HomeMy WebLinkAbout1989-03-14; City Council; 9908; ACCEPTANCE OF PUBLIC IMPROVEMENTS OF SANTA FE KNOLLS - UNIT 1 |ONSITE AND OFFSITE| CARLSBAD TRACT NO. 75-9BAB# 978 f
MTG. 3-14-Rq
DEPT-ENC.
-
TITLE: DEPT.
CITY I
CITY 1
ACCEPTANCE OF PUBLIC IMPROVEMENTS
OF SANTA FE KNOLLS - UNIT 1 (ONSITE
AND OFFSITE) CARLSBAD TRACT NO. 75-9B
.. 0
LA COSTA AVE
,.- _--
LA COSTA AV
CITY tirm's r SION ESTAt~! Ct
PACIIIC OCEAN
SANTA FE KNOLLS
0
/ ! , . XI ~ -_
t :- I-)
May 18, 1987
Building and Planning Departrent
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, Ca. 92009
RE: SANTA ET KNOLLS TRACT 75-9b
MAP UNIT 1
STREET ACCEPTANCE AND BOND RELEASE
Dear Staff:
This is to request final acceptance for the above mented Map Unit 1
Streets. (Street name is Circulo Adorno & Aclle Acervo) .
Upon final acceptance, we hereby request this release /reduction of the following (and attached) bonds.
BOND NO. DESCRIPTION AM0UT;sr
ICB 010 687 Faithful Performance $ 6151288
ICB 010 687 Labor & Material 307,644
ICB 010 688 Grading 61 Erosion 1,953,737
ICB 010 689 Momm-entation 13,000
Please let us know the status of both the final acceptance and the
bond matter.
Sincerely p
&NDm GROUP
(1 2; c ,cera ‘r&WU1
EXHIBIT 2
The Anden Group 3468 Sitio Baya Carisbad California 92008 Te eohone 61 9 L38-7902
e 0
EXHIBIT 3
ITEMIZATION OF PUBLIC IMPROVEMENTS
SANTA FE KNOLLS - UNIT 1 CT 75-9B
Street Improvements
128,7 16.00 2 112" Paving14" Subgrade 53,020.00 6" Type "G Curb 6" Curb 960.00 4" PCC Sidewalk 66,121 .OO Barricade 300.00
Double Street Name Sign 350.00 Double Stop Sign 175.00
"Not a Thru Street" Sign 150.00
Monuments 3,150.00 150.00 "End" Street Sign 29,000.00 Street Lights Street Name Sign 175.00 4,100.00 Cross Gutter
132,23 1.00 3" P aving/6" Su bgr ad e 26,928.00 6" Type "G" Curb 6" A.C. Berm 792.00 4" PCC Sidewalk 33,083.00
1,890.00 Survey Monuments
2" x 4" Redwood Header 6,488.00
5 0837 9.00
Yield Sign 300.00
MISION ESTANCIA:
Street Lights 20,300.00
Total Value of Street Improvements
Sewer Improvements
16,720.00 2,160.00
70,300.00 26,230.00
Standard Manhole Concrete Encasement
8" V.C.P. Sewerline 4" v . c . P . V.C.P. Plug 100.00
Total Value of Sewer Improvements 115,510.00
Storm Drain Improvements
2,600.00 18" R. C. P . Inlet Type "C" 3,500.00 Inlet Type "C-1" 10' 3,500.00
9,600.00
508,379.00 115,510.00 9,600.00
$ 633,489.00
Total Value of Storm Drain Improvements
Total Value of Street Improvements Total Value of Sewer Improvements Total Value of Storm Drain Improvements
Total Value of Public Improvements
a a
NOTICE OF COlLIPLETION
FOR PROJECT IMPROVEMENTS
ENGINEERING
To all Laborers and Material Mcn and to Every Other Person Interested:
YOU WILL PLEASE TAKE NOTICE that on ?LA 2 1: , 192, the Engineer
Projcct consisting of Santa Fc Knolls - Unit 1 CT 75-9B (Onsite and Offsitc) n which the Ani
Group was the Contractor, and Integrity lnsurancc Company was the surety, wits complctcd
CITY OF CARLSB
VERIFICATION OF CITY CLERK
I, thc undersigned, say:
I am the City Clcrk of the City of Carlsbad; the City Council of said City on IThm
, 19a, accepted thc above dcscribcd work ;is complctcd and ordcrcd that a Notic I &I
Completion be filcd.
