Loading...
HomeMy WebLinkAbout1993-11-02; City Council; 12461; APPROVAL OF CHANGE ORDER NO. 15 FOR PALOMAR AIRPORT ROAD AND EL CAMINO REAL WIDENING, CONTRACT NO. 3166Q 8 %ir Q 2 .. z 0 F 0 a 5 8 2 3 C'IIy OF CARLSBAD - AGENB BILL 07 ! 32 - - AB#w TITLE: APPROVAL OF CHANGE ORDER NO. 15 DEPT.~ MTG.11/2/93 FOR PALOMAR AIRPORT ROAD AND CITY AT CITY M( DEPT.FNG RECOMMENDED ACTION: EL CAMINO REAL WIDENING, CONTRACT NO. 31 66 Adopt Resolution No. 93 -3b5approving Change Order No. 15 in the estimated am( of $96,000.00 for Palomar Airport Road and El Camino Real Widening improvements ITEM EXPLANATION: The widening of Palomar Airport Road and El Camino Real is a joint capital project for Cities of San Marcos, Vista and Carlsbad. Funding for the project comes from the tl cities and from many sources including San Diego County sales taxes (TransNet), 8 sales taxes (TDA), traffic impactfees, San Diego County airport contribution, gas tax fui and Carlsbad Municipal Water District (CMWD) capital funds. In December 1992, the construction contract for the widening of Palomar Airport Road El Camino Real was awarded to West Coast General Corporation J.V. for over $6.4 mill Council authorized City Manager approval of individual change orders of $25,000 or I to a cumulative value of $650,000. Since Change Order No. 15 exceeds $25,000, the Carlsbad Municipal Code, Sec 3.28.172(c), requires that it be approved by the City Council. Change Order No. 15 was required because during construction of the west side o Camino Real it was discovered that the subgrade under the new roadway contaii excessive moisture causing instability. It was therefore structurally inadequate to constr new improvements upon it. This wet condition could not be anticipated by the contra( and is a changed condition according to the contract documents. Therefore in ordei rectify this substandard condition extra work is required, FISCAL IMPACT: Funds in the amount of $690,347.83 are available in Account No. 344-820-1 840-31 66 Change Order No. 15 which is in the estimated amount of $96,000.00. EXHIBITS: 1. Location map. 2. Resolution No. 93 - 3 05 approving Change Order No. 15 for Palomar Airport Rc and El Camino Real Widening improvements. 3. Change Order No. 15 CITY OF VISTA F CITY OF CARLSBAD z > XI 0 E CITY OF OCE NOT TO SCALE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e 0 RESOLUTION NO. 93-305 A RESOLUTION OF THE CITY COUNCIL OF THE CllY OF CARLSBAD, CALIFORNIA, APPROVING CHANGE ORDER NO. 15 FOR PALOMAR AIRPORT ROAD & EL CAMINO REAL WIDENING, CONTRACT NO. 3166 WHEREAS, construction of improvements on Palomar Airport Road and El Caminc Widening, Project No. 31 66, has necessitated contract Change Order No. 15; and WHEREAS, funds in the amount of $690,347.83 for said change order are availa Account No. 344-820-1 840-31 66. NOW, THEREFORE, BE IT RESOWED by the City Council of the City of Cai California, as follows: 1. That the above recitations are true and correct. 2. That Change Order No. 15 in the amount of $96,000.00 for Palomar Airport ROi El Camino Real Widening improvements, specifically identified as Contract No. 31 66, is apF PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City C held on the 2nd day of NOVEMBER , 1993 by the following vote, to wit: AYES: Council Members Lewis, Stanton, Nygaard, Finnila NOES: None ABSENT: Council Member Kulchin AlTEST: ALm*wiE (SEAL) 0 0 CITY OF CARLSBAD CONTRACT CHANGE ORDER TRANSMITTAL - C/O 15 Project: # 3166, Widening of Palomar Airport Road and El Camino Real Date Routed: To: /&at43 City Engineer /0-Y"F3 Engineering Inspection &-w+? Community Development Director 4 - Urr-P3 Finance Director City Manager/Mayor Engineering Inspection Reason for change: Item 1 : During construction of the west side of El Camino Real it was discovered that the subgrade under the new roadway contained excessive moisture causing instability and was therefore structurally inadequate to construct the new improvements upon it. This wet condition could not be anticipated by the contractor and is a changed condition according to the contract documents. Therefore in order to rectify this substandard condition extra work is required. COST ACCOUNTING: Original contract amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . , . . . . . . . $6,454,807.52 Total amount this c/o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96,000.00 Total amount of previous c/o's . . . , , . , . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . $277,652.1 7 Total c/o's to date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . $373,652.1 7 New Contract Amount . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . , . . . . . . $6,828,459.69 Total c/o's as % of original contract . . , , . , . , , , . . . . . . , . , . . , . . . . . . . . . . . . . . . . , . 5.8% Contingency monies encumbered . . . , . . . . . . , . . . . . . . . . . . . . . . , . . . . . . . . $968,000.00 Contingency increase or decrease . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . $0.00 Contingency Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $968,000.00 Total c/o's to date . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . $373,652.1 7 Contingency Balance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $594,347.83 H:\LIBFiARNENG\WPDATA\INSPECn3166CHAM3166-15.CHG 811 0193 0 0 CITY OF CARLSBAD PROJECT: Palomar Airport Road and El Camino Real Widening CONTRACT CHANGE ORDER N0.15 CONTRACT NO. 3166 P.O. NO. 15436 ACCOUNT NO. 344-820-1 840-31 66 CONTRACTOR: West Coast General Corporation J.V. ADDRESS: 12243 Hiqhwav 67, Lakeside, California 92040 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager/Mayor. Pursuant to subsection 3-2, Changes Initiated by the Agency, Standard Specifications for Public Works Construction, 1991, perform the following: Item 1 : Provide and install subdrain, filter fabric, and geofabric in the structural section on El Camino Real between approximate stations 330+00 and 352+50 from west curb to 25’ east. The subdrain shall consist of 6‘ diameter, perforated, schedule 40 PVC pipe wrapped in Mirafi 160N filter fabric and lapped into Mirafi Miradrain 5000. Mirafi 600X fabric shall be placed on subgrade after compaction. Scarification of the subgrade shall not be done. Tensor Geogrid fabric shall be placed on the finished sub-base after compaction and providing for a 2’ lap into the next phase of construction. Estimated Increase to Contract Cost .................................. $96,000.00 TOTAL ESTIMATED INCREASE TO CONTRACT COST ........................ $96,000.00 H:\LlBf?ARNENG\WPDATA\INSPECn3166CHAM31 E-1 5CHG * e Change Order #15 Contract 31 66, Widening of Palomar Airport Road and El Camino Real TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL NOT BE AFFECTED BY THIS CHANGE ORDER. RECOMMENDED BY: APPROVED BY 'is 3 c&-;/& / ,r ./,5gLi i FINANCE DIRECTOR (DATE) DISTRIBUTION: INSPECTION FILE (ORIGINAL) PURCHASING (W/P.O. CHANGE ORDER) FINANCE CONTRACTOR H:\LIBRARMENG\WPDATA\INSPECn3166CHAN\3166-15.CHG