HomeMy WebLinkAbout1993-04-06; City Council; 12144; AWARD CONTRACT FOR 1992-93 PAVEMENT OVERLAY PROGRAM CONTRACT NO. U/M 93-15
i 0 2 3 0 0
It is staffs goal to complete this project as smoothly and quickly as possible. Any intemptions in traffic flow will be minimal and absolutely necessary in order to
maintain safety for both drivers and workers.
I
(1) Q
PAGE 2 OF AB# 1 2. I I qL[
i ENVIRONMENTAL REVEEW
The Planning Director has determined that the proposed project which is limited tc
repair and maintenance of existing facilities is categorically exempt from environmental
review pursuant to Section 15301 of Title 14 of the California Code of Regulations
(CEQA Guidelines).
I
FISCAL IMPACT:
The total project cost will be $623,920.22 with $15,349.00 of that amount being paid
by the Carlsbad Municipal Water District to cover the cost of raising valve cans and
sewer access holes. Adequate funds were budgeted and are available in the Gas Tax
Fund to cover the balance of $608,571.22.
EXHIBITS:
1. Resolution No. 9 3 - 3 7
2. Street Listing
3. Location Maps
'i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
l5
16
17
18
19
20
21
22
23
24
25
26
. 27
28
0 e
RESOLUTION NO. 93-79
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ACCEPTING BIDS AUTHORIZING
EXECUTION OF A CONTRACI' FOR THE 1992-93 PAVEMENT
OVERLAY PROGRAM, CONTRACT NO. U/M 93-1
WHEREAS, bids have been received by the City of Carlsbad, California
the 1992-93 Pavement Overlay Program in accordance with Contract No. U/M 93-1;
WHEREAS, the lowest responsive bid received for this project
submitted by Daley Corporation of San Diego, California, with a total amoun
$623,920.22; and
WHEREAS, funds are available in the Gas Tax Fund for completion of
project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the Cit
Carlsbad, California, as follows:
1.
2.
The above recitations are true and correct.
The bid of $623,920.22 by Daley Corporation of San Di
California, for the 1992-93 Pavement Overlay Program, Con1
No. U/M 93-1, is hereby accepted and the Mayor and the City C
are hereby authorized to execute a contract therefore.
///
///
///
///
///
///
'L
r 1
2
3
4
5
6
7
a
9
10
11
12
13
14
15 .
16
17
18
19
20
21
22
23
24
25
26
27
28
0 0
PASSED, APPROVED AND ADOPTED by the City Council of the Ciq
Carlsbad, California, at its regular meeting held on the 6th day of APRIL , 15
by the following vote, to wit:
AYES:
NOES: None
Council Members Stanton, Kulchin, Nygaard, Finnila
ABSENT: Council Member Lewis
4
[s?k&!L-
-&'VIS, Mayor on, Mayor Pro Tem
ATTEST:
ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)
I
x 0 0
STREET LISTING
I
I
EL CAMINO MAL:
EL CAMINO REAL:
CARLSBAD VILLAGE DRIVE:
CARLSBAD BOULEVARD:
DAISY AVENUE:
BATIQUITOS DRIVE:
LA COSTA AVENUE:
ABEDUL STREET:
UNICORN10 STREET:
PERSA STREET:
GRULLA STREET:
VISPERA PLACE:
ABANTO STREET:
ABEDUL PLACE:
CAZADERO DFUVE:
AVENIDA DE LOUISA
CALLE SUSANA:
Marron Road to Chestnut Avenue (southbound)
Carlsbad Village Drive to Marron Road (northbound)
Monroe Street to Interstate 5
Tierra del Or0 Street to Palomar Airport Road
Batiquitos Drive to south end
Poinsettia Lane to Poppy Lane
Rancho Santa Fe Road to Camino de 10s Coches
Persa Street to Abanto Street
El Fuerte Street to Persa Street
Unicomio Street to Abedul Street
Abedul Street to Unicomio Street
Unicornio Street to end
Abedul Street to Unicomio Street
