HomeMy WebLinkAbout1993-08-16; City Council; 893-3; Zone 19 Park Land swapCITY OF CARLSBAD - AGENDA BILL
AR4 893-3
MTft 8/16/93
OFPT P&R
TITLE:
ZONE 19 PARK LAND SWAP ( ACTIONS
DEPT. HD.
HITYATTY
CITY MGR
u<
oo
RECOMMENDED ACTION:
Approve land swap in concept and direct staff to proceed with the property exchange.
ITEM EXPLANATION;
As part of the Aviara Master Plan and associated Aviara Parks Agreement, 24.25 acres
of park land was dedicated to the City of Carlsbad by Hillman Properties (HPI), the
developers of Aviara. The site is located within the Local Facilities Management Zone
19 at the north end of the Aviara development. (Exhibit 1).
In April 1986, the Parks and Recreation Commission accepted the Zone 19 park site
and on June 27, 1989 the City Council approved the Aviara Parks Agreement which
included approval of the site as well as other park related issues.
Recently, the City Engineering Department required that the alignment of Poinsettia
Lane (which runs to the south of the park site) be revised and shifted to the north.
This is a modification from what was depicted on the Aviara Master Plan. The
realignment changes the relationship of properties surrounding the park, particularly
the 2 acre piece remaining between re-aligned Poinsettia and the park site (refer to
cross-hatched area on Exhibit 2). This site was proposed as a church/day care center in
the Aviara Master Plan and was originally 4.5 acres. Now that the realignment of
Poinsettia has reduced the size of this parcel to 2 acres, HPI assert that this parcel is
no longer developable. As a result, HPI requests that an even land swap occur, trading
their leftover 2 acre parcel for another 2 acre piece located east of the park cul-de-sac
access (refer to Exhibit 3).
Staff has reviewed the land swap and finds the proposed new parcel to be suitable for
park purposes in accordance with the City's current policies for park land dedication.
The topography is relatively flat and no biological, geological or archeological
constraints appear to be present based on the technical data available. Therefore, staff
is recommending approval of the swap.
HPI has prepared two new park concept plans for the purposes of evaluating the land
swap related to its effect on park developability. The difference between the two plans
is the park program (types of amenities) provided and the grading quantities necessary
to provide for the amenities.
Alternative Plan 1A (Exhibit 4) provides the same number of ball fields and soccer
fields as in the original park concept presented to the Commission in 1986, (one (1)
ball field, one (1) soccer field and two (2) multi-purpose fields). However, the grading
required in order to provide these amenities would be substantial and would require
extensive soil exportation.
012
PAGE 2, AB #
Alternative Plan IB (Exhibit 5) eliminates one of the multi-purpose fields and provides
more passive recreation. This also allows for a balance grading operation with no
export of soil.
The Commission does not need to select an alternative park plan at this meeting. The
plans are simply to evaluate the land swap and its affect on park development. Zone
19 park is currently not slated for development until the year 2003+ and therefore the
park development concept will be reevaluated at that time.
FISCAL IMPACT;
There is no fiscal impact involved with the land swap.
EXHIBITS;
1. Park Location Map
2. Poinsettia Realignment
3. Land Swap
4. Alternative Plan 1A
5. Alternative Plan IB
6. Discussion Paper From Aviara
013
c
014
EXHIBIT 1
RE-ALIGNMENT OF
POINSETTIA LANE
MASTER PLAN
ALIGNMENT OF
POINSETT1A LANE
Natural Slopes& Vegetation
(to be preserved)
Legend
Entry Tr««tm«nt
Vtrvf.
Secnle Point
VUw Orl«nl«tlon
Key Map
AVIARA MASTER PLAN
EXHIBIT 2
015
PROPOSED PARK BOUNDARY
LAND TRADE (2.0 AC.)
/EXISTING PARK BOUNDARY
/ LAND TRADE (2.0 AC.)PA19
^'-S PROPOSED PARK BOUNDARY.. I'^""~—•-*. r\»
--- 7^!H'-.... ^U
PA32B
CNWRCH/DAY CAR!
•
AVIARA PHASE III
LAND TRADE EXHIBIT
JUNE 7. 1993
016 EXHIBIT 3
PA19
Multi-Family Housing
50' SrllKwk
: AVIARA
Aviara Phase III Park
Concept Plan IA
017 EXHIBIT 4
50' Setback
Aviara Phase III Park
Concept Plan IB
P£D m401 Wea 'A' StrML S^M 2500S»i&egaCA 92101 619-232-4466
018 EXHIBIT 5
AV1ARA
June 4, 1993
Mr. Dave Bradstreet
City of Carlsbad Parks and Recreation
1200 Carlsbad Village Drive
Carlsbad, CA 92008
RE: Aviara Phase III - Proposed park trade
Dear Dave:
As we discussed, enclosed is a discussion paper on the proposed 2.0 acre park
trade. I have also enclosed biological, archaeological and soils information as requested.
