RECOMMENDED ACTION:
Adopt Resolution No. 92- 139
for Local Facilities Management Zones 11 and 12.
ITEM EXPLANATION
Chapter 21.90 of the Carlsbad Municipal Code requires that each Local F
Management Zone have an approved Local Facilities Management Plan (LFR
prerequisite to development within the Zone. The LFMP must include a Financ
meeting certain criteria as described in the Code. A number of LFMPs, includir
11 and 12, have been adopted with the condition that they submit and obtain i
building permit.
The LFMPs for Zones 11 and 12 were originally adopted by the City Cc
February 23, 1988. Subsequently, the Zone 12 LFMP was amended, and
version was adopted on August 21, 1990. The majority property owner in bo
is the Fieldstone Company, and the Zones have a number of facilities in comi
avoid unnecessary duplication, the Financing Plan addresses both Zones. The F
Plan was first submitted in March 1991 and has undergone careful review by
departments. Staff is now ready to recommend approval of the Zone 1 1 I1 2 F
Plan.
The plan employs a combination of assessment district financing, direct d
funding, participation in Community Facilities District No. 1, bonds, con
agreements, and payment of fees to finance the public facilities needed
development within Zones 11 and 12. A summary of the facilities and '
mechanisms is provided as Exhibit 2. The key facilities requirements ai
discussed below.
Citywide Facilities. Citywide facilities needed to serve development in Zone
12 include the South Carlsbad Library and the La CostaA-5 freeway interct
later years, Veterans Memorial Park and additional City Administrative faciliti
needed, as well as widening of La Costa Boulevard from 1-5 to El Camino Re;
Citywide facilities will be funded through the CFD.
Circulation Facilities. The primary circulation facilities addressed in the pla
realignment and widening of Rancho Santa Fe Road from La Costa Bou
Questhaven Road, widening of Olivenhain Road, and widening of Rancho
Road from Olivenhain to the southerly City Limit. The property owners are I
that these projects, which are estimated to cost approximately $60 million, bc
by a 191 3/1915 Act assessment district. CFD No. 1 will provide a contribu'
million to the assessment district.
approving the Growth Management Financ
of a Financing Plan prior to finaling any subdivision map or obtaining a gr
I
7
i m w
J Page Two of Agenda Bill No. / I l 67 3
Two other roads may also be financed by assessment district if it is determir
they comply with City Council Policy No. 33 which governs the use of ass€
district financing. These are Calle Barcelona from El Camino Real to Rancho S
Road and a portion of El Camino Real fronting on Zone 12. If it is determir
these roads do not meet the Policy No. 33 criteria, they will be directly fundec
developer.
Parks. The plan proposes to satisfy the parks requirement by amending the
parks agreement between the City and Fieldstone to provide for the dedication
for Alga Norte Park and guaranteed funding for development of park facilitie
Southeast Quadrant.
Fire. The existing temporary Fire Station No. 6 will be relocated to its pel
location after completion of the widening and realignment of Rancho Santa F
The plan proposes that the cost of the relocation be spread to all Zone 11
developers by increasing the existing zone fee.
Other developer funded facilities include drainage, sewer, and water facilities
facilities will be funded and constructed when needed as determined by 1
Engineer.
In conclusion, the Zone 1 1 /I 2 Financing Plan meets all of the requirements of
21.90 of the Municipal Code with respect to financing. Following adoption of tl
a number of steps must be taken to form the assessment district and to implen
other financing measures described in the plan.
ENVIRONMENTAL REVIEW
This Financing Plan is covered by the Negative Declaration for the Zone 1
approved by the City Council on February 23, 1988, and the Zone 12 LFMP (Ar
approved by the City Council on August 21, 1990.
FISCAL IMPACT
The purpose of the Zone 11 /I 2 Financing Plan is to assure that adequate func
be provided from appropriate sources to construct the capital facilities required
development in Zones 11 and 12. Adoption and implementation of the I
guarantee private funding for a number of facilities concurrent with need. City
will be involved only to the extent that projects are scheduled and funds are i
through the City's Capital Improvement Program.
EXHIBITS
1. Resolution No. 9 9.- 137
2.
3.
Zone 1 1 /I 2 Facilities Financing Matrix
Zone 1 1 I1 2 Local Facilities Management Plan on file in the City Clerk's office.
EXHIBIT 2
rn m @ d'
I
I
m
1.
I
a
w* wulm e** ****e* a uwu III yr;s
ihL4 NdO hbr, DWlrWNd 0 N-0 00;z :z
.*I bIIII( I
NOXZ x n 23 qs 52:: w69ZXz RnnS nnnn~-am = 4 w4 m~, I
4i 0- 50 4*=;3Lz=*w
"hr g3333 I-
2 *E OX* u) , E! 3
m E>:
5: s:
P:
om %Lip sssqsgi%;a 2&g -ro,
em; 32; ==dm m 00 -*
I=
0 0-0-8
In*
8 OZ-177-7 M5";i
sal, >a
48 -1
z
rn
(.OD aln
-In ** .I - *I I I-
4 6 O?t 4$ !,I e?' !! ??? 3
ern ma, IC gfl R n
17 "X8 I I I
I 1 I I I
I I
I I I I 1 , ,
=al
I 8
1
no 1 InIn now NWWWWO TT z; oww Inn $24422 SS:! cc I "3 mm.0 EK; %E Zl
k
I
1 h
I0 44 pj mn I
?
N ZZ
I- 33 ??:In 2
d d t
4 sa; 2 >
! 3
PP -4-4 2
92 TT 3333 s;
wn 77
* 3
I 5
22 IO
om 22. cc 2
*e ** ? --
ZZ! nw I * 4 <<: if d
I ----
\\I> 00 I ; c1 52 I I I-N I
wn I In *I >In nnw wwnwww
I
pB I, ,In nww nwwwww \\ n0; 04 i d a
II IIn nwn wwnnvw I C ?
nn a z ,I ,# own nwnwww WI \\;o ww :w > :- :2 QC:m :f
wn I I I>
IZI <C:m am
\\I= ;3
\\ or) I
'sz nr,;-=; \\a& In 8-
nn I I e= :z
:- ;25
ww 1
C)n* NI \\IC) * wn I
IW
t-4 1 tL
I
I -- I . In
%
ww * , I4 z
\\,w ;E am
:- ;%
an: -f: n
OI *In nnw WnwWvW IW $S!X :c
I
ww I1 I, ownn wwnnwv
E I- e no 1 mn IW >v) nnn wnwnw~
*I >In nww wnnnwv
I I wm Ill ,,,,.I
I1 .u) fyna nnnnVV
1- I
'II
I
I
II
a
II
a
wn s
0n 1
wn I
In
IW
:-N i c
IW
In I s >(A nnn wwwwWW
1-
Cr:F : 01 wcn nww WwwnWW
as >(I) mwn wwnwW.0 IW :=;x 8
nw I
nc) 8
tn
I .
1- I .
I I I- 1
<<:x i
01 mcn own WWWW~W In rcjo nn i
wn s In we >In nnw WnwwvD
I I I- 8
1 I I ---- I I i4 em nn nn Dm uu vu
n n YV a Y I I l
m m
;;*-mu bbl*u;u- 0 -4 .m*. zGzGbb;bh :E
raa=[m---mmg~ -n nn3nnnnnnnnn 0V)VI -V)m nnw 1 --n L> x-=mwmonm !? nn- \\nnzg YY YYYYYYYYY I ';:qkp&!, r) > uu~uuuuooowc~~ 8~,%pppg~~~~,, 288, gg sags ~%e~=$~ggg~~g:
3 3 s33 3 3 mg3 3 3 3. i <-!a EO%>&&
pn=. "$S?SP L
I. rm nnnnB% &cog emn g pp, i.Lgs2g . I
%!z
0 no- x 28ililil2222 iE
!! $RE e. - L. IL
q2 q~~ 14: O 2.
pppp mmapa.p .p yy UWW~~~~~~ I W
UnCI e- Ir IL. N
*~z:pama!,, B -- ID2 on. oom0000~7 oom I
\ -<\\ o~nwwooI: woo> I -7 77-7 -077 I :i~~n~~~~ ; 5% ea ,sa ; iizg$ ~a aaaa- JJJ 1
-' 8
Y n-% I
32- c, 5. ii a YW I
=ma ow00 7
g,oOa
I 1
I 7 00 n
0- YY n-
mw-
I
I I I
I I I I ww-I-ooww I ~NNN --on-- . c 2. llrrrl32.1 :n
:e I
t4SS EErz:!! .. im !)E!! --it.'; A! 7 rS32;ssppjp 77 ia nsn n JJ_) n3$$ nn - c -* ccc IO
ddd .VI -- x*- L oeea -- -00 1" IIW I m PPP
-4 NNN
?wz
P LZZZ GG d@ @< I I I I I
I
I
I
I I
I
( 1 :- :
(
t
I <
I I c
:- :E
1*1IlI,II :n :g
ddd 4 %2% PP 111 zm N nen 000 #
I ---- , I W >
0 n>>> \>~nn> \o BIIItIIkI M > M
c1 0 ;--E i I a-4
n>>m \>~nn> I* 0w:::,0,0 G > a mb >>> I
W @ nN i > I I I --, n-m) \>*on> II 00:::wwww >>> ;
I $
io ;rl
IO en a>
OIII*I,, em I-.
l*l1Ik111 I, n>>> I>*~I>
n>>r I>I~IZ
nm>m I>I~*>
nr>> k>tnI>
IF
I4 I*
1
Dl I L , t t 1- I
8, em I>
la 1- I
IIIIIII., e,
.- is
I:-#: &
:-4: 3
I :2 1ll1111ll *= I, n>>> .>en#>
nmmm I>OOI>
nm>> IWOOI~
l ow
I, on#~#arnee I,
I m~
I 4,
I11e111l1 IL In :- :f
a. I e-
n>>> ~>en~r I1 llltll,,, i% ;: . *L I- IC) I I or I I 1
I- I
811#,,,,, I, nmam IWI~I)
os>> #>*ne>
n>>> I>O~I>
n>>> I>SC)I)
8
bx . ;
I1 IllloIIl iI i
I BO I ;
I :o'
1BI11111, #I
I I
1- I
I I
I- I
l1811'11, I,
I I I ---- I
14 im
I
1
miinli111 11 I~I-BIII~I 1 11 1
- - I.
I
I
It
t
I
I
f
i
Is
I
dd 44 4 4 0 d d4d - 0 meem ?~.Y;u ? pp:; .. ??? ? b hhkb WN4 0 d,, N4 I z IC I"
0-
N4 b ' IC WN4 0
mim 22 mm:* Ng 9 @""% w nm E~I ;PI
dd w m g $gzz p:zTmm n*'
VI HZZ, =?*g 22*2s if3 - ' c)m*aJ ?? -45 JDDP85 u u(nu a
-- v) m M E,-. gqz; OM 1s;
-.d-L11-4
4- JNJY3dn
YY 2 * :Ez $ m 6*,- 0"ii
zz= 2 *e= s's*,-, 0'0: ?? =! = - ZE=L;;; 3=:
-0 mm m 1 $if
3 ZZB g+
3 $7; gg i i;
Y'I ."5 :a I
38 5 818 $ n om1 *en jj: 111 zag wu 88
#-4 goglz PI- I 0 *NN -
ow
-m I f m1'I is-!
m2 i
om i (A f$:% I E .-b I R
I
oum w 2 my - ;."
mP I ne 86: I X
3 3 m xw I
I
I I
I I
(
I #
;; Y
ow - 000 0 v)v)vI I
44 ?? !5:q .I
qwJ
'I $$;
L. 3.3.4 r-r I;;"
$3 0,
N f$C 0-1
www >ai OR i
\ O III 0 IW\ 0 >$inN: a>'--* 05
-4 I, 44 3 vIv)o NN
ii
5
p: q; 3:
3' $33
2 cc
w 'I'I'I m
'I1
\\
c
PZ 880 m
4
I
(I, O in\ O pa'p I I ---- : ai www I, W
0
W
I
OC ow:-" 0 > II \ eo. 0 IW\ i
nww I,
W >
I --,
:a I 01, 0 WII nnn + ;g f"
I- I-
I I
I
I a- I
I . I
z IF
I4
0 III~ 1-
W **
0 I I IW .a
W :E
W la
I1 III 0 www e , i=g i G W i-, i 3
0 wnsn @I*& en
iE 0 IW> O wnw @*ax an i- is 0 In\ 0 nwn .SIC I
:= I : I
:O I : I
www 0 *w\
* IO 0 en\
80 III
1
Y
I Ow mz
I cl
I m
I 0
www II
I I s I- 1
I
am 0
I IO 0 IW\ www I *b
OI
I
W I- if o
I eo1 0 IW\ wwn l8Dt ;U I-.
81
I
I I
I- I i F) In\
I 48
01 811 0 IT)\
l
I e- W
I I cn OB ID*
.I 8 WII
I# I OII
1
\
W I I I I I- I 0
n IS wnw 0 IW\
I.-.. 8
8 I90 0 in\ w nww I(j8 i I, n
I 0 0 *n\
. I- I .. nnw #I OIS W
I ---- I I
nnn n I4 n c,aa 0 ;m
Y YYY
* Y I I
L - - --- A- *Y)WWO~B C)~W)LI~~ .* man OQ Y UYY vu .............. :;e$: ." ===:: 8;Yb Lli?.id:2
090 <,,,<P*;O% gz~~mnoo
25a~nc,n~ ~g'c,,~= Hsc
3 SEE?i% a<;BiF= q; *am ;;; ???; CPC~
or-
I+ I*
1- clSnu)u)w+m W-~WWWW -E%.. ;
?87"4gs=
qqgI[SZ$ ::3,,23 0- +g 523;
m a Loq2 a- *-% 2..
E%%: ccc. L; ?s: ;?? nnne $5 80-m Sa inn acnl %' i g? 222: ; O- ') 8'pZ 1P-m 888: ' ~mnmw zf :&; ZZZi :s!L ???:
- :a- aaa:
$E irr4"Pgsi =m24gz~ :::zmon:
2 &i*: Gm qz za2 ;FY #-- --- no-: I
-c="(TE qpz; z#= IFF ' 1 "$E37
f gca? P sq;;P3
4 gss i3 L$ YYY I
j& q Z??C* 2 3 2c x*- r, pg c, m: !3~ 6') fjf;; a gz = 8% ; 3% : 2 :s .
i g3 ;:8 on q ; p I I s i; wm c, E' ; ~ ! : E Z# 32 pi
% s Fi 26 7
0 17')
P -0
>ww: -7 not +Pi *2"$'*3
x,soa I. m n -..*a 0-6 a wC.R-3 - ?i !;I ;d /!i ?g;zgn> Slii3ti a; ;zu I I
I
I I I
c ao m W o IN -@. Ita $$$:%
no i$ :e
2 :1"
c, 0')
0 'j'""l wo 137 %E%:, G
W
o ws m 2- I L
, i I.. *u) 0 J2
5. a I
m 2 c, a * m
0 x n I
1
I L
I . e
I-.. on ; N
8. n 7 :a
I I 1
I ---- .
4
I t
c
C
7
I 2
#I\ e,,:> : I I>
e-N I 3Y) : s8 I 0
I i 4 Irn$I:
E; : s-4 I iz :
W L 8 0;: em 0 **-.
a M c.( m ot rf
M $ e- cfn -3
n .."E r iL5
Fg if:
1
I I
c,o 8 I No ia81n I
c, !I:
8 I : c, 108
, I I --,
1
IC) I- I- IC ,*<am e-
I4 $4
on
00
! a,c $ !!$
oc *c, :," e,, I1 I IO n e.
I
I
A r c n 8% gc 4.T ;
c,o i; i I I- aw I Fi
; 6 5 ;- ;#
40, @
I h
I :g *lIlW I;o
em
PI ?x I *a, IIIIC) ~m
0% IlI \ r
n 0
I .
I 1- I a: m
I I
1
I III DDIIX :Y) I"
I I Im
Ill
.. c
I
? !i
I 1 I I :-g; I- E
I :-4: e 4, 3
I '*OiC ::
IBI "Oi- 1- 'n
I , I m~
I
*I,
I I
I I 1 I
11 1- 0) #X
IL
I
I- an I
IIOlP I
d I e- I
Ill
I
I I *&I 101 :r :
I
I I
I
I * *- I I I
I L I
I- I I I **an0 I I I I I ----
*SI ao1l= I
I I I I.,
I I
I I I 8
I
I
I I
I i4 . I
I I
~m I
I 1
Y'
*-
3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
w W
RESOLUTION NO. 92-137
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CA
CALIFORNIA APPROVING A PUBLIC FACILITIES FINANCING PLAN FO
FACILITIES MANAGEMENT ZONES 11 AND 12.
