HomeMy WebLinkAbout1990-06-05; City Council; 10661; Approval Consultant Agreement for Design Services for El Camino Real and Palomar Airport Road Project 31660 0 o= 9 4 z 0 .. E a A 2 5 s 0 AUtNvLL Ut GAHLSUAU - 1 . '=, c q AB#- MTG, DEPT. TITLE: APPROVAL OF CONSULTANT AGREEMENT 6/5/90 FOR DESIGN SERVICES FOR EL CAMINO REAL AND PALOMAR AIRPORT ROAD, CITY E DEPT, ENG: MP PROJECT NO. 3166 CITY b RECOMMENDED ACTION: Adopt Resolution No. qfl-/6 f approving a consultant agreement : design services for the future improvements to El Camino Real i Palomar Airport Road, Project No. 3166. ITEM EXPLANATION: In previous Capital Improvement Program budgets, the City Counc appropriated funds for the future widening of portions of El Cam Real and Palomar Airport Road. Recently, the development detailed zone plans through the City's Growth Management Prog: indicate the need for future. widening of both El Camino Real 4 turning movements at several key intersections in this corridc Palomar Airport Road to accommodate anticipated traffic volumes ; The scope of work outlined in the attached consultant agreemc will include the following: Development of alignment alternatives for El Camino Real i Palomar Airport Road. Please reference attached Exhibit 1 : a depiction of the project area. Development of alternatives for the interim and ultimi configuration of the El Camino Real and Palomar Airport Rc intersection. Identification of right-of-way requirements includ. preparation of acquisition plats, legal descriptions, and otl appropriate documents and reports. Preparation of formal plans, specifications, and contr< documents for the construction of improvements which w include : - All field survey and aerial topographic mapping. - All hydrology and hydraulic studies and reports. - Development of preliminary and final grading, slc stabilization, drainage facilities, traffic contrc signing and striping, intersection control, construct. phasing, and related construction documents. - Development of a utility extension and relocation plan - Development of a landscape and irrigation plan. - All geotechnical services. - All environmental services and studies. e Q Page 2 of Agenda Bill No. P"D, Ah/ The alignment alternatives and preparation of the construct plans and specifications will provide the City with key informat regarding the ultimate improvement of El Camino Real and Palo: Airport Road in advance of surrounding private development. particular, right-of-way requirements, roadway alignments, intersection configurations will be identified for this corri, on a more detailed and comprehensive basis so that the ultim development of adjacent private properties will occur consist with the required roadway infrastructure improvemen Additionally, there is an increasing need to proceed with planning and implementation of a comprehensive roadway intersection strategy for this corridor of two (2) prime arter streets. P & D Technologies, currently under contract with the City, previously selected as the most qualified firm to perform ot design work on Palomar Airport Road, west of El Camino R immediately adjacent to this project area. The scope of work this project must be closely coordinated with the design servi already underway on Palomar Airport Road extending through to City of San Marcos. In particular, soils investigatio environmental studies, right-of-way requirements, traffic analys utility alignments, and roadway geometrics must be clos coordinated from one project to the other. For these reaso P & D Technologies is considered to be the most qualified firm provide the design services for this project. Additional staff's ability to oversee and manage the design process will considerably more efficient and economical in dealing with one design firm. Construction of the ultimate improvements is anticipated to phased to meet the individual zone plan requirements previou considered by the City's Growth Management Program. As an examp duel left-turns and an additional westbound lane on Palomar Airp Road is the first priority improvement for the intersection. additional priority improvement is the completion of the County San Diego owned frontage on El Camino Real between Faraday Palomar Airport Road. The project will ultimately improve balance of all County of San Diego frontage within the proj area. FISCAL IMPACT: The attached consultant agreement provides for a lump sum fee $238,260. The City Council has previously appropriated funding the improvements to El Camino Real and Palomar Airport Road in following amounts: Account No. 152-820-1840-3166 Account No. 305-820-1840-3166 $300,500 $250,000 Substantial additional project funding will be required in or to construct the ultimate improvements to El Camino Real Palomar Airport Road. Last year, the City Council approved agreement with the County of San Diego in which the County w m e Page 3 of Agenda Bill No. /fl, &&/ deposit with the City