1993-1998 time frame, the PFF bal becomes positive and continues in this mode through buildout.At build some Drainage Funds and the Sewer Fund contain negative balances. The of development will continue to control the flow of funds availablc support CIP projects. Recommended Action: 1) Balance the GCC via a transfer of funds from General Fund unappropriated reserves. 2) Review the CIP in 1989-90 and the current project scheduling against more current development re1 activity. 3) Do not pursue Drainage projects until adequate funds be available. 4) No action should be taken at this time to revise sewer f Council will be asked to consider a fee increase in early 1989. 5) Cot should be aware that the CIP schedule depends heavily on development re1 revenues. Changes in the CIP may become necessary if revenues fall t projected 1 eve1 s. DeveloDer Assisted Financing - This year’s CIP demonstrates projects v will be occurring with developer assisted funding. This approach to Cay Construction wi 11 a1 1 ow projects to occur before the City would normally funds available. The financing agreements also contain City payoffs v can occur when funds are available. Recommended Action - Allow that certain development related funds deficit balances with the understanding that the City will need devel assistance to accomplish certain projects. 3. 0 0 CIVIC PROJECTS Below is a summary of noteworthy projects occurring within the Civic Proje category. Library - S. Carlsbad will begin with the land purchase in 1988-89. Additi funds to cover the construction are needed for 25 years for debt ser payments. This project has been given priority as the City currently i short of the established standard for city-wide library services. Las Palmas has been purchased and debt service payments are shown for the nine years. Additional funds are needed in order to complete the Fire Stations #1 ar Remodeling. The remodeling is necessary to accommodate the new paramedic added in the 1987-88 Operating Budget and to more efficiently utilize admini! tive space now vacated. The Central Maintenance and Warehouse Facility is currently scheduled for 1992-93. The City’s standards for administrative office space are currt being met and probably will not be deficient until the scheduled time per- Four Community Development Block Grant (CDBG) projects for 1988-89 appear il Civic Projects category. Projects include Commercial and Residential Rehabi- tion, Girls Club Architecture, and Santa Fe Depot Rehabilitation. CDBG pro; are included within the CIP in order to give Council a clear picture of capital improvements in Carlsbad. Funds have already been appropriated. Summary of Major Projects Title Year Library S. Carlsbad - Land Purchase 1988-89 Construction/Debt Payment 1989-90 thru 20( 1988-89 thru 19! Las Palmas Debt Payment Fire Station #1 & #2 Remodel - Additional Funds 1988-89 Central Maintenance and Warehouse Facility 1992-93 Fire Station #3 Remodel 1993-98 New City Hall 1998+ Remodel Library - N. Carlsbad 1998+ Library Space for Buildout Population 1998t DRAINAGE PROJECTS The City has recently hired a consultant to revise and update the Drainage MI Plan. All projects identified have been based upon the recommendations o City Engineer in conjunction with the existing Drainage Master Plan. Dl 1988-89, a storm drain will be constructed in conjunction with the Monroe S Improvements through Hosp Grove. The Hosp Bond is the funding source. James Drive Storm Drain will be funded by both GCC and Drainage funds. A1 1988-89 a Drainage Study for the Cove Drive area is scheduled. 0 e PARK PROJECTS The first five years of the CIP includes park projects which satisfy the den of growth management. Remaining park projects will not be needed until indic on the Project List. Tax Increment Bonds will be used for the construction of the Senior Center di 1988-89. Public demand has been the impetus behind the construction of facility. No standards have been established for such a facility. The remai 20 acres for Alta Mira Park in the southwest quadrant will be purchased ir 1988-89, yielding a 42-acre park. Construction of 32 acres of this park be phased beginning in 1991-92, with the remaining 10 acres to be completc 1993-98. The phasing of Alta Mira Park satisfies park acreage needs in southwest quadrant over the next five years. Other southwest quadrant parks include the construction of 15 acres at the 19 Community Park in 1993-98. This timing is made possible through the u! a letter of credit from the developer. The remaining 9.25 acres, as well a: community center at Zone 19 Park, will be constructed in 1998+. Two major park projects are yet to be undertaken