HomeMy WebLinkAbout1992-12-15; City Council; 11990; AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE 1992-93 PAVEMENT OVERLAY PROGRAM6a w 2; oc CB 2
.. z 0
4 i 0
5
z 3 0 0
G 'I IC C1-a OF CARLSBAD - AGEN@ BILL
AB# I/, 9 7 0 DEPT. t
MTG. 12/15/92 FOR BIDS FOR THE CITY A1
DEPT. U&M 1992-93 PAVEMENT OVERLAY PROGRAM CITY MI
RECOMMENDED ACTION;
Adopt Resolution No.gl's approving contract documents, special provisions and
specifications; and authorizing the City Clerk to advertise for bids for the 1992-93
Pavement Overlay Program, Contract No. U/M 93-1.
ITEM EXPLANATION:
The City has a multi-faceted street maintenance program including both in-house
maintenance repairs and major resurfacing programs which are completed by private
contractors. The Pavement Overlay Program is just one of three annual resurfacing
programs and is used when the condition of the existing roadway has deteriorated and
the application of a new surface is required. Based on surveys and observations, the
Streets Division has established a list of locations which require overlay applications.
The list of locations and site maps are attached.
It should be noted that pavement overlay projects sometimes result in increased claims
for windshield and paint damage. The contractor is responsible for the administration
of all contract related claims.
Plans and specifications for the 1992-93 Pavement Overlay Program are on file with the
Utilities and Maintenance Department.
ENVIRONMENTAL REVIEW:
The Planning Director has determined that the proposed project which is limited to
repair and maintenance of existing facilities is categorically exempt from environmental
review pursuant to Section 15301 of Title 14 of the California Code of Regulations
(CEQA Guidelines).
FISCALIMPACT:
The City Council approved funds in the amount of $780,000 for the entire 1992-93
Asphalt Repair and Maintenance Program. Project costs for the 1992-93 Pavement
Overlay Program are estimated to be $523,300. Adequate funds are available in the
street maintenance budget.
EXHIBITS:
1. Resolution No. 92-358
2. List of locations
3. Site maps
'/-$!;
TITLE: - AUTHOmmoN To ADVERTISE
I
, iā
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e e
92-358 RESOLUTION NO.
RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA APPROVING CONTRACT DOCUMENTS, SPECIAL PROVISIONS AND
CLERK TO ADVERTISE FOR BIDS FOR THE 1992-93
PAVEMENT OVERLAY PROGRAM, CONTRACT No. U/M
93-1
SPECIFICATIONS, AND AUTHORIZING THE CITY
WHEREAS, the contract documents, special provisions
specifications for the furnishings of all labor, material, to
equipment, transportation and other expenses necessary
incidental for the 1992-93 Pavement Overlay Program, Contract
U/M 93-1, have been prepared and are on file in the Utilities
Maintenance Office of the City of Carlsbad and are incorpor
by reference herein.
NOW, THEREFORE, BE IT RESOLVED by the City Counci
the City of Carlsbad as follows:
1. The above recitations are true and correct.
2. The contract documents, special provisions
specifications as presented are hereby apprc
The City Clerk of the City of Carlsbad is he
authorized and directed to proceed to publist
accordance with law, Notice Inviting Bids foi
work of said contract in accordance with
contract documents, special provisions
specifications.
3.
///
///
///
///
I.
3
1
2
3
4
5
6
7
a
9
LO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
* 0
PASSED, APPROVED AND ADOPTED by the City Council of
City of Carlsbad at its regular meeting held on the
day of December , 1992, by the following vote, to h