Abedul Street to end
Abedul Street to Alga Road
Avenida de Anita to end
Avenida de Anita to Avenida de Louisa
B:\92-93 CNTVILH93074AGB
e 0 4 1992-93 OVERLAY
U/M 93-1
EL CAMINO REAL MARRON ROAD southbound to CHESTNUT AVENUE
NO SCALE
DESCRIPTION OF WORK: 1" ASPHALT-RUBBER HOT MIX OVERLAY with 1" HEADER & CROSS CUTS
ESTiMATED MATERIAL QUANTITIES: ASPHALT-RUBBER HOT MIX* 1,728 tons 287,980 sf)
HEADERGRIND 12.01 4 If 12 CROSS CUTS)
FACILITIES TO BE RAISED: 2 STORM DRAINS 1 MONUMENT 2 WATER VALVES (4lT)
* The transportation of Asphalt-Rubber Hot mix to the paving operation will be done with END dumping vehicles 01
md AREA OF OVERLAY
I e e 4 1992-93 OVERLAY
U/M 93-1
EL CAMINO REAL
CARLSBAD VILLAGE DRNE northbound to MARRON ROAD
NO SCALE
DESCRIPTION OF WORK 2'' OVERLAY with PETRO MAT and HEADERGRIND
PETRO MAT 1 1,470 sy
1,330 tons 1 10,820 sf) 2,554' x 37.50' + 12.5')
turn pocket 726' x 12.5') 2 cross cuts) 1 ESTIMATED MATERIAL QUANTITIES: ASPHALT
HEADERGRIND 5,188 If
FACILITIES TO BE RAISED: 2 STORM DRAINS 1 MONUMENT 18 WATER VALVES (4TT)
kmq AREA OF OVERIAY
a a
4 1992-93 OVERLAY
U/M 93-1
CARLSBAD VILLAGE DRIVE
INTERSTATE 5 to MONROE SlRm
NOSCALE
DESCRIPTION OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
1,307 tons 1217.750 sf) ~
PETRO MAT 18,611 sy 3,350' x 50' HEADERGRIND 6,830 If 2 cross cuts
ESTIMATED MATERIAL QUAMITIES ASPHALT
FACILITIES TO BE RAISED: 5 STORM DRAINS
5 MONUMENTS 25 WATER VALVES (4TT)
km AREA OF OVERLAY
@ @
1992-93 OVERLAY
U/M 93-1
CARLSBAD BOULEVARD
TIERRA DEL OR0 to PALOMAR AIRPORT ROAD
- 4
NO SCALE
TRASH DAY: MONDAY
DESCRIPTION OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
PETRO MAT 1 1,112 sy 1,000' x 25'1 HEADERGRIND 8,096 If 2 cross cuts
12 STORM DRAINS
10 WATER VALVES (4TT)
ESTIMATED MATERIAL QUANTITIES: ASPHALT 2.375 tons 198,000 sf)
FACILITIES TO BE RAISED
1 MONUMENT
f??g AREA OF OVERLAY
c @
4 1992-93 OVERLAY
U/M 93-1
DAISY AVENUE
BATlQUlTOS DRIVE to south end
NO SCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
PETRO MAT 9,389 sy HEADERGRIND 6,797 If
11 MONUMENTS 35 WATER VALVES (4TT)
750 tons 125.060 sf) 3,380' x 25') 1 1 cross cut)
ESTIMATED MATERIAL QUAMITIES ASPHALT
FACILITIES TO BE RAISED: 1 STORM DRAIN
mq AREA OF OVERLAY
1 ? @
1992-93 OVERLAY
U/M 93-1
BATIQUrrOS DRIVE
POlNSrmA LANE to POPW LANE l
NO Scw
TRASH DAY: THURSDAY
DESCRIPTlON OF WORK 2" OVERLAY and HEADERGRIND
ESTIMATED MATERIAL QUANTITIES ASPHALT 92,400 sf)
HEADERGRIND 3,::; :fans t 2 cross cuts)
FACILITIES TO BE RAISED: 0 STORM DRAIN 11 MONUMENTS 10 WATER VALVES (4TT)
mq AREA OF OVERLAY
* @
1992-93 OVERLAY
U/M 93-1
LA COSTA AVENUE
RANCHO SAMA FE ROAD to WINO DE LOS COCHES
* 4 Nos
TRASH DAY: FRIDAY
DESCRF" OF WORK: 2" OVERLAY with PETRO MAT and HEADERGRIND
ESTIMATED MATERIAL QUANTITIES: ASPHALT 930 tons 141.1 12 sf) PETRO MAT 13,889 s 2,500' x 50' HEADERGRIND 5,124 11 12 cross CU+S]
1 STORM DRAIN 5 MONUMENTS 0 WATER VALVES
FACILITIES TO BE RAISED:
f??% AREA OF OVERLAY
0 e
I i 1992-93 OVERLAY
U/M 93-1
ABEDUL STREET
PERSA STREET to ABANTO SIR=
NOSCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK: 2" OVERLAY and HEADERGRIND
HEADERGRIND 2,:;: :fans [ 0 cross cuts) ESnMATED MATERIAL QUANTITIES: ASPHALT 34,650 sf)
FACILITIES TO BE RAISED: 0 STORM DRAINS 6 MONUMENTS 1 WATER VALVE (4TT)
pmg AREA OF OVERLAY
a e
1992-93 OVERLAY U/M 93-1
UNICORNIO STREET
EL FUERTE !jlREfl to PER% STREET
U
N!?