WHEREAS, Section 21.90 of the Carlsbad Municipal Code reqi
preparation of a Local Facilities Management Plan as a prerequisite to dev
within specified Local Facilities Management Zones; and
WHEREAS, said Local Facilities Management Plans must contain a
financing the public facilities required to serve development within the Local
Management Zone; and
WHEREAS, certain Local Facilities Management Plans, including the
Zones 11 and 12, have been adopted by the City Council on condition '
prepare and submit an acceptable Financing Plan prior to recordation of any
or issuance of any grading permit or building permit within the zone; and
WHEREAS, the property owners within Local Facilities Management '
and 12 have prepared and submitted a Financing Plan which meets E
requirements of Section 21.90 of the Carlsbad Municipal Code, and staff recc
approval of the Financing Plan as submitted.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of {
California, as follows:
1.
2.
That the above recitations are true and correct.
That the Financing Plan for Local Facilities Management Zones 1
is hereby approved as submitted. 1
....
-***
F. -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
- - PASSED, APPROVED AND ADOPTED at a regular meeting of the City Cl
the City of Carlsbad on the 19th day of MAY , 1992, by the
vote, to wit:
AYES: Council Members Lewis, Larson, Stanton, Nygaard
NOES: None
ABSENT: Council Member Kulchin
ATTEST:
\ACETH A(ddA U~ N K R A N Z, City C I e r k
KAREN R. KUNDTZ, Assistant City Clerk
(SEAL)
f
2.
I a *
E
E
I
I
I
I
I
I
I
I
I
I
E
E
I
I
I
FACILITIES FINANCING PLAN
FOR LOCAL FACILITIES MANAGEMENT ZONES 11 AND 12
CITY OF CARLSBAD
April 13, 1992
Submitted by:
Zones 11 and 12 Property Owners
c/o Fieldstone/La Costa Associates
Carlsbad, CA 92009
P.O. BOX 9000-266
Prepared by:
Onaka Planning & Economics
P.O. Box 230906 I Encinitas, CA 92023-0906
(OP/E 103)
I 0
t
E
1
I
E
I
T
1
E
1
I
I
I
I
I
1
I
,,
FACILITIES FINANCING PLAN
FOR LOCAL FACILITIES MANAGEMENT ZONES 11 AND 12
CITY OF CARLSBAD
April 13,1992
Submitted by:
Zones 11 and 12 Property Owners
c/o Fieldstone/La Costa Associates
Carlsbad, CA 92009
P.O. BOX 9000-266
Prepared by:
Onaka Planning 8z Economics
P.O. Box 230906 1 Encinitas, CA 92023-0906
(OP/E 103)
I 0 W
TABLE OF CONTENTS
Page
I
1
I
1
II
1:
I
I
I
I
1
I
I
I
I
I
I
I. INTRODUCTION I- 1
1. Purpose and Use of Document I- 1
2. Areas Responsible for Facility Financing 1-3
3. Financing Method 1-3
4. Timing of Need 1-6
11. SPECIAL ASSESSMENT DISTRICT FINANCING 11- 1
111. FINANCING PLAN 111- 1
1. City Administrative Facilities 111-6
2. Library Facilities 111-7
3. Wastewater Facilities 111-8
4. Park Facilities 111- 10
5. Drainage Facilities 111- 14
6. Circulation Facilities 111-38
7. Fire Facilities 111-62
8. Open Space 111-65
9. School Facilities 111-66
10. Sewer Facilities 111-68
1 1. Water Facilities 111-79 a
APPENDIX A
APPENDIX B
Facility Areas of LFM Zones 11 and 12
List of Facilities Which Are Funded From
City of Carlsbad Development Fees
i
w 0
LIST OF FIGURES
Page
3-1 Facility Areas of Zones 11 and 12 111-5 A
3-2 Drainage Basin Boundaries - Zone 11 111- 18
3-3 Drainage Basin Boundaries - Zone 12 111-22
3-4 Sewer Basin Boundaries - Zone 11 111-7 1
3-5 Sewer Basin Boundaries - Zone 12 111-74
3-6 Water Service Area Boundaries - Zone 11 111-82
3-7 Water Service Area Boundaries - Zone 12 111-85
LIST OF TABLES
Page
1-1 Comparison of Annual Development Projected for 1-7
LFM Zones 11 and 12
2-1 List of Facilities for Zones 11/12 Special 11-2
3-1 Zones 11 and 12 Facility Requirements, Source of 111-2
Assessment District
Funds and Financing Guarantee
A-1 Relationship of Facility Areas to LFM Plan for A- 1
Drainage, Sewer and Water Areas
A-2 Facility Areas, Owners and Projects A-2
.. 11
I 0 w . I. INTRODUCTION I
II
I
0
E
I
1
1
I
1
1
1
I 1. PURPOSE AND USE OF DOCUMENT
This Facilities Financing Plan has been prepared in accordance with and in satisfaction of t
requirements of 1/16 City of Calsbad Growth Management Program (Calsbad Municipal Co
Section 21.90.010 et seq.) for Local Facilities Management (LFM) Zones 11 and 12 in t
southeast quadrant of the City.
This Plan describes the proposed financing method or methods for each of the facilities which s
identified by the Zones 11 and 12 LFM Plans as required to meet the City’s Growth Manageme
Program Performance Standards. The financing method consists of:
(1)
(2)
Source of funds for construction of the facility.
Method of guaranteeing the availability of funds, if required.
(3) Source of public funds from which reimbursement is made to the developer oft
facility, if applicable.
Separate LFM Plans were previously prepared for Zones 11 and 12. However, the two zon
share responsibility for financing many of the facilities, particularly circulation and draina
facilities. For this reason, a single Facilities Financing Plan has been prepared for both zonr
This document may be used in the following ways:
(1) For Special Conditions as described in the LFM Plan of either Zone 11 or 1
Section I11 of this Plan describes the financing method and the subarea or subarc
responsible for providing the financing guarantee required by the Grov
1 m Management Ordinance.
I- 1
1
1
1
w
(2) For any development located in LFM Zones 11 and 12, Table 3-1 of Section I11
identifies facilities for which the developer must provide the financing guarantee.
To facilitate use of this Plan, the Special Conditions of Zones 11 and 12 LFM Plans have been
reproduced verbatim in Section 111. They were obtained from the Zone 11 LFM Plan which was
approved by Resolution No. 88-46 on February 23, 1988, and from the amended Zone 12 LFM
Plan which was approved by Resolution No. 90-264 on August 21, 1990.
This Plan is based on and is consistent with the information contained in the LFM Plans, with
the following exceptions:
(1) When available, updated cost estimates are used in place of estimates contained in
the LFM Plans.
(2) Updated information on development phasing is used. As a result, some threshold
standards are satisfied for additional periods, extending the number of years until
new facilities are required to be constructed.
(3) An interim fire facility has been constructed to meet the City’s Performance
Standards. This Plan addresses financing of this facility from all benefitted
properties within Zones 11 and 12.
Cost estimates have been obtained from various sources, including the Zones 11 and 12 LFM
Plans, the City of Carlsbad Capital Improvement Program, and estimates conducted for individual
facilities by consultant registered engineers. The reader should keep in mind that these are
estimates based on plans in various stages of development. Further cost analyses shall be
conducted as additional planning and design information is made available.
1-2
I * 0 0
I
I
I
I
1
1
IE
I
I
I
II
f
2. AREAS RESPONSIBLE FOR FACILITY FINANCING
In order to clarify the responsibility of individual development projects to provide speci
facilities identified in the Zones 11 and 12 LFM Plans, the two zones have been divided by ff
Plan into 15 Facility Areas, which are shown in Figure 3-1 of Chapter In. This figure
intended to assist the City and the property owners in the satisfaction of financing conditions
development.
The Facility Areas are defined primarily to identify individual ownerships. They are also defin
to correspond where possible to infrastructure service areas as described in the Zones 11 and
LFM Plans. The correspondence between Facility Areas and infrastructure service areas is sho\
in Table A-1 of Appendix A. Table A-2 of Appendix A lists the property owners and/or nam
of projects, which are located in Facility Areas, as of October 1991.
I 3. FINANCINGMETHOD
The following sources of funds and financing guarantees are used in this Plan. The applicati,
of these funds or completion of specified actions identified as "financing guarantee" sh:
constitute the guarantee that facilities will be provided, as required by Section 21.90.080 of tl
Carlsbad Municipal Code.
DeveloDer Funding
Under this method, the developer will fund and construct certain required facilities prior to
concurrent with development of his particular property. Facilities to be funded in this way a
those which normally would be imposed as conditions of approval of a tentative map under t 1 City's development review process.
1 The financing guarantee shall be satisfied prior to the recordation of a final map by either (
construction of the facility or @) execution of an improvement agreement, subject to the approv
1-3
I
I
1
w w
of the City Engineer and in conformance with Sections 20.16.060 and 20.16.070 of the Carlsbad
Municipal Code. Said improvement agreement shall be secured with one of the following forms
of security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management
Director and City Attorney.
Zones 11 and 12 SDecial Assessment District
The owners of vacant private property in Zones 11 and 12 will establish a special assessment
district ("Assessment District") to fund certain circulation facilities, specifically Rancho Santa Fe
Road North, Rancho Santa Fe Road South, Olivenhain Road, and El Camino Real, subject to
other terms and conditions of the Assessment District when formed. As an alternative source of
funds, Calle Barcelona is proposed to be constructed by a separate assessment district or a
community facilities district. Section I1 of this Plan provides a general description of the
Assessment District. In determining the allocation of benefit of facilities to property, the
Assessment Engineer shall not assign any costs for Calle Barcelona to property in Zone 11;
furthermore, that portion of assessments to Zone 12 property due to Calle Barcelona shall not be
permitted to pass through to the ultimate homebuyer, but shall be paid in full at the time of close
of escrow for homes within that zone. In addition, because all facilities included within the
Assessment District are not needed immediately, the Engineer's Report on the Assessment District
shall contain specific provision for a phased sale of bonds to correspond to the time of need of
the facility. To assist the City in determining the appropriate estimate of timing for the sale of
bonds in phases, the property owners in Zones 1 1 and 12 have prepared an updated traffic study,
which is submitted separately ("Circulation Facility, Local Facilities Management Plan, Zone 12, "
prepared by Weston Pringle & Associates, with an expiration date of June 30, 1993). This traffic
study will be referred to in this Plan as the "Pringle Traffic Study." The Pringle Traffic Study
is not intended to supersede the City's monitoring program for Growth Management, but is
intended to supply a guideline of timing of need for facilities.
1-4
I 0 m
I
I
The financing guarantee, required by the Growth Management Ordinance, for facilities to I
funded by the Assessment District or a community facilities district will be satisfied by
successful formation of and participation in the district following a public hearing or by 0th
guarantee which may be deemed acceptable to the Financial Management Director and Cj I Attorney.
1 Citv of Carlsbad Communitv Facilities District No. 1
The City of Carlsbad has formed and voters have approved Community Facilities District No
to fund construction of certain Citywide facilities, including a number of facilities which 2
required by the Zones 11 and 12 LFM Plans.
1
I
E The financing guarantee, required by the Growth Management Ordinance, for any of the facilit
to be funded by Carlsbad CFD No. 1 is satisfied through participation in the district.
DeveloDment Impact Fees
1
I
I
B
II
!I
1
I
I
1
Capital Improvement Programs of the City of Carlsbad and water and sewer districts cont;
plans to construct certain facilities including a number of facilities which are required by Zor
11 and 12 LFM Plans. The source of funds for these facilities are development impact fe
which are collected at issuance of building permit.
Facilities which are proposed to be funded directly from development fees include wastewa
treatment facilities and two years’ operating costs of the park and fire station. For facilities wh;
are proposed to be funded from development fees, payment of such fees will satisfy the priv,
developer’s financial obligation for these facilities, as long as the applicable Growth Managemc
Program Performance Standards are satisfied.
In the event that the applicable performance standards are not met and the City does not ha
sufficient funds to construct a required facility, the developer may elect to construct the facil
1-5 m
rl e
and be reimbursed by the City at a later date. Such reimbursement will be subject to conditions
stated below. -
Reimbursement from Citv of Carlsbad Development Fee Fund
If a developer constructs a facility which is included in a fee program (see Appendix B), he shall
be reimbursed from the applicable fee fund, subject to the following conditions:
e That sufficient, unobligated funds are available;
That the reimbursement is consistent with the priority of project funding within the
Capital Improvement Program (199 1-92 to Buildout); and
That the reimbursement shall not exceed the maximum amount budgeted in the
Capital Improvement Program (199 1-92 to Buildout).
e
Parks Agreement
The required guarantee of parks facilities shall be satisfied through the execution of an amendment
to the existing Parks Agreement between the City of Carlsbad and Fieldstoneh Costa Associates
Limited Partnership, together with the payment of applicable Park-in-Lieu Fees and Public
Facilities Fees by properties in Zones 11 and 12.
4. TIMINGOFNEED
The LFM Plans cite years by which individual facilities should be constructed in order to satisfy
the Growth Management Program Performance Standards, The projected timing of need was
based on an assumed phasing of residential and commercial development in Zones 11 and 12.
This schedule was not realized due to various causes. In addition, the revision of the Zone 12
LFM Plan resulted in a lowering of the residential buildout total. For this Plan, the property
owners provided updated phasing of development and buildout projections as currently
anticipated. Table 1-1 compares the phasing and buildout used in this Plan versus that used in the
1-6
I 0 0
I
I
I
I
I
I
1
I
c
1
I
I
i
1
I
I
1
Table 1-1
COMPARISON OF ANNUAL DEVELOPMENT
PROJECTED FOR LFM ZONES 11 AND 12
This Plm(a) 1988/1990 LFM Plans@)
Year Residential Commercial Residential Commercial
@U) (Sq. Ft.) @U) (Sq. Ft.)
1987 0 0 383 0
1988 0 0 117 0
1989 0 0 432 46,885
1990 0 0 5 10 285,789
199 1 0 0 725 285,789
1992 0 0 625 285,789
1993 499 0 590 Buildout
1994 599 57,700 335
1996 5 12 304,900 164
1995 599 133,900 207
1997 456 189,400 72
1998 515 Buildout Buildout I 1999 268
2000 152
2001 Buildout
Total 3,600 685,900 4,160 904,252
1987 Existing 1.169 0 1.169 0
TOTAL 4,769 685,900 5,329 904,252
(a) Preliminary estimates, subject to change. Data are from NBS/Lowry, "City of
Carlsbad, Assessment District No. 91-1, ADT Allocation," February 6, 1992;
property owners' estimates; and Onaka Planning & Economics. NBS/Lowry
estimates a total of 3,913 dwelling units within the proposed district boundaries,
of which 212 units are in Zone 6 and 101 units allocated to MAG Properties are
anticipated to be developed as commercial.
From 1988 Zone 11 LFM Plan and 1990 Zone 12 LFM Plan (amended). @)
1-7
w W
two LFM Plans.
Based on the revised phasing, the Pringle Traffic Study was performed and submitted separately
to the City for information and review. The study indicated that many circulation facilities would
continue to satisfy the Growth Management Program Performance Standards beyond dates
indicated in the LFM Plans. This Plan utilizes the updated years of need to assist in the
determination of timing of need and sale of bonds for the Assessment District portion of this Plan.
1-8
t 0 c
1
1
I
I
I
1
I
1
II
I
I
i
I
I
I
I
II. SPECIAL ASSESSMENT DISTRICT FINANCING
A spec.al assessment district is proposed to be formed pursuant to the Municipal Improvemen
Act of 913, the Improvement Bond Act of 1915, the Integrated Financing Act, or a combinatioi
of thest I acts ("Assessment District"). The proposed district would include all privately ownet
undeve oped land in Local Facilities Management (LFM) Zones 11 and 12. The district WOU~
also inc lude properties in LFM Zone 6, for which the approval of tentative maps is or would k
conditic med upon a fair-share contribution for the improvement of Rancho Santa Fe Road Norl
to prirre arterial standards. The facilities to be financed by the Assessment District and the
estimat XI costs are shown in Table 2- 1.
In addi .ion to contributions from sources outside the proposed Assessment District noted in Tab
2-1, cc ntributions for these facilities from other property owners and agencies may occur in tl
future. Such contributions would reduce in proportion the assessments made to properties I Zones 11 and 12.
11- 1 a
w 0
hn~~ ma@u ooo#um u u a: OR:2 0088:2,%,;q; uv) ;p 2 o-o'*-: C 2=
0) In T q8 -0
I I 19mlgI' p f .C fis - a Q
.C
325 i
UVL I .YY ,w.U,N,: m.: =- d ,s 'L zz:x ggg;gblol.- c
u, yo-o-: ui;: z: z u $2 d s : --a: 0--M 1 T:m!: g a UVL I . .I . .WY I 0 b' 0 2 a~ m- mI *-:s Y :t. I !
