Loading...
HomeMy WebLinkAbout1990-06-12; City Council; 10670; FINAL MAP CARLSBAD TRACT 85-34 VIEWPOINTZ n w hl= e 2 B .. z 2 5 a s z 3 0 c9 GI-UF GAHLSUAU - AUtNvUlLL L DEPT. ENG VIEWPOINT CITY II AB#.%= TITLE: DEPT. CITY A MTG. 6/72/90 FINAL MAP CARLSBAD TRACT 85-34 RECOMMENDED ACTION: Approve the Final Map for Carlsbad Tract No. 85-34, Viewpoint. ITEM EXPLANATION: Engineering staff has completed checking the final map of Carlsbad Tract 85-34, a subdivision located north of the intersection of Alga Road and Mimosa Drive. T conforms substantially with the Subdivision Map Act, Carlsbad Municipal Ca conditions of approval and the tentative tract map as approved by the Planning Corn on April 19,1989 per Resolution No 2833. This map has been found to be consistent with the Growth Management Ordinance requirements of the Local Facilities Management Plan for Zone 6. Currently a1 facilities within or impacted by Zone 6 meet or exceed the adopted performance si For a more complete analysis of the public facilities impact for this project, see the : Local Facilities Impact Assessment form. FISCAL IMPACE This project is expected to generate the following: Park-in-lieu Fees 4 Traffic Impact Fees Bridge and Thoroughfares Sewer Connection Fees Water Connection Fees (Payable to the Carlsbad Municipal Water District) - TOTAL $ In addition to this amount, the subdivider has agreed to pay Public Facilities fec amount to be determined at building permit issuance. Also, the subdivider has agree drainage fees as a result of the forthcoming master storm drain study. These figures are for information and do not represent a detailed economic impact of this project. While increased operating expenses related to this development are t to be offset from increased tax or fee revenue, no exact percentage of offset can be pi I Facilities Zone Local Facilities Management Plan Growth Control Point Net Density Special Facility Fees 6 ComDlete 3.2 DU/ac 3.1 DU/ac. None 4 LOCATION Map N ' r-\r __ #AN34Nfn II /K/MaSA &!!ME 5TfEET s/TE ..IIO"I1DI ,.ao** PROJECT NAME: PROJ. E: NO. t "I 1. 1 V/EWPO/N7 CT 85 -3f a 0 ' ClTYOFCAlUSBAD 1 GROWTH MANAGEMENT PROGRAM LOCAL FACXJTIES IMPACTS ASSESSMENT FORM PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO.: ViewDoint CT 85-34 LOCAL FACILITY MANAGEMENT ZONE: 6 GENERALPLAN: RLM ZONING: R-1-7500-Q DEVELOPER'S NAME: ADDRESS: 901 Dove Street, Suite 299, Newport Beach CA 92660 Western National Homes I, Ltd., Matt Osgood PHONE NO.: (714)476-3031 ASSESSOR'S PARCEL NO.: 215-050-03,04,05 QUANTITY OF LAND USEDEVELOPMENT (AC., SQ. FI'., DU): 40.5 Acres 90 DUS ESTIMATED COMPLETION DATE: July 1991 A. City Administrative Facilities: Demand in Square Footage = 333.6 B. Library: Demand in Square Footage = 178 C. Park: Demand in Acreage = 90 EDU D. Drainage: Demand in CFS = 12 cfs/33 cfs Identify Drainage Basin = DE/DF (No master plan facilities will be built as part of this project.) E. Circulation: Demand in ADTs = 900 ADT F. Fire: Served by Fire Station No. = 2 G. Open Space: Acreage Provided - 13.2 H. Schools: 25 Elem. 7 Jr. High 14 High School I. Sewer: Demand in EDUs - 90 Identify Sub Basin - 60 (Trunkline used: - K. Water: Demand in GPD - 19,800 GPD L. The project is 4 units below the Growth Management Dwelling unit allowance.