HomeMy WebLinkAbout1989-10-10; City Council; 10302; Community Development new positionshB#B? DEPT. PLN MTG. 10/10/89 RECOMMENDED ACTION: -, n TITLE: NEW POSITIONS IN COMMUNITY DEVELOPMENT 3(P'P ADOPT Resolution No.87 , APPROVING new positions in the Planning and Engineering Departments and appropriating monies to fund these positions. ITEM EXPLANATION The Community Development workload has been steadily increasing over the last few years. The City's strong emphasis on enhancing the quality of review of applications and follow-up on completed projects, an increasing number of citizens' committees to provide for maximum public input on City issues and the increased federal and state environmental review requirements have all served to create additional demands on staff time. In response to these increased and varied demands placed on staff, the Engineering and Planning Departments have implemented a development processing model to identify specific staffing needs and increase effectiveness of staff utilization. The methodology of the model is outlined below: 1. The time required for basic duties of each staff position was estimated to determine the number of available hours for discretionary review. 2. The time required per staff position to complete the various applications was estimated to determine the number of hours required per application for discretionary review. 3. The number of applications that will be submitted during the years 1990- 1994/95 were projected based on Growth Management's development projections for dwelling units and industrial/commercial square footage over this same time period. 4. The number of projects in each category were then evaluated for staff time requirements. The total number of projects were converted to total number of hours required for discretionary review. 5. The number of hours required for discretionary review were then compared with the number of hours available. Planning Request: Several different scenarios of additional planning positions and their impact on the number of available hours for discretionary review have been considered. In addition, an internal review of department responsibilities in relationship to the organizational structure was performed and a reassessment of environmental review requirements in relationship to staffing levels was initiated. The result is a request for six new planning positions (2 Senior Planners, 2 Associate Planners, 1 Assistant Planner, and 1 Planning Technician) and a reorganization of the department to process applications more % 5 PAGE 2 OF AGENDA BILL NO. 16 303, efficiently. It is also anticipated that an appropriation of funds will be requested in the near future for an environmental consultant to coordinate environmental reviews. If such a consultant is hired, periodic evaluations of his or her responsibilities will be conducted to determine the feasibility of converting the consultant's position to a staff position. - Reauest: Based upon lengthy analysis of staffing requirements under increased service levels, the Engineering Department is requesting six (6) new positions be added to its current staff. The positions will be added to both Land Use and Plan Check Divisions and include: 5 Associate Civil Engineers (4 Plan Check, 1 Land Use) and 1 Assistant Civil Engineer (Land Use). Results of Additional Positions - The Engineering and Planning Departments are requesting the additional positions to achieve the following goals: 1. Accommodate Growth Management's projections of future development; 2. Process applications well within state mandated time limits to the full extent of the City's ability to control application processing time (processing time is dependent upon both the City and the applicant); 3. Continue to provide quality review of applications; 4. Continue to provide comprehensive follow-up on completed projects; and 5. Continue to serve and support citizen's committees and facilitate citizen input and participation in the City's development. Council adoption of the 1989-90 Operating Budget left funds available in the unappropriated funds balance to support this program. The total amount to be appropriated, $237,000, is based on the estimated dates all positions will be filled: January 1, 1990, and April 1, 1990, for the Planning Department and Engineering Department respectively. Appropriations from the unappropriated funds are to be distributed as follows: - 5 PAGE 3 OF AGENDA BILL NO. ~o/3o% -.