in the southeast quad) First, Alga Norte Park will begin construction of 19.48 acres in 1990-91 the remaining 15.52 acres and the community center are slated for 1998t. phasing of this park is benefiting from a letter of credit from the deve- combined with the use of City funds for later year construction. Schec construction will satisfy park acreage needs in the southeast quadrant ovei next five years. The second park within this quadrant is Leo Carrillo. acres is scheduled for construction in 1993-98 with the remaining 8.5 acrc follow in 1998t. There are three significant park projects which will occur within the Nortl quadrant; all of them at buildout. The parks are as follows: 1) Cannon Park, 2) Pine Street School Site, Acquisition and Development, and 3) a Commi Center. CDBG projects relating to parks previously approved by Council arc within the Northwest quadrant. The Northeast quadrant calls for the construction of Larwin Park in 199 The construction of Larwin Park satisfies the park acreage needs in the Nortl quadrant over the next five years. All quadrants include funds for the construction of Macario Canyon Park. plan calls for debt financing this park in the 1998+ time period. Also inc' in all quadrants are funds for Park Restoration. As parks throughout the City deteriorate and need renovation, funds will be available for their pi up keep. 0 0 1. Summary of Major Pro.iects Title Year Senior Center (NW) 1988-89 Alta Mira Land Purchase (SW) 1998-89 Larwin Park (NE) 1991-92 Alga Norte Park (SE) Alta Mira Park Development (SW) Zone 19 Community Park (SW) Leo Carrillo (SE) Cannon Lake Park (NW) 1998+ Pine Street Park (NW) 1998+ Community Center (NW) 1998t Macario Canyon Park 1998t 1990-91 and 199E 1991-92 and 1993 1993-98 and 199E 1993-98 and 199E SEWER PROJECTS During 1987-88, the Sewer Master Plan was revised and updated. All pro; occurring within the sewer category are based upon the recommended schc within the master plan. The major change occurs with the use of debt finar for the expansion of the Encina Treatment Plant. City staff is currc developing a debt financing plan. TRAFFIC SIGNAL PROJECTS Most of the traffic signals contained in the CIP are funded by the PFF. Traffic Engineer has assisted in scheduling these traffic signals over the of the CIP. Several signals are included in the CIP which are not part 0' PFF. These were deemed necessary by the Traffic Engineer in concurrence known and estimated traffic volumes, and recommendations of the Traffic Si Commission. These signals will be funded with available General Cal Construction funds. One new traffic signal is scheduled for completion in 1988-89, at Chestnu. Monroe. All other 1988-89 appropriations are to provide additional fund! signals previously scheduled and appropriated in 1987-88. STREET AND FREEWAY INTERSECTION PROJECTS There are three noteworthy street projects scheduled for appropriation dl 1988-89. These street projects are, 1) Widening of Monroe Street through Grove, 2) Rancho Santa Fe Road Realignment North of Cadencia, and 3) Park I Widening at Marina. The Transportation Sales Tax Program (TST) (Propositi is a1 so slated for 1988-89 expenditures a1 though specific projects have no been identified. It is anticipated however, that the City will accumulate funds for a loan to the BTD, thus deferring the identification and compl of speci f i c (TST) projects. 0 0 Two major arterials will be addressed within the first five years of the The Cannon Road project will begin in 1991-92, and Tamarack Avenue, Jeffe to Carlsbad Blvd. will begin in 1990-91. The next five year period 1993-98, is when the widening of La Costa Avenu scheduled. Another major expenditure slated to occur within this time pe is the widening of the Poinsettia Bridge over the Railroad. Seven out of twe six identified TIF Intersection Improvement projects are scheduled during 1 98, while five out of eleven TIF Road Segment Improvements are slated completion during this same time period. The remaining TIF projects will a in the 1998t time frame. The 1-5 Interchange at La Costa Avenue has been moved to an earlier year wi the 1998-89 CIP. It is now slated for construction in 1991-92, whereas last it appeared in the five year increment of 1992-97. Both interchange Poinsettia and Palomar Airport Road remain within the five year period of 1993-98. Summary of Major Projects Ti tl e Year Monroe Street through Hosp Grove 1988-89 Rancho Santa Fe Realignment No. of Cadencia 1988-89 Park Drive Widening at Marina 1988-89 1990 -9 1 Cannon Road (Assessment District) 1991-92 to 2001- La Costa Avenue Widening 1993-98 Poinsettia R.R. Bridge Widening 1993-98 