HomeMy WebLinkAbout1990-11-13; City Council; 10912; NOTICE OF COMPLETION FOR CARLSBAD BOULEVARD PHASE II IMPROVEMENTS APPROVING CHANGE ORDER NOS. 12 AND 18, PROJECT NO. 3205\ CIYOF CARLSBAD - AGENVBILL .- [ ' \
/
-L
, DEPT- I TITLE NOTICE OF COMPLETION FOR CARLSBAD AB# /!I qlb
MTG:1/13/90
DEPT-ENG: MP
CITY A' BOULEVARD PHASE I1 IMPROVEMENTS
CITY M AND 18, PROJECT NO. 3205
APPROVING CHANGE ORDER NO6. 12
I 1 I I ~ ~ ~~
RECOMMENDED ACTION:
Adopt Resolution No. ?8-Y$7 accepting the construction of Carlsb
Boulevard Phase I1 Improvements as complete, approving Change Ord Nos. 12 and 18, and directing the City Clerk to record the Noti
of Completion.
ITEM EXPLANATION:
Construction of Carlsbad Boulevard Phase I1 Improvements b satisfactorily completed on November '14, 1989. This proje included the widening of Carlsbad Boulevard to four (4) lam
installation of bike lanes, parallel parking, sidewalks, and raiz
and landscaped medians. The final construction cost
$2,393,960.21 includes 18 change orders for a total of $200,139.E
Change Order Nos. 8, 10, 11, 13, 15, and 16 in the amount
$175,563.45 were previously approved by the City Council, E
Change Order Nos. 1 through 8 in the amount of $24 , 576.07 wc
approved administratively. The final project cost adjustment j additional asphalt and class I1 base in the amount of $16,775<
and Change Order Nos. 12 and 18 in the amount of $53,531.37 need
be approved for additional grading and striping.
FISCAL IMPACT:
A summary of the total project costs is as follows:
Construction Design Construction Administration Inspection
Material Testing
City of Vista (FAU Funds)
Miscellaneous
$2,393,!
102 , 1
139,
22,f
491,~
20,
P
0 a
9
2 Q
2 0 F 0 a 2
..
0 z 5 0
Total Project Costs $3,169,
Funds in the amount of $3,252,182 have been previously appropria by the City Council for this project as follows:
Allocated Federal and Urban (FAU) Funds $1,747, Gas Tax Fund 351,
SDG&E Funds 60,
Water Capital Construction Fund 94 I
General Capital Construction Fund 998,
Total Available Project Funds $3,252 ,
, .* ll 0 0
I II
1
2
3
4
RESOLUTION NO. 90-407
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING PROJECT CHANGE ORDER NOS. 12 AND 18, ACCEPTING AS COMPLETE THE CARLSBAD BOULEVARD PHASE I1 IMPROVEMENTS, PROJECT NO. 3205, AND DIRECTING THE CITY CLERK TO FILE THE NOTICE OF COMPLETION
5 11
6
Project No. 3205, is satisfactorily completed; and 7
WHEREAS, the Carlsbad Boulevard Phase I1 Improve:
8 WHEREAS, additional grading and striping in the p
9 are required; and
10 WHEREAS, the formal project Notice of Completion ha
11 prepared ;
12 NOW, THEREFORE, BE IT RESOLVED by the City Council
13
14
City of Carlsbad, California, as follows:
the project Change Order Nos. 12 and 18 in the amount of $53, 16
2. That the additional expenditures of $16,775. 15
1. That the above recitations are true and corre
execute said change orders. 18
is hereby approved and the Mayor and City Clerk are authori 17'
19 3. That the Purchasing Officer of the City of Car
20
23
contract. 22
Order No. 6989 by $70,306.96 to cover the final costs 1 21
California, is hereby authorizedto increase the existing Pul
/// 27
/// 26
/// 25
/// 24
///
28 ///
,. /I 0 e
I1
1 4. That the following appropriations for Projec
2 3205 are affirmed:
3
Gas Tax Fund 3 4
Federal and Urban (FAU Funds) $If7
5 SDG&E Funds
6 Water Capital Construction Fund
7
5. That the Director of Finance is hereby authori 9
TOTAL $3,2 8
General Capital Construction Fund 9
10 close the project accounts upon payments of all final clai
11 costs. I/ 12 6. That the City Clerk of the City of 'Car
13 California, is hereby directed to record the Notice of Comp
14 far this project.