a total of $2,750,000, over time, for County's estimated share of frontage improvements. Future priv, development adjacent to El Camino Real and Palomar Airport Rl within the project area will be responsible for funding a la with the alignment studies and development of plans specifications for the improvements to El Camino Real and Palo Airport Road at this time. The design work will generate speci roadway development strategies, construction drawings specifications, and detailed cost estimates for both the inte and ultimate future improvements. Staff recommends the City Council approve the attached consult agreement with P & D Technologies and proceed with the design w on El Camino Real and Palomar Airport Road. portion of the ultimate improvements. Staff recommends proceed EXHIBITS : 1. Location map. 2. Resolution No. %-/b d approving a consultant agreement design services for El Camino Real and Palomar Airport Ro Project No. 3166, 3. Consultant Agreement. L L L~CATION MA? ,JJ FARADAY AVENUE 1 1 u1 > E n ....................... ........................ f- //////////I ///////////gam 3 0 U E 4 > LEGEND La AREA TO BE IMPROVED 1 PROJECT NAME EX^ PROJECT X EL CAMINO REAL AND PALOMAR AIRPORT ROAD WIDENING 3166 * e 0 AGREEMENT FOR EL CAMINO REAL AND PALOMAR AIRPORT ROAD WIDENING THIS AGREEMENT, made and entered into as of the , by and between the CITY OF CARLSBAD, a municipe corporation, hereinafter referred to as llCity,ll and P b Technologies, hereinafter referred to as llConsultant.ll RECITALS City requires the services of an engineering consultant t provide the necessary design services for preparation of plans ar specifications for El Camino Real and Palomar Airport Rol Widening; and Consultant possesses the necessary skills and qualificatior to provide the services required by the City; NOW, THEREFORE, in consideration of these recitals and tk mutual covenants contained herein, City and Consultant agree i follows: 1. CONSULTANT'S OBLIGATIONS PHASE 1: PRELIMINARY DESIGN The goal of this study is to evaluate several improvemer alternatives, identify one which best serves the needs of the Cit] and prepare an ultimate geometric layout plan. This plan will 1: used to develop criteria for final design, outside agenc coordination, and preliminary right-of-way acquisition discussions The scope of work for this study is as fallows! e 0 A. Field and Aerial Survey Services: (1) Establish aerial control network, horizontal a1 vertical control grid and calculations. (2) Fly, aerial photograph and prepare scribed 1 inc = 40 feet scale base topographic map with 2 foot contour interva: Area of coverage to be 1,000 feet north, south, east and 4,000 fec west of intersection and 200 feet wide for each leg. (3) Supplemental field work to include utili. line/structure markout and location. B. Traffic Enqineerinq Services: (1) Meet with City staff to identify ultimate traff: volumes and related criteria. Data required is available . various City zone plans. (2) Review City-provided data, related criteria ai previous studies. Evaluate geometric requirements. (3) Prepare up to three alternative configuratic layouts in sketch form. These may include concepts with free-rig1 turn lane, exclusive right turn bay/lane or urban interchanc scenarios. Improvements to avoid relocation of the existi] Pressure Reducing Station at the southeast corner of El Camino Re, and Palomar Airport Road will be considered. (4) Present alternatives to City staff for discussil and selection of a preferred final recommendation. (5) Prepare a short report identifying methodology us( and conclusions reached in analysis. e e (6) Finalize sketch showing lane configuration, lar widths, stacking lengths, signal type (standard or bridge) ar pedestrian/bicycle accommodations. C. Civil Ensineerins Services: (1) Research utilities and plot on base topo map. (2) Calculate and plot existing centerline, right-ol way and property lines on base map. (3) Review drainage and recommend necessa~ improvements. (4) Prepare final geometric layout concept plz including final geometrics, lanes, islands, medians, etc. dimensions: existing and required right-of-way: and requirG drainage improvements. (5) Present final plan to City. PHASE 2: FINAL DESIGN Two sets of plans and specifications shall be prepared fc construction purposes. The first set shall include tl improvements listed: (1) Full-width Prime Arterial Improvements on El Camir Real from Faraday Avenue to Palomar Airport Road. Prelimina~ plans have already been completed for this area. Copies of the: plans will be provided to the consultant. These improvements mua be designed to coordinate with the addition of right-turning lanc as determined in Phase 1 above. (2) One additional lane on the south side of Palom? Airport Road from El Camino Real to join improvements 1,000 fee east of El Camino Real. Q rn (3) One additional left-turn lane on all but.the sout leg at the