I declare under penalty of pcrjury that the forcgoing is true and corrcct.
~xccuted on Wd 15'- , IC)~ at CarlsIxici, California.
CITY OF CARLSBAD
Q-QLZL A!. Ry
ALETHA L. RAUTENKRANZ
City Clerk
EXHIBIT 4
t 9 0
.I
1200 ELM AVENUE TELEP
CARLSBAD, CALIFORNIA 92008 (619) 43
- Office of the City Clerk aiQ alf anrlsbnb
March 20, 1989
Vera L. Lyle
County Recorder
P.O. Box 1750
San Diego, CA 92112
Enclosed for recordation are the following described documents:
Notice of Completion - Engineering
CT 85-5, Unit 3, Santa Fe Knolls
The Anden Group, Contractor
Notice of Completion - Engineering
The Trails of Calavera Hills - CT 83-21, Unit 4
T.C. Construction, Contractor
Notice of Completion - Engineering
CT 75-9(B) - Santa Fe Knolls, Unit 1
The Anden Group, Contractor
Our staff has determined that the recordation of these documents is
of benefit to the City; therefore, it is requested that the fees
be waived.
Thank you for your assistance in this matter. .y4L2 REN di14)UNd R.
Aeputy kity Clerk
Encs .
x------ -- A.yyy^yL-.- _.I m rl) City Clerk
1290 Elm Ave.
Carlsbad, CA 92008
NOTICE OF COMPLETION
FOR PROJECT IMPROVEMENTS
ENGINEERING
To all Laborcrs and Material Men and to Every Other Person Interested:
YOU WILL PLEASE TAKE NOTICE that on y]eA A ‘ L , 199 thc Engineer
Projcct consisting of Santa Fe KnoIIs - Unit 1 CT 75-9B (Onsite and Offsitc) n which the Ani
Group was the Contractor, and Integrity Insurance Company was the surety, was completed
CITY OF CARLSB
VERIFICATION OF CITY CLERK
I, thc undersigned, say:
I am the City Clerk of the City of Carlsbad; the City Council of said City on II? a
, 19n, accepted the above dcscribed work as completed and ordered that a Notic I L/
Completion be filed.
I declare under penalty of pcrjury that thc foregoing is true and correct.
Executed on md 15’- , 19g at Carlsbad, California.
cI-rY OF CARLSBAD
Q-GaL i. i?-
ALETHA L. RAUTENKRANZ
City Clerk
EXHIBIT 4
&U ‘!r:LiUiJ B 1 z-. \
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO: )
)
CITY OF CARLSBAD )
1200 Elm Avenue 1 \$$? g!;l 2%{ r;j 2. 35
Documentary Transfer Tax
Signature of Declarant determining tax-
firm name
CITY OF CARLSBAD
Parcel No. 223-311-01 to 63, ; 225- -
_I__
223-321-01 to 43 - --
HOLD HARMLESS AGREEMENT
GEOLOGICAL FAILURE
In consideration of the City’s approval of a subdivisic
map and grading permit (PE 2.85.14), a grading plan (Plan Ni
205-2A), and/or improvement plans for development to occur I
property described as Carlsbad Tract No. 75-9(B), Lots 1 throui
138 (inclusive) (APN 223-311-01 to 63, 223-312-01 to 32, ai
223-321-01 to 43) and other good and valuable consideratioi
receipt of which is hereby acknowledged, I (we) THE ANDEN GROUI
the owner(s) of said property promise to indemnify and to ho
the City of Carlsbad and any of its agencies or employe
harmless from liability for injuries to any persons, or damage
or taking of any property including public property, directly
indirectly caused by geological or soils related failures of a
m 0 .- 1
nature, type or cause or any subsequent damage that may occur or
or adjacent to this subdivision due to its construction,
operation or maintenance.