'rm 3gj;e eo0 I E .&I
:k-g
c 4- 1N O-,aE8:3: mat: .-:*. o-N' e Z2i
c o mI a1 E=:= '0, :z"gig c
%=;z OOIOl p;fi; d
)L u $2;; .E 9
u s : EE N-?: I u-2. Y L :s%u d ---I ,: -a08 E3; 0
1 '==x 0: u ?E.!; o1
:uq A g b.. : 2 E+
:g2= rg c
malm 000 h IL V 2.z u ai- e %EZ PC L4q;z-
m? -6- I 0.h I #C6> 0 ii cn= 2 'c .- - ;-,.e 5 m ow -- 0 - 3s vd*gi g= i all
? Ea ?Q = - v 2 u *L a
*- l/)a - w E:
0 : :,,E 2s /;Ek OA
I o1u Cnllg2 ; -2," t 0 mu 65 hg;
mu I I -.mu 2 k g; 6 01 2. : o1Z.f e ..- a- c II) u N yl/)i E- - a= .,o 0 e- c :EE 3e:gj I ouo) ?I IN-C Z z -0 o'c'c '53: -c r9: N. '- 0)Y y. NNim n h$'E GAg .g- g 2 0 '$6: ZZk L U a $;: !x%!$? E! .;ni!< I- v). td 'c u .om c= 0 c g :k>m TlJL 'Go c d 2
: + P- dd u4.l za 00 ; ;a- 2 2.- u OB uZiEE :$-;E 05 ;x s .2 .E :*E$- mu g4 -u z >- -* ':% 8 z. ; -- w *B 2:::-C kz: g
u ;u : -5E 05 am.#
kU "2:
I : 2.2,- ZGG u .c E ZUL 6 :3gN g;; p e &..?I a= -2 k
; ; gG%y.-nn CLAf22 6 t 5" L
8 .-mu* ~~~A;s.GS rcj t!
lUo1 tuum :x-e?.!%%Ey rmm e'GE LO d f .:
3 m' E --aufii; --gz >u 82 : IL '0'";d;Lg
'8 *gY;%%gr- u e.;;L l3 $1
u u u d =; .E 6 3 2 5 D H
!E %i a OsZ i IUO, e" C a- %LE
! 101 k!! -mu %YU .c! w uo1 'jE-kY;EEkc.
1 w.-* 4 x4gz s* 2iiSireaa OU
ru "3 k uI w-c
'4 .d;.'Eoxe.L =i64 I #mumum o12.W .C CZiLZ $: &n:z*zzzzz
Io1 L o1.r rA u) ,,.E?
: gt2-g Zi'i3 :! z =: : u nna~zzz~'gf,~,c*G~*-- ?u'-
I I
3 .C
m
0 I I 3 nr:: 0
c nnn o a:
0. T : = C e- 'c 0) a U
+- In am01 0-*N 0-NI
.C
rg
U
.C i58" d LOW. B ----------- ----------
E
a U a ~rnm 01 I -- am c-qu 0
Y
00-1 UL I
m, I
v) I LU a,
uu E d a
~m euu; u u 0
aE
EC2
3'"
z
N b" 9 'malC 'my x .- : ,L 6' 2 2
W am - I- ? 'co 1u : Z?.- na - 3:
.I IC u c zg:hN - OM a
- a& w - -0. 0 00 h, U UL'c 9 :NOu v; 5 4: auo 4" 0urrl-c 9 h. : W!
> 0, '0. ; a- w N W I-uu a
00 am 00 ica- u
"a .I a- I h -- c
L
=I
:sf= -2 g e4 Q m - 5s:
0 8VFaJ byB 0 ;
3 SZ3 5: 2 a .E
UY ., M*; 2% 'vm* c
tuuc Or- 6% E' g,, nS
-M : g,Of -a u a-
8 VCnJ
Nh a 0. I= m-2 Zk E o v)g% 'Lv .- LU o1u t UI .C
c a-
c ? U
ma "&I, u?f
; ~~o2W~upg"- ,QU.
a V)L n .- u c c4
c4 0
b
o1 u a m u u c u .- u Y :e
m OL
au- L -0 m - d
o1 OaJ - u- Lm la52 -tzaaif;i.i $5; '5n*oo
I UZhu'E
I w3v*_c
: u="s.o
I vu.- -urc a- -"cam %; ;;vuvvvvvmu+~v~E3!
aaau2.E 22ESS u- uI
I aom .o Q e#a d Gdu' 'cm 2 .2 L. I **I& e2
N 4.l"
4L-i LLL 0V.u
N' *E o 5 5 'c 8 ' ,.c c .c i w *E Q
0
3
8 .-
U
U'EV.ZS uu uau-ou~
I ououooo
* 3- 0 o1 c
U
I LL.-
a. 0,. 0 e
b . 0 0
ID. F'INANCINGPLAN -,
I
B
8
t
This section describes facilities required by the Zones 11 and 12 LFM Plans, source of funds,
and areas responsible for fmancing. A summary table (Table 3-1) and a diagram of Facility
Arm (Figure 3-1) are followed by individual sections corresponding to categories of facilities
defined by the Growth Management Program. If Special Conditions are contained in the LFM
Plans, they are reproduced verbatim in this Section. The Special Conditions are shown in italics.
These are followed by descriptions of financing methods for individual facilities. 1
1 For Drainage, Circulation, Sewer and Water facilities, the financing method is described for eac1
required facility. These detailed financing methods contain the following data: 1
I
I
I
t
1 A).
I
1
I
8
Special Condition The identifying number of the special conditions
referenced in the applicable LFM Plan.
Cost contained in the LFM Plan or the most recent
cost estimated as available. Costs are for
construction cost with contingency, but mt including
engineering, bonds, and fees.
One or more of alternative sources described in
Section 1.3.
I
Estimated Cost
Source of Funds
Financing Guarantee Guarantee applicable to the selected source of funds, as described in Section 1.3 above.
Facility Area or Areas which are required to fund or
guarantee the facility (see Figure A-1 of Appendix
Responsible Area
Reimbursement Reimbursement due the initial developer of the
facility and the source of funds, if applicable. I
111- 1 a
I I I h
W 0
no 22 0 WI QQ vu U CI vu 2:
I ----, I uu I Oi>> YI aauuuu uuu VI< IO I -I
I I UY
D =I\\ * uu e -I I I I YU
UI na~uuu UYU VI- in * =a\\ I uv * -* I I
I uu
YI nauuuu YYU VI< 10 t -I*\\ I uv
21 I
-I I uu
VI UI\\ UI aaunuk UYU VI< IO =I I uu <I -1
3d I
-I I YU
IC IUU
I
us aauuuu YUU VI< a0
v: -1
YI -I\\ YI anYuYk YYV m< I I f5: --:
E: * uu
WI a:’=’= a1 ‘ uu
5: I uu
e8 Yl\\ YI aauuuu uuv mu tal
t: Wl\\
I uu ; i g-; 55 Y, nauuuu YYU VI< I I
B; -0
-I 1 N-i
VI1 XI\\ 1 uu
I
mu I I Il14II 881 &&I
f 8
E!
BW @ -I AI -I
23
25: $86
d I cc 00) U
Eg
%E
e
w
VI1
YI aauyyy uuu v,( I I
1 -I
<* I vu
*I
I -I
I uu
1 vu I, I, nauuuu uuu
nauYuu YUU
aauuuu UYU
aauuuu YUU
YU
VI 1
<I I uu
*I I, IU u* a#\\ *vu
I nu * UI\\ IN IUU
z-4
Wi13
I --I
1 I
VI1 I, UI
I --I I I
VI, I, :Em i kk YI * 10 N-, uv
I <I\\ UI aauuuu uuu VI4 I1
,
I uu b*g -L--. I uv
& uu
I uu
* \\ h;h;
22
Q uu 0 I na -010 c uu .- .L
dd .c .C
0 Z
0 00 U QQ V YU
EC E .s! .E I ..
A
N
VI1 00 n I zz
28 YY
1 .-
r r - I U 5.I ii 4 -- uu . . Wd d
ii u z: ee k-4
I uu YI F4 w 00 uu
LL *d
vu
WI O: 1; 2 i ;; VIU)V) uu SI >>uuu; uu YYL 22 55 aluuYYo uum
VI I uv WV) noaaa~ aav -- on
c
rl I
rl
f3 I
I
z 0 N
I I
I
I 1 E
I v) m m
.-
I o mo os E g *& (D 0 .-
0
1z -
C SzQorCL PQY IO
4 IC IU
IC
#VI *= wu 0 1-VI W 0
mu .- L c mw am Y 0 .C 2? 2 E t; - Ye, u I,% $f E: *e V 2 L-ESSE .I? .C .C .L YSS” 255 u gvww *E kzzr
:x: -mY Z5.z 0 YYY f=”.,O pyLc.E
*a -- LUU$ gg=z
w VI X?
Y - I-.
.-I I IY - xz $2 ,I Yu333z.2aY3m 2 .E m 0 LULLL woLLa
8 IU **a ce CU- u xmmo mz2Eggigtgg, IzfugB
I +m gz; IY~AUUUV a uw-cmm U C1U-I Id> z<
?‘f. YlrN wmm u eueuuu e** mmm myl
-I dl -1 2;99 3’;y 0 ’;~~.~~~ \YO; OWN ...
* ,. a 8
I
1
I
g 1
88 sw
GE Et5 22 1
I xgu
gsg I GZg Eg
Y 1
I
1 rl I B X
I
I
1
I
I
I
I 3 WI
21 G: , I ---- I
l I I e 1 08 1IIlIIIIl I, <1U1<8 <<<u
I -1 I I I I I 2; IIIIIIIII I1 <IUI<I <<eu
I -I I I I I 1 Le ,I,IlOII I* <IU*<I <<<u
I, <lUI<l <<<u
I -1 I I I I I 41 IIIIIIIII
u: -: E: UI Y:
Z!
IollIIll I1 <lUI<l <<<u
21 <I -1
1101',II I. <.Urn<* --=La
v)
YI 7, IF I
1111llllI I1 <loci<* a<<u ' 1 E!--; wa I w-:
-I I E-; g; -i I XI I11111111 ,I <@UI<* <<<u ::
cn:
a:
I .11111111 I, <IUk<I <<<u
W
WB VI ai I * -8 I
I 11111*1*1 I, <IU*<I <<<u w, YI <I I
>I Cl -I WI
-11
UI
<I Yt a1
a -I I I ,,,II1,1I I1 <IUI<8 <<<u
I, -, I ,
I I -- I I I I
IIIIIIIII ,I (IUI<I <<<u
<uun<% <<<u <<u a
< <YUI<\ <<<u n 1 N-&
I I < <UUI<\ <<<u <
0 IIIIIIIII a\ I <I ---- I
I UI anaa\\\on ana *a : 2-:
IW <u< tgm: aaaa~\\aa 14 00a
n
W3
I
YYY
I
I N 2 2 2
I ? ?7 bk#k# 222 2
I *a- * * .z .z .z c ddd *
20, rr cina
.r 0 .L.C uuud -'= .C == UY. uu z U rz.r - d
.C
uuw HE',
t ::a 23
'fiz2ter ugs
I CIA .a 6 I& Emou Ew
Q ZdP
I UUUn *E<=rn f UOLO uzu & nji
I m2?L,r : EQUm EU$E OLSU2Z I uuvvvv daq 3 wd .A
i .E .E .E "35.555 = .E2 -a!.wa= !Ya p<yzgy *OWL 18 I * : <&&~~Yoooovoo 0 add* OPd ""mq3,"t.i I IC cs Em C !E€ €.E€ t
i:---n-:-n 5tuu\\ Ucn*~YY U
5" ,uWw-,,q~zz5 ,gyyyyyyyyy N u- E
U# qqh;qqy=y sc .. 9 'Yrn??? h;Q?';
- .C .C
ddd
.C .C Ir
t!
2
5?
cnI
01
000 ZI z: YYY (DQQ
YI LLLL
04
Y
%i WI anaa 2tzA~v~; ;i -CUP-- "NU
0 :gs $$ cog$$
, gggg.'.'.'!$ i.5 .-: .C g 1.E f <<arn
-L uuu Y m Y crl rl
*dud- u: dddd.. .-- d. uUUU---uu u- c
rl I
8
I
I C .L
I umw 4
t u ow >Q 0 N
I
wu- c
I 06V1NUzzzz 22
CtOC aocw I m00-LLn0000m00
,,&zgss&&&&a%& aee8':e -w -~'riFs-1u-'F6wu**O aZg imE2 ::zzz:szzzz:zz
a muowYux-yu<- ZL,--ncn~,
0)
, CIAhCIhCIACIh CIA lnuu
e t:N
-In -I
-I 0
5: lnlnlnlnlnlnlnlnln my\ 0 d.o*.o.os .o***
l e W
I n I- nn- Yuu v. Y E!: 'p, YYY 01 a!,
I ----, I
I 4
Y
4 I1 : o:,, YYY \Yl a Ill e -1 0
I I 8 =..e
I -I P
6 I : =:I1 YYY \YI p
I del, YYY \YI n DI~ I
.
Y
I I I, YYY \Yl 0 I11
Y
I1 IIO I
I -1 n
u: -: P
I I I I Y
I1 =*
=s <I -1
31 I
YI 7III
m~
Y
P
-1
I an us Y+l YYY \Yl 0 III
I Y
P
LL
n
-I
I 80 YYY \&I n 111 IC I 8: --:
1: "-: I, I#-; 1 I YYU \urn n I,. wt
UI Y I I1 nuu \YI n 101
g; -:It YYY \UI n ne s <: -:
YYY \ue n PI I
LILY \YI P 01,
YYY *BY 13 I,,
* =a#. i; -; 0
6
Y
P
Y)r
!
# ;; -i
!E
w . I I1
I Y WI
I I, 0
Y
0
0 2: Y'D' mu *; -i
Ec
3
238 33g
I 01 -e w:11
YO n:mt
-I1
<I
I n*
I -- I , Y
I, : u:e< YYY \YI P .,I 3
i Em i 35 ILLILL \Yl 0 I,, <
: *;e< YYY \ut a e,,
I 1 I e-, n n IN *en
Y
I,
I
P t N-r 0
<a n
Y
I I, kE4'g --I--,
N c
I a
L CI
czz ova 88 '- Y LL 1 -'n : P; 5-62
=I La nwv) e2 0 2;o'
u 85,
Y) I <a ~NN v)v)v) n ann -
I i 82 .C
;ti Y
WI && iii .C C ii gi*zB
$;3$ utg Y owe, L
lLlL
c
4 c
LE %e{ 1 @E v)IPv) nn -Id
W 0 *I
auE
cc -e I.
k4 cv BB -- ddd gf
fZ
x
L5E WAY i ;+ e.? 2 g YYC 8 v) 2: :sd WO UEI :og tS*-gS 7803 -3- -I rrw c B - -1 -Id
ys&L;5 S!$$ !4 2 Mv)k e v --
*:wu E.:" .: $255
E: z2 9 Y?? ?YN? 0 9 Y?? J. 9 7? YObd <+ h hhrc 0000 0: ,o zzz ,o z zz
vvw - YY v)
d 82E 3
d
I
Pa LLk 2 cow
d
r( L
I 0 u e,
2
K I I : @& ux * e,= kc I wo
I >e, IU I da tu I ow le,
t W
W z
u e,-.
d .C
.8 .E .E Lo E
SLY 2
v, uu._o v) w f -me, t &&Z - c ;i
r.E.E.Ezs Yc
VI mmm a e--:?
N IN
e,L E8
L 0.
awo
LLW L a- m
K 0 N
*- 5 5 *-
w g- "a
3, fG5-G u -a w .. - I-- ~tl'c-a c 30 ow *-a - tx
c -- IL .)V a Yr
w m w QI w w vcc mmmgm 'gna % g:ib'2 = I d YtnV)Lv)
8 .uo a- ,msg;v
cm YY Y v)Wv)v) g gN -I, I,
I 0 e
I I
I , 1
WI CI
8
1
1
1
1
I
2: I
I
I I ----,
1 I I I
I
I
I I I
1 I I I I I
I I I I -1 I I
I I t I
I I I
lO11II I,,
I 0) I
n ZCIS~O 16,
I LIIO~ Ill
I -! I
I -1lIII IO I I I e* -8 31, -1 I I
Ill
I I
I,, 1- I I B
ri -I yn'*
8; -:
I f: YI vvn~a E: --: ;g+ I I I lam I
I I
I
I rl I * I ,*I
-1 I N-* I
I i
Y u
ZU
I m I u I c m 0
I m
u c -. %: z:
s WI Ill WI u:eII
z: Y:*'e I uu
f: w: *'I
G: -: 2: n:eBn
u
'1.
r$ I -1
I xgo i[l~lll <nu \It
I -5
$E k4
8 w
. :x -I
: e5
I '9' i4 rn i dg
i b -3 .C 6s .r
8 I +; i
ai
e -m I -1
I- t$a mo <I WI
U u- L s I,, mL
mw >,
w
Y
41
ur -* ao L or
IO I mu1
I -c
SF E5 2%
585
E
*,I
d
I VIIII 1n8 ' 6.: 4.0 2: u
I --I
0 t, " N ijj 'i 5
I I , 3 i$.E :
I s 5 *: u
5- rn UL M 6<
Y .C r r
0
GG
kpI I m
U ero rn
rnv $ 32
IN I I WW ! 5: ! c-l kl9
aJc3 'c w
Y M
u
a
rn .C w
L, : <:,*, 31: u
n ; 0)O
I $2 m
IC
I ---- I m
5 >
I
I
?kl t UJU
iJ Ea .C
I 0;; 5% N El gQ'k .C m L q Cd ;25 .C 'E w
":
I mrn em 4 : =VI mor * I YO B
E+
O?
n: Si
NI
ou =u
I rn urn
c,
s u .- 0
U *i 5 . u 0 E? 35 0,
I .-
w
Y .C s m on
UI
.C
U rn rw M
e
53 2- 3
rn3 .q [; Eq
*- 0 2 *- OC w
4 i $k VI0
;L* .r ne
01 6 s UU Y I x- LI 0 *- > m
rn LE izg m
OL .w ..rwuu ruscc
2:
w: UId22 .d,
1
2 8: i$k': .ff:; 08 r u E 1-
13 8
I
I
I
I
I .3q; >u 0 mow O)ZXLU
rnn UYLuUm
awww -wv 3;2&& zg: ?e non -n; - rn wo~m
I
4
I
u .C
I 5.5 0) c
1uuu U0I m
IXXX BWWW u-I k,; w3 $m *ii.![sL~ 5 rncm- w
e- v) i 1000 m-1
I>>' 1 ILL ,#: I0 ; :si3 E=; alg cuowcu u *- YP fh$PL& e, f :222 AA; *E*; LO 6cu0 8 L *- rn&Ec g :$:E 22; =pz 15;s rn LZO
:$ss <<; ro 5EL05.GS *ro=2 Y k g g ge3js i yqy'i i; 'L%*!