1
fRASH DAY: THURSDAY
DESCRlPnON OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
1,096 tons rl.280 sf) ~
PETRO MAT 7,245 sy 2,608' x 25' HEADERGRIND 5,286 If 2 cr018 cuts
ESTIMATED MATERIAL QUANTITIES: ASPHALT
FACILITIES TO BE RAISED 1 STORM DRAIN 7 MONUMENTS 9 WATER VALVES (ROUND)
ry AREA OF OVERLAY
. 0 e
c
a i 1992-93 OVERLAY
U/M 93-1
PERSA STREET
UNICORN10 STRm to ABEDUL STREET
NO SCME
TRASH DAY: THURSDAY
DESCRIPTION OF WORK 2" OVERLAY with PETRO MAT and HEADERGRIND
18,744 sf) i,::: :tons t 0 cross cuts) ESTIMATED MATERIAL QUANTITIES: ASPHALT
PETRO MAT H EADERGRI N D
0 STORM DRAINS i MONUMENT 1 WATER VALVE (ROUND)
FACILlTlES TO BE RAISED:
mq AREA OF OVERlAY
I 0 e .
1 1 1992-93 OVERLAY
U/M 93-1
GRULCA STREET
ABEDUL !STREET to UNICORN10 STREET
NO SCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK 2" OVERLAY and HEADERGRIND
23,030 sf) ,*ZP [ I cross cut)
ESTIMATED MATERIAL QUANTITIES: ASPHALT
HEADERGRIND
FACILITIES TO BE RAISELk 0 STORM DRAINS 2 MONUMENTS 3 WATER VALVES (ROUND)
mq AREA OF OVERLAY
a 0 0
b 1992-93 OVERLAY
a
t 4 U/M 93-1
ViSpERA PLACE
UNICORNIO STREET to end
NO SCALE
fRASH DAY: THURSDAY
DESCRIPTION OF WORK: 2" OVERLAY and HEADERGRIND
HEADERGRIND 11.958 sf) %PS [ 1 cross cut)
ESTIMATED MATERIAL QUANrmff: ASPHALT
FACILITIES TO BE RAISED: 0 STORM DRAINS 2 MONUMENTS
1 WATER VALVE (ROUND)
STREET
-1 AREA OF OVERLAY
* * 0
*
8 4 1992-93 OVERLAY
U/M 93-1
ABANTO STREET
ABEDUL !STRE€r to UNICORN10 SIR=
I
NO SCALE
iRASH DAY: THURSDAY
DESCRIPnON OF WORK 2" OVERLAY and HEADERGRIND
10.360 sf) :w [ 1 CrOS8 Cut)
ESllMATED MATERIAL QUANTITIES: ASPHALT HEADERGRIND
FAClllTlES TO BE RAISED: 0 STORM DRAINS 2 MONUMENTS 0 WATER VALVES
0
0
z n: 0
Z 3
my AREA OF OVERLAY
49 c, .e
$$$$ @jW - -9 -
-E7
f
(E 0
1992-93 OVERLAY
U/M 93-1
CAZADERO DRIVE
ABEDUL STREET to ALGA ROAD
Y
I 4
NO SCALE
TRASH DAY: THURSDAY
DESCRIPTION OF WORK: 2" OVERLAY and HEADERGRIND
HEADERGRIND 4,366 sf)
2::P [ 0 croas cub)
ESTIMATED MATERIAL QUAMITIES ASPHALT
FACILITIES TO BE RAISED: 0 STORM DRAINS 0 MONUMENTS 0 WATER VALVES
I
-9 AREA OF OVERLAY
0 1 1992-93 OVERLAY
a
f
1 U/M 33-1
AVENIDA DE LOUISA
AVWlDA DE ANITA to end
NOSCALE
~
I
TH DAY: WEDNESDAY
DESCRIPTION OF1 WORK: 2" OVERlAY and HEADERGRIND
69,960 sf) HEADERGRIND 4,273 If 1 cross cut) I
I 0 MONUMENTS
I
420 tons [ EsnMATED MATERIAL QUANTITIES: ASPHALT
FACILITIES TO BE RAISED: 2 STORM DRAIN
26 WATER VALVES (4TT)
I
I
I
I
I
I
I
I
I
mq AREA OF OVERLAY
I
a 0 ..
I i 1992-93 OVERLAY i
II U/M 93-1
CALLE SUSANA
AVENIDA DE ANITA to AVENIDA DE LOUISA
NOSCALE
TW\SH DAY: WEDNESDAY
DESCRIPTION OF WORK: 2“ OVERLAY and HEADERGRIND
27,060 sf) HEADERGRIND 1,673 163 ions If I 1 cross cut)
ESTIMATED MATERIAL QUANTITIES: ASPHALT
FACILITIES TO BE RAISED. 0 STORM DRAINS
4 MONUMENTS
0 WATER VALVES
-
s E %
mg AREA OF OVERLAY