- PLANNING DEPARTMENT (January 1, 1990 to June 30, 1990) Salaries: Retirement: Health: Furnishings & Equipment $105,500.00 16,200.00 18,000.00 10.200.00 TOTAL: $149,900.00 ENGINEERING DEPARTMENT (April 1, 1990 to June 30, 1990) Salaries: Retirement: Health: Furnishings & Equipment: $64,700.00 10,000.00 9,000.00 3,400.00 TOTAL: $87,100.00 The total cost of the Planning Department and Engineering Department positions in fiscal year 1990-91 is $280,000 and $335,000 respectively. Four of the six Engineering Department positions, however, will replace consultant services; as a result, funds allocated to consultant services will be reduced from $550,000 to $250,000 leaving a net budget increase estimated at $50,000 for fiscal year 1990-91. EXHIBITS 1. City Council Resolution No. 87 -36% 2. Memorandum to the City Manager from City Engineer 3. Memorandum to the City Manager from Planning Director 4. Staff Analysis 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 le 19 2c 21 22 23 24 25 26 27 28 RESOLUTION NO. 89-362 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARISBAD, CALIFORNIA, APPROVING 1 PLANNING TECHNICIAN, 2 ASSOCIATE PLANNERS AND 2 SENIOR PLANNER POSITIONS IN THE PLANNING DEPARTMENT; AND 1 ASSISTANT CIVIL ENGINEER AND 5 ASSOCIATE CIVIL ENGINEER POSITIONS IN THE ENGINEERING DEPARTMENT. WHEREAS, Community Development staffing needs have been identified by a staffing analysis; and WHEREAS, the City Manager recommends and the City Council conurs, that staffing levels in the Engineering and Planning Departments be increased. NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the City Council hereby authorizes the addition of 1 Planning Technician, 1 Assistant Planner, 2 Associate Planners and 2 Senior Planner Positions to the Planning Department; and 1 Assistant Civil Engineer and 5 Associate Civil Engineer positions to the Engineering Department. 3. That a fund transfer in the amount of $237,000 on file in the Finance Department and incorporated herein by reference is hereby approved for allocation from the unappropriated funds balance to the following accounts: Planning Department Salaries in the amount of $139,700 to account Number 001-820-3230-1100; Planning Department Capital Outlay in the amount of $10,200 to Account Number 001-820-3230-3900, Engineering Department Salaries in the amount of $83,700 to Account Number 001-820-3110-1100; and Engineering Department Office and Equipment in the amount of $3,400 to Account Number 001-820-3110-2550. 1 2 3 4 5 6 7 a 9 10 11 12 12 14 If 1€ 17 I€ 15 2c 23 22 2: 24 2: 2c 2: 21 PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Carlsbad, California, on the 10th day of October , 1989 by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None ATTEST ALETHA L. RAUTENKRANZ, City C)erk September 19, 1989 TO: CITY MANAGER FROM: CITY ENGINEER VIA: COMMUNITY DEVELOPMENT DIRECTOR 1989-90 BUDGET SUPPLEMENT RECOMMENDATION -Approve addition of four full time permanent Associate Civil Engineers in Plancheck Division to replace consultant services and addition of one Associate and one Assistant Civil Engineer in the Land Use Review Division to improve effectiveness and increase levels of service for small and moderate size projects. BACKGROUND The Planning and Engineering Departments have recently completed development of a program management model for the land development process. This model involved the following steps: Review of existing staff functions Development of Unit Time Allocations a Definition of Work Units a a Projection of Staffing Requirements a Analysls of Existing and Future Workload The results of this analysis are further detailed in the attached Staffing Analysis report. In developing future staffing levels, growth management projections have been utilized. These projections are considered moderate levels of growth. The proposed staffing levels are, therefore, consemative for a number of years into the future. FISCAL, IMPACT Four of the six ositions requested will directly replace consultant services. The total amount of salaries and : enefits for the (6) six positions total $350,000. Funds allocated to consultant