~aaag~)~' 'E" 0mo)mxzm oo.-u orno : ZcZ2 YoonwcY mDC-YvIv)v~v
=d .-- uou c
r(
r(
I om c22!';un.-rn I nnn I ... d: I WL . mn'E s c .- v- OOL aITE2-G Y
a+.- w z 0 'N Uo~dU 80 LV)aUV)w
BZL$!-T!* '- 8'in5 w
, &J .C .C -ueL
2
I cue I i;: e=* mu -u5 .,Sbg.g -= UOOY m 00, =r
uuu 3 nu u m I d-4 ~mmm ==a -
m :$Si ::; ' u$-2 auu r5oaru m ZgS:: sLZfu rn murnc 5
u-- I 4 mJz'&
I 0 a- 2:: %.-* -.-g .-mu muuo- N ns z; 5 E; ,y e E"$*;,.,i$ lCCC wan
I ..am- srnu3r
N >e C1
a* e,
-4 0 ,??v) ?rC: CLzw .............. nn nnn n 2: === -- IO 0-= -r,=uuu <uaunu)s 53 2ZZ Z
a
t
ZONE 12
ZONE 11
Not To Scale
EXIST = EXISTING DEVELOPMENT
H.S. = FUTURE HIGH SCHOOL SITE
0 0
*<
I
I
I
I
I
I
1
I
I
1
I
B
1
1
I
I
I
CITY ADMINISTRATIVE FACILITIES
Required Facilities
The following facilities are required:
Estimated Cos1
Las Palmas Purchase $2,500,000
Safety Center Phase II 3,695 ,000 I New City Hall 23,100,000
Total $29,295 ,OOO
The Same facilities are required for all zones in the City including Zones 11 and 12, There iu
no Special Conditions specified in the Zones 11 and 12 LFM Plans.
Source of Funds
The City’s Capital Improvement Program includes the above facilities. The source of funds
Public Facilities Fee collected at issuance of building permit. Portions of the Safety Center Pha
II and the New City Hall are also funded through Carlsbad CFD No. 1.
Financing Guarantee
Participation in Carlsbad CFD No. 1 satisfies the financing guarantee for the facilities includ
in the CFD. Payment of the Public Facilities Fee satisfies the financing obligation of pnva
development for the remainder of City Administrative Facilities.
111-6
a
w 0
LIBRARY FACILITIES
Required FaciIities
The following facilities are required:
Estimated Cost
North Library - Remodel $4,000,000
Library - Buildout 5,060,000
South Library
Land Acquisition/Design 4,006,000
Construction 10,700,000
Total $23,766,000
I"he same facilities are required for all zones in the City, including Zones 11 and 12. There are
no Special Conditions specified in the Zones 11 and 12 LFM Plans,
Source of Funds
The City's Capital Improvement Program includes the above facilities. The source of funds is
Public Facilities Fee collected at issuance of building permit. Remodelling of the North Library
and construction of the South Library are also funded through Carlsbad CFD No. 1.
Fimancing Guarantee
Participation in Carlsbad CFD No. 1 satisfies the financing guarantee for the facilities included
in the CFD. Payment of Public Facilities Fee satisfies the financing obligation of private
development for the remainder of Library Facilities, as long as the Growth Management Program
Performance Standard for libraries is met.
111-7
I 0 0
1
I
1
1
1
I
1
1
t
8
1
I
II
I
I
1
-* WASTEWATER FACILITIES
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
The following actions shall be pursued jointly by each sewer district' to ensure
adequate wastewater treatment capacity throughout a jive year period:
1.
1
Monitor Encina treatment plant flows on a monthly basis to
&tennine actual flow rates and to have an early warning of
Actively pursue acceleration and phasing of treatment plant Phase
IV expansion to provide adequate capacity.
capacity problem.
2.
3. Increase National Pollutant Discharge Elimination Systems
(NPDES) pennit to 27.45 MGD to allow fill utilization of
reclamation plant and ocean outjall.
The six member agencies shall form an agreement to maximize the
utilization of available treament capacity at Encina WPCF.
4.
Conditions 2,3 and 4 are satisfied through improvement programs currently underway at Encini
Water Pollution Control Facility,
The following mitigation is contained in the Zone 12 LFM Plan:
The following action shall be pursued jointly by each sewer district to ensure
adequate wastewater tremnt capacity through the year 2000=
1. Monitor Encina treatment plant flows on a monthly basis to
deternine actual flow rates and to have an early warning of
capacity problems.
'city of Carlsbad Sewer Service District, Leucadia County Water District, and Vallecitos Water District.
III-8
a
- 0
Source of Funds
The source of funds for sewer line upgrades and expansion of treatment capacity is the sewer
connection fees collected by each district.
Fmancing Guarantee
Payment of the sewer connection fee satisfies the financing obligation of privae development
for Wastewater Facilities.
111-9
I e
1
1
i
I
I
I
1
I
1
1
1
1
I
I
I
I
1
-1 PARKFACILITIES
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
1. Nor to the adoption of this Local Facilities Management Plan by the City Council, th existing parks agreement between the City of Carlsbad and La Costa Ranch shall be amended to include the following provisions:
a. The secured dedication by the La Costa Ranch Company of 21.2
acres of Alga NORe Park with the execution of this agreement at a location to be determined acceptable by the City.
The secured dedication of an additional 6.98 acres of park land by
the IA Costa Ranch Company with the execution of this agreement at a location to be detennined acceptable by the City.
i% secured dedication of an additional 4.12 acres of park land by the La Costa Ranch Company with the execution of this agreement at a location to be determined acceptable by the City.
Provide a plan which establishes acceptable access to these park
sites subject to the approval of the Planning Director and the City Engineer.
b. I
e.
d.
e. Provide a letter of credit or some other secured financing
acceptable to the City in the amount of $2,241,265 guaranteeing the
construction of 19.48 acres of park land, from a financial institute
and upon terms and conditions acceptable to the approval of the
Finance Director and City Attorney, at the time this agreement is
executed.
Earmark the budgeted 1991-92, $1,W,ooOfrom the '87-92 CIP,
for park development purposes in Park District 4 to the development
of 8.7 acres of Alga NoRe Park.
Provide for the operating expenses of the parks either through a
letter of credit or some other secured finuncing from a financial
institute and upon tern and conditions acceptable to the Finance Director and City Attorney E the establishment of a Park District
wide Growth Management Fee that would cover operating costs for
f
g.
m-lo
W 0
the park. The munt of the costs and the time for which the LA Costa Ranch Company or developers in Park District 4 would be
responsible for these costs shall be provided for within the Parks Agreement.
The Parks Agreement must be consistent with the requirements of
the City’s Growth Management Program.
lf any reimbursements andlor park-in-lieu fee credits are to be given, the Park Agreement shall provide a mechanism
h.
i.
to do so,
2. At any time the parks perfmnce standard is not complied with within Park District 4, no further residential development will be allowed in Park
District 4 or in Zone 11.
The following Special Conditions are contained in the Zone 12 LFM Plan:
I. The property owners of Zone 12 shall comply with the existing parks
agreement between the City of Carlsbad and FielditonelLa Costa
Associates, dated March 3,1988, and any amendments thereto. Currently,
this agreement contains the following provisions:
a. The secured dedication by FieldstonelLa Costa Associates of 35.0 acres of Alga Norte Park at a location to be determined acceptable
to the City, including acceptable access to the park site subject to
the approval of the City Engineer.
Provide a letter of credit or some other secured financing
acceptable to the City in the amount of $2,435,mguaranteeing the
construction of 19.48 acres ofpark land,j?om acfinancial institution
and upon tern and conditions acceptable to the Finance Director
and City Attorney, at the rime this agreement is executed.
Provide for the operating expenses for the park.
The Parks Agreement must be consistent with the requirements of
the City’s Growth Management Program.
If any reimbursements andlor park-in-lieu fee credits are to be
given, the Park Agreement shall provide a mechanism to do so.
b.
c.
d.
e.
111- 1 1
0 0
2. At any time the parks performance standard is not complied with within
Park District 4, nofirther residential development will be allowed in Park
I
I
I
I
E
I
I 4.8 8.7 Ac. 1,100,00(
1
I
I
I
I
I
I
I
District 4 or Zone 12. I In summary, the following facilities are required by the Zones 11 and 12 LFM Plans:
Facilitv No, Estimated Co
ALGA NORTE PARK I 4.1 Land Acquisition
Construction $5,168,00
4.2 19.48 Ac. 2,435,Oo
4.3 8.52 Ac. 3,190,OO
4.4 7.0 Ac. 800,Oo
4.5 Community Center 4,500,Oo 4.6 Operation 500,OO
1; CARRILLO PARK - CONSTRUCTION
4.7 10.2 Ac. 2,250,Oo
4.9 MACARIO PARK - CONSTRUCTION 7,050,001
All facilities listed above are identified as required in the Zone 12 LFM Plan. Facilities 4.
through 4.6 are identified as required in the Zone 11 LFM Plan. Facilities 4.7,4.8, and 4.9 arc 1
required to meet the parks requirements of the City’s Southeast Quadrant at buildout.
Source of Funds
For Alga Norte Park, land acquisition (4.1) and construction of 19.48 acres (4.2) shall br
guaranteed through an amendment to the 1988 Supplement to the 1982 Parks Agreement betweer
the City and Fieldstoneh Costa Associates Limited Partnership. No final maps may be recorda
111- 12
w 0
or building permits issued for residential projects until this amendment is fully executed.
Construction of additional facilities at Alga Norte Park (4.3 and 4.4) and construction of a
community center (4.5) are covered by the City’s Capital Improvement Program. The source of
funds is the Public Facilities Fee.
Operation and maintenance of Alga Norte Park for two years (4.6) is funded by the Local
Facilities Management Fee which was adopted by the City of Carlsbad as part of the Zone 6
Facilities Financing Plan. This fee is also collected from developments in Zones 11 and 12.
Construction of Carrillo Park and Macario Park are required to meet Park District 4’s park
requirements through buildout. Carrillo Park is proposed by the City’s Capital Improvement
Program (CIP) to be funded by Public Facilities Fee. Macario Park is included in the CIP with
funding from Public Facilities Fee. This park is also included in Carlsbad CFD No. 1.
Financing Guarantee
Financing requirements for park facilities will be met through execution of an amendment to the
existing Parks Agreement for Zones 11 and 12 and/or payment of Park-in-Lieu or Public
Facilities Fees as applicable.
Reimbursement
The amehded Parks Agreement shall provide for reimbursement of any excess land dedication and
fee payment with funds from the City’s Park-in-Lieu and Public Facilities Fees, subject to
availability of funds.
111- 13
I 0 0
I
1
8
I
I
I
I
I
1
1
1
I
II
I
I
1
I
“I DRAINAGE FACILITIES - ZONE 11
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
All development in Zone 11 shall comply with current city standards and the
Batiquitos Lagoon Enhancement Plan in efect at the time of issuance of any development pennit. I PHASE A:
aecial Conditions:
1. Drainage fwilities will be provided at the time of development to
the satisfaction of the City Engineer.
Prior to approval of any final map within Phare A, the developer
shall pay or enter into an agreement to pay any drainage area fees established by the forthcoming revised Master Drainage Plan.
2.
Financing:
There is IU) special financing required for Phase A.
PHASE B:
Becia1 Conditions:
I. Drainage facilities will be provided at the time of development to
the satisfaction of the City Engineer. The 48-inch storm drain
proposed along a tributary of Encinitas Creek shall be provided as
required by the City Engineer.
2. Prior to the recordation of a final map in Phase B, a
comprehensive hydraulic study shall be completed by the
landowners of Zone 11 to the satisfaction of the City Engineer.
This study shall include an analysis of the Encinitas Creek drainage
basin from Zone 11 all the way to Batiquitos Lagoon. If the study
identifies improvements that currenzly fall below the peg?onnance
standard, a financing program with reimbursement provisions shall
be approved mitigating any deJicient facility. This drainage study
111- 14
w 0
also benejits Zone 23. lkrefore, when the LFMP for Zone 23 is
submitted to the City for review, the Drainage Section shouId dress a reimbursement agreement to the propem owners within Zone I1 and 12 whoJwnced the drainage study.
3. Prior to approval of any final map within Phase B, the developer
shall pay or enter into an agreement to pay any drainage area fees established by the forthcoming revised Master Drainage Plan.
Financirg:
lk cost of the proposed 48-inch stom drain is estimated to be $431 ,ooO.
This stom drain is anticipated to be financed by the developers in Phase
B requiring the need for it. If the hydraulic study indicates mitigation is
necessary, a financing plan shall be established.
PmSE C:
JDeciul Conditions:
1. Drainage facilities will be provided at the time of development to
the satiflaction of the City Engineer.
2. Prior to the recordation of a final map in Phase C, a
comprehensive hydraulic study shall be completed to the satisfaction
of the City Engineer. This study shall include an analysis of the
Encinitas Creek drainage basin from Zone I1 all the way to
Batiquitos Lagoon. If the study identiJies improvements that
currently fall below the performance standard, a$nancingprogram
with reimbursement provisions shall be approved mitigating any
deficient facility. This drainage study also benefits Zone 23.
?%erefore, when the LFMP for Zone 23 is submitted to the City for review, the Drainage Section should address a reimbursement
agreement to the property owners within Zones 11 and 12 who
financed the drainage study.
Prior to approval of any fiml map within Phase C, the developer
shall pay or enter into an agreement to pay any drainage area fees
established by the forthcoming revised Master Drainage Plan,
3.
Financing:
Presently there is no special financing required for Phase C. If the hydraulic study indicates mitigation is necessary, a financing plan shall be established.
111- 15
1 a 0
I
I
I
8
I
1
1
8
8
1
1
I
I
I
I
P-B:
I1s:
I. Drainage facilities will be provided at the time of development to
the satisfation of the ciry Engineer. The &silt basin proposed in
Encinitas Creek shall be provided as required by the CTty Engineer prior to recordation of the first final map in Phase D.
Prior to the recordation of a final map in Phase D, a
comprehensive hydraulic study shall be completed to the satisfacon
of the City Engineer. This study shall include an analysis’of the Encinitas Creek drainage basin from Zone 11 all the way to
Batiquitos Lagoon. If the study ident@es improvements that
currently fall below the pe fomnce standard, a 3 naming program with reimbursement provisions shall be approved mitigating any deficient facility. nis drainage study also benefits Zone 23.
Therefore, when the LFMP for Zone 23 is submitted to the City for
review, the Drainage Section should address a reimbursement
agreement to the property owners within Zones 11 and 12 who
financed the drainage study.
Prior to approval of any final map within Phase D, the developer
shall pay or enter into an agreement to pay any drainage area fees
established by the forthcoming revised Master Drainage Plan.
I
2:
3.
Financing:
Re cost of the proposed desilt basin is estimated to be $36,ax). nis desilt basin
is anticipated to be financed by the developers in Phase D requiring the need for
it. If the hydraulic study indicates mitigation is necessary, a _financing plan shall
be established. 1 PHASE E:
SDecial Cod itions:
1. Drainage fwilities will be provided at the time of development to the
satisjiaction of the City Engineer.
Prior to approval of any final map within Phase E, the developer shall pay or enter into an agreement to pay any drainage area fees established by the
forthcoming revised Master Drainage Plan.
2. I
111- 16
m i m
Fiawm'6ng
Tkm? iirr am special financing required for Phase E.
For defm @€ drainage phases in Zone 11, see Figure 3-2 below. Source of funds and
financing qhents are discussed following the special conditions of Zone 12.