intersection of El Camino Real and Palomar Airport Roac The second set of plans and specifications shall include tl improvements listed: (1) Widening of El Camino Real and Palomar Airport, Roz to full-width Prime Arterial Standards plus additional right-tu1 lanes. Right-turn lanes will not be required on the southwes corner I (2) Widening of Palomar Airport Road from El Camino Ret to the west to joint existing full-width improvement (approximately 4,000 feet westerly). (3) Prepare contract documents, including specit provisions: provide typed original and disk readable I: Wordperfect. (4) Provide time to complete construction contract. (5) Prepare striping, signing and signal modificatic plans. Modify traffic signals at El Camino Real and Palam; Airport Road and at Palomar Airport Road and Yarrow Drive. (6) Prepare detour, phasing and traffic control plans (7) Provide preliminary title reports and tit1 searches. (8) Prepare right-of-way and slope easement plats, leg; descriptions and deeds for each parcel. (9) Coordinate with City-selected soils engineer a1 incorporate recommendations of the soils engineer into the plal and specifications. 0 e (10) Prepare landscape and irrigation plans. Landscape medians will be required on El Camino Real and Palomar Airpor Road. Plans and specifications shall include the following: (1) Prepare plans in ink on mylar on screened topo mz using 1'' = 40' scale and exaggerated vertical scale. (2) Include in the improvement drawings cross-sectic sheets showing existing ground and proposed improvements at leas every 100 feet. In some cases, cross-section drawings may I: necessary at closer intervals and those should be included. Alsc include 40 scale right-of-way drawings showing both existing ar proposed right-of-way and the parcel boundaries abutting the right of-way. (3) Prepare detailed quantity calculations fc excavation and embankment and all other items of work to k performed in the construction contract. Prepare a mass diagran Include shrinkage or bulking factor in earthwork calculations. (4) Prepare typed list of contract items to be includc in contract documents. (5) Prepare detailed calculations and summary sheet c Engineer's Estimate. 2. CITY OBLIGATIONS The City shall provide: A. A sufficient number of blank mylar plan and plan/profil standard drawing sheets with title block. e e B. One copy of l1boilerplateV1 standard language for contrac documents of the contract, bond forms and general provisions c disk compatible with Wordperfect. C. The City will hire a soils engineering consultant wk will prepare a preliminary soils report, take R-value tests a1 recommend a road structural section. D. The City will provide copies of City studies, drawings and traffic reports as appropriate and meet with Consultant I review design. 3. PROGRESS AND COMPLETION The work under this Contract will begin within five (5). da.1 after receipt of notification to proceed by the City and 1 completed as follows: Phase 1 Work: 210 calendar days Phase 2, First Bid Set: 300 calendar days Phase 2, Second Bid Set: 300 calendar days Extensions of time may be granted if requested by tl Consultant and agreed to in writing by the City Engineer. : consideration of such requests, the City Engineer will gil allowance for documented and substantiated unforeseeable a] unavoidable delays not caused by a lack of foresight on the pal of the Consultant, or delays caused by City inaction or othc agencies' lack of timely action. 4. FEES TO BE PAID TO CONSULTANT The lump sum fee payable according to Paragraph 5, @IPaymel of Fees,lI shall be $238,260.00. No other compensation for services will be allowed except those items covered by supplement; Q e agreements per Paragraph 7, IIChanges in Work.11 5. PAYMENT OF FEES Payment of fees shall be monthly based upon work completed ar in accordance with Exhibit A attached, Consultants Fee Schedule Schedule for completion of services shall be as per IIEXHIBIT Bt 6. FINAL SUBMISSIONS Within fifteen (15) days of completion and approval of tl final design, the Consultant shall deliver to the City the iten prepared as stated in paragraph 1 above. 7. CHANGES IN WORK If, in the course of this Contract and design, changes se6 merited by the Consultant or the City, and informal consultatior with the other party indicate that a change in the conditions c the Contract is warranted, the Consultant or the City may requez a change in Contract. Such changes shall be processed by the Cil in the following manner: A letter outlining the required change shall be forwarded to the City by Consultant to inform them of tl proposed changes along with a statement of estimated changes i charges or time schedule. After reaching mutual agreement on tl proposal, a supplemental agreement shall be prepared by the Cil and approved by the City Council. Such supplemental agreemel shall not render ineffective or invalidate unaffected portions ( the agreement. Changes requiring immediate action by tl Consultant or City shall be ordered by the City Engineer who wi: inform a principal of the Consultantls firm of the necessity t such action and follow up with a supplemental agreement coverii such work. Q e 8. DESIGN STANDARDS The Consultant shall prepare the plans and specifications i accordance with the design standards of the City of Carlsbad an recognized current design practices. Applicable City of Carlsba Standards and Regional Standards shall be used where appropriate Copies of such standards shall be obtained from the City c Carlsbad. 