Loading...
HomeMy WebLinkAbout1994-03-08; City Council; 12616; Mariners PointCl’ -- v OF CARLSBAD - AGEI\-A BILL Y 1 0 440 SDP 91-11 3ECOMMENDED ACTION: The Planning Commission, Housing Commission, and staff are recommending that the City Council direct the City Attorney to prepare documents APPROVING CT 91-12, and SDP 91-11. IYIEM EXPLANATION On November 17, 1993, the Planning Commission conducted a public hearing and recommended approval (6-O) of the Mariners Point project, located east of Paseo de1 Norte and north of Camino de las Ondas in Local Facilities Management Plan Zone 20. On January 13, 1994 the Housing Commission reviewed the affordable housing components of the project and recommended unanimously (8-O) that the City Council approve the project. The project is located on a 68 acre parcel directly north of Camino de las Ondas. Access to the property would be provided by future Hidden Valley Road (non-loaded collector road), future Alga Road (major road), and Camino de las Ondas (non-loaded collector road). The project would consist of 186 single-family homes on individual lots that range in size from 7,500 to 21,670 square feet and 176 two and three-story apartment units that range in size from 650 to 1,100 square feet. The project would feature contemporary architecture with tile roofs, and a central recreation facility with a pool, spa, and club house. There would also be laundry rooms and a future children’s play area. Per the requirements of the City’s recently adopted Inclusionary Housing Ordinance, 15% of the proposed dwelling units (55 affordable units), must be provided for lower income households. The developer is proposing to provide those affordable dwelling units as rental units within the apartment portion of the project. Subsequent to Planning Commission action on the project, the applicant decided to explore the possibility of making all of the apartments (176 units) affordable to lower income households. The Housing Commission unanimously approved a recommendation to the City Council to approve the affordable housing project containing 176 apartment units to be affordable to lower income households for a period of at least fifty-five (55) years. Within the application, the applicant indicated a need for financial assistance for the subject affordable housing project. However, the Housing Commission’s recommendation does not include support for any financial assistance from the City for the project at this time. The Housing Commission expressed a desire for staff to work closely with the applicant to develop an appropriate financing plan for the project. Recommendation for project development approval was granted by the Housing Commission with the condition that the required ratio of income restricted units be constructed concurrent with the project’s market rate units. Following Council approval of the proposed project and prior to the first final map approval, the applicant must enter into a Affordable Housing Agreement with the City. PAGE 2 OF AGENDA BILL NO. /c?.; b 1 b To adequately mitigate impacts to school facilities and per the requirements of the recently adopted Zone 20 Specific Plan the Planning Department is recommending that the following condition be added to the Tentative Map: ‘Prior to the approval of any final map or the issuance of any permits within the Zone 20 Specific Plan the applicant for the final map or permit shall submit evidence to the City that impacts to school facilities have been mitigated in conformance with the City’s Growth Management Plan to the extent permitted by applicable state law for legislative acts. If the mitigation involves a financing scheme such as a Mello-Roos Community Facilities District which is inconsistent with the City’s Growth Management Plan including City Council Policy Statement No. 38, the developer shall submit disclosure documents for approval by the City Manager and City Attorney which shall disclose to future owners in the project, to the maximum extent possible, the existence of the tax and that the school district is the taxing agency responsible for the financing district. At a minimum the project CC&R’s shall require maximum disclosure and signed statements for disclosures upon transfer of residential property”. More detailed information is included in the attached staff report to the Planning Commission and the Housing Commission. Six citizens gave public testimony to the Planning Commission. Their major concerns included: (1) impacts to school facilities and appropriate mitigation; (2) additional traffic and noise impacts to the surrounding community; (3) access to the existing agricultural parcels to the east, and ; (4) the siting of high density affordable housing in the neighborhood. The project has been conditioned to require a mitigation agreement with the school district prior to final map approval. Condition No. 62 of Planning Commission Resolution 3557 requires that to the satisfaction of the City Engineer, continued access must be maintained to agricultural properties in the area. To mitigate traffic impacts to the area, Camino de las Ondas would be extended to the east, widened to it’s ultimate width and provided with sidewalks and underground utilities. Alga Road would also be extended north of Poinsettia Lane to connect with Camino de las Ondas within the project’s boundary. This would provide a secondary access out of the neighborhood for local residents ultimately traveling west towards Interstate 5. Eventually Alga Road and Hidden Valley Road would extend all the way to Palomar Airport Road thus providing additional access for residents traveling north from the area. The apartment portion of the project would contain 348 on-site parking spaces, and the bulk, scale, and architecture of the buildings is compatible with the existing apartments and condominiums located to the south and west. The apartment buildings would have textured stucco exteriors, tile roofs, varied roof lines, architectural accent features, and varied building facades. ENVIRONMENTAL, REVIEW The project site is located within the boundaries of the Zone 20 Specific Plan (SP 203) which covers the 640 acre Zone 20 planning area. The direct, indirect, and cumulative environmental impacts from the future development of the Zone 20 planning area have been discussed in the Final Environmental Impact Report (EIR 90-03) for the specific plan. Additional project level studies have been conducted including soils investigation, , - 4 PAGE 3 OF AGENDA BILL NO. I$; b /h biological analysis, and a traffic study. These studies provide more focused and detailed project level analysis and indicate that additional environmental impacts beyond what was analyzed in Final EIR 90-03 would not result from implementation of the project. This project is in prior compliance with Final EIR 90-03 and would not create any additional significant environmental impacts. The recommended and applicable mitigation measures of Final EIR 90-03 would be included as conditions of approval for this project. FISCAL, IMPACT As discussed in the Zone 20 Local Facilities Management Plan, all major capital facilities will be funded by the developer of this project. A financing plan that comprehensively addresses the provision of public facilities within the facility zone has been approved by the City Council, With respect to the affordable dwelling units located within the project the applicant would apply for tax credits from the California Tax Credit Allocation Corm-r&tee to help finance the project. In addition, the applicant is requesting local financial assistance in the amount of $3,600,000.00 to help subsidize the cost of providing affordable units however, the Housing Commission is not supporting any subsidy at this time. GROWTH MANAGEMENT STATUS II Facilities Zone I - I 20 II II Local Facilities Management Plan I I - 20 II II Growth Control Point I - I 3.2 & 6 DU/ACRE II II Net Density I - I 5.4 DU/ACRE II II Special Facilities I - I C.F.D. NO. 1 II EXHIBITS 1. Location Map 2. Planning Commission Resolution No. 3556, 3557, & 3558 3. Planning Commission Staff Report, dated November 17, 1993 4. Excerpts of Planning Commission Minutes, dated November 17, 1993 5. Housing Commission Staff Report, dated January 13, 1994 6. Housing Commission Resolution No. 94-001 7 EXHIBIT 1 MARINERS POINT A CT 9%12/SDP 9%111 HDP 91-25 Y -. EXHIBIT 2 . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 3556 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF A TENTATIVE TRACT MAP TO DEVELOP 186 SINGLE-FAMILY LOTS AND 176 APARTMENT UNITS ON PROPERTY GENERALLY LOCATED EAST OF PASEO DEL NORTE AND NORTH OF CAMINO DE LAS ONDAS. CASE NAME: MARINERS POINT CASE NO: CT 91-12 WHEREAS, a verified application for certain property to wit: Southeast quarter of Section 21, Township 12 South, range 4 west’ San Bernardino Meridian, in the County of San Diego, State of California, according to the official plat. has been filed with the City of Carlsbad and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 17th day of November, 1993, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all ~ factors relating to the Tentative Map. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission as follows: A) That the above recitations are true and correct. B) That based on the evidence presented at the public hearing, the Commission recommends APPROVAL of CT 91-12, based on the following findings and subject to the following conditions: . . . . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Findings: - 1. The project is consistent with the General Plan and Zone 20 Specific Plan since the overall proposed density of 5.4 dus/acre is within the density range of 4-8 dus/acre specified for the site as indicated on the Land Use Element of the General Plan, and is at or below the growth control point of 6. 2. The project is consistent with all City public facility policies and ordinances since: The Planning Commission has, by inclusion of an appropriate condition to this project, ensured building permits will not be issued for the project unless the District Engineer determines that sewer service is available, and building cannot occur within the project unless sewer service remains available, and the Planning Commission is satisfied that the requirements of the Public Facilities Element of the General Plan have been met insofar as they apply to sewer service for this project. 3. The project is in compliance with the adopted mitigation measures of Final Environmental Impact Report 90-03 and would not create any additional significant adverse environmental impacts. 4. The applicant is by condition, required to pay any increase in public facility fee, or new construction tax, or development fees, and has agreed to abide by any additional requirements established by a Local Facilities Management Plan prepared pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. 5. This project is consistent with the City’s Growth Management Ordinance as it has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 20. 6. School fees will be paid to ensure the availability of school facilities in the Carlsbad Unified School District. 7. 8. Park-in-lieu fees are required as a condition of approval. All necessary public improvements have been provided or will be required as conditions of approval. 9. The applicant has agreed and is required by the inclusion of an appropriate condition to pay a public facilities fee. Performance of that contract and payment of the fee will enable this body to find that public facilities will be available concurrent with need as required by the general plan. PC RESO NO. 3556 -2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1e 19 2c 21 22 23 24 25 26 27 28 10. 11. 12. 13. 14. 1. 2. 3. 4. . . . . The project complies with all requirements of Chapter 20.12 of the Carlsbad Municipal Code. The site is physically suitable for the type and density of the development since the site is adequate in size and shape to accommodate residential development at the density proposed. The proposed project is compatible with the surrounding future land use since surrounding properties are designated for residential development on the general plan. The project is consistent with all policies of the Mello II Local Coastal Program. The tentative map satisfies all requirements of the Title 20 and 21 of the Carlsbad Municipal Code and the State Subdivision Map Act. General Planninz Conditions: Recommendation of approval is granted for CT 91-l 1, as shown on Exhibits “A” - “OO”, dated November 17, 1993 incorporated by reference and on file in the Planning Department. Development shall occur substantially as shown unless otherwise noted in these conditions. This project shall comply with all conditions and mitigation measures which may be required as part of the Zone 20 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the District Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This note shall be placed on the final map. This project is also approved under the express conditions that the applicant pay the public facilities fee adopted by the City Council on July 28, 1987 and as amended from time to time, and any development fees established by the City Council pursuant to Chapter 21.90 of the Carlsbad Municipal Code or other ordinance adopted to implement a growth management system or facilities and improvement plan and to fulfil1 the subdivider’s agreement to pay the public facilities fee dated November 26, 1991, a copy of which is on file with the City Clerk and is incorporated by this reference. If the fees are not paid, this application will not be consistent with the General Plan and approval for this project will be void. PC RESO NO. 3556 -3- 4 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5. 