1-5/Palomar Airport Rd. Interchange 1993 -98 1-5/Poinsettia Interchange 1993-98 Tamarack Avenue - Jefferson to Carlsbad Blvd. 1-5/La Costa Ave. Interchange 1991-92 Palomar Airport Rd. R.R. Bridge Widening 1998+ Leucadia B1. from ECR Westerly 1998+ 1 2 3 4 5 6 7 8 9 lo 'I. I.2 13 I.4 15 l6 I" 18 I.9 2o 21 22 23 24 25 26 27 28 0 0 RESOLUTION NO. 89-34 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE CITY'S CAPITAL IMPROVEMENT PROGRAM WHEREAS, the City Council has determined that it is in thc interest of the City of Carlsbad to adopt a long-range Capital Impra Program, and AND APPROPRIATING FUNDS FOR 1988-89 PROJECTS WHEREAS, the City Council may from time-to-time amend this pro< City priorities and needs change, and WHEREAS, funding is available or will be made available during year 1988-89 from existing funds, projected revenues or transf unappropriated funds from the General Fund to the General ( Construction Fund, and WHEREAS, the City Council finds that the projects included Capital Improvement Program are consistent with the Carl sbad Genera' NOW, THEREFORE, BE IT RESOLVED by the City Council of the ( Carlsbad that the Capital Improvement Program is hereby adopted ai the necessary funds and transfers are hereby appropriated and appro' PASSED, APPROVED AND ADOPTED, at a regular meeting of the City I day of z ,of the City of Carlsbad, California, held on the 7th 1989, by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Mamaux and Larson p&$c & fz, NOES: None ABSENT: Pettine CLA DE A. L WIS, Ma r ATTEST: l24zc!& Aj 1;<- ALETHA L. RAUTENKRANZ, City cia (SEAL) e 0 EXHIBIT 3 January 26, 1989 TO: CITY MANAGER FROM: SENIOR MANAGEMENT ANALYST - FINANCE UNFUNDED PROJECTS DISCUSSED AT COUNCIL WORKSHOP OF 1/17/89 At the City Council meeting of January 17, 1989, staff presented the 1988-89 ( During the course of discussion, four issues were raised by the Council , to wt responses have been prepared. 1. Traffic Siqnal at El Camino Real and Rancho Carlsbad The traffic signal at El Camino Real and Carlsbad Boulevard is presei located on the Unfunded Projects list in the 1988-89 CIP. According to Traffic Signal Evaluation Policy, adopted by Council on July 19, 1988, warrant requirement for this intersection has been met. The study indic that nine intersections met the qualification for warrants with intersection at El Camino Real and Rancho Carlsbad rating ninth. estimated cost for this signal is $100,000, A1 ternat i ves : 1) 2) Transfer funds from the General Fund balance. Defer the timing of GCC projects currently identified. 2. La Costa Avenue Improvements City staff has been considering alternatives which would improve the sa on La Costa Avenue between 1-5 and El Camino Real. These measures will s as an interim solution until the widening of La Costa Avenue occurs in 1 1998. The current proposal is to remove the current center 1 ine and rep it with a painted median containing raised pavement markers. The median be six feet wide. A1 ternatives: 1) 2) Transfer funds from the General Fund balance. The estimated cost of this project is $36,000. Defer the timing of GCC projects currently identified. 3. Monzano Drive Improvements The project consists of widening Monzano Drive to two full size traffic 1 from Carlsbad Boulevard east two blocks to the end of this street. included are three street lights. The total cost of this project is $90: Staff is currently executing an agreement with the state which would prc $60,000 in funds. The City has already committed $15,000 to this prr and needs to appropriate an additional $15,000. 0 e A1 ternatives: 1) 2) Transfer funds from the General Fund balance. Defer the timing of GCC projects currently identified. 4. Val 1 ey Street Improvements This project appeared in the 1987-88 CIP and was scheduled to occur in l! 89. Lack of GCC funds resulted in this project appearing on the Unfut Projects list. This project consists of installing road improvements sidewalks on Valley Street from Tamarack to the Junior High School. I street improvements will be installed approximately 1,600 linear feet i the Junior High School entrance to Chestnut Avenue. Street improvemt include roadway widening, curb, gutter, sidewalk, and safety lighting. estimated cost of this project is $300,000. A1 ternatives: 1) 2) Transfer funds from the General Fund balance. Defer the timing of GCC projects currently identified. The table below contains all the items discussed which may have an impact on General Fund balance. The first four items were discussed above while the two were noted at the January 17, Council meeting. 