9. COVENANTS AGAINST CONTINGENT FEES The Consultant warrants that their firm has not employed c retained any company or person, other than a bona fide employe working for the Consultant, to solicit or secure this agreement and that Consultant has not paid or agreed to pay any company c person, other than a bona fide employee, any fee, commissior percentage, brokerage fee, gift, or any other consideratic contingent upon, or resulting from, the award or making of thi agreement. For breach or violation of this warranty, the Cit shall have the right to annul this agreement without liabilitm or, in its discretion, to deduct from the agreement price c consideration, or otherwise recover, the full amount of such fee commission, percentage, brokerage fee, gift, or contingent fee. 10. NONDISCRIMINATION CLAUSE The Consultant shall comply with the State and Federi Ordinances regarding nondiscrimination. 11. TERMINATION OF CONTRACT In the event of the Consultant's failure to prosecutt deliver, or perform the work as provided for in this Contract, ti City may terminate this Contract for nonperformance by notifyin5 0 e the Consultant by certified mail of the termination of tk Contract. The Consultant, thereupon, has five (5) working days t deliver said documents owned by the City and all work in progre5 to the City Engineer. The City Engineer shall make a determinatic of fact based upon the documents delivered to City of tl percentage of work which the Consultant has performed which : usable and of worth to the City in having the Contract complete( Based upon that finding as reported to the City Council, tl Council shall determine the final payment of the Contract. 12. DISPUTES If a dispute should arise regarding the performance of WOI under this agreement, the following procedure shall be used 1 resolve any question of fact or interpretation not otherwi: settled by agreement between parties. Such questions, if tht become identified as a part of a dispute among persons operati] under the provisions of this Contract, shall be reduced to writii by the principal of the Consultant or the City Engineer. A co] of such documented dispute shall be forwarded to both partic involved along with recommended methods of resolution which wou: be of benefit to both parties. The City Engineer or principi receiving the letter shall reply to the letter along with recommended method of resolution within ten (10) days. If tl resolution thus obtained is unsatisfactory to the aggrieved part: a letter outlining the dispute shall be forwarded to the Cii Council for their resolution through the Office of the Ci' Manager. The City Council may then opt to consider the directc solution to the problem. In such cases, the action of the City 0 e 1 Council shall be binding upon the parties involved, althoug nothing in this procedure shall prohibit the parties seekin remedies available to them at law. 13. RESPONSIBILITY OF THE CONSULTANT The Consultant is hired to render professional services a designing and drawings for El Camino Real and Palomar Airport Roa Widening and any payments made to Consultant are compensatio solely for such services. Consultant shall certify as to th correctness of all designs and sign all plans, specifications, an estimates furnished with Registered Civil Engineer's number, (a Landscape Architectls registration number.) 14. SUSPENSION OR TERMINATION OF SERVICES This agreement may be terminated by either party up0 tendering thirty (30) days written notice to the other party. I the event of such suspension or termination, upon request of th City, the Consultant shall assemble the work product and put Sam in order for proper filing and closing and deliver said product t City. In the event of termination, the Consultant shall be pai for work performed to the termination date: however, the tota shall not exceed the guaranteed total maximum. The City shall mak the final determination as to the portions of tasks completed an the compensation to be made. Compensation to be made in complianc with the Code of Federal Regulations. 