6. 7. 8. 9. 10. 11. . . . . If any condition for construction of any public improvements or facilities, or the payment of any fees in lieu thereof, imposed by this approval or imposed by law on this project are challenged this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid, this approval shall be invalid unless the City Council determines that the project without the conditions complies with all requirements of law. Approval of this request shall not excuse compliance with all sections of the Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance. Approval of CT 91-12 is granted subject to the approval of SDP 91-11, HDP 91-25, SP-203, and Final EIR 90-03. The developer shall provide the City with a reproducible 24” x 36”, mylar copy of the Tentative Map as approved by the Planning Commission. The Tentative Map shall reflect the conditions of approval by the City. The map copy shall be submitted to the City Engineer and approved prior to building, grading, final map, or improvement plan submittal, whichever occurs first. A 500’ scale map of the subdivision shall be submitted to the Planning Director prior to the recordation of the final map. Said map shall show all lots and streets within and adjacent to the project. As part of the plans submitted for building permit plan check, the applicant shall include a reduced version of the approving resolution/resolutions on a 24” x 36” blueline drawing. Said blueline drawing(s) shall also include a copy of any applicable Coastal Development Permit and signed approved site plan. The applicant shall provide the following note on the final map of the subdivision and final mylar of this development submitted to the City: “Chapter 21.90 of the Carlsbad Municipal Code establishes a Growth Management Control Point for each General Plan land use designation. Development cannot exceed the Growth Control Point except as provided by Chapter 21.90. The land use designation for this development is RM and RLM. The Growth Control Point for these designations are 6 and 3.2 dwelling units per nonconstrained acre. All parcels were used to calculate the intensity of development under the general plan and Chapter 21.90. Subsequent redevelopment or resubdivision of any one of these parcels must also include all parcels under the general plan and Chapter 21.90 of the Carlsbad Municipal Code”. PC RESO NO. 3556 -4- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 12. 13. 14. 15. 16. 17. 18. . . . Prior to approval of the Enal map, the applicant shall receive approval of a Coastal Development Permit issued by the California Coastal Commission that substantially conforms to this approval. U the approval is substantially different, an amendment to CT 91-12 shall be required. The applicant shall submit a street name list consistent with the City’s street name policy subject to the Planning Director’s approval prior to final map approval. The applicant shall pay park-in-lieu fees to the City, prior to the approval of the final map as required by Chapter 20.44 of the Carlsbad Municipal Code. The applicant shall establish a homeowner’s association and corresponding covenants, conditions and restrictions. Said CC&R’s shall be submitted to and approved by the Planning Director prior to final map approval. The CC&R’s shall include provisions specifying the Homeowner% Association maintenance responsibility for all natural open space and slope maintenance easements, and offsite manufactured slopes shown on the approved tentative map and landscape plan (CT 91-12), which is on file in the Planning Department. The developer shall provide a minimum of 25% of the single-family lots with adequate sideyard area for recreational vehicle storage pursuant to City Standards. The CC&R’s shall prohibit the storage of recreational vehicles in the required front yard setback. Adjustments in the plotting of units as illustrated on the approved site plan will be allowed in final Engineering to accommodate this requirement. The applicant shall provide school fees to mitigate conditions of overcrowding as part of building permit application. These fees shall be based on the fee schedule in effect at the time of building permit application. Prior to the issuance of the building permit there shall be a Notice of Restriction placed on the deed to this property subject to the satisfaction of the Planning Director notifying all interested parties and successors in interest that the City of Carlsbad has issued a Tentative Map, Site Development Plan, and Hillside Development Permit by Resolutions No.‘s 3556, 3557, and 3558 on the real property owned by the declarant. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. Said Notice of Restriction may be modified or terminated only with the approval of the Planning Director, Planning Commission or City Council of the City of Carlsbad whichever has final decision authority for this project. PC RESO NO. 3556 -5- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Planning and Building. In Area “c’ all visitor parking spaces shall be striped a different color than the assigned resident parking spaces and shall be clearly marked as may be approved by the Planning Director prior to occupancy of individual units. The developer shall display a current Zoning and Land Use Map in the sales office at all times, or suitable alternative to the satisfaction of the Planning Director. Trash receptacle areas in Unit “C” shall be enclosed by a six foot high masonry wall with gates pursuant to City standards. The enclosure shall be of similar colons and/or materials to the project to the satisfaction of the Planning Director. For Area “c’ an exterior lighting plan including parking areas shall be submitted for Planning Director approval prior to issuance of building permits. All lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property- The applicant shall submit a wall and fencing plan subject to Planning Director approval prior to issuance of building permits. Prior to issuance of a building permit the applicant shall submit detailed building elevations and floor plans of the recreational buildings subject to approval by the Planning Director. Prior to approval of the final map or issuance of building permits, whichever occurs first, the applicant shall establish, a process to notify, to the satisfaction of the Planning Director and City Attorney, all owners, users and tenants of this project that a community park site is located near this project to the northwest. Prior to approval of the final map, the owner proposing a future neighborhood commercial development of overlay designated property shah obtain Planning Director approval of a program to disclose the potential commercial use to future owners of the surrounding properties. To service this development the project shall provide bus stop facilities at locations subject to the satisfaction of the North County Transit District. Said facilities shall at a minimum include a bench, free from advertising, and a pole for the bus stop sign. The bench and pole shall be designed in a manner so as to not detract from the basic architectural theme of the project and said design shall be subject to the approval of the Planning Director and North County Transit District. PC PESO NO. 3556 -6- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29. This project shall comply with the requirements of the Zone 20 Specific Plan (SP 203). Affordable Housing Conditions: 30. 31. 32. This project is approved, subject to the condition that the required ratio of income restricted units shall be constructed concurrent with the project’s market rate units. The project shall construct housing units affordable to persons and families of lower income and comply with all the requirements of the Affordable Housing Plan of the Zone 20 Specific Plan (SP 203). Prior to final map approval, an Affordable Housing Agreement shall be required to be submitted by the applicant to the City, approved by the Planning Director and Director of Housing and Redevelopment, and completed and recorded as a deed restriction on those units of the project which are designated for the location of low-income affordable units. The Affordable Housing Agreement shall be binding to all future owners and successors in interest. The Affordable Housing Agreement, for which the inclusionary housing requirement will be satisfied through new construction of inclusionary units on-site, shall establish, but not be limited to, the following: F The number of inclusionary dwelling units proposed; The unit size(s) (square footage) of the inclusionary units and the number of bedrooms per inclusionary dwelling units; : The proposed location of the inclusionary units; Tenure of affordability for inclusionary units (30 years minimum); F.- Schedule for production of the dwelling units; Incentives and/or financial assistance provided by the City; $5 Where applicable, terms and conditions establishing rules and procedures for qualifying tenants, setting rental rates, filling vacancies, and operating and maintaining units for affordable inclusionary dwelling units; h. Standards modifications granted by the City. Sign Conditions: 33. Prior to occupancy of any of the apartment units, the applicant shall construct a directory sign at the entrance to the project. The design of this sign shall be approved by the Planning Director. 34. Building identification and/or addresses shall be placed on all new and existing buildings so as to be plainly visible from the street or access road; color of identification and/or addresses shall contrast to their background color. PC RESO NO. 3556 -7- 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 35. Any signs proposed for this development shall at a minimum be designed in conformance with the City’s Sign Ordinance and shall require review and approval of the Planning Director prior to installation of such signs. Landscape Conditions: 36. 37. 38. 39. 40. 41. 42. 43. 44. The applicant shall prepare a detailed landscape and irrigation plan which shall be submitted to and approved by the Planning Director prior to the approval of grading or building permits, whichever occurs first. Ail landscaping shall comply with the Landscape Requirements of the Zone 20 Specific Plan (SP 230). Prior to approval of the building permits, all manufactured offsite slopes created by this project shall be landscaped to the satisfaction of the Planning Director, and shall include at a minimum, landscaping to control erosion and to provide visual screening of the slopes. To provide play areas for children (in Area “C”), prior to approval of the final landscape plan the development shah: (1) provide on the Landscape Plan flat turf areas (minim um area - 100 square feet) between buildings, slopes, and parking areas when feasible; and (2) two “tot lot” areas dispersed within the site. Prior to approval of the fInal map, the applicant shall establish a 10 foot landscape easement along the project’s street frontage on both sides of Camino de las Ondas and along the east side of Hidden Valley Road as shown on the tentative map. These planting easements shall be planted by the applicant per the landscape requirements of .the Zone 20 Specific Plan prior to occupancy of individual units. All building pad and street areas that are graded and remain vacant or undeveloped for a period of more than 6 months after the grading operation is completed shall be seeded to reduce erosion and visual impacts. If grading is phased, the six month time period shall start at the completion of each individual grading phase. All landscaped areas shall be maintained in a healthy and thriving condition, free from weeds, trash and debris. The developer shall install street trees at the equivalent of 40-foot intervals along all public street frontages in conformance with City of Carlsbad standards. The trees shall be of a variety selected from the approved Street Tree List. All landscape plans shall be prepared to conform with the Landscape Manual and submitted per the landscape plan check procedures on file in the Planning Department. PC RESO NO. 3556 -8- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. Landscape plans shall be designed to minimize water use. Lawn and other zone 1 plants (see Landscape Manual) shall be limited to areas of special visual importance or high use. Mulches shall be used and irrigation equipment and design shall promote water conservation. The developer shall avoid trees that have invasive root systems, produce excessive litter and/or too large relative to the lot size. Prior to final occupancy, a letter from a California licensed landscape architect shall be submitted to the Planning Director certifying that all landscaping has been installed as shown on the approved landscape plans. All herbicides shall be applied by applicators licensed by the State of California. The applicant shall pay a landscape plan check and inspection fee as required by Section 20.08.050 of the Carlsbad Municipal Code. The first set of landscape and irrigation plans submitted shall include building plans, improvement plans and grading plans. All landscape and irrigation plans shall show existing and proposed contours and shall match the grading plans in terms of scale and location of improvements. The minimum shrub size shall be 5 gallons. One (1) gallon shrub sizes may be used if it is deemed to be more beneficial for the long term survivability of the plants as determined by the Planning Director. The number of trees in the project shall be equal to or greater than the number of residential units. Twenty percent (20%) of the trees in the project shall be 24” box or greater. Environmental Mitination Conditions: 55. To offset the conversion of non-prime agricultural land to urban land uses per the requirements of the Mello II Local Coastal Program the applicant shall implement one of the following three mitigation options prior to approval of the final map: a. b. Preserve prime agricultural property within the Coastal Zone consistent with sections 30241 and 30242, or cluster new development consistent with Section 30250, of the Coastal Act; or ~Illustrate that continued or renewed agricultural use is not feasible per the guidelines of Mitigation Option 2 of the Local Coastal Program; or PC RESO NO. 3556 -9- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 56. 