services however, will be reduced from $550,000 to $250,000 leaving a net budget increase estimated at $50,000 for fiscal year 1990-91. CONCLUSION The Engineering Department feels that the addition of permanent staffing will provide a more cost-effective program, and will add depth and vitality to the staff, which will result in higher morale and overall iricreased effectiveness. LLO~ B. HUBBS City Engineer LBH:rp Att. -_ I ENGINEERING DEPARTMcNT STAFFING ANALYSIS This analysis was developed through a five (5) step process designed to project workload in terms of work units and manpower allocation. Step 1 - Review Existinn Staff Functions and Time Allocations. The results of this analysis for the Land Use Review and Plancheck Division are shown in the attached Exhibit 1, Functional Time Distribution Chart. This information is based on historical and time card data and established manpower availability. Steu 2 - Define Work Units. Four basic categories have been developed to provide the basis for workload projections: Master Plans Major Projects m Minor Projects m Miscellaneous Projects Further definitions of these activities for the Engineering functions are shown on Exhibit 2, Land Use Review Project Categories. Steu 3 - Develop Manhour Allocation Model bv Proiect Ifrw. Based on historical time sheet data and experience, manpower allocations have been assigned to each project category to provide the basis for manhour projections. It should be noted that these allocations are general and will be monitored and adjusted in future years. Manpower allocations for plan check functions have been related to plan sheet reviews based on data developed over this past year. Exhibit 3 documents assumed manhour allocations. Step 4 - Proiect Existinn and Future Workload Staff reviewed all project categories currently in process and those in past years. This data was compared with Growth Management Projections to provide the basis for workload projections over the next five years. The results of this analysis are shown on Exhibit 4 and 5. Steu 5 - Estimate staff in^ ReaUirements. Workload projections are multiplied by manpower allocation rates to obtain the overall manpower requirement for each of the next five years. These numbers were then compared with existing staff levels to identify new staffing requirements. Results of this analysis are shown on Exhibits 6, 7, 8 and 9. CONCLUSION This staffing analysis indicates a long-term need for four additional Plancheckers and two additional Land Use Review staff. The projected long-term need for four additional Plancheckers will allow replacement of existing consultants, resulting in an estimated annual saving of $220,000 (see Exhibit 10). It should be noted that consultant services will be used in the future to deal with peak workload periods. Consultant requirements would average 1.3 man years each year over the next five years. Page: 2 Additional Land Use Review staff has been programmed to improve service effectiveness with a goal of reducing review time of minor and miscellaneous projects to well below State-mandated levels. It should be noted that attraction and retention of qualified personnel is a continual problem. Full staffing levels have proven to be the exception over the past years. The increased staff will provide a broader cushion to absorb these staffing fluctuations in all engineering functions. FUNCTIONAL TIME USAGE DEVELOPMENT DIVISIONS A D M I N / LE AV E 31% GRWTH MGMT 8% PUBLIC INFO 28% LAND USE 34% 10% PLANCHECK 59% LAND USE PLANCHECK REVIEW -- AUGUST 1989 EXHIBIT 1 Land Use Review Project Categories C 1 PROJ C CATION TY Master Plan 1. Master Development Plan 2. Master Plan Amendments 3. Specific Plans 4. Specific Plan Amendments 5. EIR's Major Site Plans 1. Tentative Tracts (major) 2. Site Development Plans 3. Cond. Use Permits (major) Minor Site Plans 1. Minor Subdivisions 2. Tentative Tracts (minor) 3. Redevelopment Permits 4. Special Use Permits 5. Planned Industrial Permits 6. Precise Development Plans 7. Site Development Plans Miscellaneous .- 1. 2. 3. 4. 5. 6. 7. 9. 10. 11. 12. 