AYES: Council Hembets Lewis, Stanton, Kulchin, Nygaard an
NOES: None
ABSENT: None
15th
Finnila
CLAUDE A. LEWIS, Mayor
ATTEST:
P 1 0- &-(,-!& -[ f&L&..&t--h-,, 1 ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)
e 0
STREET LISTING
EL CAMINO REAL: Marron Road to Chestnut Avenue (southbound)
EL CAMINO REAL: Carlsbad Village Drive to Marron Road (north
Tierra del Oro Street to Palomar Airport Ro
DAISY AVENUE: Batiquitos Drive to south end
Poinsettia Lane to Poppy Lane
ABEDUL STREET: Persa Street to Abanto Street
UNICORN10 STREET: El Fuerte Street to Persa Street
CARLSBAD VILLAGE DRIVE: Monroe Street to Interstate 5
CARLSBAD BOULEVARD:
BATIQUITOS DRIVE:
LA COSTA AVENUE: Rancho Santa Fe Road to Camino de 10s Coche
PERSA STREET: Unicornio Street to Abedul Street
GRULLA STREET: Abedul Street to Unicornio Street
VISPERA PLACE: Unicornio Street to end
ABANTO STREET: Abedul Street to Unicornio Street
ABEDUL PLACE: Abedul Street to end
CAZADERO DRIVE: Abedul Street to Alga Road
AVENIDA DE LOUISA: Avenida de Anita to end
CALLE SUSANA: Avenida de Anita to Avenida de Louisa
B:WLH93036.AGB
0 4 1992-93 OVERLAY
U/M 93-1
EL CAMINO REAL
MARRON ROAD southbound to CHESTNUT AVENUE
e
NO SCALE
DESCRIPTION OF WORK: 1" ASPHALT-RUBBER HOT MIX OVERLAY with 1" HEADER & CROSS CUTS
ESTIMATED MATERIAL QUANTITIES: ASPHALT-RUBBER HOT MIX* 1,728 tons 287,980 sf) HEADERGRIND 12.01 4 If 12 CROSS CUTS)
FACILITIES TO BE RAISED: 2 STORM DRAINS 1 MONUMENT 2 WATER VALVES (4ll)
* The transportation of Asphalt-Rubber Hot mix to the paving operation will be done with END dumping vehicles o
mq AREA OF OVERLAY
0 4 1992-93 OVERLAY
U/M 93-1
EL CAMINO REAL
0
CARLSBAD MLJAGE DRIVE northbound to WRON ROAD
NO SCALE
DESCRIPTION OF WORK: 2* OVERLAY with PETRO MAT and HEADERGRIND
PETRO MAT 1 1,470 sy HEADERGRIND 5,188 If
1,330 tons 1 10,820 sf) 2.554' x 37.50' + 12.5') 2 cross cuts) 1 turn pocket 726' x 12.5')
ESTlMAED MATERIAL QUANTITIES: ASPHALT
FACILITIES TO BE RAISED: 2 STORM DRAINS 1 MONUMENT 18 WATER VALVES (4ll)
-1 AREA OF OVERLAY
e 0
i 1992-93 OVERLAY
U/M 93-1
CARLSBAD VILLAGE DRIVE
INTERSTATE 5 to MONROE STREET
NO SCALE
DESCRlPTlON OF WORK: 2" OVERLAY with PETRO MAT and HEADERGRIND
ESTIMATED MATERIAL QUANTITIES: ASPHALT 1,307 tons 21 7,750 sf) PETRO MAT 18.61 1 sy b.350' x 50'1 HEADERGRIND 6,830 If 2 cross cuts
FACILITIES TO BE RAISED 5 STORM DRAINS 5 MONUMENTS 25 WATER VALVES (4TT)
pmg AREA OF OVERLAY
e 0
1992-93 OVERLAY
U/M 93-1
CARWAD BOULEVARI)
TlERRA DEL OR0 to PALOMAR AIRPORT ROAD 4
NO Scw
TRASH DAY: MONDAY
DESCRIPTION OF WORK 2* OVERLAY with PETRO MAT and HEADERGRIND
ESTIMATED MATERUV QUANTITIES ASPHALT 2,375 tons 198,000 sf) PETRO MAT 11,112 sy ),OOOB X 25ā1 HEADERGRIND 8,096 If 2 cross cuts
FACILITIES TO BE RAISED 12 STORM DRAINS 1 MONUMENT 10 WATER VALVES (4TT)
my AREA OF OVERLAY
e e
4 1992-93 OVERLAY
U/M 93-1
DAISY AVENUE
BATIQUITOS DRIVE to south end
NO SCALE
TRASH DAY: THURSDAY
DESCRlPTlON OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
PETRO MAT 9,389 sy HEADERGRIND 6,797 If
11 MONUMENTS 35 WATER VALVES (4TT)
750 tons 125,060 sf) 3,380' x 25') I 1 cross cut)
ESTIMAlED MATERW- QUANTITIES: ASPHALT
FACILITIES TO BE RAISED 1 STORM DRAIN
p?q AREA OF OVERLAY
* 0
I4
1992-93 OVERLAY
U/M 93-1
BATIQUITOS DRIVE
POlNSrmA LANE to POPPY LANE
NO SCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK 2" OVERLAY and HEADERGRIND
ESTIMATED MATERW QUANTITIES: ASPHALT 92,400 sf) HEADERGRIND 3,:;; if""" [ 2 cross cuts)
11 MONUMENTS 10 WATER VALVES (4TT)
FACILITIES TO BE RAISED 0 STORM DRAIN
