HomeMy WebLinkAbout1990-04-03; City Council; 10557; RANCHO DEL ORO/HIGHWAY 78 INTERCHANGE PROJECT STUDY REPORT+
n
0
Fi E Q. Q
.. 2 G
I- o a s z 3 0 o
CITWF CARLSBAD - AGENDWILL 2 (a
AB#,-!? TITLE: DEPT. I
CITY A' MTG. 4-3-90
DEPT.FNG. CITY M
RECOMMENDED ACTION:
RANCHO DEL ORO/HIGHWAY 78
INTERCHANGE PROJECT STUDY REPORT
Council Adopt Resolution No. %-'X& requesting the California Trans.
Commission to adopt a 100% locally funded project to the State Trans
Improvement Program to construct the Rancho Del Oro Highway 78 Intercl
ITEM EXPLANATION:
For a number of years, CALTRANS and the cities of Oceanside and Carls
discussed the potential transportation benefits which would occur with the COI
of a new interchange at Rancho Del Oro Drive and the Route 78 Freeway.
Planning efforts within the area of the interchange in both Oceanside and
require that better defined roadway geometrics and the alignment of MarroI
more closely determined. These refined geometrics will allow other plar
environmental studies to proceed.
The initial step to begin this process is approval by the local agency of the
resolution. This resolution indicates the local agencies' willingness to insur
of the facility and requests CALTRANS to place the project in the State Trans
Improvement Program (STIP) and to initiate a Project Studies Report. (PSF
The Project Study Report (PSR) is a concept document which analyzes pro.
and basic interchange design characteristics. Upon approval of the PSR, the
would be for the City to enter into a cooperative agreement with CAL'
prepare a detailed Project Report proceeding to design and construction.
To date details of how these improvements will be funded have not been c
Incorporated into the proposed resolution is a provision indicating that a Cc
Agreement would not be executed until the financial plan for the interchangf
adopted by the appropriate governmental agencies.
FISCAL IMPACTS:
All costs associated with further development of the Rancho Del Oro interc'
be borne by the property owners. Processing efforts will involve staff time
and management.
EXHIBITS:
1. Resolution No. qb-7 a
I
I
t
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
W 0
RESOLUTION NO 90-82
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAT
CALIFORNIA, REQUESTING THE CALIFORNIA TRANSPORTAT101
COMMISSION TO ADOPT A 100% LOCALLY FUNDED PROJECT TO TH
STATE TRANSPORTATION IMPROVEMENT PROGRAM TO CONSTRUC
THE RANCHO DEL ORO/HIGHWAY 78 INTERCHANGE.
WHEREAS, the City of Carlsbad General Plan designates Marron Road a
lane secondary arterial between El Camino Real and College Boulevard;
WHEREAS, the Highway 78 interchange is closely coupled with adjac
streets and frontage roads, including Rancho del Oro Drive and Marron Road; i
WHEREAS, development of adjacent properties will result in an increase(
traffic; and
WHEREAS, the City of Carlsbad desires to participate with CALTRANS
long term solution to the above problem; and
WHEREAS, CALTRANS currently is planning the widening of the Highw
six lanes in the Rancho del Oro area; and
WHEREAS, the City is prepared to enter into a Cooperative Agreem
CALTRANS for project development and construction of the proposed interchai
NOW, THEREFORE, the City Council of the City of Carlsbad resolves as
1. That the recitals herein above stated are true and correct.
2. That the City of Carlsbad requests CALTRANS to undertake a proj
report and to provide the oversight necessary for development and constructif
Rancho del Oro/Highway 78 interchange.
3. That the City of Carlsbad requests the California Transportation Co
to amend the State Transportation Improvement Program to include constructi
Rancho del Oro/Highway 78 interchange.
r.
1
2
3
4
5 '
7
0
9
10
11
12
13
14
15
X
17
18
19
20
21
22
23
24
25
26
27
20
m e
4. That the City of Carlsbad is committed to secure 100% of the
necessary to develop and construct the proposed project from alternate hnding
including a Mello-Roos Commudty Facilities District Bond Issue, development
contributions, and other agency contributions.
5. That upon final approval of a detailed financing plan for Zone 25, M
include construction of Rancho del Oro/Highway 78 interchange and related
improvements, the City will enter into a Cooperative Agreement for ha
development and construction of the proposed project.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Cads
Council held on the 3rd day of April , 1990 by the following vote, to wit:
AYES: Council Members Lewis, Kulchin, Pettine and Larsor
NOES: None
ABSENT: None
ABSTAIN: Council Member Mam
r
ATTEST:
&J$&
METHA L. ~~EN'A~EZ~
(SEAL)