Approval of the plans or permits, or inspection of an
work done pursuant to those plans or permits by the City shal
not constitute an assumption by the City of any responsibil
ity for any damage or taking referenced in this agreement. Cit
shall not be responsible in any manner whatsoever for the design
compaction, construction or maintenance of the slopes, cuts
fills or improvements made or done pursuant to the approve
plans, nor shall any officer or employee thereof be liable o
responsible for any accident, loss or damage happening o
occurring during the construction work or improvements i
specified in this agreement. The entire risk of any lo$
resulting from or caused by any geological failure is assumed i:
and shall be borne by the owner.
It is agreed that the above owner(s) will maintain a1
slopes, landscaping and related subdrains in a manner to insu
slope stability to the satisfaction of the City Engineer. Th
owners agree to repair any damage to public improvements caus
by any geological failure referred to in this agreement to t
satisfaction of the City Engineer. The owner(s) agree to repa
or stabilize any slope which the City Engineer determines m
fail and cause damage to public improvements. It is furth
agreed that this agreement shall be binding on all heir
-2-
4:
I I- MTDEN ra-
the corporation that executed the within instrument on
the partnership that executed
the within instrument, and acknowledged to me that such
corporation executed the same as such partner and that
such partnership executed the same.
WITNESS my hand and official seal.
.i behalf of THE ANDEN GROUP
euL
-
:
(This area for official notarial seal)
1
t 8 m L
li
havingyinwt iw oryy Yt\ Lye&xl\in.
IN WITNESS WHEREOF, the undersigned has executed thi
9 19 27; +-4 instrument this k ;d--day of&/>&1
OWNER(5): THE ANDEN GROUP
BY:
TITLE:
BY:
TITLE:
e .$-L 4 s-p240-+ c a -- "7 /,A / ve d -,
(Notarial acknowledgment of exe ce OWNER($) must
attached, 1
Iss STAT,? SF CAL1SO?&tA
- 0 COUNTYOF ORANGE
1 Q Opfhisthe 17th dayof October 19 8Gbeforeme ' the undersigned a Notary Public in and for said County and State,
persoia~y appeared
, personally
known lo me or proved to me on the basis of satisfactory evidence to be
Kim J * Walker
I R
o the Vice President and Craig A. Hardy
a personally
known to me or proved to me on the basis of satisfactory evidence to be
0 ;; AS S is tan t Secretaiy of the corporation that executed the within 'T instrument on behalf 01 ihe corporation therein named, and acknow- z" 2 ledged to me that such corporaSon executed the within I~StrUment LLlo 2 o pursuant fo its by-laws or a resolution of it s board of directors
WZ ux ao
1
FATRlClA A CHEL'NI
hOTCfiY PUBLIC - CAItFO?hIA
I/ * /, "8 _- ^I_ ~ __--
3 : e?: CGZ
zxg 5 2 YY
G c.3
PATRICIA A. CHELINI-HARVEY
( His name (notary s) shall be typed or legibly prlnted ')
(Sec 8205 - Government Code 1959)
-3-
e (I
h
TELE
(714)
1200 ELM AVENUE
CARLS BAD, CALI FORN I A 92008
Office of the City Clerk
Citp of @Larfs”bab
August 22, 1986
La Costa Executive Offices
Costa Del Mar Road
Carlsbad, CA 92008
Attn: Burton L. Kramer
Re: Bond Release for Traffic Signal - CT 75-9
Santa Fe Knolls
We have now been given authorization by our Engineering Department
to release the remaining 25% of the Performance Bond for the
above referenced traffic signal.
Allianz Insurance Company Performance Bond No., ASB 900947 which
you will find enclosed.
Therefore, we are releasing
xiizx= Deputy City Clerk
Enc .
4t
h * CITY OF CARLSBAD
4 INTER-OFFICE CORRESPONDENCE
TO: City Clerk
FROM: Engi neeri ng OFFICE: GUR=NT DEVELQPME
SUBJECT: C.7 75-9 DATE: Wuq. - 8, ;? ~b
MESSAGE: Please release the following Bonds on file in your office for subject su
Bond No. Amount Date Insurance
IC A) 5ci.R Ak3
Ef f ec ti ve
(1) A5i3 qo-oq-47: ?4,\ 4 $aU ji4 bz- Faithful Performance Bond
CO . --* -
~~~~~~ T$~E ~~fini~~~~~<$ 2 5 % QF j HE BsM3-
CJ$”ALS AT $LEASE --c
&%A.AW@& ‘s-@&- 1 E%FPtC fz/TdFfi-
LA ccST4 %V@. &.JQ VU&& .saAlrcA ’* Fp&.w
00“ .‘il dgL
‘”75% of Bond to be released after recordation of Notice of Completion. 25% of Bond to be retained for one year after recordation of Notice of Completion
(2)100% of Bond to be retains4 for 6 months after recordation of Kotice of Cornpletio
(Warranty 6ond). Final inspection required for Bond re1 ease.