III- 17
I
I
I
i
1
I
I
I
8
I
1
I
1
I
I
I
I
I
q
q
I :
t I
f
t
t
4
I
I
I
I
i 1
I
I 1
i
1
t
n
I
I
i
---J.,.Dn,
0,
(I) U v)
0 z
-
c
w 0
DRAINAGE FACILITIES - ZONE 12
Required Facilities
The following Special Conditions are contained in the Zone 12 LFM Plan:
A. Allwre developmeru within Zone I2 shull be required to construct any
firture Zone 12 storm drain failities idemted in the curreni Drainage
Master Plan and the revised Master Drainage Plan as determined by the
City Engineer. Any facilities necessary to accornmodaieefwure development
must be financially guaranteed prior to the recordation of a final map,
issuance of a grading or building pemit, whichever occurs first for any development requiring@ure storm drain facilities in Zone 12.
Prior to the recordation of the firstfinal map, issuance of a grading permit or building permit, whichever occurs first for any specvc development
within Zone 12, the developers of that project are required to:
1.
B.
Pay the required drainage area fees established in the current
Master Drainage plan and;
Enter into an agreement to pay any drainage area fees established
in the forthcoming revised Master Drainage Plan. 2.
C. Prior to the recordation of any final map within Zone 12, a comprehensive
hydraulic study shall be completed to the satisfaction of the City Engineer.
l3is study shall include an analysis of the Encinitas Creek drainage basin
from Zone 11 all the way to Batiquitos Lagoon. The hydrologic analysis
must propose altemte forms of mitigating peak storm rurwflflows to
include a possible jlood attenuation action plan for the entire Encinitas
Creek drainage basin. If the subsequent study idempes existing major
storm drain facilities that currently fall below the perfrmunce standard, a Jnancing program shall be approved mitigating any deficient facility.
Financing
This drainage study also beneJits Zones I1 and 23. llzerefore, when the
LFMP for Zone 23 is submitted to the City for review, the Drainage Section
should dress a reimbursement agreement to the propeny owners within
Zones 11 and 12 who financed the drainage study.
111- 19
I 0 0
1
I
1
I
I
I
I
1
I
1
I
1
i
I
I
1
D. WAlERSHELI A
1 Prior to the recordation of the first final map, issuance of grading pennit or building permit, whichever occurs$rst, within Watershed A of Zone 12,
the developers are required to financially guarantee the design and construction of the following storm drain facirties:
a. A 48" stom drain facility carrying water past a proposed road crossing in the north central portion of Zone 12.
A 54" storm drain carrying water past a proposed road crossing
north of the riparian area in Zone 12.
A detention/desiltation fmility north of Calle Barcelona in the
western pomon of the zone.
A double barrel 42N stom drain facility carrying water from the
detentionldesiltation facility to the northeast corner of Calle
Barcelona and El Camino Real.
A double 6 by 5 foot box culvert extension of the existing box
culvert which currently carries water to the west side of El Camino
Real.
A 30" storm drain facility carrying water across Calle Barcelona
in central portion of zone.
A 30" storm drain faciliv connecting to the 48 " storm drain facility
in the north central portion of zone.
A 30" storm drain facility in the northwestern portion of Zone 12.
b.
c.
d.
e.
f.
h.
I i.
Financing:
7be cost of the proposed storm drains within Warershed A is estimated to
be $792,200. These drainage facilities are anticipated to bejinanced by the developers of Watershed A. 1
E. WATERSHEDB
No special conditions.
n1-20
- F. WAlERSHW C
I. Prior to the recordation of thejirstfinal map, issuunce of a grading
C of Zone 12, the developers shullfimtally guarantee the design
and corntruetion of the following drainage facilities:
a.
pennii or building pennit, whichever occurs first within Watershed
A proposed 36" stonn drain carrying water from Santa Fe
Glens through La Costa SW I to Olivenhain Road.
A 30" stonn drain facifiq along the alignment of Calle
Barcelona carrying water across Rancho Santa Fe Road.
b.
Financing:
lbe cost of the proposed 36 " storm drain is estimated to be $120,W. The cost of the proposed 30" storm drain is $58,000. These stonn drains are
anticipafed to be financed by the developers of Watershed C.
For definition of watersheds in Zone 12, see Figure 3-3 below. Source of funds and financing
requirements are discussed following this figure.
111-2 1
t c I
D
1
I
I
I
1
I
I
I
I
I
I
8
I -
I
I
II
8
..--.W..YY
'.*-...
01 -
. :-- 0 z ,.-.. -- . .-
I.
4fi YW
i 2:. i: s-4
'.: JI ','. -. -- ic --
4 1
I i I
I I
1
I
I
( I
I
I
1
'I
W
FINA3UXSGMETHOD DRAINAGE FACILITIES
$85,655 (Included in Facility 6.7) Sourced Funds
Fin-Gctarantee
Assessment District
Facility
This facility is a part of Facility 6.7 (Olivenhain Road from El Camino Real to Rancho
Sara& Fe Road).
Source dEiends
Fieldstone/La Costa Associates has previously funded this study, which was completed in
S-mber 1990.
Financing Guarantee
Since the study is completed, no guarantee is required.
Reimbursement
This study shall be acquired by the Assessment District for the Olivenhain Road project.
FieldstonelLa Costa Associates shall be reimbursed from proceeds of the first bond sale
for Olivenhain Road.
III-23
I e @
I
I
I
I
FINANCING METHOD DRAINAGE FACILITIE
$368,940 (Included in Facility 6.7)
Source of Funds Assessment District 1 Financing Guarantee Formation of and participation in Assessment District
Reimbursement
I Facility
I This facility will be constructed as part of Facility 6.7 (Olivenhain Road from El Camin
Real to Rancho Santa Fe Road).
Source of Funds
This facility shall be funded and constructed by the Assessment Dk&t for the Olivenhai Road project. Alternatively, it may be privately designed andlor constructed and late
acquired by the Assessment District.
I
I
I
1
1
I
I
I
I
I
1
Financing Guarantee
The financing will be guaranteed upon formation of and participation in the Assessmen
District.
Reimbursement
If the facility is privately designed and/or constructed, the developer shall be reimburser:
from proceeds of the first bond sale for Olivenhain Road.
111-24
FINANCNXW DRAINAGE FACILITIES
Source of FS&S
This W- be funded and constructed by the first developer in drainage basin B of
Zone U.
Financing GpramaQe&
Prior to~dation of a find map in drainage basin B of Zone 11, this facility shall
be con& or an improvement agreement shall be executed, subject to the approval
of the CiBngineer. The improvement agreement shall be in accordance with Section
66462 of** Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal
Code. Szridimprwement agreement shall be secured with one of the following forms of
security asibcribed in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevaeable instrument of credit or letter of credit, acceptable to the Financial
ManagementDirector and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for this
facility is mpired at this time.
111-25
I’ V e 0
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I’ FINANCING METHOD DRAINAGE FACILITII
Estimated Cost
Source of Funds
Financing Guarantee Improvement agreement
Reimbursement K, L @art), M @art), N, 0
Facility
This facility is currently required by the LFM Plan for Zone 11. However, if Facility 5
(Olivenhain Detention Basin) is confirmed by the City as the preferred facility, then tl
facility would no longer be required, subject to review by the City Engineer.
Source of Funds
If required, this facility shall be funded and constructed by the first developer in draina
basin D of Zone 11. I Financing Guarantee
If Facility 5.2 (Olivenhain Detention Basin) has not been approved and guaranteed, th
prior to the recordation of a final map in drainage basin D of Zone 11, this facility sh
be constructed or an improvement agreement shall be executed, subject to the appro’
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municil
Code. Said improvement agreement shall be secured with one of the following forms
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonc
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financ
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for tl
facility is required at this time.
If Facility 5.2 is approved, then, subject to confirmation by the City Engineer, neither tl
facility nor financing guarantee for the facility would be required.
of the City Engineer. The improvement agreement shall be in accordance with Secti
111-26
w 0 #
FINANCING METHOD DRAINAGE FACILITIES
Source of Funds
Improvement agreement
Reimbursement
~~ ~ ~~~
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A of Zone 12,
Financing Guarantee
Prior to the recordation of a final map in drainage basin A of Zone 12, this facility shall
be constructed or an improvement agreement shall be executed, subject to the approval
of the City Engineer. The improvement agreement shall be in accordance with Section
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal
Code. Said improvement agreement shall be secured with one of the following forms of
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for this
facility is required at this time.
III-27
I 0 w
* FINANCING METHOD DRAINAGE FACILITIE 1
I
I
I
I
I
I
IC
I
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A (I
Zone 12. I Financing Guarantee
Pnor to the recordation of a final map in drainage basin A of Zone 12, this facility shd
be constructed or an improvement agreement shall be executed, subject to the approvi
of the City Engineer. The improvement agreement shall be in accordance with Sectio
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipa
Code. Said improvement agreement shall be secured with one of the following forms c
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financia
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for thi
facility is required at this time.
I
I
I
I
I
I
I
I
111-28
w
FINANCING METHOD DRAINAGE FACILITIE
Source of Funds
Financing Guarantee
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A o
Zone 12.
Financing Guarantee
Prior to the recordation of a final map in drainage basin A of Zone 12, this facility shal
be constructed or an improvement agreement shall be executed, subject to the approva of the City Engineer. The improvement agreement shall be in accordance with Sectior
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipa
Code. Said improvement agreement shall be secured with one of the following forms 0:
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for this
facility is required at this time.
HI-29
I’ a m
I
I
1
I
I
I
1
I
I
I
1
I
t
I
I
1
I
FINANCING METHOD DRAINAGE FACILITIE
Estimated Cost
Source of Funds
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A Zone 12, 1 Financing Guarantee
Prior to the recordation of a final map in drainage basin A of Zone 12, this facility sh,
be constructed or an improvement agreement shall be executed, subject to the appro!
of the City Engineer. The improvement agreement shall be in accordance with Secti
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad MuniciI
Code. Said improvement agreement shall be secured with one of the following forms
security as described in Section 2 1.16.070 of the Carlsbad Municipal Code: surety bonc
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financ
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for tl
facility is required at this time.
111-30
w 0
FINANCING METHOD DRAINAGE FACILITIES
Included in Facility 6.12
Developer or Assessment District
Improvement agreement or formation of and
participation in Assessment District
Financing Guarantee
Facility
This facility is a part of Facility 6.12 (Calle Barcelona from El Camino Real to Rancho
Santa Fe Road).
Source of Funds
This facility is located within the right-of-way of Calle Barcelona. It shall be funded and
constructed by the first developer in drainage basin A of Zone 12. Alternatively, if found
to be consistent with Council Policy 33 or 38 and approved by the City Council, it may
be funded and constructed by a public financing district for the Calle Barcelona project,
as described in the financing method for Facility 6.12, or it may be privately designed
and/or constructed and later acquired by the public financing district. Any special tax or
special assessment related to this facility shall be levied only on properties located in Zone
12, which shall not pass through to homebuyers, but shall be paid in full at close of
escrow.
Financing Guarantee
Prior to the recordation of a final map in drainage basin A or B of Zone 12, this facility
approval of the City Engineer. The improvement agreement shall be in accordance with
Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad
Municipal Code. Said improvement agreement shall be secured with one of the following
forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code:
surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the
Financial Management Director and City Attorney.
shall be constructed or an improvement agreement shall be executed, subject to the
111-3 1
I 0 0
1
B
I
2
I
1
1
E
I
T
I
E
1
E
I
I
El
1
* If the facility is funded by a public financing district, the financing will be guaranta
upon formation of and participation in the district. The formation of a public financir
district for the facility shall satisfy and release any subdivision improvement bor
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed andh
constructed and thereafter acquired by the public financing district, the developer shall 1
reimbursed from proceeds of the frrst bond sale for the Calle Barcelona project, for tho
items of cost as shall be determined by the provisions of an Acquisition a~
Reimbursement Agreement between the developer and the City, said Agreement to 1
subject to the review and approval of the City.
111-3 1 A
W
FINANCING METHOD DRAINAGE FACILITIES
Included in Facility 6.12
Developer or Assessment District Improvement agreement or formation of and
participation in Assessment District
Source of Funds
Facility
This facility is a part of Facility 6.12 (Calle Barcelona from El Camino Real to Rancho
Santa Fe Road).
Source of Funds
This facility is located within the right-of-way of Calle Barcelona. It shall be funded and
constructed by the first developer in drainage basin A of Zone 12. Alternatively, if found
to be consistent with Council Policy 33 or 38 and approved by the City Council, it may
be funded and constructed by a public financing district for the Calle Barcelona project,
as described in the financing method for Facility 6.12, or it may be privately designed
and/or constructed and later acquired by the public financing district. Any special tax or
special assessment related to this facility shall be levied only on properties located in Zone
12, which shall not pass through to homebuyers, but shall be paid in full at close of escrow.
Financing Guarantee
Prior to the recordation of a final map in drainage basin A or B of Zone 12, this facility
shall be constructed or an improvement agreement shall be executed, subject to the
approval of the City Engineer. The improvement agreement shall be in accordance with
Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad
Municipal Code. Said improvement agreement shall be secured with one of the following
forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code:
surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the
Financial Management Director and City Attorney.
111-32
0 0
b If the facility is funded by a public financing district, the financing will be guarante
c
1
1
I
f
I
I
0
I
t
D
I
1
1E
t
1
8
I
1
upon formation of and participation in the district. The formation of a public financii
district for the facility shall satisfy and release any subdivision improvement bor
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/
constructed and thereafter acquired by the public financing district, the developer shall 1
items of cost as shall be determined by the provisions of an Acquisition a
Reimbursement Agreement between the developer and the City, said Agreement to 1
subject to the review and approval of the City.
reimbursed from proceeds of the first bond sale for the Calle Barcelona project, for tho
111-32A
0 0
FINANCING METHOD DRAINAGE FACILITIES
Source of Funds Financing Guarantee Improvement agreement or formation of and
n in Assessment District
Facility
This facility is a part of Facility 6.12 (Calle Barcelona from El Camino Real to Rancho
Santa Fe Road).
Source of Funds
This facility is located within the right-of-way of Calle Barcelona. It shall be funded and
constructed by the first developer in drainage basin A of Zone 12. Alternatively, if found
be funded and constructed by a public financing district for the Calle Barcelona project,
as described in the financing method for Facility 6.12, or it may be privately designed
and/or constructed and later acquired by the public financing district. Any special tax or
special assessment related to this facility shall be levied only on properties located in Zone
12, which shall not pass through to homebuyers, but shall be paid in full at close of
escrow.
Financing Guarantee
to be consistent with Council Policy 33 or 38 and approved by the City Council, it may
Prior to the recordation of a final map in drainage basin A or B of Zone 12, this facility
shall be constructed or an improvement agreement shall be executed, subject to the
approval of the City Engineer. The improvement agreement shall be in accordance with
Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad
Municipal Code. Said improvement agreement shall be secured with one of the following
forms of security as described in Section 21.16.070 of the Carlsbad Municipal Code:
surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the
Financial Management Director and City Attorney.
111-33
I- a *
I
1.
I
1
I
I
II
I
I
I
I
8
f
I
I
1
E
E
If the facility is funded by a public financing district, the financing will be guarank
upon formation of and participation in the district. The formation of a public financir
district for the facility shall satisfy and release any subdivision improvement bor
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/c constructed and thereafter acquired by the public financing district, the developer shall k
reimbursed from proceeds of the fust bond sale for the Calle Barcelona project, for tho!
items of cost as shall be determined by the provisions of an Acquisition an
Reimbursement Agreement between the developer and the City, said Agreement to t:
subject to the review and approval of the City.
J
111-33A
w W
FINANCING METHOD DRAINAGE FACILITIES
Source of Funds
Reimbursement
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A of Zone 12.
Financing Guarantee
Prior to the recordation of a final map in drainage basin A of Zone 12, this facility shall
be constructed or an improvement agreement shall be executed, subject to the approval
of the City Engineer. The improvement agreement shall be in accordance with Section
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal
Code. Said improvement agreement shall be secured with one of the following forms of
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for this
facility is required at this time.
111-34
I 0 0
1
8
I
B
i
I
[I
I
1
b FINANCING METHOD DRAINAGE FACILITIE
Estimated Cost
Source of Funds
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin A c
Zone 12. IE Financing Guarantee
Prior to the recordation of a final map in drainage basin A of Zone 12, this facility shal
be constructed or an improvement agreement shall be executed, subject to the approva
of the City Engineer. The improvement agreement shall be in accordance with Sectioi
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipa
Code. Said improvement agreement shall be secured with one of the following forms o security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for thi!
I
I facility is required at this time.
1
B
t
I
I
I
111-35
w e
FINANCING METHOD DRAINAGE FACILITIES
Source of Funds
Financing Guarantee Improvement agreement
Reimbursement
Source of Funds
This facility shall be funded and constructed by the first developer in drainage basin C of Zone 12.
Fiincing Guarantee
Prior to the recordation of a final map in drainage basin C of Zone 12, this facility shall
be constructed or an improvement agreement shall be executed, subject to the approval
of the City Engineer. The improvement agreement shall be in accordance with Section
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal
Code. Said improvement agreement shall be secured with one of the following forms of
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for this
facility is required at this time.