57. 58. C. Provide payment of an agricultural mitigation fee, the amount of which is $lO,OOO.OO for each converted acre. Compliance with APCD Rules 51 (The “Nuisance” Rule), 52 (Particulate Matter), and 54 (Dust and Fumes) of the Air Quality Chapter would effectively mitigate dust impacts generated during grading operations. A note shah be placed on the grading permit stipulating that the following measures shah be required to achieve compliance with these rules, and reduce construction-related air pollutants: a. b. d. e. h. The watering of all surfaces being graded and haul routes shall be required during dry weather conditions. AU unpaved areas shall be revegetated according to approved landscape plans as soon as possible after grading. All construction-related traffic shall be restricted to routes that are dust-controlled, and reduced speed limits shall be maintained for all haul and construction vehicles. All construction activities shall be limited during periods of high winds. All heavy-duty, diesel-powered construction equipment shall be operated according to manufacturers suggested operating instruction (with the fuel-injection timing retarded to recommended levels for NO, emissions, but which would not result in excessive visible smoke emissions) in order to control pollutant emissions. Construction equipment shall be subject to regularly scheduled maintenance/tune-ups, and be turned off when not being utilized to avoid excessive idling emissions. The application of architectural coating and cut-back asphalt shall adhere to APCD Rules 67.0 and 67.7, to effectively control other construction-related emissions of air pollutants. The Engineering Department shall monitor for compliance during all grading operations of the project. The Homeowners Association and apartment project owner shall obtain and distribute to owners and tenants annual information from Cahrans and North County Transit regarding the availability of public transportation, ride-sharing, and transportation pooling services in the area. This information shall also be provided in the sales and rental offices of the project. A condition so stating this shall also be placed in the Cc&R’s for the project. The applicant shall provide the following noise mitigation measures to comply with the current Noise Policy: a. Prior to occupancy of individual units, the applicant shall construct a six foot high noise attenuation wall on the top of the slope along lots PC RESO NO. 3556 -lO- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 59. 60. 61. b. C. d. adjacent to the west side of Alga Road per the requirements of the project’s noise study dated May 29, 1992 and as shown on the Landscape Concept Plan for the project, which is on file in the Planning Department. The said wall shall be faced with stucco to be compatible with proposed development, and have masonry pilasters and offsets with landscape screening to reduce visual impacts along Alga Road. To obtain an interior noise level of 45 CNEL, the windows and doors in homes on Lots 3 through 7 must be closed, therefore, a “windows closed” condition is applicable and a mechanical ventilation system with fresh air provisions in accordance with the Uniform Building Code and Planning Department Policy No. 17 is required. Prior to approval of the final map or issuance of building permits, whichever occurs first, the applicant shall prepare and record a notice that this property may be subject to impacts from a proposed or existing transportation corridor (see Noise, Form #l on file in the Planning Department) and overflight, sight, and sound of aimraft operating from Palomar Airport (see Noise, Form #2 on file in the Planning Department). The notice shall be prepared in a manner meeting the approval of the Planning Director and the City Attorney The applicant shall post aircraft noise notification signs in all sales and/or rental offices associated with the new development. The number and locations of said signs shall be approved by the Planning Director (see Noise, Form #3 on file in the Planning Department). Prior to approval of a grading permit a detailed soils testing and analysis report shall be prepared by registered soils engineer and submitted to the Planning Department and County Health Department for review and approval. The report shall identify a range of possible mitigation measures to remediate any potentially significant public health impacts if hazardous pesticides or other chemicals are detected at high concentrations in the soil. Prior to occupancy of individual units a solid wall or fence, and landscaped windbreaks shall be installed along the perimeter of any future developable area that abuts property under “open field” cultivation, in order to reduce public nuisance effects of adjacent pesticide spraying and dust generation from farm vehicles and operations. Prior to approval of the final map or issuance of a building permit, which ever occurs first, a minimum 25-foot wide open space easement shall be provided between “open field” agricultural operations and the adjacent lot lines of future developable areas on-site. This buffer area may be located on the adjacent agricultural property. PCRJZSON0.3556 -ll- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 62. Prior to approval of a final map or issuance of a building permit, which ever occurs first, an infrastructure improvement plan shall be submitted to the Planning and Engineering Departments for review and approval by the Planning Director and City Engineer. This plan shall illustrate the temporary road connections required to maintain continued access to adjacent agricultura.l properties that could be impacted by future roadway improvements. 63. Drainage water from buildings, streets, parking lots, and landscaped areas within the project shah be disposed of through stormdrains or otherwise in a manner that will avoid any runoff onto agricultural areas whether planted or fallow. All runoff, agricultural and urban, shall conform with the National Pollution Discharge and Elimination System Permit requirements pursuant to San Diego Regional Water Quality Control Board Order No. 9042, adopted by City Council Resolution No. 90- 235. 64. Prior to approval of the final map or issuance of building permits, whichever occurs first, the applicant shall notify, to the satisfaction of the Planning Director and City Attorney, all owners, users and tenants of this project that this area is subject to dust, pesticides, and odors associated with adjacent agricultural operations, and that the owners, users, and tenants occupy this area at their on risk. 65. Paleontology: a. b. C. d. e. Prior to any grading of the project site, a paleontologist shall be retained to perform a walkover survey of the site and to review the grading plans to determine if the proposed grading will impact fossil resources. A copy of the paleontologist’s report shall be provided to the Planning Director prior to issuance of a grading permit. A qualified paleontologist shall be retained to perform periodic inspections of the site and to salvage exposed fossils. Due to the small nature of some of the fossils present in the geologic strata, it may be necessary to collect matrix samples for laboratory processing through fine screens. The paleontologist shall make periodic reports to the Planning Director during the grading process. The paleontologist shall be allowed to divert or direct grading in the area of an exposed fossil in order to facilitate evaluation and, if necessary, salvage artifacts. All fossils collected shall be donated to a public, non-profit institution with a research interest in the materials, such as the San Diego Natural History Museum. Any conflicts regarding the role of the paleontologist and the grading activities of the project shall be resolved by the Planning Director. . . . . PC RESO NO. 3556 -12- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 66. 67. 68. 69. 70. 71. 72. Prior to issuance of a building permit the project shah comply with the City of Carlsbad’s standards for solid waste management. All grading shall comply with the recommendations of Leighton and Associates Incorporated in the Geotechnical Fngineering Investigation and Geologic Reconnaissance dated August 31, 1992, and on file in the Planning Department. To reduce the visual impacts of the project, a percentage of homes along the north/south trending and gently sloping ridgeline shall be one-story in height and have varying roof lines. All structures and roofs within the project shall be earth tone in color. Prior to issuance of the first building permit the applicant shall submit to the Planning Department a sample color board depicting the proposed earth tones subject to the approval of the Planning Director. To reduce the visual impacts of manufactured slopes and roadway cuts, all cut and fill slopes shall be landform-graded, contoured, and heavily screened by landscaping in conformance with Specific Plan 203. All planted slopes shall be watered with a complete irrigation system using low precipitation-rate sprinkler heads to stabilize exposed slopes and curtail visual impacts associated with possible erosion. Prior to approval of a final map, improvement plans shall be submitted to the Engineering Department showing locations and sizing of reclaimed and or urban runoff diversion facilities, in accordance with the Carlsbad Municipal Water District requirements and the phasing schedule provided in the Zone 20 LFMP. Reclaimed water facilities shall be constructed in all major roadways within the project. Prior to final map approval, the applicant shall be required: (1) to consult with U.S. Fish and Wildlife Service (FWS) regarding the impact of the project on the Coastal California Gnatcatcher; and (2) be issued any permits required by the FWS. Engineering Conditions: 73. The alignments, tangents and horkontal radii of the streets in this project are specifically approved as shown on the tentative map. 74. In order to meet the cul-de-sac standard, no building permits shall be issued for any lot on Street “L” unless a secondary access to the satisfaction of the City Engineer has been provided. 75. Lot 1, Unit A shall be reserved on the final map for access to properties easterly from this project unless a particular access has been sufficiently identitkl to the . . . . PC RESO NO.3556 -13- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 76. 77. 78. 79. 80. 81. 82. 83. 84. . . . . - satisfaction of the City Engineer. In that event an offer of dedication for the particular access shah be made on the tinal map. The drainage system shah be designed to ensure that runoff resulting from lo-year frequency storms of 6 hours and 24 hours duration under developed conditions, are equal to or less than the runoff from a storm of the same frequency and duration under existing developed conditions. Both 6 hour and 24 hour storm durations shah be analyzed to determined the detention basin capacities necessary to accomplish the desired results prior to tinal map approval, issuance of building or grading permit whichever occurs first. This condition may be met if the Applicant demonstrates to the satisfaction of the City Engineer that adequate downstream flow capacity and detention/retention capacity already exists or will exist after upgrades have been guaranteed. H this project is required to provide an onsite detention/retention basin as per the condition to require reduction of peak flows from a 10 year storm to predeveloped conditions, the south east portion of Lot 191, Unit C shall be resemed for this purpose as is shown on the tentative map. In that event this portion of Lot 191 shall not be developed with structures as shown on the Site Development Plan, SDP 91-11. No building permits for more dwelling units in Unit “C’ than the number of dwelling units that will generate 500 ADT shall be issued unless secondary access to Unit “C has been guaranteed to the satisfaction of the City Engineer. Only the number of dwelling units that will generate no more than 500 ADT within Unit “c’ shall be occupied, until secondary access has been provided. Unless a standards variance has been issued, no variance from City Standards is authorized by virtue of approval of this tentative map. The applicant shall comply with all the rules, regulations and design requirements of the respective sewer and water agencies regarding services to the project. The applicant shall be responsible for coordination with S.D.G.