I am looking forward to finalizing this issue as soon as possible prior to our scheduled
July 19 Parks Commission hearing.
Sincerely,
Paul J. Klukas
Director of Community Planning
s PJK/er
v cc: Mark Steyaert '
( Mike Grfm \
phSparicakz
019 EXHIBIT 6
DISCUSSION PAPER: PROPOSED AVTARA 2 ACRE PARK TRADE-OFF
A. Background of Problem:
The Aviara Master Plan, approved in 1988, designated a general alignment
for future Poinsettia Lane through Phase III, and demonstrated how
surrounding land uses would be distributed and accessed. Since that time,
the City Engineer is recommending a modified alignment for Poinsettia Lane,
moving the alignment northerly and at a slightly different horizontal angle
than that in the approved Master Plan.
This modification of Poinsettia Lane affects the interrelationships of adjacent
properties on both sides of the road. Properties on the south side of the new
alignment now find themselves larger in size than shown on the approved
Master Plan, those on the north, smaller.
On the eastern side of Phase III along the Poinsettia alignment, this results in
little overall impact to the land uses. Multi-family PA 19 is reduced in size,
but the expansion of multi-family PA 20 on the south offsets this loss.
To the west of these residential neighborhoods, however, realignment of
Poinsettia Lane has resulted in the approved church/day care site being
reduced from 4.5 acres to only 2.0 acres. A 2.0 acre church/day care site is
infeasible. To resolve this problem, Aviara proposes that 4.5 acres of
residential property on the south side of Poinsettia Lane be rezoned for
church/day care uses. The 2.0 acre remaining property on the northern side
of Poinsettia Lane is virtually unusable, however, unless merged as part of
the adjacent park.
To this end, Aviara proposes that an even swap be conducted between the
subject 2.0 acre parcel (traded to City) and a 2.0 acre parcel of parkland
(adjacent to residential PA 19) traded back to Aviara. Under this proposal,
the City's usable park acreage will stay the same as originally approved, and
Aviara's developable acreage and land uses can be accommodated as
originally approved. And the Poinsettia Lane realignment can be
accommodated.
1989 Park Dedication
The Aviara park was dedicated to the City in 1989, as a condition of approval
of the Master Plan. Aviara was the first Master Plan to comply with new
ordinance requirements that all anticipated buildout park acreage required
must be dedicated up-front, prior to beginning development of the Master
Plan.
020
A problem inherent in such a policy is that economic factors or agency
policies may change during the phased period of Master Plan development,
affecting the dedicated parkland. In this particular case, the City realigned
the adjacent roadway (Poinsettia Lane), rendering an adjacent private parcel
unusable, except if consolidated with the adjacent park.
This 1989 Aviara (then the Pacific Rim Country Club and Resort) park
dedication involved the requirement to dedicate 24.25 acres of non-
constrained, developable property. This acreage met the requirement for
original maximum possible Aviara buildout (2836 d/u), plus acreage for
maximum buildout of neighboring properties eventually to be developed by
others within the entirety of LFMP Zone 19. This 24.25 acres is 8.25 acres in
excess of the now expected Zone 19 buildout forecast.
Had (1); full dedication of parkland not been required so early in the
process, or (2); the alignment of Poinsettia Lane not been changed, this issue
of the 2.0 acre park trade would not exist.
B. Trade-off Properties
The 2.0 acre parcel proposed by Aviara for trade to the City consists of
almost totally flat topography, previously under agricultural production. As
shown on the attached exhibit, its location fronts on future Poinsettia Lane.
The 2.0 acre proposed for return to Aviara consists of naturally sloping
topography from elevation 310 at the western edge to elevation 265 at the
eastern-central valley of the parcel. Some native chaparral grows in this
valley. This property is situated on the south east section of the existing
dedicated park land.
1989 Concept Park Layout
As part of the 1989 parkland dedication, Aviara was required to conduct
environmental, archaeological and soils analysis of the park and provide the
results to the City. In addition, Aviara was requested to prepare concept
park layout designs for the park to ensure its feasibility. The site design
deemed most attractive to the Parks Commission and staff was the October
17, 1988 design which accommodated an extensive array of facilities, including
2 multi-use Softball fields, 2 multi-use soccer fields, one independent softball
and one independent soccer field, 5 tennis courts, 5 basketball courts, three
handball courts, a community center building, tot lots, open passive areas,
parking, and other minor uses.