Please mail a copy OF the letter of release to:
__
Signature: Attachments : Reply Requested :
REPLY:
DATE : S I G N ATUR E :
a. 0 e
P
1200 ELM AVENUE T
CARLSBAD, CA 92008-1989 (6
Office of the City Clerk
July 30, 1986
La Costa Executive Offices
Costa Del Mar Road
Carlsbad, CA 92008
Attn: Burton L. Kramer
Re: Bond Release for Traffic Signal on Rancho Santa Fe Road
at La Costa Avenue - CT 75-9
Faithful Performance Bond - No. ASB 90-09-47
In response to your letter requesting the release of the remaining
25% of the Faithful Performance Bond for the above referenced
matter, please be advised that the bond cannot be released at
this time. We have been requested by our Engineering Department
to hold the bond, and I cannot release without their approval.
Any specific questions regarding the retention of the bond should
be directed to the Engineering Department.
2%
Deputy City Clerk
-'/ . Q) "1 / w
CTS costft
EXECUTIVE OFFICES
May 14, 1986
City of Carlsbad i200 Elm Avenue Carlsbad, CA 92008
Attention: Icls. Karen R. Kundtz Deputy City Clerk
Bond Release for Traffic Signal on Rancho Santa Fe Road at La Costa Avenue - CT 75-9 Faithful Performance Bond - No. ASB 90-09-47
Re:
Dear Ms. Kundtz:
On May 14, 1985, you were kind enough to advise me that the City was reducing the above bond and that if no claims were filed, the bond would be released in one year.
As the required time has OW elapsed, we respectfully request that the City release Allianz Insurance Company Bond No. 90-09-47, Faithful Performance Bond, and either return the bond directly
to Allianz Insurance Company, or send it to me for forwarding.
We appreciate your usual fine cooperation.
Very truly yours,
LA COSTA HOTEL AND SPA
-iy I L
Burton L. Kramer Authorized Signature
BbK:rny
COSTA DEL MAR ROAD . CARLSBAD, CALIFORNIA 92008 , AREA CODE 619 . TELEPHONE 438-9111
AM ' TO Tim F. DATE 6-13 19 86 P An
Eng. Dept.
Re: Bond Release - CT 75-9
This is a second request for authorization to release
the remaining 25% of the Performance 3ond for the
Thanks.
/8 "2 - karen
I I
I I
WRITE IT%ONT SAY IT INTER-DE*RTMENT MEMORAN
Ah
DATE 5/14 19 86 Pk TO Tim F. -
Eng. Dept.
Re: CT 75-9 - Unit No. 2
Our records indicated that it is time to release the
remaining 25% of the Performance Bond. Need your authorization
to release. Please notify if it is 0.k.
Thanks.
Karen K.
Deputy City Clerk
11
REPLY ON THIS SHEET FROM
-~
WI.Y-3 SIRVLCE KhE STANDARD INTER DEPT. MEMO FOR1
-
I - I NBER-DEPARTMENT AN^^^ I/
It
11 AM 11 TO Tim F. DATE 6-13 is 86 P M
I Eng. Dept .
Re: Bond Release - CT 75-9
I !I This is a second request for authorization to release
the remaining 25% of the Performance Bond for the
above subdivision. The bond was due for release
in May. /I
1 :j Thanks.
I 'i 11
I1
karen
1
1
Ah
DATE 5/14 19 86 Pb TO Tim F. -
Eng. Dept.
Re: CT 75-9 - Unit No. 2
Our records indicated that it is time to release the
remaining 25% of the Performance Bond.
to release. Please notify if it is 0.k. Need your authorization
I I
Karen K.