&E., Pacific Bell Telephone, and Cable TV authorities. This project is approved specificahy as three Units for the purposes of recording. Lots shall be numbered consecutively through the three recording units. If the applicant chooses to construct out of phase, the new phasing must be reviewed and approved by the City Engineer and Planning Director. PC RESO NO. 3556 -14- - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 85. 86. 87. 88. 89. 90. 91. 92. . . . . Approval of this tentative tract map shall expire twenty-four (24) months from the date of City Council approval unless a final map is recorded. An extension may be requested by the applicant, Said extension shall be approved or denied at the discretion of the City Council. In approving an extension, the City Council may impose new conditions and may revise existing conditions pursuant to Section 20.12.110(a)(2) Carlsbad Municipal Code. The applicant shall defend, indemnify and hold harmless the City and its agents, officers, and employees from any claim, action or proceeding against the City or its agents, officers, or employees to attack, set aside, void or null an approval of the City, the Planning Commission or City Engineer which has been brought against the City within the time period provided for by Section 66499.37 of the Subdivision Map Act. The applicant shall pay the current local drainage area fee prior to approval of the final map for this project or shall construct drainage systems in conformance with Master Drainage Plan and City of Carlsbad Standards as required by the City Engineer. Prior to approval of the final map, the owner shall enter into an agreement with the City to pay any drainage area fees established as a result of the Master Drainage Plan Update. The owner of the subject property shall execute a Hold Harmless Agreement regarding drainage across the adjacent property prior to approval of the final map for this project. Based upon a review of the proposed grading and the grading quantities shown on the tentative map, a grading permit for this project is required. Prior to final map approval, the applicant must submit and receive approval for grading plans in accordance with City Codes and standards. No grading shall occur outside the limits of the subdivision unless a grading or slope easement is obtained from the owners of the affected properties. If the applicant is unable to obtain the grading or slope easement, no grading permit will be issued. In that case the applicant must either amend the tentative map or change the slope so grading will not occur outside the project site in a manner which substantially conforms to the approved tentative map as determined by the City Engineer and Planning Director. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, the applicant shall submit to and receive approval from the City Engineer for the proposed haul route. The applicant shall comply with all PC RESO NO. 3556 -15 P 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 93. 94. 95. 96. 97. 98. 99. 100. -. conditions and requirements the City Engineer may impose with regards to the hauling operation. The developer shall exercise special care ‘during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with the Carlsbad Municipal Code and the City Engineer. Reference Chapter 11.06. Additional drainage easements may be required. Drainage structures shall be provided or installed prior to the issuance of grading or building permit as may be required by the City Engineer. The owner shall make an offer of dedication to the City for all public streets and easements required by these conditions or shown on the tentative map. The offer shall be made by a certificate on the final map for this project. All land so offered shall be granted to the City free and clear of all liens and encumbrances and without cost to the City. Streets that are already public are not required to be rededicated. The applicant shall underground all existing overhead utilities within the subdivision boundary prior to issuance of building permits. Direct access rights for all lots abutting Camino de las Ondas and Alga Road (except Lot 1 as shown) shall be waived on the final map. Some improvements shown on the tentative map and/or required by these conditions are located offsite on property which neither the City nor the owner has sufficient title or interest to permit the improvements to be made without acquisition of title or interest. The applicant shall conform to Section 20.16.095 of the Carlsbad Municipal Code. This conditional approval is null and void if title to said property is not obtained, unless the City Engineer and Planning Director make findings of substantial conformance without construction of said improvements. The applicant shall comply with the City’s requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to approval of the final map, issuance of grading or building permit, whichever occurs first. The following note shall be placed on the Enal map: “Prior to issuance of a building permit for any lot within the subdivision, the property owner shall pay a one-time special development tax in accordance with City Council Resolution No. 91-39.” PC RESO NO. 3556 -16- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 101. Plans, specifications, and supporting documents for all public improvements shall be prepared to the satisfaction of the City Engineer. Prior to approval of the final map in accordance with City Standards, the applicant shall install, or agree to install and secure with appropriate security as provided by law, improvements shown on the tentative map and the following improvements: a. b. C. d. e. f. A traffk actuated signal at the intersection of Alga Road and Can&o de las Ondas shall be designed and guaranteed for future construction. Construction shall be at the direction of the City Engineer. A storm dram approximately 600 feet in length running offsite westerly along Camino de las Ondas to connect to the existing 36 inch line near Seascape Drive. The City Engineer may approve an alternate that provides sufficient downstream capacity to meet the needs for handling drainage from this project. Alga Road between the subdivision boundary and Poinsettia Lane shall be constructed with full major arterial width grading in a 102 foot right-of-way, two inside lanes, full median curbing, all needed storm drain facilities and all utilities that will be beneath the paved roadway sections. The City Engineer may accept an alternate proposal that fulfihs the need to provide this vital roadway link that the residents of this project will use. This condition may be met by another developer based on which developer wishes to proceed first. All or a portion of these improvements may be eligible for reimbursement under the Zone 20 LFMP Finance Plan Alga Road within the subdivision boundaries shall be constructed with full public improvements to major arterial standards based on a right- of-way width 102 feet. Hidden Valley Road within the subdivision boundaries shall have half street improvements plus 12 feet of paving. An offsite portion of Hidden Valley Road from Camino de las Ondas to the subdivision boundary shah be constructed for two lanes of travel. This offsite portion of Hidden Valley Road is required in order to meet the cul-de- sac policy for Unit “C’of this subdivision. AU or portions of these Hidden Valley Road improvements may be met by a City project pursuant to a reimbursement agreement between the developer and the City. Upgrade the detention/retention basin located near Poinsettia Lane and Batiquitos Drive on Lot 71, CT 73-24, Map No. 79%. The upgrade shall result in an increase in the volume retained and/or an increase in time of retention to the satisfaction of the City Fngineer. . . . . The City Rngineer may approve an alternate proposal that meets the retention needs. PC PESO NO. 3556 -17- - 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A note to this effect shall be placed on an additional map sheet on the final map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the secured improvement agreement or such other time as provided in said agreement. Fire Conditions: 102. 103. 104. 105. 106. 107. 108. 109. 110. . . . . Additional on-site public water mains and fire hydrants are required. Applicant shall submit a site plan to the Fire Department for approval, which depicts location of required, proposed and existing public water mains and fire hydrants. The plan should include offsite fire hydrants within 200 feet of the project. Applicant shall submit a site plan depicting emergency access routes, driveways and traffic circulation for Fire Department approval. An all weather, unobstructed access road suitable for emergency service vehicles shah be provided and maintained during construction. When in the opinion of the Fire Chief, the access road has become unserviceable due to inclement weather or other reasons, he may, in the interest of public safety, require that construction operations cease until the condition is corrected. AU required water mains, fire hydrants and appurtenances shall be operational before combustible brtikhng materials are located on the construction site. All security gate systems controlling vehicular access shall be equipped with a “Knox”, key-operated emergency entry device. Applicant shall contact the Fire Prevention Bureau for specifications and approvals prior to installation. Native vegetation which presents a fhe hazard to structures shall be modified or removed in accordance with the specifications contained in the City of Carlsbad Landscape Guidelines Manual. Applicant shah submit a Fire Suppression plan to the Fire Department for approval. An approved automatic fire sprinkler system shall be installed in all buildings having an aggregate floor area exceeding 10,000 square feet, if required by the Fire Department. The applicant shall provide a street map which conforms to the following requirements: A400 scale photo-reduction mylar, depicting proposed improvements and at least two existing intersections or streets. The map shah also clearly depict street centerlines, hydrant locations and street names. PC RESO NO.3556 -18- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Water District Conditions: 111. 112. 113. 114. 115. . . . . The entire potable and non-potable water system/systems for subject project shall be evaluated in detail to ensure that adequate capacity and pressure for domestic, landscaping and fire flow demands are met. The developer will be responsible for all fees and deposks plus the major facility charge which will be collected at time of issuance of building permit. The developer shall pay a San Diego County Water Authority capacity charge which will be collected at issuance of application for meter installation. Sequentially, the developer% Engineer shall do the following: a. b. C. Meet with the City Fire Marshal and establish the fire protection requirements. Prepare a colored reclaimed water use area map and submit to the Planning Department for processing and approval. Schedule a meeting with the District Engineer for review, comment and approval of the preliminary system layout usage (G-P-M. - E-D-U.) plan for potable, reclaimed and sewer systems prior to the preparation of improvement plans. This project is approved upon the expressed condition that building permits will not be issued for development of the subject property unless the water district serving the development determines that adequate water service and sewer facilities are available at the time of application for such water service and sewer permits will continue to be available until time of occupancy. This note shall .be placed on the final map. Developer shall be responsible for the following systems/lines: A) Potable Svstems: 1. ONSITE CONDITIONS: (Units A & B) a. Install 8" water mains in Streets “c’, “F”, “G”, “H”, “I”, “.I”, “IC’, “L”, (Note that “L” Street main must be looped to new 12” high pressure main) and Camino De Las Ondas from Street “H” to College Boulevard. b. Install 12” water mains in Street TT, College Boulevard (Alga Road) boundary to boundary, Camino De Las Ondas from College Boulevard northeasterly to its termination, and Hidden Valley Road boundary to boundary. PC RESO NO. 3556 -19. - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 C. Install fire hydrants and gate valves per attached District approved map. 2. OFFSITE CONDITIONS: a. b. C. d. e. Install 12" water main (High Pressure) along the southerly boundary from Street 7-L” easterly approximately 460 feet to the existing 12” high pressure line. This new main will be parallel to existing W/16" steel low pressure main. Additional right-of-way easement may be required. Also, the relocation of this existing 18"/16" main may be required because of possible grading conflicts. The existing high and low pressure mains along the southerly lot lines of Lots 67, 66,65 & 56 could or will have conflicts with grading. These issues must be discussed with District Engineer prior to preparation of mylar improvement plans. Install approximately 220 feet of temporary 12" high pressure main in future College Boulevard from the existing 12" high pressure AC-P. main northwesterly to the easterly boundary line. (This main will require an offsite easement). Install 12" low pressure main in Hidden Valley Road from Camino De La Ondas to the westerly boundary line. This will take place when Hidden Valley Road is improved. Also, the District has a 20 foot wide easement located along the westerly boundary of which 5.00 foot is located in your subdivision. Arrangements must be made with District prior to any grading and/or construction in this easement. Obviously the existing 6” main will be removed/abandoned and the easement quitclaimed when the Hidden Valley Road main is constructed but in the meantime arrangement must still be made. All offsite mains shall require easements and all weather vehicular access roads. 