CARLSBAD TRACT 85-34
RECOMMENDED ACTION:
Approve the Final Map for Carlsbad Tract No. 85-34, Viewpoint.
ITEM EXPLANATION:
Engineering staff has completed checking the final map of Carlsbad Tract 85-34, a
subdivision located north of the intersection of Alga Road and Mimosa Drive. T
conforms substantially with the Subdivision Map Act, Carlsbad Municipal Ca
conditions of approval and the tentative tract map as approved by the Planning Corn
on April 19,1989 per Resolution No 2833.
This map has been found to be consistent with the Growth Management Ordinance
requirements of the Local Facilities Management Plan for Zone 6. Currently a1
facilities within or impacted by Zone 6 meet or exceed the adopted performance si
For a more complete analysis of the public facilities impact for this project, see the :
Local Facilities Impact Assessment form.
FISCAL IMPACE
This project is expected to generate the following:
Park-in-lieu Fees 4 Traffic Impact Fees
Bridge and Thoroughfares
Sewer Connection Fees
Water Connection Fees
(Payable to the Carlsbad Municipal Water District)
- TOTAL $
In addition to this amount, the subdivider has agreed to pay Public Facilities fec
amount to be determined at building permit issuance. Also, the subdivider has agree
drainage fees as a result of the forthcoming master storm drain study.
These figures are for information and do not represent a detailed economic impact
of this project. While increased operating expenses related to this development are t
to be offset from increased tax or fee revenue, no exact percentage of offset can be pi
I
Facilities Zone
Local Facilities Management Plan Growth Control Point
Net Density
Special Facility Fees
6
ComDlete
3.2 DU/ac
3.1 DU/ac.
None
4 LOCATION Map
N
' r-\r
__ #AN34Nfn
II
/K/MaSA
&!!ME 5TfEET
s/TE
..IIO"I1DI ,.ao**
PROJECT NAME: PROJ. E:
NO.
t "I 1.
1 V/EWPO/N7 CT 85 -3f
a 0 ' ClTYOFCAlUSBAD
1 GROWTH MANAGEMENT PROGRAM
LOCAL FACXJTIES IMPACTS ASSESSMENT FORM
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO.: ViewDoint CT 85-34
LOCAL FACILITY MANAGEMENT ZONE: 6 GENERALPLAN: RLM
ZONING: R-1-7500-Q
DEVELOPER'S NAME:
ADDRESS: 901 Dove Street, Suite 299, Newport Beach CA 92660
Western National Homes I, Ltd., Matt Osgood
PHONE NO.: (714)476-3031 ASSESSOR'S PARCEL NO.: 215-050-03,04,05
QUANTITY OF LAND USEDEVELOPMENT (AC., SQ. FI'., DU): 40.5 Acres 90 DUS
ESTIMATED COMPLETION DATE: July 1991
A. City Administrative Facilities: Demand in Square Footage = 333.6
B. Library: Demand in Square Footage = 178
C. Park: Demand in Acreage = 90 EDU
D. Drainage: Demand in CFS = 12 cfs/33 cfs
Identify Drainage Basin = DE/DF (No master plan facilities will be built as part of this project.)
E. Circulation: Demand in ADTs = 900 ADT
F. Fire: Served by Fire Station No. = 2
G. Open Space: Acreage Provided - 13.2
H. Schools: 25 Elem.
7 Jr. High
14 High School
I. Sewer: Demand in EDUs - 90
Identify Sub Basin - 60 (Trunkline used: -
K. Water: Demand in GPD - 19,800 GPD
L. The project is 4 units below the Growth Management Dwelling unit allowance.