Deputy City Clerk
FROM REPLY ON THIS SHEET ____ _____ ~___________~
;' e e
1200 ELM AVENUE CARLSBAD, CA 92008-1989 (
Office of the City Clerk
C1t.p of (ICarIs'bab
November 5, 1985
La Costa Executive Offices
Costa Del Mar Rd.
Carlsbad, CA 92008
Attn: Paul Graham
Re: Bond Release for Traffic Signal on Rancho Santa Fe
Road at La Costa Avenue - CT 75-9
Per instructions from our Engineering Department, we are
releasing the following bond:
Labor & Materials Bond No. ASB 900947
Allianz Insurance Company
$40,000
If you have any questions, please don't hesitate to contact
this office.
qiiiYLDB eputy City Clerk
Enc .
TO TkF,
Engineering
Re: Bond Release for CT 75-9
Attached is a copy of a letter I received this date regarding
the release of Labor & Materials Bond for the above project.
Need your authorization to release bond, or your direction
to retain the bond.
Thanks for your assistance. ~
Karen
~
REPLY OK TWBS S's;,EET
- _________ ~ __ ______ - __
5-ANDAPD IhTER DEPT. MEN0 FORM 11 -24-P Vv LMLR SERVICE KNE
\ e e
CR COStR
EXECUTIVE OFFICES
September 24, 1985 PG-1727
Ms. Karen R. Kundtz
Deputy City Clerk
CITY OF CARLSBAD
1200 Elm Avenue
Carlsbad, California 92008
Re: Bond Release for Traffic Signal on Rancho Santa Fe Road at La Costa Avenue - CT75-9
Dear Ms. Kundtz:
In accordance with the information contained in paragrap
three of your letter dated May 14, 1985, it is requested that t
Labor and Materials Bond No. ASB 900947 in the amount of $40,00
be released.
Very truly yours,
LA COSTA HOTEL AN
Aw PAUL GRAHAM
PG: jb
Attachment
COSTA DEL MAR ROAD . CARLSBAD, CALIFORNIA szooa . AREA CODE 619 . TELEPHONE 438-9111
L 1 /*' *- *
4,203 ELM AVEh'UE
CAF,LSSAD, CALlFO8NlA S2006
o::lc€ ol Ihf city ClEfk
Eitp af (Sarlgbab
MZ]' 14, 1985
Lz Costa Executive Offices
Cosra Del Mar Rd.
Czrlsbac?, CA 92008
kttn: 3urton L, Krmer
Re: Bond Release for Traffic Signal on Rencno Sata E
Road at La Costa Avenue - CT 75-9
The Notice of Completion for the zbove reference6 imp]
xents recorded on Marcn 29,
Per instructions from our Engineering Depar-aent we e:
releasing 75% of the Tzithful Perfomance aond, Allie.
Insurance Co. Bond No. AS3 900947. Please consider & letter as your notification that $60,000 of the F'aith
Perfornance Bond is hereby released. We z.re required retein the remaining 25% for e period of one year. A thttt time, if no claims hzve been filed, it will be I:
leesed,
ine Lzbor & Fleterials sond, Alllanz Ir\.surance Co. Bor
So. AS3 900947, in the zmount of $40,000 will De rele six months from ',he d~te of recordztion of the Notice
Coir,?let ion.
1985.
n. - y-5- xm R.4ilN"IZ
De29ty City Clerk
RE: Substitute %rids for CT 75-9 B
The new bonds which were substituted are in file No. CT 85-5,
which is a new number for the subdivision. (Per Tim F. Engineering)
k,
I
REPBY ON TWBS SHEET
! 0 *
TE
(6 1 1200 ELM AVENUE
CARLSBAD, CA 92008-1989
Office of the Cify Clerk
citp of clCarIsbab
August 28, 1985
Tb: Mr. Barry Bender, Rick Engineering (Representing Pardee Construction) - CY 75-9 (B) , Unit No. 1
We are releasing the follming bonds for the above referenced
subdivision per instructions frm our Engineering Demnt:
Faithful Performance Bond No. 400FW 6012
St. Paul Fire and Marine Insurance Coo
$78,000
Labor & Materials Eond No. 400EW 6012
St. Paul Fire and Marine Insurance Co.