3. UNIT “c’ Conditions (MULTI-FAMILY) The Developer shall process preliminary potable layout plans through the Fire Marshal and District Engineer at which time all potable conditions/requirements shall be set. B) Reclaimed Systems: 1. Install 12" line in College Boulevard (Alga Road) from Poinsettia Lane to north property line. 2. Install lines to adequately serve Unit “c’. PC RESO NO.3556 -2o- . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. Install system to Service all open space and slopes as determined by District Engineer. Sewer Svstems: 1. 2. Pursuant to local facilities management plan Zone 20, install 8” local trunk line in Hidden Valley Road from West property he to San Marcos Interceptor line (gravity). Install 12” trunk line (VBT2 per Zone 20) in Laurel Tree Drive (or College Boulevard). Any temporary sewer service alternates must be approved by the District Engineer. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 17th day of November, 1993, by the following vote, to wit: AYES: Chairperson Noble, Commissioners: Schlehuber, Welshons, Savary & Erwin. NOES: None. ABSENT: Comissioner Hall. ABSTAIN: None. BAILEY NOBCE, Chairperson CARLSBAD PLANNING COMMISStON ATTEST: MICHAEL J. HOEZMILER PLANNING DIRECTOR PC RESO NO. 3556 -21- Betz, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2c 21 22 23 24 25 26 27 28 - - PLiNNINGCOMMISSIONRESOLUTIONNO.3557 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF SITE DEVELOPMENT PLAN NO. SDP 91-11 FOR 186 SINGLE-FAMILY LOTS AND 176 APARTMENT UNITS ON PROPERTY GENERALLY LOCATED EAST OF PASEO DEL NORTE AND NORTH OF CAMINO DE LAS ONDAS. CASE NAME: MARINERS POINT CASE NO: SDP 91-l 1 WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, pursuant to the provisions of the Municipal Code, the Planning Commission did, on the 17th day of November, 1993, consider said request on property described as: Southeast quarter of Section 21, Township 12 south, range 4 west San Bemadino Meridian, in the County of San Diego, State of California, according to the official plat. WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to SDP 91-11. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Commission recommends APPROVAL of SDP 91-l 1, based on the following findings and subject to the following conditions: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 2% Findims: 1. 2. 3. That the requested use is properly related to the site, surroundings and environmental settings, is consistent with the various elements and objectives of the general plan, will not be detrimental to &sting uses or to uses specifically permitted in the area in which the proposed use is to be located, and will not adversely impact the site, surroundings or traffic circulation, because the project is consistent with the General Plan and Zone 20 Specific Plan. The project would not have a significant impact on the environment and is in compliance with mitigation requirements of Final EIR 90-03. The proposed residential land uses are compatible in scale, architecture, and building materials with the multi-family residential development to the south. Public street improvements would be provided to accommodate traflk generated by the project and the project must comply with all the circulation and public facility requirements of Local Facilities Management Plan Zone 20. That the site for the intended use is adequate in size and shape to accommodate the use, because the project site is fairly geometric in shape, the topography is gently sloping, and the grading and development to accommodate streets and building pads would conform to all required City ordinances as illustrated on the attached exhibits. The proposed 176 apartment units would be accommodated on the level building pad areas of the lc I without encroaching into the manufactured slopes located along the eastern portion of the site. That all of the yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use. to existing or permitted future uses in the neighborhood will be provided and maintained for the following reasons: The project would be conditioned to provide a solid wall or fence, and landscaped windbreaks along the perimeter of any future developable area that abuts property under “open field” cultivation, in order to reduce public nuisance effects of adjacent pesticide spraying and dust generation from farm operations. Single-family Residential Area: a. b. Standard front, side and rear setbacks are provided for each home, and all homes have three-car garages for offstreet parking. The front yards of all the lots would be provided with 3 street trees of varying sizes, a special 10 foot planting easement is provided along the entire northern property line, a 10 foot planting easement is provided on both sides of Camino del as Ondas, and the 50 foot setback along Alga Road would be land form graded and heavily landscaped. PC RESO NO. 3557 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 C. An average 3 foot reduction in lot width for a single-family lot would not preclude the placement of a home on the lot, would not constrain access to the lot, nor substantially reduce the physical separation of the homes when viewed from the public street. The Zoning Ordinance currently designates 60 feet as the lot width for R-1-7500 single-family lots. All the lots in Unit “A” would still maintain a minimum of 10,000 square feet of lot area, therefore, the modification of the lot width standard for purposes of providing affordable housing would not have a detrimental effect on public health., safety and welfare. Multi-Family Residential Area: a. The bulk and scale of the proposed two and three-story apartment buildings would be compatible with the existing and surrounding residential development to the south. The proposed multi-family residential land use would provide an appropriate transition between the proposed single-family land use to the east and the future community park land use to the northwest. A 20 to 25 foot building setback along Hidden Valley Road and a 20 to 35 foot setback along Camino de las Ondas would provide an adequate bulTer between this project and the public streets. The building pads for the apartments would be 20 feet lower in elevation than the single-family homes to the east. The single-family homes are adequately set back a distance of approximately 27 to 40 feet from the top of the slope that separates the two land uses. In the area of the apartment site where the apartments are only approximately 5 to 10 feet below the grade elevation of the homes to the east, there would be a public street separating the two residential land uses. These slope separations and setbacks are adequate to buffer the two land uses in terms of noise and visual aesthetics. b. The design of the project would assure a unique mix of residential development, and enhance the aesthetic quality of the area as follows: i. The street setbacks would be landscaped with a combination of trees and shrubs to partially screen the residential str~~ctures from the public streets. . . . . ii. The building elevations would have textured stucco exteriors and tile roofs, varied roof lines, architectural accent features and building forms, and varied building facades. PCRESON0.3557 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 . . . Ill. The dwelling units would be orientated at various angles along the driveway to provide an enclosure of space between the buildings and to provide more visual interest when the project is viewed from the public streets. 4. That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use for the following reasons: Single-Family Residential Area: All the local, collector, and major streets within this area would be constructed to full public street width standards, have underground utilities, and contain public sidewalks. Multi-Family Residential Area: a. b. C. d. e. The project would provide adequate onsite parking (348 parking spaces) and circulation to serve the needs of the residents and their guests, and it would not impact the availability of offsite street parking. Sidewalks and drainage facilities would be provided along the project’s street frontages to serve the project. The proposed 30 foot wide central private driveway would be adequate to provide safe and efficient traffic circulation, vehicle turn movements, and emergency access. The City’s Parking Ordinance requires a minimum standard width of 24 feet for a two-way traffic aisle containing ninety degree parking on both sides. A 24 foot driveway aisle provides adequate separation and distance for vehicles backing out of parking spaces and adequate separation for two-way trafk (12 feet per travel lane). An internal pedestrian circulation system, that is separated from the driveways, would be provided and it would allow sufkient and safe access to the recreation facility and adjacent public streets. Adequate emergency access is provided by the central 30 foot wide private driveway that leads from Hidden Vahey Road to Camino de las Ondas. The 30 foot wide driveway is wide enough to accommodate emergency vehicles, and the project would be conditioned to prohibit parallel parking along this central access way. The project has been reviewed and approved by the Fire Department. 5. The project is consistent with all City public facility policies and ordinances since: The Planning Commission has, by inclusion of an appropriate condition to this project, ensured building permits will not be issued for the project unless the PC RESO NO. 3557 4 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 6. 7. 8. 9. 10. 11. 12. District Engineer determines that sewer service is available, and building cannot occur within the project unless sewer service remains available, and the Planning Commission is satisfied that the requirements of the Public Facilities Element of the General Plan have been met insofar as they apply to sewer service for this project. The applicant is by condition, required to pay any increase in public facility fee, or new construction tax, or development fees, and has agreed to abide by any additional requirements established by a Local Facilities Management Plan prepared pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. This project is consistent with the City’s Growth Management Ordinance as it has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 20. School fees will be paid to ensure the availability of school facilities in the Carlsbad Unified District. Park-in-lieu fees are required as a condition of approval. All necessary public improvements have been provided or will be required as conditions of approval. The applicant has agreed and is required by the inclusion of an appropriate condition to pay a public facilities fee. Performance of that contract and payment of the fee will enable this body to find that public facilities will be available concurrent with need as required by the General Plan. The project provides affordable housing units that will be available to low income households. Conditions: 1. All conditions of approval for GT 91-12 as contained in Planning Commission Resolution No. 3556 are applicable to this approval and incorporated through this reference. 2. Approval for SDP 91-l 1, as shown on Exhibits “A” - “CO”, dated November 3,1993, incorporated by reference and on fle in the Planning Department. Development shall occur substantially as shown on the approved exhibits. Any proposed grading and/or development substantially different from this approval as determined by the Planning Director, shall require an amendment to this permit. PC PESO NO. 3557 5 1 2 3 4 5 6 7 8 9 1C 11 12 12 Y 1t 1C 17 1E 1s 2c 23 2: 21 2! 2! 2t 2: 2t c i i r I 1 b L 2 3 1 5 5 I 3 3. Approval of SDP 91-11 is subject to approval of CT 91-12 and HDP 91-25. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 17th day of November, 1993, by the following vote, to wit: AYES: Chairperson Noble, Commissioners: Schlehuber, Welshons, Savary & Erwin. NOES: None. ABSENT: Commissioner Hall. ABSTAIN: None. BAILEY NOBLE, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: Y MICHAEL J. HOLZMILtiR PM’JNING DIRECTOR PC RESO NO. 3557 Betz, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO. 3558 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A HILLSIDE DEVELOPMENT PERMIT FOR 186 SINGLE-FAMILY LOTS AND 176 APARTMENT UNITS ON PROPERTY GENERALLY LOCATED EAST OF PASEO DEL NORTE AND NORTH OF CAMINO DE LAS ONDAS. CASE NAME: MARINERS POINT CASE NO: HDP 91-25 WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, pursuant to the provisions of the Municipal Code, the Planning Commission did, on the 17th day of November, 1993, consider said request on property described as: Southeast Quarter of Section 21, Township 12 south, Range 4 west San Bernardino Meridian, in the County of San Diego, State of California, according to the official plat. WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to HDP 91-25. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) B) That the foregoing recitations are true and correct. That based on the evidence presented at the public hearing, the Commission APPROVES HDP 91-25, based on the following findings and subject to the following conditions: PC RESO NO. 3558 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Findings: 1. 2. 3. That hillside conditions and undevelopable areas of the project have been properly identified because the site’s hillside slope conditions and undevelopable areas have been identified on a slope constraints exhibit. That the development proposal and all applicable development approvals and permits are consistent with the purpose, intent, and requirements of this chapter and that the project design substantially conforms to the intent of the concepts illustrated in the hillside development guidelines manual for the following reasons: a. All manufactured cut and Eli slopes are land form/contour graded and do not exceed a height of 30 feet. b. The project’s cut/fill grading volumes of 8,915 cubic yds. per graded acre falls within the “potentially acceptable range” of 8,000 - 10,000 cubic yds./acre. Included in these volumes is 43,200 cubic yds. of grading for Alga Road which is a circulation element roadway. When Alga Road is subtracted out of the grading calculations, the project’s grading volumes are reduced to 8,481 cubic yds. per graded acre and are still within the “potentially acceptable range”. Based on engineering requirements to meet specific fixed vertical and horizontal alignments for proposed Alga Road and the extension of Camino de las Ondas, which is a non-loaded collector road traversing across the entire project, the Planning Director and City Engineer approve the proposed grading volumes. C. Landscaping in conformance with the Zone 20 Specific Plan would be provided on all manufactured slopes to assist in visually screening the slopes erosion and to reduce erosion. d. All structures and roofs within the project would be earth tone in color to reduce visual impacts. e. A percentage of the homes along the north/south trending and gently sloping ridgeline would be one-story in height and all homes would have varying roof lines. f. Homes are setback from the top of manufactured slopes from a range of 17 to 50 feet. That no development or grading will occur in those portions of the property which are undevelopable pursuant to the provisions of Section 21.53.230 of this code PC RESO NO. 3558 2 . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 because all undevelopable areas have been identified and no development or grading would occur in the areas containing 25 to 45%+ slopes. The project contains no wetland areas, riparian or woodland habitats, floodways, major power transmission easements, beaches, or permanent bodies of water. 4. That the project design and lot configuration minim&s disturbance of hillside lands because the proposed grading would create building pads that are terraced for views and step down the slope. A majority of the local streets and manufactured slopes are cmving and are aligned to follow the north/south trending contours. The street alignments and curving land form graded slopes would reduce visual impacts created by the grading and help simulate the natural slope conditions. 5. The project is consistent with all City public facility policies and ordinances since: The Planning Commission has, by inclusion of an appropriate condition to this project, ensured building permits will not be issued for the project unless the District Engineer determines that sewer service is available, and building cannot occur within the project unless sewer service remains available, and the Planning Commission is satisfied that the requirements of the Public Facilities Element of the General Plan have been met insofar as they apply to sewer service for this project. 6. The applicant is by condition, required to pay any increase in public facility fee, or new construction tax, or development fees, and has agreed to abide by any additional requirements established by a Local Facilities Management Plan prepared pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. 7. This project is consistent with the City’s Growth Management Ordinance as it has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 20. 8. School fees will be paid to ensure the availability of school facilities in the Carlsbad Unified District. 9. 10. 11. Park-in-lieu fees are required as a condition of approval. All necessary public improvements have been provided or will be required as conditions of approval. The applicant has agreed and is required by the inclusion of an appropriate condition to pay a public facilities fee. Performance of that contract and payment of the fee will enable this body to find that public facilities will be available concurrent with need as required by the general plan. PC RESO NO. 3558 3 . 1 2 2 4 c: c 6 ‘i E s 1c 11 12 13 14 15 16 17 18 19 20 23. 22 23 24 25 26 27 28 Conditions: 1. All conditions of approval for CT 91-12 as contained in Planning Commission Resolution No. 3556 are applicable to this approval and incorporated through this reference. 2. Approval for HDP 91-25, as shown on Exhibits “A” - “OO”, dated November 17, 1993, incorporated by reference and on file in the Planning Department, Development shall occur substantially as shown on the approved exhibits. Any proposed grading and/or development substantially different from this approval as determined by the Planning Director, shall require an amendment to this permit. 3. Approval of HDP 91-25 is subject to approval of CT 91-12 and SDP 91-11. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 17th day of November, 1993, by the following vote, to wit: AYES: Chairperson Noble, Commissioners: Schlehuber, Welshons, Savary & Erwin. NOES: None. ABSENT: Commissioner Hall. ABSTAIN: None. BAILEY NOBfE, Chairperson CARLSBAD PLANNING COMMISSION ATTEST: MICHAEL J. WLZMIWER PLANNING DIRECTOR PC RESO NO. 3558 4 Betz, EXHIBIT 3 DATE: TO: FROM: SUBJECT: I. APPLlir. A ION COMPLETE DATE: JULY 8. 1992 STAFF PLANNER: JEFF GIBSON a STAFF REPORT 0 3 NOVEMBER 17, 1993 PLANNING COMMISSION PLANNING DEPARTMENT CT 91-12/SDP 91-ll/HDP 91-25 - MARINERS POINT - Request for recommendation of approval for a Tentative Tract Map, Site Development Plan, and Hillside Development Permit to subdivide and construct 186 single- family homes, and 176 - one, two, and three bedroom apartment units, all on property generally located east of Paseo de1 Norte, and north of Camino de las Ondas in the RDM-Q Zone and R-1-10,000-Q Zone in Local Facilities Management Plan Zone 20. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution Nos. 3556, and 3557, recommending APPROVAL of CT 91-12, SDP 91-11, and ADOPT Planning Commission Resolution No. 3558 APPROVING HDP 91-25, based on the findings and subject to the conditions contained therein. II. PROJEfX DESCRIPTION AND BACKGROUND The applicant is requesting recommendation of approval for a Tentative Tract Map, Site Development Plan, and Hillside Development Permit to subdivide and construct 186 single- family homes and 176 - one, two, and three bedroom apartment units on a gradually sloping and rectangular lot located east of Paseo de1 Norte and directly north of Camino de las Ondas. The parcel is located in the Coastal Zone, totals 68 gross acres, is undeveloped, and mostly contains disturbed grassland habitat as a direct result of past agricultural usage of the site. The property has a split zoning and General Plan Land Use designation. The property is located in the Residential Density-Multiple Zone with the Qualified Overlay Zone (RD-M-Q) and in the One-Family Residential Zone with the Qualified Overlay Zone (R-1-10,000-Q). The General Plan Land Use designation is Residential Medium (RM) and Residential Medium Low (RLM). In addition, the project is subject to the requirements of the Zone 20 Specific Plan (SP 203) and Final Environmental Impact Report 90-3. CT 91-12/SDP 91-l l/HDb 31-25 - MARINERS POINT NOVEMBER 17, 1993 As shown on Exhibits “A” - “OO”, the proposed project would consist of one and two story single-family homes with three-car attached garages located on individual lots ranging in size from 7,500 to 21,670 square feet. In the western portion of the project site on an 8.7 acre lot there would be two and three story apartment buildings containing one, two, and three bedroom units all developed around a central 30 foot wide driveway and central parking courts. Along the central 30 foot wide driveway that leads to future Hidden Valley Road and Camino de las Ondas there would be a variety of resident and guest parking spaces, trash enclosures, and one large active corm-non recreation complex containing a swimming pool, clubhouse, and restroom facility. The project would contain additional flat grassy common passive recreation areas between buildings, parking areas and slopes. The apartment buildings would contain one, two, and three bedroom units that range in size from 797 to 1,219 square feet. Per the requirements of the City’s recently adopted Inclusionary Housing Ordinance, 15% of the proposed dwelling units (55 affordable units) must be provided for lower income households. The applicant is proposing to provide those affordable dwelling units within the apartment portion of the project. The project would be conditioned to require an Affordable Housing Agreement that would be submitted for review and approval by the City prior to Final Map approval. The project would feature contemporary architecture consisting of tile roofs with varying roof lines, and stucco exteriors. The surrounding neighborhood is developed with two- story multi-family residences to the south, and vacant land to the east, north and west. The future Poinsettia Community Park would be located approximately 100 feet to the northwest across future Hidden Valley Road. ANALYSIS The proposed project is subject to the following land use plans, and ordinances: A. Carlsbad General Plan: Land Use Element - (Residential Medium Low (RLM) and Residential Medium (RM) Land Use Designations); Open Space Element; and Housing Element; B. Zone 20 Specific Plan (Specific Plan 203); C. Carlsbad Municipal Code, Title 21; 1. Chapter 21.53, Section 2153.120 - Site Development Plan - “Affordable Housing”; 2. Chapter 21.95, Hillside Development Regulations; 3. Chapter 21.85, Inclusionary Housing. - CT 91-12/SDP 91-11/r& 31-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 3 D. Carlsbad Municipal Code, Title 20, Subdivision Ordinance; and the California Subdivision Map Act; E. Mello II Local Coastal Program; F. Growth Management (Local Facilities Management Zone 20); G. Carlsbad Municipal Code, Title 19, Environmental Protection Procedures; and the California Environmental Quality Act (CEQA). A. GENERAL PLAN LAND USE ELEMENT The property has a Residential Medium (RM) and Residential Medium Low (RLM) General Plan Land use Designation. The RM designation allows the development of low density apartment or condominium developments that range in density from 4 to 8 dus/acre with a 6 dus/acre growth management control point. The RLM designation allows single-family homes that range in density from 0 to 4 dwelling units per acre with a 3.2 dus/acre growth control point. The project contains a combination of apartments and single-family homes and therefore, is consistent with the land use designations of the General Plan. OPEN SPACE AhiD CONSERVATION ELEMENT The property contains no existing or approved General Plan open space, conceptual open space and greenways, or any planned trail system links per the open space exhibits found in the City’s Open Space and Conservation Resource Management Plan. In addition, the Zone 20 Specific Plan designates open space in the. very northeastern comer of the property. The project would preserve the steep coastal sage covered slopes located in this portion of the project in protected open space. The project would not preclude or negatively affect the attainment of any of the open space action priorities designated in the Open Space and Conservation Resource Management Plan for Zone 20, therefore, the project is consistent with the Open Space and Conservation Element of the General Plan. HOUSING ELEMENT All residential development within the Zone 20 Specific Plan is required to include a percentage of housing units affordable to persons and families of lower income. Consistent with the policies and programs of the Housing Element and subsequent to the affordable housing requirements of the Zone 20 Specific Plan the project would provide 15% or 55 apartment units available and affordable to lower income households. In addition, and consistent with Housing Element Policy 3.2 the project would provide at least 10% of the lower income units with three or more bedrooms. - CT 91-12/SDP 91-11/i-L 91-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 4 B. ZONE 20 SPECIFIC PLAN (SPECIFIC PLAN 203‘2 The Zone 20 Specific Plan provides a framework for the development of the vacant properties within Zone 20 to ensure the logical and efficient provision of public facilities and community amenities for the future residents of the planning area. This project meets the goals and objectives of the specific plan for the following reason: 1. The project conforms to all aspects of the General Plan and applicable City ordinances, regulations and policies. 2. As conditioned the project provides coordination between surrounding developments through the provision of roadway connections with properties to the north, east and south. 3. The residential land uses are compatible with the existing multi-family residential land use to the south. 