13. a. Hillside Development Plans Zone Changes General Plan Amendments Street Name Changes Day Care Coastal Development Permits Satellite Antennas Local Coastal Plan Amend. Zone Code Amendments Condominium Permit Variance Administrative Variance CM Conditional Use Permit EXHIBIT 2 LAND USE REVIEW Proiect Category MANPOWER ALLOCATIONS BY PROJECT CATEGORY Master Plans Major Projects Minor Projects Miscellaneous Projects PLANCHECK Proiect Category Man Hours 65.5 Hours 70.5 Hours 20 Hours 6.5 Hours *Manhours Single Family 3 sheets/project 11 Hours Minor Residential (4-50 units) 9 sheets/project 33 Hours Major Residential (SO+ units) 34 sheets/project 125 Hours CommerciaVIndustrial 24 sheets/project 88 Hours Plancheck Capacity: 150 Plan Sheets/Planchecker/Month *Note: Manhours per sheet based on historical data ypically including 3 planchecks per sheet. EXHIBIT 3 REQUIRED PROJECT CATEGORY 0 YEAR Master Plans Major Plans Minor Plans 65.5 70.5 20 Miscellaneous Appl 6.5 .- 1989 1990 1991 1992 1993 1994 1995 1989 1990 1991 1992 1993 1994 1995 1989 1990 1991 1992 1993 1994 1995 1989 1990 1991 1992 1993 1994 1998 NUMBER OF PROJECTS 43 6 5 8 7 8 6 93 129 134 121 197 169 157 99 99 99 99 99 99 99 EXHIBIT 4 PLAN CHECK MAN HOUR/PROJECTS SUMMARY REQUIRED NUMBER OF PROJECT CATEGORY REVIEW HOURS YEAR PROJECTS Single Family 11 Minor Residential 33 Major Residential 125 Commercial/Industrial 88 .- 1990 1991 1992 1993 1994 1995 1990 1991 1992 1993 1994 1995 1990 1991 1992 1993 1994 1995 1990 1991 1992 1993 1994 1995 50 51 47 76 61 64 70 77 70 121 109 94 22 21 19 28 22 23 EXHIBIT 5 I c I z a Y w W c f E E 2 W LAND USE REVIEW STAFFING REQUIREMENTS THOUSAND HOURS 8 6 4 2 0 1989 1990 1991 1992 1993 1994 YEAR 1995 ISSS! REQUIRED HOURS + AVAILABLE HOURS ++ PROPOSED HOURS EXHIBIT 7 '. II I1 I I I I I1 I1 I I I I1 II I1 I1 I1 I1 I1 II I1 II II ?? ?J uth 0. F Ln p! 3 N N I x W PLANCHECK DIVISION STAFFING REQU I REM EN TS HOURS(X1000) (Thousands) 14 1 I ~ 12 10 8 6 4 2 0 1 1990 1991 1992 1993 1994 1995 YEARS ~~ ~~~ I 8@8 WORKLOAD + EXIST STAFF LEVEL ++ PROPOSED STAFF LEVEL ENGINEERING AUGUST 1989 EXHIBIT 9 .. COST OF PLANCHECK SERVICES CONSULTANT VS STAFF 2000 1500 1000 500 0’ I t I CUMULATIVE 5 YEAR SAVINGS $1,100,00 90-91 91-92 92-93 93-94 94-95 FISCAL YEAR ENGINEERING AUGUST 1989 EXHIBIT 10 September 22, 1989 TO: CllY MANAGER FROM: Planning Director STAFF ANALYSIS The analysis to determine staffing requirements for the years 1990-1 994 is now complete. An in-depth explanation of the model used to project staffing needs and the assumptions that form the basis of the analysis are provided in the report entitled "Staff Analysis - Methodology" attached. The following is a brief summary of the background, results and implications of the analysis. BACKGROUND Planning Department responsibilities have been steadily increasing over the last few years. The number of applications submitted during the first two-thirds of this year is 217 compared with a total of 155 applications submitted in 1988. As of August 25, 1989, for example, more than three times the number of tentative tract applications and more than twice the number of hillside development permit applications have been submitted as in 1988. In addition to the rising number of applications submitted, the City's strong emphasis on enhancing the quality of review of applications and follow-up on completed projects, an increasing number of citizens' committees to provide for maximum public input on City issues, and the increased federal and state environmental review requirements have all served to create additional demands on staff time. In response to these increased and varied demands placed on staff, the Planning Department has implemented a development processing model to identify staffing needs and increase effectiveness of staff utilization. The model projects the available staff time and required staff time for long range planning and discretionary review of applications for the years 1990-1 994 and is based on: 1) estimates of available and required staff time for discretionary review and long range planning ("advance planning"); and 2) the Finance Department's projections of development utilizing Growth Management data. .. RESULTS To achieve the highest possible degree of validity for an analysis based on estimates, projections of the number of applications to be submitted during the 1990-1994 period and required staff time to process these applications in a timely manner are very conservative. Despite this