Loading...
HomeMy WebLinkAbout1991-04-23; City Council; 11128; ACCEPTANCE OF PUBLIC IMPROVEMENTS OF TAMARACK POINTE, UNIT 3| CT 84-14/PUD 694 I a Ui P 0 o=. a a. 4 .. z G 5 a $ z 3 0 0 CIMOF CARLSBAD - AGENWBILL - AB#&& TITLE: ACCEPTANCE OF PUBLIC IMPROVEMENTS OF TAMARACK POINT - UNIT 3 CARLSBAD TRACT 84-14 PUD 69 MTG. 4-23-91 DEPT.ENG. RECOMMENDED ACTION: Accept improvements, authorize City Clerk to record the Noticl release bonds, and direct the Utilities and Maintenance Depart maintaining the public street, storm drain and sewer improvemi at Southampton Road. ITEM EXPLANATION The Developer has constructed all improvements required of tl City Engineer is requesting that City Council accept the Pub' itemized in Exhibit 3. City forces have inspected the public found them to be satisfactory. FISCAL IMPACT The Utilities and Maintenance Department will be required public street, storm drain and sewer improvements. Tht improvement is estimated at $921,195.00. EXHIBITS 1. Location Map. 2. Notice of Completion. 3. Itemization of Public Improvements. - LOCATION MAP TAMARACK PT. Subdivision Boundary Recording requested by: CITY OF CARLSBAD When recorded mail to: City Clerk City of Carl sbad 1200 Elm Avenue Carlsbad, CA 92008 SDace above for Recorder's Use a e i EXHIBIT 3 IT EM I ZAT I ON OF PUBL I C IMPROVEMENTS TAMARACK POINTE, CT 84-14, UNIT 3 Dwg. 24 Street Improvements Pavement 416'' $ 147,961 Pavement 183,511 4" P.C.C. Sidewalk 109,544 6" Type "GN Curb 87,310 PCC Cross Gutter 3,091 City Monuments 9,280 Street Lights 49,300 Pedestrian Ramp 5,000 Street Name Signs 1,925 Street Trees 13,650 Total Value of Street Improvements $ 610,572 Sewer Imwovements Manholes $ 27,36C 6" V.C. Mains 23,518 Sewer C.O. (S-3) 65C 4" V.C. Lateral 49,41C Slope Anchor 2,375 Total Value of Sewer Improvements $ 182,63E 8" V.C. Mains 79,325 Storm Drain Improvements 18" RC P 39, OOC 24" RCP 29,24C 21" RCP 24,515 Curb Inlet Type B-1 18,83C C1 eanout Type A-4 10,61C Curb Outlet D-25 5,64C Total Value of Storm Drain Improvements $ 127,98E Spl ash Wall 15C TOTAL VALUE OF PUBLIC IMPROVEMENTS $ 921,19!