4. The project does not preclude the provision of an integrated open space and trail system within the planning area. 5. The project provides an attractive, well buffered, and landscaped circulation system that safely and aesthetically provides for the needs of automobiles, cyclists, pedestrians and adjacent land uses. 6. The provision of a combination of single-family lots ranging in size from 7,500 to over 10,000 square feet and apartment units available to low income households that would be located close to a 42 acre City park and adjacent to a collector street creates a well planned, yet diversified community. 7. The project is located within the Commercial Overlay Zone and would provide a small commercial area on the east side of future Alga Road. This site may be developed for commercial uses subject to a future Site Development Plan approved by the Planning Commission. If access to the neighboring property to the east is required in this location the site may only be large enough to accommodate a small Recreational Vehicle Storage area. 8. ’ To achieve densities conducive to the provision of affordable housing in Area “C”, the project transfers density from Areas “A” and “B” to Area “C”. The specific plan allows one area to be developed at a higher density than would normally be allowed, subject to the remaining area being developed at a lower density for purposes of affordable housing. The density transfer is allowed only if the overall density of the area does not exceed the total number of housing units allowed under the Growth Management Ordinance. - CT 91-12/SDP ti'l-ll/nDk- 91-25 - MARINERS POINT NOVEMBER 17, 1993 The project is located in Planning Area “A” of the Zone 20 Specific Plan and complies with the required “Special Design Criteria” as follows: 1. An average 50 foot setback from Alga Road would be provided. 2. Noise mitigation measures for homes impacted by traffic noise from Alga Road would be provided. 3. Enhanced landscaping would be provided along Camino de las Ondas and Alga Road, and on the manufactured slopes between the terraced building pads. 4. The building elevations for the single-family homes and apartment buildings would have a variety of materials, architectural accent features, articulated wall and roof planes, varying roof heights and building massing, building street setbacks, and curvilinear streets are provided. The Zone 20 Specific Plan also designates the Residential Density-Multiple Zone with the Qualified Development Overlay Zone (RD-M-Q) and the R-l One-Family Residential Zone with the Qualified Development Overlay Zone (R-1-10,000-Q) of the City’s Zoning Ordinance as the implementing zones for development standards in the project. The proposed project would comply with the standards of the R-l, RD-M, and Qualified Development Overlay Zones as follows: SINGLE-FAMILY RESIDENTIAL ZONE (R-l)/CHAPTER 21 .lO REQUIRED PROPOSED I LOT SIZE I 10,000 SQ. FT. I 10,000 SQ. FT. LOTCOVERAGE 40% MAX. 39% MAX. FRONT YARD SETBACK 20 FEET 20 FEET STREET SIDE YARD SETBACK 10 FEET lo-FEET SIDE YARD SETBACK S-10 FEET 5-10 FEET REAR YARD SETBACK lo-20 FEET 20-90 FEET BUILDING HEIGHT 30 FEET 18-24 FEET CT 91-12/SDP 91-ll/nb 31-25 - MARINERS POINT NOVEMBER 17, 1993 RESIDENTIAL DENSITY MULTIPLE ZONE @D-M)/ CHAPTER 21.24 REQUIRED PROPOSED LOT SIZE 7,500 SQ. FT. 7,500 S. F. & 8.4 ACRES LOT COVERAGE 60% MAX. 19% FRONT YARD SETBACK lo-20 FEET 21-35 FEET STREET SIDE YARD S-10 FEET 15-30 FEET SETBACK SIDE YARD SETBACK 5 FEET 40-50 FEET REAR YARD SETBACK 10 FEET 15 FEET BUILDING HEIGHT 35 FEET 32-35 FEET & , QUALIFIED DEVELOPMENT OVERLAY ZONE (Q)/ CHAPTER 21.06 The zoning for the property includes the Qualified Development Overlay Zone (Q), therefore, before the Planning Commission recommends approval of the project to the City Council, Title 21, Chapter 21.06, Section 21.06.020(b) requires the Planning Commission to make the following findings: 1. ‘That the requested use is properly related to the site, surroundings and environmental settings, is consistent with the various elements and objectives of the General Plan, will not be detrimental to existing uses or to uses specifically permitted in the area in which the proposed use is to be located, and will not adversely impact the site, surroundings or traffic circulation”. The project is consistent with the General Plan and Zone 20 Specific Plan as explained in Sections A and B of this report. The project would not have a significant impact on the environment as discussed in Section G of this report. The proposed residential land uses are compatible in scale, architecture, and building materials with the multi-family residential development to the south. Public street improvements would be provided to accommodate traffic generated by the project and the project must comply with all the circulation and public facility requirements of Local Facilities Management Plan Zone 20. 2. “That the site for the intended use is adequate in size and shape to accommodate the use” The project site is rectangular in shape, the topography is gently sloping, and the grading and development to accommodate streets and building pads would conform CT 91-12/SDP 91-ll/~Dk 31-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 7 to all required City ordinances as illustrated on the attached exhibits. The proposed 176 apartment units would be accommodated on the level building pad areas of the lot without encroaching into the manufactured slopes located along the eastern portion of the site. 3. ‘That all of the yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested use to existing or permitted future uses in the neighborhood will be provided and maintained”. The project would be conditioned to provide a solid wall or fence, and landscaped windbreaks along the perimeter of any future developable area that abuts property under “open field” cultivation, in order to reduce public nuisance effects of adjacent pesticide spraying and dust generation from farm operations. Single-family Residential Area: a. Standard front, side and rear setbacks would be provided for each home, and all homes would have three-car garages to satisfy offstreet parking requirements. b. The front yards of all the lots would be landscaped with 3 street trees of varying sizes, a 10 foot planting easement is provided on both sides of Camino de las Ondas, and the 50 foot setback along Alga Road would be landform graded and heavily landscaped. Multi-Family Residential Area: a. The bulk and scale of the proposed two and three-story apartment buildings would be compatible with the existing and surrounding residential development to the south. The proposed multi-family residential land use would provide an appropriate transition between the proposed single-family land use to the east and the future community park land use to the northwest. A 20 to 25 foot building setback along future Hidden Valley Road and a 20 to 35 foot setback along Camino de las Ondas would provide an adequate buffer between this project and the public streets. The building pads for the apartments would be 20 feet lower in elevation than the single-family homes to the east. The single-family homes would be adequately setback a distance of approximately 27 to 40 feet from the top of the slope that separates the two land uses. In the area of the apartment site where the apartments are only approximately 5 to 10 feet below the grade elevation of the homes to the east, there would be a public street separating the two residential land uses. These slope separations and setbacks are adequate to buffer the two land uses in terms of noise and visual aesthetics. CT 91-12/SDP 91-ll/HDk 31-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 8 b. The design of the project would assure a unique mix of residential development, and enhance the aesthetic quality of the area as follows: i. The street setbacks would be landscaped with a combination of trees and shrubs to partially screen the residential structures from the public streets. ii. The building elevations would have textured stucco exteriors and tile roofs, varied roof lines, architectural accent features and building forms, and varied building facades. ,.. 111. The dwelling units would be orientated at various angles along the driveway to provide an enclosure of space between the buildings and to provide more visual interest when the project is viewed from the public streets. 4. “That the street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use”. Single-Family Residential Area: All the local, collector, and major streets, both within and offsite from this area, would be constructed to City standards, have underground utilities, and contain public sidewalks. Multi-Family Residential Area: a. The project would provide adequate onsite parking (348 parking spaces) and circulation to serve the needs of the residents and their guests, and it would not impact the availability of offsite street parking. b. Sidewalks and drainage facilities would be provided along the project’s street frontages to serve the project. C. The proposed 30 foot wide central private driveway would be adequate to provide safe and efficient traffic circulation, vehicle turn movements, and emergency access. The City’s Parking Ordinance requires a minimum standard width of 24 feet for a two-way traffic aisle containing ninety degree parking on both sides. A 24 foot driveway aisle provides adequate separation and distance for vehicles backing out of parking spaces and adequate separation for two-way traffic (12 feet per travel lane). d. An internal pedestrian circulation system that is separated from the driveways would be provided and it would allow sufficient and safe access to the recreation facility and adjacent public streets. - CT 91-12/SDP 91-ll/HDk 31-25 - MARINERS POINT NOVEMBER 17, 1993 e. Adequate access for emergency vehicles is provided by the central 30 foot wide private driveway that leads from Hidden Valley Road to Camino de las Ondas. The 30 foot wide driveway is wide enough to accommodate emergency vehicles, and the project would be conditioned to prohibit parallel parking along this central access way. The project has been reviewed and approved by the Fire Department. C. CARLSBAD MUNICIPAL CODE. TITLE 21: 1. CHAPTER21.53, SECTION 21.53.120, SITE DEVELOPMENT PLAN -“AFFORDABLE HOUSING” The Carlsbad Municipal Code Section 21.53.120 requires a Site Development Plan for any multi-family residential apartment development having more than 4 dwelling units or an affordable housing proiect of any size. This project would have 362 residential units of which 55 of those units must be designated as affordable to lower income households. Lots within the proposed single- family R-1-10000 portion (Unit “A”) of the project do not meet the Zoning Ordinance’s 75 foot lot width standard for R-1-10,000 lots. An overall lot width average of 72 feet would be maintained in Unit “A”. A lot width ranging from 70 to 75 feet is adequate to accommodate a home and still maintain -side yard setbacks that meet the ordinance. This reduction in lot width for a portion of Unit “A” allows approximately 9 additional single- family units to be developed which reduces the financial burden to provide affordable units elsewhere in the project. In order to provide affordable housing in this project the applicant is requesting that the Planning Commission recommend to the City Council that this standard be waived under Section 21.53.120(c) Development Standards. A Site Development Plan for an affordable housing project may allow less restrictive development standards than specified in the zone code or underlying zone if the project is in conformance with the General Plan and would not have a detrimental effect on public health, safety and welfare. Before the Planning Commission recommends approval of the project to the City Council, Title 21 of the Municipal Code under Section 21.53.120(c) requires that the following finding be made: “That the project is in conformity with the General Plan and adopted policies and goals of the City, and it would have no detrimental effect on public health, safety and welfare”. See the Section B of this report entitled Qualified Development Qverlav Zone tQ] for additional findings of fact that also apply to this finding requirement of the code. An average 3 foot reduction in lot width for a single-family lot would not preclude the placement of a home on the lot, would not constrain access to the lot, nor substantially reduce the physical separation of the homes when viewed from the public street. The Zoning Ordinance currently designates 60 feet as the lot width for R-1-7500 single-family CT 91-12/SDP 91-ll/nDk- 31-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 10 lots. All the lots in Unit “A” would still maintain a minimum of 10,000 square feet of lot area. 2. HILLSIDE DEVELOPMENT REGULATIONS/CHAPTER 21.95 The project site contains slopes of 15% or greater and an elevation differential greater than 15 feet, therefore, a Hillside Development Permit is required. Before the Planning Commission approves the Hillside Development Per-n-tit, Title 21, Chapter 21.95, Section 21.95.030 requires that the Planning Commission make the following findings: 1. ‘That hillside conditions and undevelopable areas of the project have been properly identified”. The site’s hillside slope conditions and undevelopable areas have been identified on Constraints Exhibit “JJ” dated, November 17, 1993. 