111-36
4 I * e
I
I
I
u
1
B
I
It
I
- - FINANCING METHOD DRAINAGE FACILITE
Estimated Cost
Source of Funds
Financing Guarantee
Included in Facility 6.12
Developer or Assessment District
ovement agreement or formation of and II ipation in Assessment District
1 Facility
This facility is a part of Facility 6.12 (Calle Barcelona from El Camino Real to Ranch
Santa Fe Road).
Source of Funds
This facility is located within the right-of-way of Calle Barcelona. It shall be funded an
constructed by the first developer in drainage basin C of Zone 12. Alternatively, if foun
to be consistent with Council Policy 33 or 38 and approved by the City Council, it ma
be funded and constructed by a public financing district for the Calle Barcelona projecl
as described in the financing method for Facility 6,12, or it may be privately design0
and/or constructed and later acquired by the public financing district. Any special tax 01
special assessment related to this facility shall be levied only on properties located in Zonr
12, which shall not pass through to homebuyers, but shall be paid in full at close o
escrow. I Financing Guarantee
Prior to the recordation of a final map in drainage basin C of Zone 12, this facility shal
be constructed or an improvement agreement shall be executed, subject to the approva
of the City Engineer. The improvement agreement shall be in accordance with Sectior
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal
Code. Said improvement agreement shall be secured with one of the following forms oj
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial
Management Director and City Attorney.
n
1
B
I
I
II
111-37
W 0
If the facility is funded by a public financing district, the financing will be guaranteed
upon formation of and participation in the district. The formation of a public financing
district for the facility shall satisfy and release any subdivision improvement bond
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/or
constructed and thereafter acquired by the public financing district, the developer shall be
reimbursed from proceeds of the first bond sale for the Calle Barcelona project, for those
items of cost as shall be determined by the provisions of an Acquisition and
Reimbursement Agreement between the deveIoper and the City, said Agreement to be
subject to the review and approval of the City.
111-37A
I 0 e
I
I
I
I
1
CIRCULATION FACILITIES - ZONE 11
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
A. IMPROEMEhTS hEEDED NOW
1. Interstate 5 and La Cost a Avenue
pecessay Im~rovements
a. Wden overpass to accommodate 4 lanes plus lefr turn 8 channelization.
1 intersections.
b. Signalize both northbound and southbound ramp
estimated Cost - $3,4OO,aK)
Completion Date - 1993
$aecial Condition - A finuncing program guaranteeing the
construction of the interchange of 1-5 and La Costa Avenue shall be
approved prior to the issuance of a development permit for any
I
1
I
1
I
E
I
I
1
1
i development within Zone 11.
B. IMPROVEMENTS NEELIED BY 1990
1. Olivenhain Road
Necessarv Im ~rovements
a. Complete grading to ultimate right-of-way width to prime
Sarua Fe Road.
Minimum of 4 lane improvements.
Improved intersection, including signalization of Olivenhuin
Road and El Camino Real.
arterial standards (126’)from El Camino Real to Rancho
b.
c.
III-3 8
w 0
Estimated Cost - $1,500,000
Completion Date - 1990
Special Co nditioq - A cfinancing program guaranteeing the
construction of 4 lanes of Olivenhuin Road between Rancho Santa Fe Road and El Camin0 Real, including the improvement of the
intersection of Olivenhain Road and El Chino Real, shall be
approved prior to the recordation of the first final map within zone 11.
Rancho Sa nta Fe Rod
pc’ecessan, Imyovements
a.
2.
Complete grading to ultimate right-of-way width to Prim
Arterial Standards (126’) from La Costa Avenue to the
Carlsbad City Limits.
Minimum of 4 lane improvements.
Include signalization and le# turn channelization where
necessary.
b.
c.
Estimared Cost - $12,aK),Oa,
Comtdetion Date - 1990
$pedal Condition - Acfinancing program guaranteeing construction
of Rancho Sama Fe Road to 4 lanes including adequate signalization shall be approved prior to the recordation of the first
final map within Zone 11.
Rancho Santa Fe Road (South of Olivenhain Road)
flecessarv ImDrovements
a.
3.
Full width street improvements to major arterial standards
for all portions of Ranch Santa Fe Road within the
Carlsbad City limits.
*North of La Costa Avenue.
111-39
I 0 e
b. Necessary street improvements to QccormflOdQce four through
lanes and a filly improved median adjacent to the existing
improvements along the Carlsbad-Encinitas City boundary. I
1
B
8
I
I
I
I
I
c
I
I
1
8 c. Including &quare signal modflcations.
Estimated Cost - $3,400,000
Com Dletr *on Date - 1990
Special Conditioq - A financing program guaranteeing construction of Rancho Santa Fe Road to Major Arterial Standards from Olivenhuin Road to the southerly city limits shall be approved prior to the recordation of the first finul map within Zone 11. I
C. IMPROIEMEhTS NEEDED BY 1995
I, Rancho Santa Fe Road II Necessa? Im_orovements
a. lko additional lanes to completefill width improvements to
prime arterial standards from La Costa Avenue to the
Carlsbad City Limits. I b. Including adequate signal mod@cations.
hmated Cost - $5,000,ooO
Completion Date - 1995
JDecial Condition - A jinancing program guaranteeing the
additional improvements necessary for Rancho Santa Fe Road to
comply with Prime Arterial Standards shall be approvedprior to the
recordation of the jirst jiml map within Zone 11.
2. Qlivenhain Rod
Necessa y Im Drovements
a. Two additional lanes to completefull width improvements to
prime arterial standrrrdsfrom El Camino Real to Rancho E Santa Fe Road.
III-40
W 0
b. Adequate signal mod@ca.tions.
Estimated Cost - $1,500,000
pecial Condition - A financing program guaranteeing construction
of the additional improvements necessary for Olivenhain Road to
comply with Prime Arterial Standards shall be approvedprior to the
recordution of the first final map within Zone 11.
3. Costa Avenue
Necessa? Improvementj
a. Full width improvements to Major Arterial Standardrfrom
El Camim Real to I-5.
Estimated Cost - $5,OOO,OOO
Comdetion Date - 1995
SDecial Condition - A financing program guaranteeing the
construction of La Costa Avenue from I-5 to El Carnim Real to Major Arterial Standards shall be approvedprior to the recordation of the cfirst final map within Zone 1 I.
Rancho Santa Fe & C alle Lomas Verde
Necessarv Improvements
a.
Estimated Cost - $2,000
4.
Provide an additional westbound le$ turn lane.
Completion Date - 1995 or with adjacent development, whichever
occurs prst.
XDecial Condition - The necessary improvements for CaIle Lomas
Verde as described herein shall be guaranteed prior to any
development permits for any adjacent properties or by 1995,
whichever occurs first.
111-4 1
I -' 0 a
I
8
1
I
t
I
1
I
1
1
I
1
I
D
I
D. IMPROVEMENXS NEEDED BY 2000
1. El Camino Real 8 pecessarv Improvements
a. Additional lanes necessary to complete fill width
improvements to Prime Arterial Standards from Olivenhain Road to La Costa Avenue.
Estimated Cos t - $3,700,000
ComDleh 'on Date - 2000
ecral Condition - Prior to the recordation of the first final map
within Zone 11, a financing program shall be approved guararueeing the corntruetion of a proportional share of El Camim
Real from Olivenhain Road and La Costa Avenue. The proposed
plan shall address the possibility of an ultimate right-of-way width to accommodate eight lanes if it is shown by more detailed analysis that eight lanes are necessary.
Source of funds and financing requirements are discussed following the list of Special Condition I for Zone 12.
111-42
n
W a
CIRCULATION FACILITIES - ZONE 12
Required Facilities
The following Special Conditions are contained in the Zone 12 LFM Plan:
lk proposed mitigation is divided into the categories established under the
phasing portion of this section. It should be understood that all cost estimates
presented in this plan are preliminary in nature and will need firther reflnemnt
as the actual scope of work, utility needs and right-of-way dedications are
determined.
A. An on-going monitoring program shall be established to evaluate the aspects of improvements, development, and demand on circulation facilities. The required timing of improvements is based upon the projected
demand of development in the zone and the surrounding region. This
timing may be modified without amendment to this plan, however, any deletions or additions to the improvements will require amending this local
plan.
Prior to recordation of the Arroyo La Costa Phase IIflml map, the
developer shall prepare a traflc study to evaluateJiLtui-e traflc conditions with and without Leucadia Boulevard. The developers of Zone 12 will be
required to implement any mitigation required by the cfirture study to the
satisfaction of the City Engineer.
Prior to recordation of the first final map, issuance of grading pennit or
building permit, whichever occurs first, within Zone 12, a comprehensive
financing program guaranteeing construction of the following circulation
improvements shall be approved:
I. IMPROWMEflS NEELED NOW
B.
C.
a. Rancho Santa Fe Road
Three road segments from Melrose Avenue North to La Costa
Avenue shall be constructed to include the following improvements:
1. Complete grading of Rancho Santa Fe Road to ultimate right-of-way width to prime arterial standards;
111-43
i e 0
2. Construction of four through lanes, two in each direction,
imlding a filly lanascaped median;
warrams by the City Engineer.
t
I 3. Intersection signalization as required to meet traflc
ComDleti ‘on Date - 1990
gstimated Cosi - $1 2,ooO,aX,
b. Qlivenhain Rod
Olivenhain Road between El Camino Real and Rancho Santa Fe Road shall be constructed to include the following:
1.
2.
3.
I
1
I
1
I
1
I
1
Complete grading for four lane interim improvement;
Construction of interim four lanes:
Intersection improvements at El Camino Real/Olivenhain
intersection.
Completion Dare - I990
Estimated Cost - $I ,500,000
2. IMPROVEMENTS NEEDED BY 1991 I a. El Camino RealXalle Barcelona
t Barcelona.
Improvements to the intersection of El Camino Real and Calle
ComDletion Date - 1991
Estimated Cost - (included in cost estimates for Calle Barcelona, 1
I
1
0
8
*1
1995)
HI-44
w
3. IMPROWMEhTS NEEDED BY 1993
a. Costa Avenue
La Costa Avenue between El Camino Real and 1-5 northbound on-
ramps shall be constructed to include the following:
1. Complete grading to ultime right-of-way width to major arterial standards;
Construction of one additional through travel lane in each
direction.
Completion Date - 1993
Estimated Cost - $5,ooO,ooO
4. IMPROEMEhTS h?EEDW BY I995
a. Rancho Santa Fe Road
Rancho Santa Fe Roadfrom Melrose Avenue North to Camin0 de
10s Coches shall be constructed to include the following:
1.
2.
Complete grading to ultimate right-of-way width to prime
arzerial standarb;
Construction of four through travel lanes, two in each direction, to include intersection improvements including a
filly landscaped median;
2.
Completion Date - 1995
Estimated Cost - $42, OOO, ooO
b. Olivenhain Rod
Olivenhain Road from El Camino Real to Rancho Santa Fe Road
shall be comtructed to include the following:
1. Construction of six through travel lanes, three in each
direction, to fill prime arterial standardr;
III-45
1 @ 0
1
1
1
1
I
I
I
I
1
I
I
,
2. Improvement of the Olivenhain Road intersections with El
Camino Real and Rancho Santa Fe Road. I Comdetion Date - 1995
Estimated Cost - $8,700,000
C. Calle Barcelona
Calle Barcelonafrom El Camirw Real to Rancho Santa Fe Road
shall be constructed to include the following:
1. Complete grading to ultimate right-of-way width;
2. Construction of two through travel lanes in each direction.
This requirement is needed concurrent with Phase I1 of the Arroyo
La Costa project in Zone 12. For purposes of this analysis, it is
assumed to be in place prior to 1994 (Zone 12 Build Out).
1
I Completion Date - 199.5
Estimated Cost - $5,600,000
d.
Improvement of the intersection of El Camin0 Real and La Costa
Avenue.
Completion Date - 1995
Estimated Cost (included in cost estimates for La Costa Avenue,
1993)
El Camino Real/La Costa Avenue
5. IMPROVEMENTS MEDELI BY I998
Rancho Santa Fe Road from Olivenhuin Road to the southern Carlsbad City boundary shall be constructed to include the li following:
I anerial standards;
a. Complete grading to ultimate right-of-way width to major
I III-46
I
w 0
b. Construction of four through travel lanes, two in each
direction, to include intersection improvements and a filly
landscaped median.
6. IMPROEMEMS MWED BY 2000
No improvements needed.
IMPROIEMEN?S NEEDED BY BUILD OUT
a. El Camino Real
El Camino Real between LQ Costa Avenue and Olivenhain Road
shall be constructed to include the following:
1.
7.
Complete grading to ultimate right-of-way width to prime arterial standards;
Construction of six through travel lanes, three in each 2.
direction, to full prime arterial standards:
Improvements of the intersections of El Camino Real and La
Coda Avenue, Levante Street, and Calle Barcelona. 3.
Completion Date - Build Out
Estimated Cost - $3,700,00
b.
Improvements to the intersections of Rancho Santa Fe Road on
Melrose Avenue North, Questhaven Road, Melrose South, La Costa
Rancho Santa Fe Road Intersections
.
Avenue, and Calle Barcelona.
Completion Date - Build Out
Estimated Cost (included in Rancho Santa Fe Road cost estimates,
1995)
Source of funds and financing requirements are discussed below.
111-47
I
1
I
I
Facility 6.1 ECWOlivenhain Intersection
Special Condition
Zone 11 B.l.c, C.2.b
Zone 12 C.l.b.3, C.4.b.2
Estimated Cost
Source of Funds Assessment District Financing Guarantee
Reimbursement See below
Included in Facility 6.7
Formation of and participation in Assessment District
Responsible Area A-0 (all)
J
I. *
Facility 6.2
Special Condition
ECWLa Costa Avenue Intersection
Zone 11 No Special Condition
Zone 12 C.4.d
Estimated Cost $58,000 Source of Funds
Financing Guarantee
Reimbursement Not applicable
Traffic Impact Fee
Payment of Traffic Impact Fee
~
Responsible Area A-C
I 0 e
I
1
1
8
1
I
I
I
I
I
1
I
I
I
* I FINANCING METHOD CIRCULATION FACILITIE
Estimated Cost
Source of Funds
Financing Guarantee
Carlsbad CFD No. 1
Participation in CFD No. 1
Mimated Cost
Estimated cost is obtained from City of Carlsbad Capital Improvement Program. 1 Source of Funds
This facility has been previously funded by the existing Bridge and Thoroughfare Benef
District No. 1, and the City has formed Carlsbad CFD No. 1 which will provide fundin
for this project, 1 Financing Guarantee
The financing is guaranteed by participation in CFD No. 1.
I In-50
*
Facility 6.4
Special Condition
RSF/Camino de 10s Coches Intersection
Zone 11 c.4 Zone 12 Not Required
Estimated Cost $2,000
Source of Funds Developer
Financing Guarantee Not applicable
Responsible Area I, J Reimbursement Not applicable
I
I
1
1
Facility 6.5 RSF Intersections
Special Condition
Zone 11 B.2.c, C.1.b
Zone 12 C.7.b
Estimated Cost
Source of Funds Assessment District
Financing Guarantee
Reimbursement See below
Included in Facility 6.8
Formation of and participation in Assessment Districl
Responsible Area A-0 (all)
J
Facility 6.6
Special Condition
Zone 11
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Responsible Area
Reimbursement
ECWCalle Barcelona Intersection
Not required
No Special Condition
Included in Facility 6.12
Developer or Assessment District
Improvement agreement or formation of and
participation in Assessment District
See below
A-C
I 0 0
I
I
I
I
8
I
1
I
I
I
I
I
I
I
I
I
I
If the facility is funded by a public financing district, the financing will be guarantee
upon formation of and participation in the district. The formation of a public financin
district for the facility shall satisfy and release any subdivision improvement bon
previously posted with respect to the facility,
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/[
constructed and thereafter acquired by the public financing district, the developer shall 1
reimbursed from proceeds of the first bond sale for the Calle Barcelona project, for thc
items of cost as shdl be determined by the provisions of an Acquisition a
Reimbursement Agreement between the developer and the City, said Agreement to
subject to the review and approval of the City. i
III-53A
Facility 6.7
Special Condition
Olivenhain Road from ECR to RSF
Zone 11 B.1, C.2
%ne 12 C.l.b, C.4.b
Estimated Cost $11,431,409
Source of Funds
Financing Guarantee
Reimbursement See below
Assessment District and Carlsbad CFD No. 1
Formation of and participation in Assessment District
Responsible Area A-0 (all)
A
1 I) 0
I
I
I
t
1
I
1
I
I
1
I
I
I
1
I
I
8
I
Financing Guarantee
The financing is guaranteed upon formation of and participation in the Assessmen
District.
Reimbursement
If the facility is privately designed andlor constructed and thereafter acquired by thc
Assessment District, the developer shall be reimbursed from proceeds of the first bonc
sale for Olivenhain Road, for those items of cost as shall be determined by the provision:
of an Acquisition and Reimbursement Agreement between the developer and the City, saic
Agreement to be subject to the review and approval of the City. The developer shall bt
reimbursed for design and engineering costs out of the first bond sale for this project.
