HomeMy WebLinkAbout1989-05-09; City Council; 10012; Design of Traffic Signal and Street Light4B# /+
MTG. 05/09/89
DEPT. ENG
RECOMMENDED ACTION:
TITLE:
DESIGN OF TRAFFIC SIGNAL AND STREET LIGHT IMPROVEMENTS ON CARLSBAD BOULEVARD
Adopt Resolution No. f%/36 authorizing funds to be appropriated for the design and construction of a traffic signal system at the intersection of Carlsbad Boulevard/Cerezo Drive and for the design and construction of three street lights on Carlsbad Boulevard between Manzano Drive and Palomar Airport Road.
Adopt Resolution No. fqH/37 authorizing funds to be appropriated for the design of a traffic signal system at the intersection of Carlsbad Boul evard/Pi ne Avenue.
ITEM EXPLANATION:
At the City Council meeting of April 18, 1989, Council directed staff to return with documents to authorize funds for design and construction of a traffic signal system at the Cerezo Drive/Carl sbad Boulevard intersection and for the design and construction of three street 1 ights on Carl sbad Boulevard between Manzano Drive and Palomar Airport Road. Said documents are provided for adoption by the City Council.
The traffic signal at Carlsbad Boulevard/Pine Avenue is scheduled for design and construction in the 1989/90 Capital Improvement Program. Documents are provided to authorize funds for design of this signal system at this time, prior to adopting the C.I.P. later this year. The streetscape project will close Ocean Street at Carlsbad Boulevard, therefor, this intersection will become a signalized "TI' intersection.
FISCAL IMPACTS:
Funds in the amount of $80,000 are available in the General Fund Contingency Account Number 001-840-1990-2999 to perform the design and construction of the traffic signal system at Carl sbad Boulevard/Cerezo Drive and three street lights on Carlsbad Boulevard south of Manzano Drive and for the design of a traffic signal system at the intersection of Carlsbad Boulevard/Pine Avenue.
EXH I BITS :
1. Location Map - Carlsbad Boulevard/Cerezo Drive Intersection.
2. Location Map - Carlsbad Boulevard/Pine Avenue Intersection.
3. Resolution No. fY-/36 authorizing funds to be appropriated for the design and construction of a traffic signal system at the intersection of Carl sbad Boul evard/Cerezo Drive and for the design and construction of three street lights on Carlsbad Boulevard between Manzano Drive and Pal omar Airport Road.
PAGE TU0 OF AB# /d,
4. Resolution No. fT4/37 authorizing funds to be appropriated for the design of a traffic signal system at the intersection of Carlsbad Boul evard/Pi ne Avenue.
'.OCATION MP
NO SCALE
~~~
1
~ ~~~ PROJECT NAME:
TRAFFIC SIGNAL AND STREET LIGHT SYSTEMS
CARLSBAD BOULEVARD
.- LOCATION Mc,P
N.T.S-
PROPOSED
TRAFFIC SIGNAL
PACIFIC
OCEAN
OAK AVE- TI-
n a m
a a
a -J
0
~ PINE
. AVE.
MAPLE AVE.
TAMARACK
BEACH RESORT
PROJECT NAME: IEXHlBiT
CARLSBAD BOULEVARD / PINE AVENUE
PROPOSED TRAFFIC SIGNAL 2
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
i
RESOLUTION NO. 89-l36
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROPRIATING FUNDS FOR THE DESIGN AND CONSTRUCTION OF A TRAFFIC SIGNAL SYSTEM AT THE INTERSECTION OF CARLSBAD BOULEVARD
DRIVE AND FOR THE DESIGN AND CONSTRUCTION OF
CARLSBAD BOULEVARD BETWEEN MANZANO DRIVE AND
WHEREAS, the City Council of the City of C
determined it necessary and in the public interest to
system at the intersection of Carlsbad Boulevard and
WHEREAS, the City Council *ty ofhrlsbad, California, has
to construct three street
d Palomar Airport Road; and
cessary for the design and
light system; and
cessary to be transferred
nt Number 001-840-1990-2999 to Account
Number 001 -840- 1840-
NOW, THEREFORE, BE 1 of the City of Carlsbad,
California, as follows:
ngineer to solicit
eparation of design
I
plans and for said traffic signal system and street light
system.
///
///
///
///
///
///
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That the Finance Director is hereby authorized and directed to
transfer funds in the amount of $75,000 from
Number 001-840-1990-2999 to Account Number 001-840-1840-3333.
PASSED, APPROVED AND ADOPTED at a r
Council held on the day of
wit:
AYES :
NOES:
ABSENT:
ATTEST:
ALETHA L. RAUTENKRANZ, City Clerk (SEAL)
1 A. LEWIS, Mayor
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
/4 f
RESOLUTION NO. 89-137
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROPRIATING FUNDS FOR THE DESIGN OF A TRAFFIC SIGNAL SYSTEM AT THE INTERSECTION OF CARLSBAD BOULEVARWPINE AVENUE.
WHEREAS, the City Council of the City of Carlsbad, California, has
determined it necessary and in the public interest to design a traffic signal
system at the intersection of Carl sbad Boulevard/Pine Avenue; and
WHEREAS, the traffic signal system is scheduled to be funded and
constructed in the 1989/90 Capital Improvement Program; and
WHEREAS, funds in the amount of $5,
traffic signal system; and
WHEREAS, funds in the am ansferred from
the General Fund Contingency ccount Number
001-840-1840-3332.
NOW, THEREFORE, B
///
///
///
///
///
///
///
///
7 J
.
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
h
3. That the Finance Director is
transfer funds in the amount of $5,000 from
Number 001-840-1990-2999 to Account Number 001-840-1840-3332.
PASSED, APPROVED AND ADOPTED at a r
Council held on the day of
wit:
AYES:
NOES:
ABSENT :
ATTEST:
ALETHA L. RAUTENKRANZ, City Clerk (SEAL)