$39 , 000
Grading & Erosion Control Bond No. 400EW 6013
St. Paul Fire and Marine Insurance Co.
$78 , 000
Faithful Performance Bond No. 400FW 6014
St. Paul Fire and Marine Insurance Coo
$1,021,244
Labor & Materials Bond No. 400EW 6014
St. Paul Fire and Marine Insurance Co.
$510 , 622
Grading & Erosion Control Bond 1Jo. 400FW 6015
St. Paul Fire and Marine Insurance Co.
$977 , 000
Subdivision Mmumentation Bond No. 400FW 6016
St. Paul Fire ad Marine Insurance Co.
$3,200
These bonds have been replaced by bonds frm the Anden Group.
8-e- LEE City €44-z Clerk Bonds F@ceived By: B’&‘ .j-,x-5$ b ,<
r- t
Date: %- Z%-%’h I
0 0
T 1200 ELM AVENUE
(6 1 CARLSBAD, CA 92008-1989
Ofhce of the City Clerk
Cltp of Carls’bab
August 28, 1985
TO: Mr. Barry Bender, Rick Ehgineering
(Representing Pardee Construction) - CC 75-9 (B) - Unit No, 2
We are releasing the following bonds for the above referenced
subdivision per instructions frm our Engineering =par-t:
Faithful Performance Bond No. 400EW 6017
St. Paul Fire and Marine Insurance Co.
$801,000
Labor & Materials Bond No. 400FW 6017
St. Paul Fire and Marine Insurance Co.
$400 , 500
Grading & mosion Control Bond No. 400FW 6018
St. Paul Fire and Marine Insurance Co.
$372 , 000
Subdivision Pbnwntation Bond No. 400FW 6019
St. Paul Fire and Marine Insurance Co,
$6 , 400
These bonds have been replaced by bonds from the Anden Group.
City Clerk
Bonds Received 3y:b
Date : %:as- d
0 CITY OF CARLSBAD 0
INTER-OFFICE- CORRESPONDENCE
TO: City Clerk
FROM: Engi neeri ng OFFICE: CQM?,ENi- J2EVELl
SUBJECT&^^^..++) ,GT~ SA-& ,G c. /7- 75-7 DATE: ALP&. x , /?&-
c.7 -9s-7&31 &+//T / c. T g 5- 5-[NL- /VQH8HKl
MESSAGE: Please release the following Bonds on file in your office for subject S(
Date I nsurancf
Ef f ec ti ve Bond No.
( 1 1 #OO FLddO/$. /o,/g/8ou SZPAUL F
Labor & Materials Bond (2) #OCF-bd@/4 /s/CJdLa.”” /O/&[&G ‘ C0MPAV)J
AN4 fl.4R/#E
Faithful Performance Bond
x&~/r//~/~,,, /%Mu~~fl..?J~~ I!?) fa00 f M60/6 8 3,2 00 = E? ,I 0/8/8 O
G&A&/dL +LCXD~/OQ Com7*OL (4) go& ,@W60/5 # 9 7 ? 0 00.22
&7/vo
FA /T-p-&L PERF5n.BNCE 4%@0 @9&bfM/&D/z &78,000. epo
/VO&.-H NALF or‘ @/S=.ON Ev8AJc/a
L4Hod gmMT;Ex//L s dwo d&/ 900 /+J &o/z /.-Qx s75 ~#RRUV&-/SrCN~S QP
/e/o,qrA, M,u& Of#fS.r/OM Es7.4&u.4
&@/& ,Go& J-X zmPm7v-MRM~
OH A/6/TN e+- m/ss/o*, bSTAP/L./A -
/g/$,/dO
/D/@/@’
~o,q 57: Z&R&Or/E&&a/l~ QF
/0/8/&0 g 37/00 0 o-3
@/J/MG p K/&/o..d coflROL(i) fW6f?/3 l76: 19°0* @ h?2w80 ~
IN%SF BOND3 70 &‘E /GO .% /?/LEACED. L dF/ HAvk- @..Ed
pEp&9c&9 &y sL4/J-/aZri-c-7 430NdS. Ax
CF)TS”/- - o of-Bond -to-be-nq eased &t?r reeordation-of ftfotice 0-f Cs;np?etim.
