HomeMy WebLinkAbout1990-11-06; City Council; 10880; APPROVAL OF CHANGE ORDER NO. 4 FOR AGUA HEDIONDA LAGOON PUMP STATION PROJECT NO. 3303a a ". CIYOF CARLSBAD - AGENWBILL . I AB# '5 ''& Td: APPROVAL OF CHANGE ORDER NO. 4 MTG. 11 6 90 DEPT. PROJECT NO. 3303 DEPT.ENG. CITY e FOR AGUA HEDIONDA LAGOON PUMP STATION CITY n " I I RECOMMENDED ACTION: Adopt Resolution No. 78.. 3 g6 approving Change Order No. 4 fo Hedionda Lagoon Pump Station improvements. ITEM EXPLANATION: A change in dimensions for the pump station generators has necessitated an ir in dimensions for the generator housing structure, Relocation of the structl an existing fence is also required. FISCAL IMPACT Funds in the amount of $28,063.00 for Change Order No. 4 are available in P NO. 512-820-1850-3303. EXHIBITS: 1. Location Map 2. Resolution No. 98*3f6 approving Change Order No. 4 3. Change Order No. 4 P w > 0 CL: a 2 z 0 .. F a 0 d 0 z 3 0 0 e W & LOCATION MAP HLGHWAY 78 AGUA HEDIONDA LAGO( PUMP STATION L PROJECT NAME r PROJ. NO- , AGUA HEDIONDA LAGOON PUMP STATION 3303 I1 I/ 1 W W RESOLUTION NO. 90-386 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING CHANGE ORDER NO. 4 FOR THE AGUA HEDIONDA LAGOON PUMP STATION. PROJECT NO. 3303 2 /I WHEREAS, a revision in the construction of improvements on the Agua Hec 3 I1 4 // Lagoon Pump Station, Project No. 3303, has necessitated contract Change Order 5 and 6 WHEREAS, funds in the amount of $28,063.00 for said change ord 7 8 available in Account No. 512-820-1850-3303. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the ( 9 10 11 12 13 , Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That Change Order No. 4 for Agua Hedionda Lagoon Pump : Improvements, specifically identified as Project No. 3303 is approved. 14 AYES: Council Members Lewis, Kulchin, Pettine, Mamaux ar 16 Council held on the 6th day of November, 1990 by the followir_g vote, to M I.5 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsb: 17 18 NOES: None ABSENT: None 19 LAUDBA. LEWIS, Mayor 20 11 A'ITEST: 21 lz&&ap fl&f&J nETHA L. RAUTENKRANZ, C=rk 22 (SEAL) 23 11 24 25 26 27 28 e V CITY OF CARLSBAD PROJECT: Agua Hedionda Pump Station CONTRACT CHANGE ORDER NO. 4 CONTRACT N0,3303 P,O, N0.9567 ACCOUNT N0.512-820-1840-3303 CONTRACTOR: The Industrial ComDany - ADDRESS! 2722 Loker Avenue, Ste. G, Carlsbad, CA 92008 The Contractor is directed to make the following changes 2 described herein. Changes shall include all labor, material: equipment, contract time extension, and all other goods a] services required to implement this change. Payment stated on th: change order includes all charges, direct or indirect, arising 01 of this additional work and is expressly agreed between City ai Contractor to be the complete and final costs hereof. TI requirements of the specifications, where pertinent and not conflict with this change order, shall apply to these change! This change order is not effective unless signed by the Ci. Manager and/or the Mayor. Item 1: Enlarge the emergency generator building and appurtanc as describe here-in and shown on attachments. Replace existing plan sheet S-2 (10 of 19) with revis sheet S-2 (delta 2, 7-23-90). Delete details 1, 7, and 9 on sheet S-3 (11 of 19). Revise detail 6, sheet S-3, by removing the reference the type and manufacturer of the door; change the do size from 6'8" x 3'0" to to 8'0" x 4 '0". Revise detail 7, sheet S-5 (13 of 19) by changing 3/4 0S.S Hilti Kwik Bolts (4" min. embed) shown in the pl view to 5/8" 0~2~~ embed Ramset Dynabolt. Delete detail 9, sheet S-5 (13 of 19).' Relocate existing fence as shown on revised sheet C (delta 1, 7-23-90) and locate generator building as shc and directed by the engineer. Increase to contract cost ........................... ..$28#063.0C Total Increase to Contract Cost.. .................... $28/063.OC rT .- 0 e TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL B INCREASED BY ELEVEN (11) CALENDAR DAYS. APPROVED BY: DISTRIBUTION: INSPECTION FILE (ORIGINAL) MUNICIPAL PROJECTS PURCHASING (W/P.O. CHANGE REQUEST) FINANCE CONTRACTOR \