HomeMy WebLinkAbout1992-03-10; City Council; 11584; ADVERTISE FOR BIDS FOR IMPROVEMENTS TO THE INTERSECTION OF EL CAMINO REAL AND TAMARACK AVENUE, PROJECT NO. 3363r I €3 0 c% U 9 2 .. Z 5 q g Z 3 0 0 9 97 c F CARLSBAD - AGENDP ILL dl AB# 1; 58 q TITLE: ADVERTISE FOR BIDS FOR IMPROVEMENTS TO DEPT. C. CITY A1 MTG. DEPT. ENG CITY MC RECOMMENDED ACTION: 311 0/92 THE INTERSECTION OF EL CAMINO REAL AND TAMARACK AVENUE, PROJECT NO. 3363 Adopt Resolution No. Y2-33 approving plans and specifications and authorizing thc Clerk to advertise for bids for the construction of improvements to the intersection Camino Real and Tamarack Avenue, Project No. 3363. ITEM EXPLANATION: This project consists of intersection improvements that includes the removal of an exi right-turn only lane utilized by traffic from westbound Tamarack Avenue to northbout Camino Real. Additionally, there will be removal and reconstruction of curb, gutter, asphalt paving. The existing traffic signal will be modified to provide protected left. phasing for vehicles on Tamarack Avenue. ENVIRONMENTAL RWIEW: The Planning Director issued a Notice of Exemption for this project on Septembc 1991. A Coastal Development Permit was not required because construction is entirely wi the existing right-of-way, does not increase the paved roadway width, and maintains same number of vehicle through lanes and turning movements. GENERAL PIAN CONSISTENCY The Planning Commission on September 4, 1991, determined the propo improvements are consistent with the Carlsbad General Plan. FISCAL IMPACT Estimated project costs are as follows: Design $24,000 Construction 1 30,000 Construction Contingencies (1 5%) 19,500 Inspection1Administration (1 0%) 13,000 TOTAL PROJECT COST ESTIMATE $1 86,500 Funds are available through trust funds of $270,000 designated for construction of t improvements for this project. Funds were received from Mike Foote in 1987 for CT 84- and are available for intersection improvements as described above. Of the $270,000 in trust funds available, $186,500 will be appropriated into the Gene Capital Construction Fund. Remaining funds of $83,500 will be returned to Mike FOC after all final costs associated with the project have been determined and the Notice Completion has been issued. I e 0 Page 2 of Agenda Bill No. ‘I! 58 f Originally, funds of $105,000 from the PFF account were anticipated to be used for project. However, because of the availability of the trust funds, the $105,000 wi disappropriated from the PFF account. EXHIBITS: 1. Location map. 2. Resolution No. approving plans and specifications and authorizing the Clerk to advertise for bids for the construction of improvements to the intersec of El Camino Real and Tamarack Avenue, Project No. 3363. 99.43 A a F TAMARACK II I I/ I 1I I 11; I 0 2 ;il WI -I I J' I z'' I 4 PROJECT NAME: EL CAMINO REAL & TAMARACK AVENUE INTERSECTION IMPROVEMENTS PRUJECT # EXHIE 3363 1 d . * 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 l6 17 18 19 20 21 22 23 24 25 26 27 28 c e 0 RESOLUTION NO. 92-73 A RESOLUTION OF THE CrrY COUNCIL OF THE CRY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF IMPROVEMENTS TO THE INTERSECTION OF EL CAMIN0 REAL AND TAMARACK AVENUE. PROJECT NO. 3363 WHEREAS, the City Council of the City of Carlsbad has determined it necessi desirable, and in the public interest to construct improvements to the intersection of El Can Real and Tamarack Avenue, Project No. 3363; and WHEREAS, plans, specifications, and contract documents for the furnishing of all la1 materials, tools, equipment, transportation, and other expenses necessary or incidental said project have been prepared and are on file in the Engineering Department of the Ci Carlsbad; and WHEREAS, $270,000 is available in the trust fund for said project; and WHEREAS, $186,500 will be transferred from the trust fund into the General Cap Construction fund and be appropriated into Account No. 300-820-1840-3363; and WHEREAS, unused funds will be returned to Mike Foote after the Notice of Cornplei is issued for Project No. 3363; and WHEREAS, $1 05,000 of PFF funds were previously designated for this project; an WHEREAS, the PFF funds are no longer necessary to be used for this project; ar WHEREAS, the PFF funds of $105,OOO previously designated for this project will disappropriated; and WHEREAS, construction of said improvements is a matter of public necessity E safety. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbi California, as follows: 1, 2. That the above recitations are true and correct. That the ptans, specifications, and contract documents as presented are here approved. / J 1. 1 1 2 3 4 5 6 7 8 -i 0 e 3. The City Clerk of the City of Carlsbad is hereby authorized and directe proceed to publish, in accordance with law, Notice to Contractors inviting bids for construction of improvements to the intersection of El Camino Real and Tamarack Avc Project No. 3363, in accordance with the plans, specifications, 'and contract docurr hereinabove referred. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Co held on the 10 day Of March , 1992 by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Larson, Stanton & Nygaard b IS: None 12 13 14 15 16 AlTEST: 21 22 23 24 25 26 27 28 '