conservative approach, however, the results of the model point to a clear need for additional staff time for discretionary review. Exhibit 1 illustrates this need with a comparison of the number of hours available for discretionary review with the number required under current staffing levels. As shown in the chart, there is a rapidly growing pool of work in progress, or Work backlog", each year. Exhibit 2 provides the projections of manpower requirements for the 1990-1 994 and Exhibit 3 shows the results of these projections in the form of a new organizational structure proposed with 6 new planning positions (2 Senior Planners, 2 Associate Planners, 1 Assistant Planner, and 1 Planning Technician). Exhibit 4 illustrates the impact of these new positions (see "proposed hours") on both discretionary review and long range planning workload capacity. Under this proposal, available hours approximate required hours for discretionary review and long range planning. IMPLICATIONS The model provides a framework and direction for determining staff level requirements. Actual numbers in the analysis, however, are based on estimates and there are both internal and external factors beyond and within our control which affect application processing time requirements and therefore staffing needs. As a result, the proposed organizational structure is recommended not only because the available hours provided under' this structure approximate the estimated hours required, but also for the reasons listed below. 1. The proposed organizational structure in and of itself should increase the efficiency of processing applications. The planners under the Advance Planning and Current Planning Divisions will concentrate on assignments specific to these divisions. This requires a greater degree of specialization among planners, and therefore, allows them to achieve a higher level of technical expertise and work more efficiently with experience. 2. The Associate Planner has the ability to work on projects requiring a wide range of skills. This flexibility inherent to the position should provide a consistent level of application processing efficiency when there are periodic changes in the numbers and types of applications submitted. 3. The Senior Planners will provide a higher level of skill for the more complex applications and will be able to function as project leaders for multiple applications submitted simultaneously in the same zone. In conclusion, my recommendation is based in part on the results of the model and in part on the anticipated improvement in processing applications with a new organizational structure. Changes in policies and economic conditions, however, will require a re-evaluation of the model results and staffing requirements. MICHAEL J. HOLZMI~LER MJH:EKUaf c I- I x w - m - 3 w > w - w \ I \ \ \ I It I 0 rn I 0 I 0 c9 I 0 cv I I 0 0 r L 0 3 a 0 -e w U 4 9, 3 4 4 E N I- - m - I X w A na? W 3 0 n z 4: r -- * In I- u w 7 0 PI n 000 000 aam mm 000 NwO mwm -am -am 000 *-YW NW 000 0 \m rw a I1 0 Ol100 .It .. - mIIoLn m wt1ma - -11Ln-t I1 4 4 I1 N mitmo 0 U \Ln LW 0 U \Ln zw I1 0 01100 000 awN Nh ----- 000 0 U \Ln LW 000 Nh am- 0 ULn \w L m h w c L W r 0 2 W > W PI W I- In I n n a I1 I1 I1 In m I1 m I1 0) I1 a I1 It It 0 Q1 I1 I1 0 w 11 . . I1 h N I1 0 I1 m It I I1 I1 0 - I1 . . I1 m * I1 * I1 0 I1 N I1 I1 It I1 0 rg I1 . . I1 m Ln I1 h I1 w 11 N I1 I1 I- - 2 LL W n -1 W 0 c n ww Ln n V 4 W 3 U E 2 .- - > W PI % L c 0 c, aJ L U In W W PI+ Win 3w 03 nu TW uc* PI z: ww ws uo en 4 .C .C PI^ sz n UI c .- SECRETARY EXHIBIT 3 SR. MGMT ANALYST MGMT ANALYST W.P. OPR I1 W.P. OPR I W.P. OPR I PLANNING DEPARTMENT ~'ONQ4AR.T PL. DIR I I I ADVANCE/SPECIAL PROJECTSI PRINCIPAL SENIOR *SENIOR *Assoc. Assoc. Assoc. Assoc. ASSIST. G. TECH PRINCIPAL SENIOR ASSIST. *AsI!sr. TECH. mcH. *SENIOR *Assoc. Assoc. TECH. .. *NEW POSITIONS ... _- - I x w c3 z 7 a I IL W >o oe >o 2 0 n i 1 a a W > 8 a 3 0 I W A m a -I - d t 8 3 0 I W U 3 0 W a a - a 8 3 0 I a W 8 0 p. 0 U n I a J, I .