15
NOES : None 19
AYES : Council Members Lewis, Kulchin, Larson, Mamaux, and Pe 18
1990 by the following vote, to wit: 17
Carlsbad City Council held on the 13th day of November 16
PASSED, APPROVED AND ADOPTED at a regular meeting
20
21
22
23
24
ABSENT : None
CLAUDE A. LEWIS, Mayor
ATTEST: 25
26 @LlJh'HAI5-/& TE&h?Z, City Clerk
KAREN KUNDTZ, Assistant City Clerk
.,
27
28
(SEAL)
e 0
Page 2 of Agenda Bill No. q9/2
EXHIBITS :
1. Resolution No. 5@-9°7 approving Change Order Nos. 12 and 3
accepting the Carlsbad Boulevard Improvements and directj
the City Clerk to file the Notice of Completion.
2. Contract Change Order Nos. 12 and 18.
3. Notice of Completion.
\
0- \ e -,
CITY OF cARLsB9D
PlJBLIC WORKS PRQSECrr CHANGE ORDDR NO. 12
152
CONTRAcrr NO. 3205 ' HlRCHASE ORDER NO. 6989 ACCOUNT NO.S820-1840-3;
CXNFRAmR'S NAME WEST COAST GENERAL
~NTRA~R~S ADDRESS 12243 HIGHWAY 67, LAKESIDE, CA 92040
The Contractor is directed to make the following changes as described herein.
shall include all labor, materials, equipment, contract time extensions, and
goods and services required to implement this change. Payment stated on tl-
order includes all charges, direct or indirect, arising out of this additional is expressly agreed between City and Contractor to be the complete and fi
hereof. The requirements of the specifications , here pertinent and not in con3 this change order, shall apply to these chqes. This change order is not
unless signed by the City Manager and/or the Mayor,-
CHANGE:
1. Construct key on the east side of road from STA. 21 + 30 to STA. 29 + 50
STA. 29 + 50 to STA. 34 + 00 1 ! STA. 35 + 00 to STA. 40 f 50 1,
2. Remove A.C. section STA. 40 + 50 to STA. 45 + 90 2; STA. 54 + 44 to STA. 68 + 00
6: TOTAL: 6519 C.Y. @ $7.76/C.Y. = $50,587.44 -
REASON FOR CHANGE:
1. To stabilize the slopes per soils engineer's recommendation.
2. To remove the existing high points on the road section.
COST: TIME CHANGE:
b sum ' Unit prices X Both Add days Muct days - Total this extra $ 50,587.44 Add/deduct days this change - Previous net changes $ 147,002.58 Previous add/deduct days original contract amount $ 2,107,278.38 Original contract days New contract total $ 2,304,868.40 New contract time -
-
-
F 'P Date
CXINTRArnR
BY
CALT RAN S
BY
White - Job File
Pink - Project Inspecrtor
Yellow - Contractor
Gold - purchasing with P. 0. Chi
e e
. */, 2 CITY OF CARLSBAD
PUBLIC WORKS PRQTECT CHANGE ORDER NO. 12
CONTRACT NO. 3205 PURCHASE ORDER NO. 6989 ACCOUNT ~0.300-820-1840-320!
CT>NTRACTOR'S NAME WEST COAST GENERAL
~NTRACIOR'S ADDRESS 12243 HIGHWAY 67, LAKESIDE, CA 92040
The Contractor is directed to make the follming changes as described herein.
shall include all labor, materials, equipment, contract time extensions, and al
goods and services required to ixplement this +e. Payment stated on this order includes all charges, direct or indirect, arising out of this additional I is expressly agreed between City and Contractor to be the complete and fin2 hereof. The requirements of the specifications, where pertinent and not in confl
this change order, shall apply to these changes. This change order is not e
unless signed by the City Manager and/or the Mayor.