Since the dedicated park site is not flat (no Aviara neighborhood is flat) the
extent of grading ( and the provision of broad, flat playing fields) is a
judgement call to be ultimately made by the City decision makers.
The October 1988 design minimized internal slopes and grade changes, and
maximized level play areas to maximize active usability. It also required
approximately 490,000 cubic yards of soil export. This soil export can be
reduced at the expense of level play area. At a balance earthwork situation
with some slopes internal to the site, the above-mentioned facilities appear
021
cramped, and park facilities are probably better served by eliminating one
multi-use softball/soccer field, although the City administrators may decide
otherwise.
1993 Concept Studies
At the City's request, two concept facility layout studies have been prepared
for the park assuming the proposed land trade. Once concept study proposes
an earthwork export condition (approximately 390,000 cubic yards). Active
facilities have been provided per City input. An alternative concept study
demonstrates a balance earthwork condition. One multi-use field is
eliminated in this study, however a larger open play area is provided.
C. Remaining Issues
1) The proposed Phase III grading for Poinsettia Lane results in a zero to 35
foot high manufactured slope on the trade piece that the City receives. Will
this slope encumber the usability of the parcel for park purposes?
The City Engineering standards dictate the vertical grades and
alignment for future Poinsettia Lane. As a result of these standards,
Poinsettia Lane must be constructed up to 35 feet lower in elevation
than surrounding natural grade along the park trade piece frontage.
This area of the future park, however is the highest portion of the park,
and is logical excavation (cut) material during park construction. As a
result, studies have shown that final park grades will achieve grades
equal to or approximate with Poinsettia Lane. Any resulting
manufactured slopes will be minimal in size and should not affect the
usability of the parcel for park purposes.
2) Approval of the proposed trade will result in park frontage along Poinsettia
Lane. This could become a disadvantage if playing fields are designed
where balls could readily fly or roll into Poinsettia Lane travel lanes.
Under the proposed alternative design schemes, the nearest Softball
field home run line is some 100 feet from Poinsettia Lane. The nearest
soccer field sideline is over 60 feet. In addition, park perimeter fencing
along the Poinsettia Lane frontage should readily control balls and
playthings from venturing into the travel lanes.
3) Does Aviara have a responsibility to relocate the existing 18" water line that
transverses the park site?
Aviara does not believe they have a responsibility to relocate the water
line. If the park is graded, however after on-site Phase III Poinsettia
Lane improvements are installed, the majority, and probably all, of this
line will be relocated by Aviara. This is of course, subject to a) Aviara
Phase III grades prior to the park; and b) off-site zone 21 owners
construct the line up to the Phase III boundary at Poinsettia Lane.
Both of these conditions appear to be highly likely.
022
4) Are there any soils, biological or archaeological features on the 2.0 acre
trade property that would impact park development?
Enclosed with this discussion paper are the following:
a) Letter re: Biological resources on the trade property. No
significant resources exist.
b) Archaeological Studies (testing and data recovery) for the
nearest archaeological site (south of park and future
Poinsettia Lane). No archaeological sites were found within
the park trade area.
c) Soils Report for entire Aviara project. Geotechnical map
shows the trade site to be ridge terrace deposits, consisting of
sandstone. Excavation may be accomplished with ordinary
heavy earth-moving equipment.
5) The proposed trade-off will result in a less rectangular-shaped park, and
generally a more "L1'-shaped park. Does this factor negatively affect park
design?
Several concept park layout studies have been conducted reflecting the
"L"-shape. These studies conclude that the net acreage is the same, that
the same park facilities can be constructed, the interrelationships of uses
remain intact, and a logical construction phasing program can be
accommodated. These studies do not conclude that the change hi the
overall park shape is a negative feature.
6) The City presently has reserved the right to purchase a 1.75 acre park
reserve (potential expansion area) adjacent to the park. What is Aviara's
proposal relative to this reserve acreage?
The City has conditioned Aviara to reserve 1.75 acres of Aviara land for
possible purchase by the City for future park expansion. This condition
gpgfethfeKCi^ uijtU July 1, 1995 to determine wheth^ to purchase or
aot tojiglrt of the reduced Zone 19 residential intensity, and that as a
result Zoire 19 has ever-dedicated some 8 acres of parkland, Aviara
requests ;&at the City remove their claim to right of purchase at this
time. It is-*not anticipated that this reserve acreage will be needed for
Park District 3 needs, certainly not within the next two years.
parfctiadakz
023
AVIARA PHASE III
Land Trade Exhibit
0AO Tbcftn*o«M
024
Figure 4
SCALE.nr.