- 25%--of_Bond -ta-be-retai rled for mcyear-af-ter recordation- of-Jlo_ti e- of comp]-e%isr
ff’?00%-O=f7301Td tort-e-Teta-i-flsA for- 6 morrths after recordation of- Notice-of &j7+p+etG
fm-ramty -6fmb)-:-- Fjm7 insgecti-on requ-lfred- for Bund--tce-7 ease.
Please mil a copy of the letter of release to:
__ -
REPLY:
DATE : SIGNATURE:
0 CITY OF CARLSBAD 0
INTER-OFFICE- CORRESPONDENCE
TO: City Clerk
FROM: Engineering
SUBJECT:~F~~~ROL) go/ si,T/ k: cr7s-y DATE: /&s. Zd/P$5
OFFICE :CU&&...A/T &’DL=&
f* 7- 7 r-77 Dm/,- 2 c1 T gc-5- f.hEW /?%~fl&-/fy
MESSAGE: Please release the following Bonds on file in your office for subject s
I nsuranc
Faithful Performance Bond(’) 400Fh/&/7 $$O<QUo. e /o/E/dO . fiQ3pUL 1
ADD N//f/b
Ef f ec ti ve Bond No. Amount Date
Labor & Materi a7 s Bond (2) #oOFh’ Lo/ 7 bf@] soo. OJ /O/J/$O zA/SMk?/N L. / ~~~~,+,x/ux/ /~~ YOQr-kJ 60/7 8- &/ f@o.- go
~~/~~~ +Z&S/ON c ofl~ QL 41 @d’ FCI/ 60 / 8 43 7 Z1 a 0 0. O3
/u/8/to
/Q/ @Ifa __(i
f70MO
/?g&gr&. /&.70~ UP /T--LS-- Ad TW
&A/@ flpgd /‘f~fLAec7 fly 227fl/s/Tu7~
&6~’L7 5 ~ 4;
ecorda ti on ~f&&%e-.+g~~iim~-&~~.
. -&&#&-i~y~-~ - d==r-+Bou&eA.- -
-3tC-- 0 ‘- -%P-*++~-F-&~XW rK+w $-Ne t?5e4L&@ w
L f- *- r3 n$-+-be +%Ti7i~&foy--+?mon+&-~~~ -c%-otv
F+%~-letter of release to:
_-
Signature: 7~ PT- ,, Attachments : /r/9kv.cT Reply Requested -Nt.w@
/
// Y
REPLY:
DATE : SI GNATURE :
* e
Pardee Construction Compan
A Weyerhaeuser Company
August 23, 1985
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
Attention: Vincent Biondo, City Attorney
Re: Pardee Bonds for Santa Fe Knolls
Unit 1 and Unit 2
(CT 75-9 A & B) Onsite and Offsite
Gentlemen:
This will confirm that Mr. Barry Bender of
Rick Engineering Company is authorized to pick up the
above described bonds on behalf of Pardee Construction
Company.
Very truly yours,
PARDEE CONSTRUCTION COMPPdY
1 i
Raymond C. Sandler
J'
RCS : bh
10639 Santa Monica Boulevard MAILING ADDRESS:
Los Angeles, California 90025 Post Office Box 54089
(213) 475-0833 879-0880 Los Angeles, Californ
0 0
1200 ELM AVENUE TELEF CARLSBAD, CALIFORNIA 92008 (714) 4
Office of the City Clerk
Citp ~f Car'lle'lbab
May 14, 1985
La Costa Executive Offices
Costa Del Mar Rd.
Carlsbad, CA 92008
Attn: Burton L. Kramer
Re: Bond Release for Traffic Signal on Rancho Santa Fe
Road at La Costa Avenue - CT 75-9
The Notice of Completion for the above referenced improve-
ments recorded on March 29, 1985.
Per instructions from our Engineering Department we are
releasing 75% of the Faithful Performance Bond, Allianz
Insurance Co. Bond No. ASB 900947. Please consider this letter as your notification that $60,000 of the Faithful Performance Bond is hereby released. We are required to
retain the remaining 25% for a period of one year. At
that time, if no claims have been filed, it will be re-
leased.