15. STATUS OF THE CONSULTANT The Consultant shall perform the services provided for herei in Consultantls own way as an independent Contractor and in pursui of Consultantls independent calling, and not as an employee of th e e 1 City. Consultant shall be under control of the City only as t the result to be accomplished and the personnel assigned to th project, but shall consult with the City as provided for in th request for proposal. The Consultant is an independent contractor of the City. Th payment made to the Consultant pursuant to this contract shall b the full and complete compensation to which the Consultant i entitled. The City shall not make any Federal or State ta withholdings on behalf of the Consultant. The City shall not b required to pay any workers' compensation insurance on behalf o the Consultant. The Consultant agrees to indemnify the City fa any tax, retirement contribution, social security, overtim payment, or workers' compensation payment which the City may b required to make-on behalf of the Consultant or any employee of th Consultant for work done under this agreement. The Consultant shall be aware of the requirements of th Immigration Reform and Control Act of 1986 and shall comply wit those requirements, including, but not limited to, verifying th eligibility for employment of all agents, employees, subcontractor and consultants that are included in this agreement. 16. CONFORMITY TO LEGAL REQUIREMENTS The Consultant shall cause all drawings and specifications t conform to all applicable requirements of law: Federal, State ar local. Consultant shall provide all necessary supportir documents, to be filed with any agencies whose approval j necessary. 0 0 1 The City will, provide copies of the approved plans to an other agencies. 17. OWNERSHIP OF DOCUMENTS All plans, studies, sketches, drawings, reports, an specifications as herein required are the property of the citm whether the work for which they are made to be executed or not In the event this Contract is terminated, all documents, plans specifications, drawings, reports, and studies shall be delivere forthwith to the City. Consultant shall have the right to mak one (1) copy of the plans for his/her records. City shall not us any of the documents produced by the consultant for any purpos other than the improvements identified herein. 18. HOLD HARMLESS AGREEMENT The City, its officers, and employees shall not be liable fo any claims, liabilities, penalties, fines, or any damage to goods properties, or effects of any person whatever, nor for persona injuries or death caused by, or claimed to have been caused by, o resulting from, any intentional or negligent acts, errors o omission of Consultant or Consultant's agents, employees, o representatives. Consultant agrees to defend, indemnify, and sav free and harmless the City and its officers and employees agains any of the foregoing liabilities or claims of any kind and any cos' and expense that is incurred by the City on account of any of thc foregoing liabilities, including liabilities or claims by reaso: of alleged defects in any plans and specifications. e 0 1 19. ASSIGNMENT OF CONTRACT The Consultant shall not assign this Contract or any par thereof or any monies due thereunder without the prior writte consent of the City. 20. SUBCONTRACTING If the Consultant shall subcontract any of the work to b performed under this Contract by the Consultant, Consultant shal be fully responsible to the City for the acts and omissions o Consultantls subcontractor and of the persons either directly o indirectly employed by the subcontractor, as Consultant is for th acts and omissions of persons directly employed by Consultant Nothing contained in this Contract shall create any contractua relationship between any subcontractor of Consultant and the City The Consultant shall bind every subcontractor and ever: subcontractor of a subcontractor by the terms of this Contrac, applicable to Consultant's work unless specifically noted to th contrary in the subcontract in question approved in writing by tht City. 21. PROHIBITED INTEREST No official of the City who is authorized in such capacity 01 behalf of the City to negotiate, make, accept, or approve, or taka part in negotiating, making, accepting, or approving of an: architectural, engineering, inspection, construction or materia; supply contractor, or any subcontractor in connection with thc construction of the project, shall become directly or indirect11 interested personally in this Contract or in any part thereof. Nc officer, employee, architect, attorney, engineer, or inspector of e 9 1 or for the city who is authorized in such capacity and on behal of the City to exercise any executive, supervisory, or othe similar functions in connection with the performance of this Contract shall become directly or indirectly interested personall in this Contract or any part thereof. 22. VERBALLY AGREEMENT OR CONVERSATION No verbal agreement or conversation with any officer, agent or employee of the City, either before, during, or after th execution of this Contract, shall affect or modify any of the term or obligations herein contained nor such verbal agreement oJ conversation entitles the Consultant to any additional paymeni whatsoever under the terms of this Contract. 