CHANGE :
1. Construct key on the east side of road from STR. 21 + 30 to STA. 29 + 50 9'
STA. 29 -t 50 to STA. 34 + 00 1,01 STA. 35 -t 00 to STA. 40 + 50 1,O'
2. Remove A.C. section STA. 40 -t 50 to STA. 45 + 90 2,91 STA. 54 t 44 to STA. 68 + 00 4;
TOTAL: 6519 C.Y. @ $7.76/C.Y. = $50,587.44 -
4 695
REASON FOR CHANGE:
1. To stabilize the slopes per soils engineer's recommendation.
2. To remove the existing high points on the road section.
COST: TIME CHANGE:
w SUm - unit prices X Both Add days Deduct days - Total this extra $ 50,587.44 Adwdduct days this change __
previous net charges $ 147,002.58 Previous add/deduct days Original contract amount $ 2,107,278.38 Original contract days
New contract total $ 2,304,868.40 New contract time
~
- -
CITY OF CAFUSBAD co Ci-ClR X / &c,c, t'b ( 2.. &A+-*
- I, Construction Inspector Date By David E. Davey, Vice Pres.(-)
CALT RAN S mject Manager Date
Municipal Projects Manager Date BY
City Manager and/or Mayor Date White - Job File
Pink - project Inspector
Yellm - Contractor
Gold - Purchasing with P.0 Chai
/ * e C.C.O. #12 f. 0
ITEM 1
The east side of the road, Sta. 21 +30 to Sta. 68+00, consisted of slopes which contained
90% beach sand. In order to stabilize the slopes, a Z-foot deep key was constructed along the eastern slopes. This item was recommended by the soils engineer and was
not covered in the project.
ITEM 2
The existing A.C. section from Sta. 54+44 to Sta. 68+00 which were to remain were .8'
higher than the design grade and had to be removed and reconstructed. ,
i //: //Q sf / d/ ,r/
PAT ENTEZARI
Project Manager
". .. 8 @
h,
CITY OF CARLSBAD
FUBUC woRE(s PRQSECT CHANa ORDER NO. 18
152 (XNIPACI' NO. 3205 PURCHASE ORDER NO. 6989 . ACXXJNC NO. BiW-828-1840-32(
~~~R'S m WEST COAST GENERAL
~NTRA~R'S ADDRESS 12243 HIGHWAY 67, LAKESIDE, CA 92040
The Contractor is directed to de the following changes as described herein. (
shall include all labor, mte?zials, equiprent, contract time extensions, and all
goods and services rqired to Wlement this change. payment stated on this
order includes all charyes, direct or indirect, arising out of this additional w(
is expressly agreed between City and Contractor to be the complete and final
hereof. The requiramdzs of the specifications, where @&.& and not in anflit this change order, shall apply to these changes. This change order is not ef: unless signed by the city Manager and/or the Mayor.
/ CHANGE : 1. Paint curb red 650 L.F. ) $356.00 2. Paint curb blue 160 L.F. ) 200.00 3. Paint no parking 20 @ $10.00 777.00 4. Traffic control 960.00 5. Sandblasting 267.00 6. Instal 1 sign anchor in median $2,56o.00 Profit 15% 383.93
REFSON FOR CHANGE: . TOTAL $2,943.93
1. Striping for no parking adjacent to A.C. berm
2. Handicapped parking curb
- COST: TIME CHANGE:
~rrmp sum X Unit prices Both - Add days Deduct days -
Total this extra $ 2,943.93 Add/dedu& days this change -
previous net changes $ 306,176.27 Previous, adwdeduct days -
original contract amount $ 2,107,278.38 Original contract days -
New contract total $ 2,416,398.58 New contract time -
Fo 6 clFiEgor I ;mte 27/39 ~ - G YJ ' -(Ad/ /+ Ftm i
BY I:
I g /$ AlfCRANS * Date \ "I
BY [:
YOY " Date . ._ .& - .. White - Job File
Pink - project Inspector
Yellm - Contractor Gold - Purchasing with P.O. Chaq
,F 0 @
4 *. . ,
," c
C.C.O. #I8
During the striping of the road, it was discovered that no provision was made for stripin of red curb in the areas restricted for parking and for handicapped symbols and paintin<
These were added to the contractor's work and C.C.O. #18 was issued. All prices wer
verified by the resident engineer. OQPF PAT T RI
Project Manager