RECOMMENDED ACTION:
Adopt Resolution No. 42-3020 approving the plans and specifications for Pal Airport Road and El Camino Real Widening, Project No. 3166 (Rebid).
ITEM EXPLANATION :
All bids were rejected for the first bidding of the Palomar Airport Road an( Camino Real Widening Project. At the time of rejection, the Council authorized solicitation of new bids for the project. In keeping with that authority, 1 staff has started the bid solicitation process and presently plan to open the bids on November 5, 1992 at 4:OO p.m. During the preparation of the rl documents, additional Bidder's information and certification requirements as 1 as definitions, technical requirements and material specification were added to plans and specifications. The extent of the modifications are not so great a: change the basic nature of the documents but they are significant. Upon advict the City Attorney that we eliminate a possible point of confusion, the plans specifications are being presented for the City Council's approval. Plans specifications are on file with the City Clerk for review.
ENVIRONMENTAL REV1 EWS :
The Planning Director issued a Negative Declaration for the Palomar Airport I portion of this project on November 12, 1990 and a Mitigated Negative Declarat for the El Camino Real portion on December 5, 1991.
GENERAL PLAN CONSISTENCY:
The Planning Commission Determinations for General Plan Consistency have t approved. PCD/GPC 90-5 for Palomar Airport Road was approved on June 5, 1991 PCD/GPC 91-2 for El Camino Real, among others, was approved on September 18, 1I
FISCAL IMPACT:
The approval of the plans and specifications has no direct fiscal impact. When project has been rebid and the lowest responsible bidder selected, the project w be presented to the City Council for authorization to award. Sufficient funds h been previously appropriated. No additional appropriations are expected to needed due to the changes in the plans and specifications.
EXHIBITS :
1. Location map.
2. Resol uti on No. 72 -32' approving the pl ans and speci f i cat i ons , as modi f i 1 for the Palomar Airport Road and El Camino Real Widening, Project No. 311
Plans and Specifications are on file with the City Clerk for review,
and upon approval by the City Council, will be returned to the Engineer1
Department.
3.
‘” LO CAT IO N MAP
CITY OF MSTA
6 CITY OF CARLSBAD )y$g -n C
F BUSINESS PARK DRIVE
4
(
A(
PALOMAR A\RPORT @3@ n $\ //LA / I \ -4 -< q v) z D I
I > XJ 0
I \ ri fjqr
s:
NOT TO SCALE
SIT
CllY OF ENCINITA
PROJECT EX
NUMBER
rl PAR-ECR PROJECT NAME
DRAW BY SCOTT EVANS. CARLSEAD ENGINEERING DEPT
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
0 0
RESOLUTION. NO. 92-320
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS FOR THE PALOMAR AIRPORT ROAD AND EL CAMINO REAL WIDENING, PROJECT NO. 3166 (REBID).
WHEREAS, the City Council of the City of Carlsbad has determir
necessary, desirable, and in the public interest to construct improvemei
Palomar Airport Road from El Camino Real to Acacia Avenue in San Marcos
El Camino Real from Faraday Avenue to Palomar Airport Road, Project No. 316
WHEREAS, the Cities of Carlsbad, San Marcos and Vista have enterel
joint agreements to fund the design, construction, inspection and administ
of said improvements; and
WHEREAS, plans, specifications, and contract documents for the furn
for all labor, materials, tools, equipment, transportation, and other ex1
necessary or incidental for said project have been prepared and are on f
the Engineering Department of the City of Carlsbad; and
WHEREAS, modification to the original project plans and specification
necessary to provide for unforeseen needs; and
WHEREAS, the City Engineer has caused said plans and specifications
modified; and;
WHEREAS, the City Council the City of Carlsbad has previously appropi
funds for said project; and
WHEREAS, construction for said improvements is a matter of pub1 ic neci
and safety.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carl
California, as follows:
1, That the above recitations are true and correct.
///
///
F
1
2
3
4
5
6
7
8
9
10
11
12
l3
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e
2. That the plans, specifications, and contract documents as pres
are hereby approved.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad
Council held on the M day of NOVEMBER , 1992 by the following
to wit:
AYES:
NOES: None
ABSENT: None
Council Members Lewis, Kulchin, Larson, Stanton, Nygaard
ATTEST:
ALETHA L. RAUTENKRANZ, City a I /? &J&-dL k. ,'(& (SEAL)