1. Traffic Signal - El Camino Real & Rancho Carlsbad $100,000 2. La Costa Avenue Improvements 36,000 3. Monzano Drive Improvements 15,000 4. Valley Street Improvements 300 , 000 5. 88-89 CIP, GCC Shortfall 125,849 6. Swim Complex 66,411 TOTAL $637 , 260 Should the Council opt to transfer funds from the General Fund balance to GCC for all of the above projects, the General Fund balance would be $3,359,715. I T)d IO IO 10 401 " 0 z. ffil m:oe 10 10 I" IO IO Id e: I =: rlld I I I I I I ., NO1 00 0 10 a1 00 0 10 0 IO I- 0 IO 0 lrl N I9 %&; 00 !2%t E2 -- dl rlrl I I I I I I dm I o000090 I cy oo0ooc~o I T) cot ooooowo I a u300womm I d ww I brn I N0T)Orlt- IO dl VirlNNT) IO I I- I Id I I I I I I I I I I __-_-....I _. $23 I I I I I ~P4t00000000co01~ <0l0000000000l0 €-~1000000000010 Oh1 -. --------I - E.+& looomoocoocoL~ I w lrlrlrl rlr(rleNmIw I I- I Id 32 <loor( 0oT)oWt-lm EP: rn 20 I I Hffi I I PI I I I I c.3 zE3 wal HZ VEI 24 I WW dEI p13 401 4P: I PI I I mc I I E-. H I I V I I I I Wd Q4 mml OP rl r- IC3 4 T) I9 W w IN - I- m rl Id t- m Id Id $2 <L%1 p10 mhi rn t- IW m IN co m t- Irl - I- N IT) N IN bL t %E Zffil 4 p1mi vu XCI v WE31 1 am VI t co GZI I Ql ow1 I wco 1 I ZU2 I 34 I I h I I nw za/ I c.3wIvvvvvvvvvv zvlvuvvvvvvvv HffiIUc.3rnc.3UWWc.3~U nE3 I zo I 3m I hl I I I < n V I ;I p. I w a I h 0 IE 4 13 E+ IZ m I -00 z I mvvw z WIWH\3 W 4 Z +.~izc~l;lncn~md u EIV 4ffi:cffim~1 H HI\O 042 dm !3 I z w I 5 PIJHZ ROld<< b HI \O>\\EZHffi w Wl43HUU3 H<O 0 I~PI w<c zw v vIf2EzOMEauffi 9 b 0 I I mz:c IRE-4 I 2:;g; E ;g~Cm~~gg&% 2 1mmcn4mm 4ag 2 p: I JL?V PI I EL4 Lrv IVVW3PV ow4 u I €4 zffi!=lE+ l4zdZ2a2Uz v I IIlUlllH!&HZ d z E= 444440QffiZ ImE.+€4aPrUlmPIP: IhhhHhhffiWkdV I2 ffiGGffiffiHH44 ,+ e e NOTICE OF PUBLIC HEARING CITY OF CARLSBAD The City of Carlsbad will hold a public hearing on Tuesday, Februi 7, 1989, at 6 P.M. in the Council Chambers at City Hall, 1200 Elm Avenue, Carlsbad, California, to discuss the 1988-89 to Buildout Capital Improvemt Program budget. The City Council will also be considering the use of Fedc Revenue Sharing funds in the amount of $214,000 at this meeting. Interested parties are invited to attend this meeting and present their views and comments to the City Council. Copies of the CIP budget are available for public inspection at tl City Clerk’s office, 1200 Elm Avenue, or the two libraries: 1250 Elm Aven Carlsbad, and La Costa Branch, 7750 #M, El Camino Real, Carlsbad. Written and telephone inquiries may be directed to Debbie Neville the Finance Department, 1200 Elm Avenue, Carlsbad, 434-2973. PUBLISH: January 27, 1989 e .- FC ! LL 2622 EL AGUlLA LANE CARLSBAD, CA 92009 0 f February 7, 1989 Good evening Mayor Lewis and Members of Council. My name Joan Kindle and I reside at 2622 El Aguila Lane in Carlsbad. represent the friends of Carrillo Ranch. The Carrillo Ranch : associated with the life of a person who was significant in Carlsbad's past and connected to the broad patterns of the h: Of California. This valuable cultural resource, with its background buildings, embodies the distinctive characteristic early California in its method of construction and artistic complements. The opportunity for preservation of history in Southern California through the Carrill0 legend has been our5 many years; an opportunity I might add, that is unique to Carlsbad. But progress has been slow and I am here to report are being criticized for the delay. The admirable efforts of Housing and Redevelopment Department and the Historic Presen Commission must certainly meet with your approval. The forthc State grant monies for analysis and stabilization they have t so diligently to secure are an important first step. However City's initial restoration money is not scheduled to be alloc until the 1992/93 fiscal year .... three more years away. Compl of the project .... with the Ranch open to the public .... will r realized until 1998. This beautiful facility will have been i City's hands for 20 years. Why deny our children the rare chc to learn history in a laboratory setting or deny their hard-working parents a retreat from the fast-lane pace they r keep or deny those in their golden years a chance to reflect 0 .c * -2- i. the past and volunteer as docents? Carlsbad has the most beaL parks I've seen for a city of our size. In its own way, Carri Ranch can be the finest and most comprehensive of them all ... passive historic park site of extraordinary imagination and innovation .... done only as Carlsbad can do it. And so, tonight I ask you to accelerate all of the CIP k elements for the 10 acre portion of Carrillo Ranch. It will represent a gesture of good faith to those who believe that history plays an important role and gives balance to life in wonderful community. Thank you.