mg AREA OF OVERLAY
0 0
4 1992-93 OVERLAY
U/M 93-1
LA COSTA AVENUE
RANCHO SANTA FE ROAD to CAMINO DE LOS COCHES
NOSCA
TRASH DAY: FRIDAY
DESCRIPTION OF WORK: 2" OVERLAY wfth PETRO MAT and HEADERGRIND
ESTIMATED MAlERlAL QUAMTI1ES ASPHALT 930 tons 1141.1 12 sf) ~
HEADERGRIND 5,124 If 2 cross cuts PETRO MAT 13,889 sy 2,500' x 50'
FACILITIES TO BE RAISED 1 STORM DRAIN 5 MONUMENTS 0 WATER VALVES
mg AREA OF OVERLAY
a 0
4 1992-93 OVERLAY
U/M 93-1
ABEDUL STREET
PERSA STRER to ABM0 STREET
NOSCALE
RASH DAY: THURSDAY
DESCRIPTION OF WORK: 2" OVERLAY and HEADERGRIND
ESTIMATED MATERIAL QUANTITIES: ASPHALT 34,650 sf) HEADERGRIND 2,::: :fans [ 0 cross cuts)
FACILITIES TO BE RAISED: 0 STORM DRAINS 6 MONUMENTS 1 WATER VALVE (4TT)
mfl AREA OF OVERLAY
0 0
f 1992-93 OVERLAY
U/M 93-1
UNICORNIO STREET !+io Scale
EL FUERTE STREm to PERSA !TF?EET
TRASH DAY: THURSDAY
DESCRIPTION OF WORK T OVERLAY with PETRO MAT and HEADERGRIND
PFTRO MAT 7,245 sy 2,608' x 25' HEADERGRIND 5,286 If 2 croas cuts
ESTIMATED MATERIAL QUANTITIES: ASPHALT 1,096 tons r1,280 sf) ~
FACILITIES TO BE RAISED 1 STORM DRAIN 7 MONUMENTS 9 WATER VALVES (ROUND)
Ymy AREA OF OVERLAY
0 0
4 1992-93 OVERLAY
U/M 93-1
PERSA STREET
UNICORN10 STRER to AEEDUL STREn
NO SCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK: T OVERLAY wlth PETRO MAT and HEADERGRIND
18,744 sf) I ,136 225tonr If t 0 cross cds) ESTIMATED MATERIAL QUANTITIES: ASPHALT PETRO MAT HEADERGRIND
0 STORM DRAINS 1 MONUMENT I WATER VALVE (ROUND)
FAClUTfES TO BE RAISED:
md AREA OF OVERLAY
0 0
4 1992-93 OVERLAY
U/M 93-1
GRULLA STREET
ABEDUL STRED to UNICORN10 SlREm
NOSCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK 2" OVERLAY and HEADERGRIND
23,030 sf) f 1 cross cut) 1,351 277tons If ESTIMATED MATERIAL QUANTmff: ASPHALT HEADERGRIND
FACILITIES TO BE RAISED: 0 STORM DRAINS 2 MONUMENTS 3 WATER VALVES (ROUND)
mg AREA OF OVERLAY
0 0
4 1992-93 OVERLAY U/M 93-1
UNICORN10 SIRED to end
YISPERA PLACE
NO SCALE
TRASH DAY: THURSDAY
DESCRIFTON OF WORK: 2" OVERLAY and HEADERGRIND
11,958 sf) t 1 cross cut) 765 144tons If ESTIMATED MATERIAL QUANTITIES: ASPHALT HEADERGRIND
FACILITIES TO BE RAISED: 0 STORM DRAINS 2 MONUMENTS 1 WATER VALVE (ROUND)
STREET
p?q AREA OF OVERLAY
0 0
4 1992-93 OVERLAY
U/M 93-1
ABANTO STRErn
ABEDUL STREET to UNICORN10 STREIT
NOSCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK: Y OVERLAY and HEADERGRIND
10,360 sf) I I cross cut)
597 125tons If ESllMATED MATERIAL QUAMTTIES: ASPHALT
HEADERGRIND
FACILITIES TO BE RAISED 0 STORM DRAINS 2 MONUMENTS 0 WATER VALVES
Q
0
z LT 0
z 3
wg AREA OF OVERLAY
-
/
-%r
e 0
1992-93 OVERLAY U/M 93-1
CAZADERO DRIVE
ABEDUL SlREEr to ALGA ROAD i
NO SCME
TRASH DAY: THURSDAY
DESCRIPTION Of WORK 2" OVERLAY and HEADERGRIND
4,366 sf) 2:::fons [ 0 cross cuts)
ESTIMATED MATERIAL QUANTITIES: ASPHALT
HEADERGRIND
FACILITIES TO BE RAISED: 0 STORM DRAINS 0 MONUMENTS 0 WATER VALVES
m AREA OF OVERLAY
* 0
4 1992-93 OVERLAY
U/M 93-1
AVENIDA DE LOUISA
AVENIDA DE ANITA to end
Now
TRASH DAY: WEDNESDAY
DESCRIP~ON OF WORK: 2" OVERLAY and HEADERGRIND
69,960 sf) HEADERGRIND 4,273 420tons If t 1 cross cut) ESTIMATED MATERIAL QUANTITIES: ASPHALT
FACILITIES TO BE RAISED: 2 STORM DRAIN 0 MONUMENTS 26 WATER VALVES (4")
my AREA OF OVERLAY
e e
1992-93 OVERLAY
U/M 93-1
CALLE SUSANA
AVENIDA DE ANITA to AVENIDA DE LOUISA 4
NO SCALE
TRASH DAY: WEDNESDAY
DESCRIFTION OF WORK 2" OVERLAY and HEADERGRIND
HEADERGRIND 1 .lf; :tons [ 1 cross cut) ESTIMATED MATERIAL QUAMITIES: ASPHALT 27,060 sf)
FACILITIES TO BE RAISED 0 STORM DRAINS
4 MONUMENTS 0 WATER VALVES
E5
2 z
mu AREA OF OVERLAY