23. SUCCESSORS OR ASSIGNS Subject to the provisions of Paragraph 18, "Hold Hannles: Agreement," all terms, conditions, and provisions hereof shal: insure to and shall bind each of the parties hereto, and each 0: their respective heirs, executors, administrators, successors, anc assigns. 24. EFFECTIVE DATE This agreement shall be effective on and from the day and yeax first above written. 25. CONFLICT OF INTEREST The Consultant shall file a Conflict of Interest Statement with the City Clerk of the City of Carlsbad in accordance with the requirements of the City of Carlsbad Conflict of Interest Code. 26. INSURANCE The Consultant shall obtain and maintain a policy of liability e 9 1 insurance from an insurance company authorized to be in bushes in the State of California, in an insurable amount of not less tha one million dollars ($1,000,000) . This insurance shall be in forc during the life of this agreement and shall not be cancell€ without ten (10) days prior notice to the City. The City shall be named as an additionally insured on thi policy. The Consultant shall furnish a certificate of sai insurance to the City upon request. IN WITNESS WHEREOF, we have hereunto set our hands and seals. P & D TECHNOLOGIES: CITY OF CARLSBAD: Mayor lL4g PR~%/&q" Title APPROVED AS TO FORM: ATTEST: Assistant City Attorney City Clerk a EXHIBIT "A" I) TASK COST REPORT CITY OF CARLSBAD 2075 LOS PAM DRIVE CARLSBAI), CA. 92009 PALW AIMRT RD CONTRACT I1 DESIGN FAR Project Hw:ROGER HOCKING, P.E. run time ) ~01:14:49 ** 01-01-1980 page 1 """""""""""""""""""""""""""""""""""""""""""""""" COST IN DOLLARS DATE WTAL clmgH ACTIVITY / TASK START FINISH WRS LABOR DIRECT TOTALS ................................................. 100 DATA COLLECTION 110 Gather Reference Data 56/01/90 06/15/90 64 3780 275 4055 120 Define New Data Requirements 06/01/90 06/15/90 14 960 0 960 SUBTOTAL TASK 100 SERIES 06/01/90 06/15/90 78 4740 275 5015 200 FIELD SURVEYS 210 Control Surveys 06/15/90 06/30/90 32 3600 0 3600 220 Field Verify Aerial Tow Map 08/15/90 08/30/90 24 2560 0 2568 230 Ebundarv Ties 06/01/90 08/30/90 28 3260 0 3260 240 Supplemental Ground Survevs 06/01/90 08/30/90 65 5679 0 5679 SUBTOTAL TASK 200 SERIES 06/01/90 08/30/90 149 15107 0 15107 300 AERIAL TOPOGRAPHIC HAPPING 310 Aeridl Photography 06/15/90 06/29/90 0 0 2200 2200 320 Color Photoaaphy (40 Scale) 06/15/90 06/29/90 0 0 1650 1650 SUBTOTAL TASK 300 SERIES 06/15/90 08/01/90 10 850 11550 12400 330 Prepare Mapping 07/01/90 08/01/90 10 850 7700 8550 400 HvdroloEy 1 Hydraulics 410 Roadway Hydrology 06/01/90 07/15/90 40 2350 0 2350 420 Hydrolow/Hydraulics Report 06/01/90 07/15/90 67 3379 0 3379 SUBTOTAL TASK 400 SERIES 06/01/90 07/15/98 107 5729 0 5729 500 PRELIHINARY ROANAY DESIGN 510 Gradinr: / Slope Stabilization 08/01/90 09/15/90 520 Roadway Layout 08/01/90 09/15/90 530 Drainage Pacilltla ~eslm oeiollw ~W1.5190 540 Traffic control concept plans 08/01/90 09/15/90 550 Intersection Controls 08/01/90 09/15/90 560 LANDSCAPE ARCHITECRURE 08/01/90 09/15/90 570 Utilitv Extension 1 Relocation ORlOll90 09/15/40 580 Preliminary Electrical plans 08/01/90 09/15/90 590 Coordinate With SDGBE 08/01/90 09/15/90 591 Quantities and Cost Estimate 09/07/90 09/15/90 SUBTOTAL TASK 500 SERIES 08/01/90 09/15/40 96 #180 0 118 6910 0 60 3312 0 30 2340 0 48 3172 0 0 0 4400 108 6446 0 0 0 2200 0 0 1100 68 4020 0 528 32880 7700 6180 6910 3312 2340 3172 4400 6946 2200 1100 4020 40580 e 0 TASK COST REPORT (COntinUedi CITY 9F CARLiNAD 2075 L9s PALMS DRIVE CARLSBAIZ, CAz 92009 PALW A1RmP.T RP CONTRACT I1 PESIGN PAR Prrr jH? %r ; RGER HKKINCI, PI E : run tiae j )01:15:54 ** 01-01-1980 P@e 2 --"-----"--""-""""""""""""""""""""""""""""""""""""""" COST IW DOLLAR8 ACTIVITY / TASK START FINISH HOURS LABOR DIRECT TOTALS BATE: TOTAL Om8 600 FINAL ROAMAY PSBE """""""""""""""""""""""""""""""""""""""""""""""" 610 Plan Set 611 Striping and Signing plans 10/01/90 02;01/91 50 3940 0 3940 612 Traffic Signal Plans l0/01/90 02/01/91 104 8390 0 8390 613 Traffic Control Detour Plans 10/01/90 02/01/91 68 5612 0 5612 '. 614 Electrical Plans & Specs. 10/01/90 02/01/91 0 0 3300 3300 615 LANDSCAPE ARCHITECTURE 10/01/90 02/01/91 0 0 6050 6050 616 Seuer Extensions/Hodification 10/01/90 02/01/91 32 2232 0 2232 617 WATER UTILITY HODIFICATIONS 10/01/90 02/01/91 0 0 5500 %Or) 618 Plan and Profile sheet Rep, 10/01/90 92i01/91 329 19480 660 2096? 619 GradinR and Drainage Plans 10/01/90 02/01/91 188 10450 0 10450 630 Quantities And Cost Estimates lololi90 02/01/91 32 3100 Q 3100 640 Independent Ouant.