- PLANNING DEPARTMENT STAFF ANALYSIS The analysis identifies workload capacity under the current staff level and projects the workload and staff level requirements for the years 1990-1994. An explanation of the model and the assumptions that form the basis of the analysis are provided below in an outline of the methodology used and illustrated in the exhibits attached. Time Available- The amount of time available hours for discretionary review and advance planning under the current staff level was determined with an analysis of the time distribution of available man-hours (Exhibit 1). The analysis was based on staff member estimates of his or her time spent on the various staff functions. Time Reauired- The total time required per di scret i onary appl i cat ion was determined by estimating the average number of hours required per staff position to complete an application in each of the 4 major categories of applications (Exhibits 2, and 2A). The time required for advance planning was determined by combining the average number of hours required per staff position to complete a major application (from Exhibit 2), e.g., general plan amendments, zone changes and zone code amendments, with the annual time required to support Planning Commission subcommittees and citizens’ committees (Exhibit 26). Pro.iected Workload- The number of applications in each of the 4 categories that will be submitted in the years 1990-1994 was projected (Exhibit 3) using historical data and Growth Management projections of development in terms of dwelling units (Exhibit 4) and industrial/commercial square feet (Exhibit 5). These applications were then converted to hours to determine the hours required for discretionary review. Estimated Staff Level Reauired- The time available for discretionary review and advance planning was then compared with the projected hours required for the years 1990-1994. The results are shown in Exhibit 6. Conclusion- The staff analysis indicates a long-term need for six additional planners. The hours that will be provided by these additional staff members approximate the prDjected required hours for discretionary review and advance planning. c I- - m - I X w W? Z G Z - Z Z z 0 - t- W ‘3 Y II 0 Z UJ W 0 0 CO _- 'I ,'.I X u -I =a wa ac ti w c 5 r e4 mi 0 d Y e .C 0-UOOlnr r I- ON :;g IC d 6 U 0 I- C 0 I- 4 6 Y 0 c DISCRETIONARY APPLICATION8 EXHISIT 2A CATEGORY APPLICATION TYPE MASTER DEVELOPMENT Master P1 ans Master Plan Amendments Specific Plans Speci f i c P1 an Amendments EIRs MAJOR MINOR MISCELLANEOUS RMH Tentative Tracts Site Development Plans Redevelopment Permits Conditional Use Permits Tentative Tract Amendment/Revisions Zone Code Amendments P1 anned Developments Zone Changes General P1 an Amendments Minor Subdivisions Conditional Use Permits Redevelopment Permits Site Development Plans Special Use Permits Preci se Devel opmen t P1 ans Planned Industrial Permits Coastal Development Permits Hillside Development Permits Administrative Variances Local Coastal Plan Amendments Day Cares Satellite Antennas Planning Commission Determinations CM Conditional Use Permits Variances Street Name Changes Condominium Permits rn m N I- I X w - - A Fl ’ B L .- B L VI 5 z .- I YI alc xu CN .- , UI Y AU . .- - ‘E “O “ al u -* Y Y gi u* L 0 L U al L .- n L 0 Y u u L .- n L E 0 d n m C .- L 0 C m .- u d Y C .C E 0 0 d m I- - rn - I X w W L c - .. I, I, , .' * m I- - m - I x w --------------- I, I, I. crncb0D.40; N A v) W 25 8 i CI v) W Q, H - L Y I. c g: c I DU I I A 4 0 c c - U C 0 u m v I- - rn - I X w Ur, II t N 0 N L 1 -_ U C 0 V m Y I- - .. I, I X W m 0 0 m - I I- , I t 1 J N. cI u) w a a I- - m u 5e - I X w 0 9 h U F c h N cz m c U W 2 n c X w z W w : a CI u) L 0 w 5 W a a -5 alu of 3z Ne '2 B t L V)- .- -a c <* ua -< a a 4- I- .C W x I- - P 3 L t .- c 4 a Y c 0 -\ Ln I- I x W - m 1: iE c -$ c A U : Y c = -l W > W Q aJ U .4 U * 3 c 8 Y h m N Fl Fl '"8'" 99,: h ON :% 3 E c a Y CL 3 a w - a W c f 5 - d f W f c u \ 4 < c 0 c - -l < c E 11 It 0 m I1 . . I1 4 w I1 ul I1 - 11 m I1 w m10 0 0 el‘ 3IN Q m 01- cu Q xim m - z14 w In a1 XI 11 - 4 11 I m IO 0 0 m71 . mo~u u m -ai I mm 0 a \In zw 11 I1 0 w I1 . . 11 h N I1 0 II m I1 4 11 I1 m10 0 0 I1 II 0 - I1 . . II 0 u II u II 0 II N I1 II I1 0 01100 .II .. -I v)IIQU, m W IIQw 4 II m 4 I1 4 4 11 N ~“00 11 I1 0 u I1 . . I1 In In I1 h 11 w 11 N 11 I1 000 000 umh Nh m c .- Q h u I- r w I a 0 -l W > w a: W I- m a 9 d a 0 Q) I 0 Q) 4 c Io > 0 U m 2 U U c 4 3 3 aJ > 0 a: L Io C 0 U Q L U Y) 0 n W E s .- a:a W a:+ wm 3w 03 -u zw ea: I a: ww CY= uo a:- wz .C .C wa ax w 0-l wm 55 3- uu w> m a:a .- * VI I- V W 7 0 a: a