111-55
Facility 6.8
Special Condition
Rancho Santa Fe Road (North)
Zone 11 B.2, C.l
Zone 12 C.l.a, C.4.a, C.7.b
Estimated Cost $36,015,912
Source of Funds
Financing Guarantee
Reimbursement See below
Assessment District and Carlsbad CFD No. 1
Formation of and participation in Assessment District
I Responsible Area A-0 (all)
-
I 0 0
I
I
I
t
I
1
I
I
I
1
I
8
I
1
I
8
1
1
Reimbursement
If the facility is privately designed and/or constructed and thereafter acquired by th
Assessment District, the developer shall be reimbursed from proceeds of the bond sale fc
Rancho Santa Fe Road (North), for those items of cost as shall be determined by th
provisions of an Acquisition and Reimbursement Agreement between the developer an
the City, said Agreement to be subject to the review and approval of the City. Th
developer shall be reimbursed for design and engineering costs out of the first bond sal for this project.
111-56A
Facility 6.9
Special Condition
Zone I1
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Reimbursement
Responsible Area
Rancho Santa Fe Road (South)
B.3
c.5
$5,165,289
Assessment District and Carlsbad CFD No. 1 Formation of and participation in Assessment District
See below
A-0 (all)
1 0 '0
I
I
I
I
1
1
I
I
t
I
i
8
I
1
1
1
I
I
c Reim-
If lhe ikility is privateIy designed and/or constructed and thereafter acquired by t):
Ranc3ro Santa Fe Road (South), for those items of cost as shall be determined by tl
pnwisims of an Acquisition and Reimbursement Agreement between the developer an
the CBy, said Agreement to be subject to the review and approval of the City. Th
dewdqer shall be reimbursed for design and engineering costs out of the first bond sa
fa shib project,
Assement District, the developer shall be reimbursed from proceeds of the bond sale fc
111-57A
Facility 6.10
Special Condition
Zone 11
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Reimbursement
Responsible Area
La Costa Avenue Widening
C.3.a
C.3.a
$5,000,000
Carlsbad CFD No. 1
Participation in CFD No. 1
A-0 (all)
Not applicable
I
I
t
8
P
Facility 6.11
Special Condition
El Camino Real Widening
Zone 11 D. 1 Zone 12 C.7.a
Estimated Cost $1,430,715
Source of Funds
Financing Guarantee
Reimbursement
Assessment District or developer
Formation of and participation in Assessment District
or improvement agreement
$1 10,OOO (See source of funds below) Responsible Area A-0 (all)
w e
Financing Guarantee
If deemed eligible for assessment district financing, such financing is guaranteed up01
formation of and participation in the district.
If deemed ineligible for assessment district financing, prior to the recordation of a fina
map in Zone 12, this facility shall be constructed or an improvement agreement shall bi
executed consistent with the conditions of approval of CT 88-3 and subject to the approva
of the City Engineer. The improvement agreement shall be in accordance with Sectio
66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipa
Code. Said improvement agreement shall be secured with one of the following forms o
security as described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds
cash, irrevocable instrument of credit or letter of credit, acceptable to the Financia
Management Director and City Attorney.
As this requirement guarantees the construction of this facility, no other guarantee for thi!
facility is required at this time.
Reimbursement
The City shall allocate-to or reimburse the Assessment District or the developer of thii
facility, whichever provides the initial financing for its construction, $1 10,OOO from thr
-Public Facilities Fee Fund at times indicated in the City’s Capital Improvement Program
subject to availability of funds.
111-60
1 0 m
1
I
i
I
8
E
111
1
8
I
1
1
I
8
il
I
I
FINANCING METHOD CIRCULATION FACILITII
Estimated Cost
Source of Funds
Financing Guarantee
Developer or Assessment District
Improvement agreement or formation of and participation in Assessment District
Facility
This facility is the phased construction of Calle Barcelona from El Camino Real to Rancl
Santa Fe Road, as set forth in the conditions of approval for CT 88-3, approved by Cj Council Resolution No. 90-258 and Planning Commission Resolution No. 3032. It al
includes Facilities 5.9, 5.10, 5.11, and 5.15 (drainage improvements F, G, H, and I
Facility 6.6 (improvement of the intersection at El Camino Real and Calle Barcelon:
Facility 10.4 (sewer main); and Facility 11.6 (water line).
Estimated Cost
The estimated cost for this facility is obtained from "Preliminary Construction Cc
Estimate," dated February 22, 1991, prepared by Project Design Consultants. T
estimated cost includes drainage, water, sewer, and other work located within the ro I right-of-way.
Source of Funds
This facility shall be funded and constructed in phases by the developer, consistent wi
the conditions of approval of CT 88-3. Alternatively, if found to be consistent wi
Council Policy 33 or 38 and approved by the City Council, it may be funded by :
assessment district for Calle Barcelona or by a community facilities district, or it may '
privately designed and/or constructed and later acquired >y the assessment district or tl
community facilities district. If a public financing district is established to fund tk
facility, the special assessment or special tax related to this facility shall be levied only (
properties located in Zone 12 and shall be paid in full upon close of escrow of ea
residential unit in the zone.
111-61
w 0
Financing Guarantee
If the facility is funded and constructed by the developer, the financing guarantee shall be
provided in phases, as follows: Prior to the recordation of a final map in Zone 12, only
the portion of the facility which is required to serve the area covered by that final map
shall be constructed or an improvement agreement shall be executed for that portion,
subject to the approval of the City Engineer. The improvement agreement shall be in
accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the
Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the
following forms of security as described in Section 21.16.070 of the Carlsbad Municipal
Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable
to the Financial Management Director and City Attorney.
If the facility is funded by a public financing district, the financing is guaranteed upon
formation of and participation in such a district. The formation of an assessment district
or a community facilities district for the facility shall satisfy and release any subdivision improvement bond or bonds which were previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/or
constructed and thereafter acquired by the public financing district, the developer shall be
reimbursed from proceeds-of the first bond sale for the Calle Barcelona project, for those
items of cost as shall be determined by the provisions of an Acquisition and
Reimbursement Agreement between the developer and the City, said Agreement to be
subject to the review and approval of the City.
111-61 A
1 0 0
I
1
1
I
I
B
I
1
i
t
FIRE FACILITIES
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
I. Prior to the adoption of this Local Facilities Management Plan by the City
Council, the following actions shall take place:
A. The La Costa Ranch Company shall provide a suitable fire station
site at a location acceptable to the Fire Chief, Planning Director
and Ciry Engineer. This site shall be exchanged for the existing site
located along the present alignment of Rancho Santa Fe Road.
A letter of credit or som other securedfinancing acceptable to the City in the amount of $1,118, Oa, guaranteeing the construction of Fire Station No. 6 shall be provided from a financial institute and upon tern and conditions acceptable to the approval of the Finance Director and City Attorney.
Prior to the City accepting a location for Fire Station No. 6, the
preparers of this LFMP shall be required toprepare a modfledfive
minute response time map for the southeast quadrant to ensure
compliance with the pelfomance standard.
Prior to the approval of any _final map within Zone 11, a schedule shall be
approved by the City guaranteeing the construction of Fire Station No. 6
B.
1
C.
2. I by 1989.
3. No residential building permits shall be issued until the Planning Director
and City Engineering make the findings that sucigicient progress has been
made towards the completion of Fire Station No. 6 and the opening of this
station is projected to occur prior to the completion of any residential 1 units.
I 6 is operational.
5.
4. No residential units will receive a urility inspection until Fire Statim No.
Prior to the occupancy of the Fire Station No. 6, an access load shall be
providedfrom the new Fire Station No. 6 location to the existing Ranch Santa Fe Road by the La Costa Ranch Company or other property owners within Zone 11 acceptable to the Fire Chiefi Planning Director and the
1
1
1
1
111-62
w e
City Engineer.
The Zone 12 LFM Plan does not contain any Special Conditions for Fire Facilities.
In summary, the following facilities are required by the Zone 11 and 12 LFM Plans:
@timated Cost
Fire Station No. 6
Construction and Equipment $650,000
Operation (one year) 530,000
Fire Station Relocation 375,000
(Reimbursement to City)
Total $1,555,000
Permanent Fire Station No. 6 is a required facility for both Zones 11 and 12. Prior to completion
of a permanent fire station, an interim fire station was constructed in accordance with an
agreement between the City of Carlsbad and Fieldstone/La Costa Associates. (See "1988 Fire
Station Agreement" and amendment.)
The amended fire station agreement also obligates Fieldstoneb Costa Associates to contribute
up to $375,000 for relocation of the fire station. This amount is intended to reimburse the City
for the cost of constructing the interim fire station. The availability of an interim fire station
benefits all properties in Zones 11 and 12, which otherwise would fail to satisfy the City's Fire
Facilities performance standards.
Source of Funds
Funds for construction and equipment will be obtained from the Public Facilities Fee Fund.
Under terms of the Zone 6 Facilities Financing Plan, the City has fully funded the costs of
construction and equipment of Fire Station No. 6 by transfemng funds from the General Capital
111-63
i a e
I'
I
I
1
I
I
I
I
1
I
1
I
1
1
1
I
I
Construction fund to the Public Facilities Fee fund.
One year's cost of operating the fire station will be funded through a Local Facilities Manageme
Fee imposed by the Zone 6 Facilities Financing Plan. This fee, which is currently $310 p
residential unit, is also collected from developments in Zones 11 and 12. The requirc
contribution toward relocation of the fire station shall be funded by an increase in the LFM Fa
The increase shall be implemented through an amendment to the existing LFM Fee program ar
applied to new residential and non-residential development in Zones 11 and 12. .
The increase in LFM Fee shall be based on equivalent dwelling units (EDU), as currently us<
by the City of Carlsbad, Single family and multi-family residential units would be assigned 01
EDU. Non-residential development would be assigned one EDU per 0.17 acres, which represen
the land area occupied by the average housing in the City. In Zones 11 and 12, there are plar.
for 3,600 residential units (see Table 1-1) and 73.1 acres of commercial development. The tot;
EDUs planned in the two zones is 4,030 EDUs (= 3,600 + 73.U0.17). The increase in the fe
is therefore $94 per EDU (= $375,000 f 4,030). With the increase, LFM Fee in Zones 11 an
12 would be $404 per residential unit (= $310 + $94) and $553 per non-residential acre (= $9
f 0.17).
Financing Guarantee
Financing for permanent Fire Station No. 6 is guaranteed by the Zone 6 Facilities Financing Pla,
and subsequent actions by the City. No additional guarantees are required. Since the interim fir1
station is already constructed, no financing guarantee is required.
The relocation cost of Fire Station No. 6 is guaranteed by the Fire Station Agreement, a
amended. No additional guarantees are required. 1
111-64
w m
Reimbursement
FieldstoneLa Costa Associates shall be reimbursed for the portion of the relocation cost incurre
in excess of its prorata share. The reimbursement shall be made from the amended Loci
Facilities Management Fee for Zones 11 and 12.
111-64A
1.- 0 0
3 i OPEN SPACE FACILITIES
I Required Facilities
I The following Special Conditions are contained in the Zone 11 LFM Plan:
1. All future development within this zone shall be required to show how it contributes to meeting the open space pefonnance standard and that the
development does rwt preclude the provision of performance standard open
space at build out of Zone 11.
Open space compliance will be monitored annually and as individual projects are reviewed within this zone.
Prior to the approval of any development within this zone, the Planning
Director shall be required to find that the development does rwt preclude
the provision of pe formance standard open space at build out of Zune 11.
I
I
8
I
I
I
1
2. I
3.
. The Zone 12 LFM Plan contains the identical Special Conditions, except that references 1
"Zone 11" are changed to "Zone 12".
Source of Funds
Funding for open space shall be provided by private developers.
I Financing Guarantee
I No specific financing guarantee is required.
I
II
I
1
I 111-65
w a
SCHOOL FACILITIES
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
Encinitas Union Elementary School District:
No special conditions are required.
San Dieguito High School District:
No special conditions are required.
San Marcos Unified School District:
Prior to the approval of ajinal map for any projects within the San Marcos
Un@ed School District, an agreement shall be entered into between the San
Marcos Unijied School District and the La Costa Ranch Company that
shall provide for the following:
I. 77z deeding of an acceprable school sire to the San Marcos Unified
School District.
The guarantee for the financing and construction of a school for the Disirici. This guarantee shall be in the form of bonding, cash
deposit or some other form of security as spec@ed in said agreement.
If any reimbursements and/or school fee credits are to be given, the
school agreement shall provide a mechanism to do so.
2.
3.
The Zone 12 LFM Plan contains no Special Conditions for School Facilities.
111-66
D >- 0 0
I
I
I Elementary School No.3 3,500,000
I
I
I
I
I
I
I
I
I
I
1
I
I
I
>
In summary, the following facilities are required:
Estimated Cost
ENCINITAS USD
Mission Estancia E.S. $3,500,000
SAN DIEGUITO UHSD
High School 35,000,000
Junior High School 16,500,000
SAN MARCOS USD
Elementary School 3,500,000
Zone 11 is served by Encinitas Union School District, San Dieguito Union High School Distric
and San Marws Unified School District. Zone 12 is served by Encinitas USD and San Dieguil
UHSD.
Source of Funds
FieldstonelLa Costa Associates or its predecessor have dedicated, sold, or negotiated futu
transfer of sites for all required schools except San Marcos USD elementary school.
Source of funds for construction of required schools are State funding under various prograr
and school fees.
Financing Guarantee
Payment of applicable school fees satisfies the financing obligation of private development for 1
required school facilities.
I 111-67
W 0
SEWER FACILITIES - ZONE 11
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
PHASE A:
$Decial Conditions:
1. Phase A is located within the SMCWD'. Since SMCUZ, will maintain conformance to the adopted pe fomzance standard urd1 ultimate build out,
there are 110 special conditions for Phase A.
Financing:
&re is 110 special financing required for Phase A.
PHASE B:
SDecial Conditions:
I. Prior to any occupancy within Phase B, the proposed 12-inch sewer line
east of La Costa Racquet Club, from the existing 12-inch stub in Calle
Lomas Verde to the existing 12-inch terminus in Stagecoach Park must be
installed.
Phase B is located within Lm4 drainage basin 8. The improvements
recommended by the LCWD Planning Study will continue to be made by
LCHD to maintain conformance with the adopted peglonnance standard.
All development within this phase will pay the required sewer fees to
Lccn>.
2.
Financing:
77~ COS( of the proposed 12-inch sewer is estimated to be $92,100. This sewer 'is
anticipated to be$financed by the developers of Phase B. LcUa willflnance the
facilities recommended in the Planning Study through the collection of sewer fees.
3ValIecitos Water District, formerly Sa0 Marcos County Water District.
bucadia County Water District.
111-68
I "' e e
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PHASE C:
SDecial Conditions:
I. Phase C is located within Lcr;lz) drainage basin 10. 17te Lcuz) Planning
Study recommends improvements for the development of their drainage
basin 10. These improvemews will continue to be ntade by LCKD to
maintain conformance with the adopted per$omnce standard. All development within Phase C will pay the required sewer fees to Lm.
Jhimcing:
LCWD willfinance the facilities recommended in the Planning Study through the
collection of sewer fees.
PHASED: I Special Conditions:
2. Prior to occupancy in Phase D, the proposed 12-inch sewer l;ne west of La
Costa Racquet Club,from the misting 12-inch stub in La Costa Avenue to
the existing 12-inch trunk sewer in Stagecoach Park must be installed.
Phase D is located within LCWD drainage basin 8. The improvements
recommended by the LCWD Planning Study will continue to be made by
LCWD to maintain conformance with the adopted per$ormance stamhrd.
All development within this phase will pay the required sewer fees to
LCUI).
2.
I Financing
The cost of the proposed 12-inch sewer is estimated to be $59,100. This sewer is
anticipated to be financed by the developers of Phase D. LCWD willfinance the
facilities recommended in the Planning Study through the collection of sewer fees.
PHASE E:
SDecial Conditions:
1. Phase E is located within Lcr;lz) drainage basin 8. The improvements
recommended by the LClW Planning Study will continue to be made by
LCWZ, to maintain conformance with the adopted per$ormance standard.
All development within this phase will pay the required sewer fees to
LCUI).
111-69
W e
Financing:
LCWD willfifinance the facilities recommended in the Planning Study through the collection of sewer fee.
PHASE F:
JDecial Conditions:
1. Prior to occupancy in Phase F, one of the following must occur:
Q. The pump station and force main must be irtstalled.
b. An agreement must be reached with the CardifSanitation District.
c. A septic system must be approved by the County Sanitation
Depamnent and the City of Carlsbad for the lots that can’t gravity
flow toward the LCWD sewer system.
Phase F is located within LCWD drainage basin 8. The improvements
recommended by the LCWD Planning Study will continue to be made by
LcWa to maintain conformance with the adopted pe$omance standard.
All development within this phase will pay the required sewer fees to
Lam.