& Cost Check 10/01/90 02/01/91 66 3560 0 3560 SJJE75TAL TM 60U SIRIES ioloiisa ozioilsi 956 61016 15510 76526 620 sWd.fiCatiQM lO/Ol/90 02/01/91 @J 4332 g 432 7QQ RIGHT-BF-WAY EAIMERINrr 710 Rwearch Wndary/~nership 08/15/90 09/15/90 10 500 2200 2700 720 pmelir. R/W Ws ~ssessilent 08lUi90 09/15/90 32 2252 0 22% ?3!J Right Of WdY DmUiW 94/13/91 1z/ae/3o 104 6209 0 5268 740 Construction Easements 09/15/90 12/30/90 48 2700 0 2700 750 kgal Descriptions 09/15/90 12/39/90 98 4660 0 4860 SUBTOTAL TASK 700 SERIES 00/15/90 12/30/90 292 16592 2200 18792 800 CITY PUN CHECKS / PERHITS 810 City Plan Checks 811 nelim, Plan 09/15/90 U9/30/90 4 300 0 39 812 Final Design 100% Corplete 02/01/91 02/15/91 4 360 798 1178 420 Peraits 01/01/91 02/01/91 0 0 350 550 830 R/W Docunent Reviews 01/01/91 01/15/95. 4 380 330 710 SUETOTAL TASK 869 SKRIES 09/15/90 02/15/ 91 12 I140 1678 2010 900 PRQJECT HANAGBENT / COORDINATION 910 Project nanaesent 06t01/9u 02/15591 a2 7190 0 7190 920 Progress Meetings 06/01/90 02/15/91 60 5050 0 5050 93Q Coordination with Utilities 06/01/90 02/15/91 32 2800 550 3350 940 Quality Control and Assurance 06/01/90 02/15/91 42 3890 825 4715 950 utter Agency Coordination 06/01/90 02/15/91 56 4320 0 4320 , SUBTOTAL TASK 900 SERIES 06/01/90 02/15/91 272 23250 1375 . 24625 1000 GEOTECHNICAL SERVICES 06/15/90 08/15/90 0 0 25300 25300 SUBTOTAL TASK 1000 SERIES 06/15/90 08/15/90 0 0 25300 25300 CITY OF CARLSBAD e PALOMAR AIRPORT 9 CONRACT I1 2075 LOS PALMS DRIVE CARLSEAD, CA. 92009 DESIGN PAR Project t4gr:ROGER WING, P.E. run time j )01:18:38 ** 01-01-1980 Pee 3 ................................................ COST IN DOLLARS ACTIVITY / TASK START FINISH HOURS LABOR DIRECT TOTALS DATE TOTAL OTHER """""""""""""""""""""""""""""~""""""""""""""""""~ 1100 EHVIRMENTAL SERVICES 1110 INITIAL STUDIES 06/15/90 08/15/90 0 0 1749 1749 1120 BIOLOGICAL RECONNAISSANCE 06/15/90 08/15/90 0 0 2800 2800 1130 CULTURAL RESOURCE 06/15/90 08/15/90 0 0 1320 1320 SUBTOTAL TASK 1100 SERIES 06/15/90 08/15/90 0 0 5869 5869 1200 IRRIGATION SERVICES 1210 IRRIGATION DESIGN & SPECS. 08/15/90 10/30/90 0 0 5500 5500 SUBTOTAL TASK 1200 SERIES 08/15/90 10/30/90 0 0 5500 5500 -"""""""""-"""""""""""""""""""""~""""~"""""""""~""" 2404 161304 76956 238260 ***X TOTALS *X** Resource code Average Rate """""""""" """""""- A = PRINCIPAL 125.00 B = PROJECT WAGER 95.00 C = PROJECT ENGINEER 75.00 D = ASSCC. ENGINEER 68.00 E = ASST. ENGINEER 50,OO F = TECHNICAN 45.00 G = DRAFTER/CADD OPER. 45.00 I = SURVEY CREW 129 9 00 J = WRD PROCESSOR 45.00 n = REG. SURVEYOR 85.00 sac:,;;; : :,."&.-.. T sQ+EZ-$jE m EXHIBIT "B" 0 223 OF i#,?SBfi$8 <#,L,tSBg&I, CA, ?2!j$j ," . 7c ' ,- -. L-. !I! /,I - Li!k, PALfrlfiS ;:l!I!iE "ALCNAR AIRp$T zr; cG!jc&;; TT LA c!ggI(J,j PAR Prgj& $43r;R&&E &~~~~$. ;,Es :..:.ir, ,;fie ;. )o[l:08:51 ** [i1-01-198[l pa':? I """""""""""""""""~"""""""""""""~~"""""""--"-"-"----------------"--"---------------- t&j 6 6, c, 7 - 8 ; 'j :? !i; I$ il ;i ii i: 1; I L ., '/ ijiJ 1 15 23 1.2 27 io 24 7 2: 5 iq 2 ;6 >$ :it J 14 -7:: ~,-: 11 25 2 2; i, L :2 1" ILL . ry .. t2$ :;{I q :qrj -30 :jq 30 :jg ,;$ 30 :;it :!O 30 '30 s?" 't$ 4; 4; 31 .;; ~ __ """"__""""""""""""""""~""~~""""""~"""""""""""""""""-"-""""""""""""" .. .. j .i i.1.j. i. { .i.i.i. ,. i .i .i.i.i.i { ./.i.i. f i j.I.i.i.i .i.i.i.;. 1 i .i .;.i.i, ; [ .{ ./.!.I. i 4 .j ,i.i. $ 1 ,I ./.!.I. E .i .i.i. i. [. t i .i.i. i. b 4 .i.:.i. j. 1 j .I ,j.i. i ... .. i !jg $$id ;:cLiJCTI& I. i io &&her Refererice Dat,a i:;:;-G.f,i. j. 4 .I.;.,. i i 4 .i.i.i. i j 1.i.i. i i i .i,i.I. 1 .i .(.i.!. .I 1. j , { .i'.i.; .i ' iL2.i +fine keg c1at.2 Rpq:.i~rem~fi~:~ p".;.;. f ; .i.i.!. f i 4 .!.i.i. 1 4 ././.I. t : j 4 .i.j_i. r { _i.i_!_ 1 j f .;.!.I. i ::;;$TOTAL Tss<, 160 SERIES t:~'~-~.i.~.?~.~.i.~.~~~.~.i.i.~i.~.~.~.~.i{.~.~.~.~.ij.~.i.!~.~.~.~.i.~ r. If a. If 2. . ?. i i i .i.j.i. } 4 .i .I./. + i j ,i.i.i. 6 .! .! ,i.i. 1 1 4 .j ./.I. 1 i _i.i. j. i j j .i.'. 1. i 1 .i .\.!.I. i ,i .I .;./_ /. j i .i.j.I. i. i ,j ,i.i. [ j 4 .I .j.j. ? 4 .i.i.i. I ; ./ .{./. j. ! 1. i .I II 1 i Jfii:; FIELD ~~&l~~~ 210 Cc;nj.rai Sl~rvey.: ". &-I . - '2 . ,,,..I/ .. . Flpi.i verifii Aeri& 7," 1 :gpJ #2p 220 Eot-jridary 7 1 e5 241 s~.ipp]cme&I Grot.tp,i Sur:veys SiBTOTgL iHS# 250 SERIES 'jc<! GERIAL T!jposRAPHIC /@PPIfjfi ?1<! &rlal &" li1t.S -rraphy j 'yM __ ,, r- -.i~:or Pt;r_;;trJq-&y [4[! Scaip) .j2!! PrEparg &ppiri3 ". ~jB~<l~& ?&!3: 3cfi SERIES +$ iI SYd .. ilra-.io3y .-, i hydraulics 4 i D W~atjway Hydroi ~qg 4'20 Hydroiogi!ti\i3ial.l!irr. fieport $I~~~QT~L TASK 490 SERIES 50[! PRELifiIfjARY EQ@dfiy DESIGN Ziij Grading j Sil:lpe St.&;lirat.im C;-+ dLLj kcadway Lay1:& .J.:U Drair!age facilities Design 540 Traff ir cot-krol cormpt. pfam 550 Irit.erz.ect.icfn Ccfr+,rc.ls 560 LAfiDSCKfi &RCYITECRI$E 576 ilt.iiitj, Ext.en~icln & j&lacatiorf Stir:! Frelisiffary Ejectricaj p!at;s 596 !::oor&r& Mitis SD&E 591 &.iani.it.ies and Cast E5t.i;Rat.e 3jETOSAL T$& 50[! SERIES IT.-, - Pfi[!.jECT SMED!ii-i icantlrwd) e 0 ZITi{ OF CA&siiAp .- - 7c . - .-. Li.I JJ Lt-h pm&s DRIVE iAftLSEc&, c;, ':120[19 p&riMf,( ;Ip"jig, LI ~ 511 C@$TRicT iI DESiCfi P$jR Project. i4gr:F:iJER HOCKING, ?.E, r;.irl t.1me :j. >Qf!:!I:r:25 f* [11-01-19#0 """""""~"""""""""""" """"""""""~""""""""" t,ilii ,#, q:Vk l Qk ,:'f+L{?