The Labor & Materials Bond, Allianz Insurance Co. Bond
No. ASB 900947, in the amount of $40,000 will be released six months from the date of recordation of the Notice of Completion.
r-777 REN R. KUNDTZ
Deputy City Clerk
CITY OF CAWLSBAD
City Clerk
-,
TO :
FROM: Engi neeri ng OFFICE:
-.
MESSAGE: Please release the following Bonds on file in your office for subject sub
Insurance Bond No. Amount Dia te Effective
(1 1 Faithful Performance Bond
Labor & Materials Bond (2)
'"75% of Bond to be released after recordation sf Notice of Completion.
25% of Bond to be retained for one year after recordation of Notl'ce of Completion
(*)IOO% of Bond to be retained for 6 months after recordation of Notice of Cornpletio
(Marranty Bond). Final inspection required for Bond release.
Please mail a copy of the letter of release to:
-
\
.__
-.
REPLY:
DATE : SIGNATURE:
199 Recording Requested By and Return Tp:-
City Clerk 1200 ~ln Avenue
Carlsbad, CA 92008 NOTICE OF COMPLETION *--
0
FOR PROJECT CONSTRUCTION
ENGINEERING
To All Laborers and Material Hen an
Person Interested:
YOU WILL PLEASE TAKE NOTICE that on February 20, 1985, t
Engineering project consisting of the installation
traffic signals at the intersection of La Costa Avenue :
Rancho Santa Fe Road on which McCAIN CONSTRUCTION was t
Contractor, and ALLIANZ INSURANCE CO. was the surety, c1
completed.
CITY OF CARLSBAD
e?& [G k> d, /c: w - --------.------- d ->- --- City Enaineer
VER,IFICATION O,F CITY, CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the Ci
Council of said City on March-EJ -I-^- 1985 -*------ accepted t
above described work as completed and ordered that a Notice
Completion be filed.
I declare under penalty of perjury that the foregoing
true and correct.
Executed on March 20 1985 at Carlsbad, California. -~ ---- ~ -- J- -_-.-x--I -- - --
CITY OF CARLSRAD
A a&. ----- - .------I- 62) City Clerk
- w 0
1200 ELM AVENUE TELEPI
CARLSBAD, CALIFORNIA 92008 (714) 43
Office of the City Clerk
<p of Carls'bab
March 20, 1985
Vera L. Lyle County Recorder
P.O. Box 1750 San Diego, CA 92112
Enclosed for recordation are the following described
documents:
Notice of Completion for Project Improvements
CT 76-11, Unit 2 - Carlsbad Developement
Corporation - Tamarack Shores
' Notice of Completion for Project Construction -- f?s / McCain Construction; Installation of Traffic
Signals, La Costa Avenue and Rancho Sante Fe Road
Notice of Completion - Army-Navy Academy
Crossing Signal - Maco Services, Inc.
Notice of Completion - Traffic Signal - Alga Road and Alicante Road - McCain Construction co .
_rr i. .. . _-
Our staff has determined that the recordation of these
documents is of benefit to the City; therefore, it is
requested that the fees be waived.
Thank you for your assitance in this matter,
$%ZNDW eputy City Clerk
Encs.
a Recording Requested k5y ann
City 1200 clerk in Avenue
re=u,, .Iv:
Ca--lsbad, CA 92008 NOTICE OF COMPLETION
FOR PROJECT CONSTRUCTION
ENGINEERING
Yo All Laborers and Material Men and to Every Othc
Person Interested:
YOU WILL PLEASE TAKE NOTICE that on February 20, 1985, t
Engineering project consisting of the installation
traffic signals at the intersection of La Costa Avenue a
Rancho Santa Fe Road on which McCAIN CONSTRUCTION was t
Contractor, and ALLIANZ INSURANCE CU. was the surety, CI
completed.
CITY OF CARLSBAD
.i3/4/3&,L- __
Ci tyEngineer
VERIFICATION OF CITY,CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the C Council of said City on . March 19, 1985 accepted
above described work as completed and ordered that a Notice
Completion be filed.
I declare under penalty of perjury that the foregoing
true and correct.
Executed on PIarch 20, 1985 at Carlsbad, California ----- e----- -
CITY OF CARLSRAD
&L@-
G City Clerk