2.
Financing:
fie cost of the proposed pump station, force main and trunk sewer is estimated to
be $200,axl. These sewer facilities are anticipated to be jinanced by the
developers in Phase F. LCWD will finance the facilities recommended in the
Planning Study through the collection of sewer fees.
For definition of sewer facilities phases in Zone 11, see Figure 3-4 below. Source of funds and
financing requirements are discussed following the list of Special Conditions for Zone 12.
111-70
I ""
1
I
I
I
I
1
1
1
I
I
IE
1
I
1
I
1
I
I
F
P
0
!5
2
C PI;
I
p: $
f
5
2
p:
U 4 @
b
T
U
CI
f
i i;
0,
llJ 0 v)
0 z
-
w 0
SEWER FACILITIES - ZONE 12
Required Facilities
The following Special Conditions are contained in the Zone 12 LFM Plan:
A. All development within Zone 12 shall pay the required sewer connection fee to the Lewadia County Waer District.
B. sewer Basin A
I. Prior to the recordation of the first final map, issuance of a grading
permit or building permit, whichever occurs first, for any
the construction of the following sewer facilities shall be provided
to the satisfaction of the Leucadia County Water District:
a.
development in Sewer Basin A, aJfinancing mechanism guaranteeing
The proposed IO-inch sewer line within Calle Barcelona
must be installed;
The improvements recommended by the LCWD Planning
Study will continue to be made by LCWD to maintain
conformance with the adopted performance standard.
b.
Financing:
The cost of the proposed IO-inch sewer is estimated to be $27,100.
C, Sewer Basin B
I. Prior to the recordation of the firstfinal map, issuance of a grading
permit or building permit, whichever occurs first, for any
development in Sewer Basin B, a financing mechanism guaranteeing
the construction of the following sewer facilities shall be provided
to the satisfaction of the Leucadia County Water District:
a. The improvements recommended by the LCWD Planning
Study will continue to be made by the LCWD to maintain
conformance with the adopted pelfonnance standard.
111-72
I A- 0 0
1 I Financing:
I Leucadia County Water District will finance the facilities recommended in
the Planning Study through the collection of sewer fees.
For definition of sewer basins in Zone 12, see Figure 3-5 below. Source of funds and financir
requirements are discussed following this figure. t
I
I
1
I
1
1
I
E
8
E
I
I
I
I
E 111-73
.
c ..
Y) e $
i
0
C
C PI I 5 -
PI i
E
E z P
c/1
c 2 0 z
E
Y
e a
iz
v:
yc;
e4
UI
0
Ill
0 &I
*l~*W*Hllolmlo~i~~~n~n~~~~~
0 z 1'1
III 2
'4
1W
I
I
1
t
Facility 10.1
Special Condition
Basin B 12" Sewer Main
Zone 11 B. 1
Estimated Cost $92,100
Source of Funds Developer
Financing Guarantee Improvement agreement
Reimbursement Not applicable
Zone 12 Not required
Responsible Area F @art), G @art)
c
Facility 10.2
Special Condition
Basin D 12" Sewer Main
Zone 11 D. 1
Zone 12 Not required
Estimated Cost $59,100
Source of Funds Developer
Financing Guarantee Improvement agreement
Responsible Area H @art) Reimbursement Not applicable
Y
I -' 0 0
t
I
t
I
1
I
1
1
I
I
I
6
8
I
1
b FINANCING METHOD SEWER FACILITIE
Source of Funds 1 Financing Guarantee Improvement agreement
Source of Funds
This facility shall be funded and constructed by the first developer in sewer bash F c
Zone 11. 8 Financing Guarantee
Prior to the recordation of a final map in sewer basin F of Zone 11, this facility shall b
constructed; or an acceptable security instrument shall be provided to the City; or a
improvement agreement shall be executed with the appropriate sewer district. The sewc
improvement shall be constructed concurrent with development.
i
111-77
Facility 10.4
Special Condition Zone 11
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Responsible Area
Reimbursement
Basin A 10" Sewer Main
Not required
B. 1 .a
Included in Facility 6.12
Developer or Assessment District
Improvement agreement or formation of and
participation in Assessment District
€3 (Part), c See below
a e e
8
1
1
I
1
1
I
1
1
I
I
I
1
1
1
S
U
I
If the facility is funded by a public financing district, the financing will be guarantee
upon formation of and participation in the district. The formation of a public financinl
district for the facility shall satisfy and release any subdivision improvement bonc
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/o
constructed and thereafter acquired by the public financing district, the developer shall b
reimbursed from proceeds of the first bond sale for the Calle Barcelona project, for thos
items of cost as shall be determined by the provisions of an Acquisition an
Reimbursement Agreement between the developer and the City, said Agreement to b
subject to the review and approval of the City.
111-78A
w 0
WATER FACILITIES - ZONE 11
Required Facilities
The following Special Conditions are contained in the Zone 11 LFM Plan:
PHASE A:
SDecial Conditions:
1. Water facilities will be provided at the time of development to the
existing 12-inch stub in Coriruia Street to El Fuerte Street shall be installed
as required by SM-.
AI1 development within Phase A shall pay the appropriate water fees
established by SMCM?>.
satisfaction of SMW, Re 12-inch water line proposed from the
2.
Financing:
The cost of the proposed 12-inch water line is estimated to be $154,600. This
water line is aruicipated to be financed by the developers of Phase A.
PHASE B:
SDecial Conditions:
1. Water facilities will be provided at the time of development to the
satisfaction of Om6.
All development within Phase B shall pay the appropriate water fees
established by OMWD.
2.
Financing:
There is no special financing required for Phase B.
5Vallecitos Water District, formerly San Marcos County Water District.
601ivenhah Municipal Water District.
111-79
I -+ 0 0
II
I
1
E PHASE C:
XDecial Conditions:
1. Water facilities will be provided at the time of development to the
satisfaction of OMWD. T;he 12-inch water line proposed in tht extension of Calle Barcelona and a portion of the 16-inch water line proposed in the @ure extension of Calle Acervo shall be installed as reguired by Om.
2. All development within Phase C shall pay the appropriate water fees
established by OMUD. I Financing:
I
1 PHASE D:
The cost of the proposed water lines are estimated to be $151,800. These water
lines are anticipated to becfinanced by the developers of Phase C.
JDecial Conditions:
1. Water facilities will be provided at the time of development to the
II
I
I
I
I
I
1
1
1
I 111-80
1
satisfaction of OMRD. The portion of the 16-inch water line proposed in the future extension of Calle Acervo shall be installed, as required by
OMRD.
All development within Phase D shall pay the appropriate water fees
established by Om.
2.
Financing:
77~ cost of the proposed water line is estimated to be $I 14,400 for Phase D. This
water line is anticipated to be financed by the developers of Phase D.
PHASE E:
SDecial Conditions:
I. Water facilities will be provided at the time of development to the
satisfaction of OMUD. The portion of the 16-inch water line proposed in
the future extension of Calle Acervo shall be installed, as required by
Om.
0 0
2. All development within Phase E shall pay the appropriate water fees established by OMWLI.
Financing:
The cost of the proposed water line is estimated to be $1 16,600 for Phase E. This water line is anticipated to be$nanted by the developers of Phase E.
PHASE F:
$Decial Conditions:
1. Water facilities will be provided at the time of development to the
satisfaction of OMWD.
All development within Phase F shall pay the appropriate water fees
established by OMKD.
2.
Financing:
There is no specialflnancing required for Phase F.
For definition of water facilities phases in Zone 11, see Figure 3-6 below. Source of funds and
financing requirements are discussed following the list of Special Conditions for Zone 12.
111-8 1
I -'
f
I
1
I
I
I
II
8
1
1
8
i
I
I
I
I
m
I
v v
I f t C
1 L
I
I
I 1
I ( I
1 I
I
!
I
I i
1 I
1
q
i
c -
0 z
m e
WATER FACILITIES - ZONE 12
Required Facilities
The following Special Conditions are contained in the Zone 12 LFM Plan:
A. Water Service Area A
I. Water facilities shall be provi&d at the tim of development to the
sCLtiSfaCCion of OMWD7. The water district may require
improvements outside of Waer Service Boundaries if deemed
necessary to serve development.
All development within Water Service Area A shall pay the
appropriate water fees established by OMWLl.
2.
Financing:
nere is no specialfinancing required for Water Service Area A.
B. Water Service Area B
1. Water Facilities shall be provided concurrent with development to
the satisfaction of OMWD. A portion of the existing 12" water line
in Calle Barcelona shall be removed and an extensionkonnection
&e to the 12" main in the new alignment of Calle Barcelona as
well as its atension and connection to the 16" main in El Camino
Real and the 12" line in Rancho Santa Fe Road, as required by
Om.
All development within Water Service Area B shall pay tk 2.
appropriate water fees established by OMWD.
Financing:
13te cost of the removal, reloctrtion, and extension of the proposed 12-inch
water line is estimated to be $256,W. This water line is anticipated to be
financed by the developers of Water Service Area B.
'Olivenhain Municipal Water District.
111-83
I I> 0 a
I
8
I
I
C. Water Service Area C
I. Water Facilities shall be provided concurrent with development to
the satisfaction of OMWD.
The existing 14" water line in the northwesterly ponion on Zone 12
shall be removed and replaced with a 16" water line in Levante
StreetIAnillo Way with a connection a& the La Costa pressure
reducing station and QC the 16" main in El Camino Real.
All development within Water Service Area C shall pay the
appropriate fees established by OMMI).
2.
3.
1 Financing:
1 to be $300,080,
The cost of the proposed facilities in Water Service Area C are estimated
For definition of water service areas in Zone 12, see Figure 3-7 below. Source of funds an
financing requirements are discussed following this figure.
1
I
1
I
I
I
1
1
It
1
I
I
111-84
-
Y) - ::
0 M- -- - 5 -0 Om 6U - Ed
LC rl! co -b
0, m 0 v3
0 z
-
!A YW
t 7
1 ;
E
i
t
L
C
c
I
5
4 1
f C l!
c f
r
t P 4
L- U v
r
f i i;
cc
C
Facility 11.1
Special Condition
Zone 11
Zone 12 Estimated Cost
Source of Funds
Financing Guarantee
Responsible Area
Reimbursement
I
1
1
I
Service Area A 12" Water Line
A. 1
Not required
$154,600
Developer
Improvement agreement
D, E @art) Not applicable
Facility 11.2
Special Condition
Zone 11
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Responsible Area
Reimbursement
Service Area C 12" Water Line
e. 1
Not required
$40,200
Developer
Improvement agreement
J, K Not applicable
I -> e e
I
1
I
8
1
1
1
I
I
8
I
I
i
1
ll
I
I FINANCING METHOD WATER FACILITIE!
Estimated Cost
Source of Funds
Reimbursement
Source of Funds
This facility shall be funded and constructed by the first developer in water service arc
C of Zone 11.
. Financing Guarantee
Prior to the recordation of a final map in water service area C of Zone 11, this facilil
shall be constructed or an improvement agreement shall be executed with the appropria
water district.
1 III-88
r
Facility 11.4
Special Condition
Service Area D 16" Water Line
Zone 11 D. 1
Zone 12 Not required
Estimated Cost $1 14,400
Source of Funds Developer
Financing Guarantee Improvement agreement
Reimbursement Not applicable
Responsible Area M
8
I
I
I
I
Facility 11.5
Special Condition
Service Area E 16" Water Lie
Zone 11 E. 1
Zone 12 Not required
Estimated Cost $1 16,600
Source of Funds Developer
Financing Guarantee Improvement agreement
Reimbursement
Responsible Area N
Not applicable
Y
Facility 11.6
Special Condition
Zone 11
Zone 12
Estimated Cost
Source of Funds
Financing Guarantee
Responsible Area
Reimbursement
Service Area B 12" Water Line
Not required
B. 1
Included in Facility 6.12
Developer or Assessment District
Improvement agreement or formation of and
participation in Assessment District
See below A @art), €3
I ** 0 0
1
I
I
II
I
I
8
I
1
I
8
I
1
I
I
I
1
1
If the facility is funded by a public financing district, the financing will be guaranta
upon formation of and participation in the district. The formation of a public financii
district for the facility shall satisfy and release any subdivision improvement bo]
previously posted with respect to the facility.
Reimbursement
If the facility is funded by a public financing district and if it is privately designed and/
constructed and thereafter acquired by the district, the developer shall be reimbursed fra
proceeds of the first bond sale for the Calle Barcelona project, for those items of cost
shall be determined by the provisions of an Acquisition and Reimbursement Agreeme
between the developer and the City, said Agreement to be subject to the review a
approval of the City.
111-9 1 A
W e
FINANCING METHOD WATER FACILI"E5
Source of Funds
Financing Guarantee Improvement agreement
Source of Funds
This facility shall be funded and constructed by the first developer in Water Service Area
C of Zone 12.
Financing Guarantee
Prior to the recordation of a final map in Water Service Area C of Zone 12, this facility
shall be constructed or an improvement agreement shall be executed with the appropriate
water district.
111-92
I *' 0 e
8' x
X
I
I
X
I
I
I
1
I
I
I
I
1
1
I
I
APPENDIX A
FACILITY AREAS OF LFM ZONES 11 AND 12
i :* 0 m
I
I
I
8
I
I
I
t
I
I
I
8
I
1
1
t
Table A-1
RELATIONSHIP OF FACILITY AREAS TO LFM PLAN
FOR DRAINAGE, SEWER AND WATER AREAS I
Facility Area (a) Zone Drainage 6) Sewer (c) Water (d)
A 12 Watershed C Basin B Service Area A,
B 12 Watershed A, B Basin A, B Service Area B
C 12 Watershed A, D Basin A Service Area C
D 11 Phase A Phase A Phase A
E 11 Phase A Phase A, C Phase A, B
F 11 Phase B, C Phase B, C Phase B
G 11 Phase C Phase B, E Phase B
Phase C, D Phase B H 11 Phase C
I 11 Phase C Phase E r (Existing) (e)
Phase C J 11 Phase C
K 11 Phase D Phase E Phase C
L 11 Phase D, E Phase E, F Phase B I M 11 Phase D, E Phase E, F Phase D
N 11 Phase C, D Phase E Phase E
0 11 Phase C, D Phase E Phase F
Phase E
(a) See Figure 3-1.
@)
(c)
(d)
(e)
See Figures 3-2 and 3-3.
See Figures 3-4 and 3-5.
See Figures 3-6 and 1-7.
This subarea is served by existing water distribution facilities.
a
A- 1
w
Table A-2
FACILITY AREAS, OWNERS AND PROJECTS
Facility Area Owner Project
A Fieldstone/La Costa Associates Arroyo La Costa
B Fieldstone/La Costa Associates Arroyo La Costa
C Fieldstone/La Costa Associates Arroyo La Costa
D Fieldstone/La Costa Associates Southeast 111
E Fieldstoneb Costa Associates Southeast I1
F Fieldstone/La Costa Associates Southeast I1
G D. Shelley Residential - 80 Ac.
H M. A. G . Properties Commercial
I Leisure Technology C.T. 85-15
Mission Estancia Partnership C.T. 85-21
La Costa Funding (Vistar) Commercial
Union Oil Company Commercial
La Costa Estancia Partnership Commercial
J Broadmoor Homes C.T. 85-11
K Donald L. Bren Company C.T. 85-9B
L Brighton Homes C.T. 89-23
M Rice Enterprises C.T. 85-10
N D. Shelley Residential - 115 Ac.
0 Wiegand Properties Residential
Note: Ownership information as of October 1991.
A-2
I :,* 0 e
1
I
t
1
1
1
I
I
I
I
I
I
1
1
I
I
1
1:
e
APPENDIX B
LIST OF FACILITIES WHICH ARE FUNDED
FROM CITY OF CARLSBAD DEVELOPMENT FEES
I :,o * m
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
.* APPENDIX B
LIST OF FACILITIES WHICH ARE FUNDED
FROM CITY OF CARLSBAD DEVELOPMENT FEES (a)
Facility Source of Funds Amount Reference 8 I. Park Land Acquisition PIL $5,168,000 Parks Agreement (b)
2. Park Construction PFF $2,630,000 Parks Agreement
CIP (1991-92), p. 27
3. Traflic Signal - PFF $110,000 CIP (1991-92), p. 128
ECR/Calle Barcelona
4. Traffic Signal PFF $125,000 CIP (1991-92), p. 131
ECR/Olivenhain
I (a) This table is a list of facilities which are proposed in the Zone 11/12 Financing Plan to be construct
part of projects to be initially funded by the developers or by one or more public financing district:
which are also funded from development fees collected by the City of Carlsbad.
- (b) Park land will initially be dedicated by Fieldstone/La Costa Associates in accordance with the 1
Agreement. A portion of the value of the dedicated land may be subject to reimbursement from the I
In-Lieu Fee revenues. The reimbursable portion may be less than this amount. The exact amoun
timing of reimbursement will be determined as part of a new master plan, appraisal, and reimburse
agreement, as described in the Parks Agreement between the City of Carlsbad and Fieldstone/La ( I Associates.