\r: k~~~>h~! &E " 610 pisrj Set. 6ii Striping 3rd Sleing pl~m i:12 Tfat'flc $ly)naT Plans 614 Elect.rlilal Piatis pi 4ec5;. <:!3 Traffic Cc;ritro! Bet.nur piarls 6j5 IAjtJ[>SCAPE AR[j-iITEi;TI-IRi 616 Swer E:~t.ensionsi~aciiiicat.ion 617 WA?EF! UTILITY MODiFiCfrTiirNS 616 Plan and Profile jheet Prep. <-I9 Grading avid Dramge Pians 628 SF*ciflc&ims 630 QiJant.itie; bd Cpst. Est.lnat.er, 640 ItdWE&nt. QuxI~.~? C05k Check SliBTrjTkL TfrSK 604 S&IES 7.- .-. ;IJI> RI&/T-[lF-HRf E&I)jEEF.rI)jG 710 Research iiourdaryiOmerd-iip 728 Prelim, R/W Meeds Azsessmt - .I ,-. /)I Right. of Nay Brawitw ?do &&~~.&i~~ &sep,&r, 756 Legal i&5cr ipi; i orj5. SgE;TGT& TgsK 700 SEF.riE$ 500 c~f! ?~g,td CHECKS i PE~~MITS SjO [:;t.y Plan ck&s 811 Prella. Flan 812 Flnai iteslm loox i:omplef,e :5;2[i Pg-mit.5 o.>ij h/W fj~ct.~m&. &vi ~5 $EGTijS$i i&# $o[t SERIES i'rn .-. ?Uil PRKECT WAt4AGEMEMT I CMtlRDINATION 910 Pro-&. fianageir&. :- r - !dl Progresj Heet.1ngs 940 kality Cot;trol arid ks;uratxe S!..iETQT& T93; 9iiO SERIES :%<I toordinat-ion w1t-h ijti lit.ip_f r" ?XI Other A~WIC~ Coaraination iijC0 GEfiTECHNIC$L SER\iICES SgIjTrjTAL TfiSK 101]f! SERIES .~ .~ ~~- ~~ ". ."A, e cpy [!F .I.$LS&[:I 0 pAL$fl@ ;IRPgF,i 'Rp CgkTgfiCT ;I -.n;r ' 1$ p$dfis I$J& [jESI$j ,DGR t:$i&b3 !-,G. ~~~~i~ .;~QJ& %gr:Ritii?fiER .&!ciriI!&? -?,E. r:.jyi t.18~ j. :;[IC: 12: 12 *+ !j]-ij1-1'3@J p$ze .: .................................................................... " 6 6, E, 7 7 :-. 3 8 '3 4 Ir:i 10 1: ;; i;, 12 12 1 112 y;I 90 j1] zjp :jl fig 78 go 39 'j; ji JjO 90 31 y\ 90 40 'ji 3) 'j\ $1 QD i 15 2'3 YJ 2; 19 24 7 21 j 1.3 2 :b .<t 14 ,>e, 1 1 25 8 2: ............................................................... % i ./ .I , .;. 1. .I k .i .I .I. I. $ j .I .I .i. j. ; .I _I ,I. j. : j .i .I ,I_ 1. t .j ,/ ,i. j. /. i 1 ,i .j_ ,. f j .i .i.i.i. i 4 .i.I.j. 1. 14 .i.i.i. F i { .i.I.i. !. i .{ !.i.i. t i .{ ;.I. i ! ./ .\.I i i i i .].i.i. j. 4 .j.I. J. i ! .j .i./.I. 1. ./ .f.i.j. 1 i .i ./.i.i. 1 4 .I.;./. 1 j ./ ./.i.!. i I' I. 1 I I1 I< i 106 El$,IRi$#qEfiTAi SE+iCE$ 1 ./ .j.j.i. i. .i .j.I.i. i i ./ .i.i.i. 1 j .I.i. j. 1 j ./ .j .j.i. 1 .i .I.,. i. 1 i 4 .I./. i. i ; i i 0 IMITl& SS!JDIES i ,/ ,f"t-.i-~y;L+--j 4 .j _i. 1. t j ,/ .j. J. i I i ,j .i. /. t 4 ,j .;. [. j. i .j j ,i. 1. i I. . IliQ ai<!~jGi~.&i ,C$C@#iAISSAiJi:E i i .$+-LA-' ' ; F:-tl ./ .I .I. f. j. ./ .j .j. 1. j. 1 4 ./ .(. i. t i .j .I. 1. 1 j .j .i .!_ i. i fI! %I It ;1'2$ C!-i!-Ti-iRkL jY$-iiffCES i i ,"Al".L"L" ~-, , , ~ , t I ,,I ,j .i.I.i. 1 .j .I .,.I. t i i .j.i.i. } .I .i.l. 1. i. / 1 .!.\. 1. ; ,$!iETgS& " i$$jj; ii[1[1 SERIES 1 .I .~--;--~--;-~~-i--'"~~i ,j .i .j. /. 1 ./ ./ .I. j. 1 i i ./ .: i. [ 4 .i .i. i. ;. i i .I .I. (. ' i ./ .I./. j. 1. ./ .!.(.I. 1 i .I .i.I.i. t .{ .I.{.;. t 1 ./ .I.;.;. C .i .i.i.{. + i 4 .j.i. 1. i 8 I. *i 1 i .j.i.j. 1 j .j.i.i. i. f i .i.i.i. i { ./.[.I. I. 1 ./ .i.I.i. I .j .I .I.!. } ] .I _f .I./. i i?$j IRHIfitiTfON SERVICES j ./ .i.j.i. i. .j .].;.I. 1. J 4 .I.j.I. t 4 .I.l.i. } j ./ .j.i.i. ) i ./.I./. I r I ' 4 ' .I ,i. i. I 1210 ifiiffIC&iION DESI!:iM e( SPECS. I 4 .I ,I. 1. f 4 .I . ] . 1. t ~-Lt---~-L"--] -8 IIII' I 4 .t.j. j. 1 4 .f .i.i. t / .j .i.].j. i Si-iBTOTAt TASK, I?[I(! SERIES / i.i.(.i.t 4.1.1.1. ;eci ' ' ' 'I/ 4.i.j.i.f i ./.!.I. j. j ./ -1.i.I. 1 - t' *I I ............................................................... * . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 l e e RESOLUTION NO. 90-168 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A CONSULTANT AGREEMENT FOR EL CAMINO REAL AND PALOMAR AIRPORT ROAD, PROJECT NO, 3166 WHEREAS, the City of Carlsbad requires the servic a professional design engineering consultant to prepare : improvement plans and specifications for El Camino Real and Pi Airport Road; and WHEREAS, a scope of work and consultant agreemer been prepared for said services; and WHEREAS, the City Council hereby finds it neces desirable and in the public interest to approve said agreeme NOW, THEREFORE, BE IT RESOLVED as follows: 1. That the above recitations are true and corre 2. That the consultant agreement between P Technologies and the City of Carlsbad is hereby approved an Mayor and City Clerk are hereby authorized and directed to ex said agreement, 3. Following the Mayor's signature of said agree] ~ the City Clerk is further authorized and directed to forward CI I 1 /// I /// ~ /// I /// 1 /// /// I ~ /I/ ~ /// r 1 Y II a ab ii I 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 of said agreement to Marinus W. Baak, Senior Vice Presj P & D Technologies, 401 W. ggAgg Street, Suite 2500, San I California 92101, and the Municipal Projects Department for files. PASSED, APPROVED AND ADOPTED at a regular meeting c Carlsbad City Council held on the 5th day of June I by the following vote, to wit: AYES: Council Members Lewis and Larson . NOES: None ABSENT: Council Member n and Pettine ABSTAIN: Council Member ATTEST: && k fln*A.-* ALETHA L. RAUTENKRANZ, Cityblerk (SEAL) 28