2. ‘That the development proposal and all applicable development approvals and pennits are consistent with the purpose, intent, and requirements of this chapter and that the project design substantially conforms to the intent of the concepts illustrated in the hillside development guidelines manual”. a. All manufactured cut and fill slopes are landform/contour graded and do not exceed a height of 30 feet. b. The project’s cut/fill grading volumes of 8,915 cubic yards per graded acre falls within the “potentially acceptable range” of 8,000 - 10,000 cubic yards/acre. Included in these volumes is 43,200 cubic yards of grading for Alga Road which is a circulation element roadway. When grading for Alga Road is subtracted out of the grading calculations, the project’s grading volumes are reduced to 8,481 cubic yards per graded acre and are still within the “potentially acceptable range”. Based on engineering standards and requirements to meet specific fixed vertical and horizontal alignments for proposed Alga Road and the extension of Camino de las Ondas, which is a non-loaded collector road traversing across the entire project, the Planning Director and City Engineer recommend approval of the proposed grading volumes. C. Landscaping in conformance with the Zone 20 Specific Plan would be provided on all manufactured slopes to assist in visually screening the slopes and to reduce erosion. d. All structures and roofs within the project would be earth tone in color to reduce visual impacts. CT 91-12/SDP 91-ll/tiDi 31-25 - MARINERS POINT NOVEMBER 17, 1993 e. A percentage of the homes along the north/south trending and gently sloping ridgeline would be one-story in height and all homes would have varying roof lines. f. Homes are setback from the top of manufactured slopes from a range of 17 to 50 feet. 3. ‘That no development or grading will occur in those portions of the property which are undevelopable pursuant to the provisions of Section 21.53.230 of this code”. All undevelopable areas have been identified and no development or grading would occur in the areas containing 25 to 45%+ slopes. The project contains no wetland areas, riparian or woodland habitats, floodways, major power transmission easements, beaches, or permanent bodies of water. 4. ‘That the project design and lot configuration minimizes disturbance of hillside lands”. The proposed grading would create building pads that are terraced for views and step down the slope. A majority of the local streets and manufactured slopes are curving and are aligned to follow the north/south trending contours. The street alignments and curving landform graded slopes would reduce visual impacts created by the grading and help simulate the natural slope conditions. 3. INCLUSIONARYHOUSING ORDtNANCE,CHAPTER21.85: The Inclusionary Housing Ordinance implements the inclusionary objectives of the Housing Element (Objective 3.6), and at a minimum, the project would be required to provide not less than 15% of all proposed residential units affordable to lower income households. The project proposes 362 dwelling units, therefore, 15% of those units would yield a minimum requirement to provide 55 housing units affordable lo lower income households. The applicant is proposing to meet the affordable housing requirement of the project within the apartment portion of the site plan. Six (10% min.) of the affordable apartment units would be three-bedroom and contain 1,219 square feet to accommodate larger families. The project would be conditioned to require an Affordable Housing Agreement that would be submitted .for review and approval by the City prior to Final Map approval. The Affordable Housing Agreemknt is a legally binding agreement between the applicant and the City which provides the specific details regarding the implementation of the affordable housing requirements of the Zone 20 Specific Plan and subsequent conformance with the City’s Housing Element. ,- CT 91-12/SDP 91-l l/ riDl 31-25 - MARINERS POINT NOVEMBER 17, 1993 D. GROWTH MANAGEMENT The proposed project is, located within Local Facilities Management Plan Zone 20 in the Southwest Quadrant. The impacts on public facilities created by this project and compliance with the adopted performance standards are summarized as follows: FACILITY IMPACTS CITY ADMINISTRATION 1262 Sq. Ft. LIBRARY 673 Sq. Ft. WASTE WATER TREATMENT 362 EDU PARKS 2.52 Acres DRAINAGE N/A CIRCULATION 2926 ADT FIRE Station # 4 OPEN SPACE 10.1 Acres SCHOOLS CUSD SEWER COLLECTION SYSTEM 362 EDU WATER DISTRIBUTION SYSTEM 72,640 GPD COMPLIANCE WITH STANDARDS Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes The project is 3.4 dwelling units below the Growth Management Dwelling unit allowance for the property. E. SUBDMSION ORDINANCE/ TITLE 20 The proposed tentative map would comply with all the requirements of the City’s Subdivision Ordinance, Title 20. Adequate drainage and sewer would be provided within the proposed public streets. The project’s drainage and sewer systems would flow south into existing systems and towards Batiquitos Lagoon. Grading quantities would consist of 625,000 cubic yards of cut and fill that would be balanced onsite, thus eliminating the impacts associated with export or importation of soil. The project’s proposed streets are adequate to handle its circulation needs as conditioned. Street “L” as shown on the tentative map will not meet cul-de-sac standards. A condition of approval has been added to ensure that the project comply with the Final EIR 90-03 and Local Facilities Management Plan Zone 20 requirements for meeting cul-de-sac standards and for the phasing of improvements for Alga Road. The applicant’s proposal to comply CT 91-12/SDP 91-ll/nDI 31-25 - MARINERS POlNT NOVEMBER 17, 1993 PAGE 13 with the cul-de-sac standard involves the use of a 20 foot drainage easement with grades up to 20% that leads from the end of “L” Street to Camino De Las Ondas. That proposal would also serve to circumvent the EIR and facility plan conditions for phasing of Alga Road. The Engineering Department does not find that alternative acceptable. As conditioned the project would provide the following public street improvements: 1. A traffic actuated signal at the intersection of Alga Road and Camino de las Ondas shall be designed and guaranteed for future construction. 2. Alga Road between the subdivision boundary and Poinsettia Lane shall be constructed with two inside lanes, full median curbing, all needed storm drain facilities and all utilities that will be beneath the paved roadway sections. The City Engineer may accept an alternate proposal that fulfills the need to provide this vital roadway link that the residents of this project will use. This condition may be met by another developer based on which developer wishes to proceed first. 3. Alga Road within the subdivision boundaries shall be constructed with full public improvements to major arterial standards based on a right-of-way width 102 feet. 4. Hidden Valley Road within the subdivision boundaries shall have half street improvements plus 12 feet of paving. An offsite portion of Hidden Valley Road from Camino de las Ondas to the subdivision boundary shall be constructed for two lanes of travel. This offsite portion of Hidden Valley Road is required in order to meet the cul-de-sac policy for Unit “C’of this subdivision. F. MELLO II LOCAL COASTAL PROGRAM The project is located in the Mello II Segment of the City’s Local Coastal Program (LCP) and complies with the plan as follows: 1. All grading avoids steep coastal sage covered slopes in the very northeastern comer of the property per the requirements of the Coastal Resource Protection Overlay Zone. The project would be conditioned to provide adequate drainage, siltation, and erosion control facilities as part of the approved grading permit. The grading operation would be limited to the summer construction season, April 1 to October 1. 2. The project contains vacant non-prime agricultural land containing Class III and IV soils and is located in the Coastal Agricultural Overlay Zone (Site II). The Mello II LCP requires mitigation when non-prime coastal agricultural land is converted to urban land uses. The project would be conditioned to comply with one of the three LCP mitigation options provided when projects are located in. Site II: (1) “Prime Land Exchange”; (2) “Determination of Agricultural Feasibility”; and (3) “Agricultural Conversion Mitigation Fee”. . CT 91-12/SDP 91-ll/Hbr 91-25 - MARINERS POINT NOVEMBER 17, 1993 PAGE 14 G. ENVIRONMENTAL REVIEW/ TITLE 19 AND CEOA The project site is located within the boundaries of Zone 20 Specific Plan (SP 203) which covers the 640 acre Zone 20 planning area. The direct, indirect, and cumulative environmental impacts from the future development of the Zone 20 planning area have been discussed in the Final Environmental Impact Report (EIR 90-03) for the specific plan. The recommended mitigation measures of Final EIR 90-03 would be included as conditions of approval for this project. These studies provide more focused and detailed project level analysis and indicate that additional environmental impacts beyond what was analyzed in Final EIR 90-03 would not result from implementation of the project. This project is in prior compliance with Final EIR 90-03 and would not create any additional significant environmental impacts. Iv. SUMMARY AND RECOMMENDATION The proposed project: (1) is consistent with the General Plan; (2) complies with the Zone 20 Specific Plan; (3) meets the requirements of Titles 20 and 21; (4) findings for the Site Development Plan can be made under Section 21.06.020 and 21.53.120; (5) complies with the Mello II Segment of the Local Coastal Program; (6) is in conformance with Growth Management; and (7) is in compliance with the mitigation requirements of Final EIR 90- 03, and will not significantly impact the environment, therefore, staff recommends approval of CT 91-12/SDP 91-ll/HDP 91-25. A’ITACHMENTS 1. Planning Commission Resolution No. 3556 2. Planning Commission Resolution No. 3557 3. Planning Commission Resolution No. 3558 4. Location Map 5. Background Data Sheet 6. Local Facilities Impact Assessment Form 7. Disclosure Form 8. Reduced Exhibits 9. Full size Exhibits “8’-“OO”, dated November 17, 1993. JG:km:lh:vd September 20, 1993 - BACKGROUND DATA SHEEl CASE NO: CT 91-12/SDP 91-ll/HDP 91-25 CASE NAME: Mariners Point APPLICANT: Bramalea California Inc. REQUEST AND LOCATION: 186 single-far& homes and 176 apartment units LEGAL DESCRIPTION: Southeast Quarter of Section 21. Township 12 south, Range 4 west San Bernardino Meridian, in the Countv of San Diego, State of California. according to the official plat. APN: 214-140-08 Acres 68 Proposed No. of Lots/Units 187 Lots & 176 Units GENERAL PLAN AND ZONING Land Use Designation Residential Medium and Residential Medium Low Density Allowed 3.2 & 6 Dus/Acre Density Proposed 5.4 Existing Zone RD-M-Q & R-1-10.000-Q Proposed Zone N/A Surrounding Zoning and Land Use: (See attached for information on Carlsbad’s Zoning Requirements) Zoning Land Use Site RD-M-Q & R-1-10.000-Q Vacant North RD-M-Q & R-1-10.000-Q Vacant South RD-M Multi-familv East LC Agricultural West PC Vacant PUBLIC FACILITIES School District Carlsbad Water District Carlsbad Equivalent Dwelling Units (Sewer Capacity) 362 EDU Public Facilities Fee Agreement, dated November 26, 1991 Sewer District Carlsbad ENVIRONMENTAL IMPACT ASSESSMENT Negative Declaration, issued Certified Environmental Impact Report, dated November 9, 1993 (Final EIR 90-03) Other, JG:lh -- CITY OF CARISBAD GROWTH MANAGE&lENT PROGRAM LOCAL FACILITIES IMPACTS ASSESSMENT FORM (To be Submitted with Development Application) PROJECT IDENTITY AND IMPACT ASSESSMENT: FILE NAME AND NO: Mariners Point - CT 91-12/SDP 91-ll/HDP 91-25 LOCAL FACILITY MANAGEMENT ZONE: 20 GENERAL PLAN: RM/RLM ZONING:RD-M-Q/R-1-10.000-Q DEVELOPER’S NAME: Bramalea California Inc. ADDRESS: 100 Bavview Circle, Suite 2000, Newport Beach, CA 92660 PHONE NO: (714) 509-4600 ASSESSOR5 PARCEL NO: 214-140-08 QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 68 Acres/362 UNITS ESTIMATED COMPLETION DATE: N/A A. B. C. D. E. F. G. H. I. J. K. L. City Administrative Facilities: Demand in Square Footage = 1262 Library: Demand in Square Footage = 673 Wastewater Treatment Capacity (Calculate with J. Sewer) 362 Park: Demand in Acreage = 2.52 Drainage: Demand in CFS = N/A Identify Drainage Basin = N/A (Identify master plan facilities on site plan) Circulation: Demand in ADTs = (Identify Trip Distribution on site plan) Fire: Served by Fire Station No. = Open Space: Acreage Provided - Schools: 2962 NO. 4 10.1 CUSD (Demands to be determined by staff) Sewer: Demand in EDUs - Identify Sub Basin - 362 N/A (Identify trunk line(s) impacted on site plan) Water: Demand in GPD - 72,640 The project is 3.4 units below the Growth Management Dwelling unit allowance., DISCLOSURE STATEMENT A?PLICAIKT’S STATEMEFUT OF XCLOS’JRE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS WHICH &ILL GEC~,FE ;ISCAE~IONAAY ACTICN ON :irE PAF(T OF THE C;Ty COLINCIL. OR ANY APPOlN-rED BOARD, CO&,MlSSjON 0~ CCMM~EE ‘P iease Prm) The following information must be disclosed: 1. ArMcant List the names and addresses of all persons having a financial interest in the application. Bramalea California, Inc. One Park Plaza, Suite 1100 lrvine, LA Y.2114 2. Owner List the names and addresses of all persons having any ownershi Bramalea California, Inc. One Par R interest in the pro erty involved. Plaza, Suite 1 00 P lrvlne, LA 92114 3. If any person identified pursuant-ta-(-lj=q--@)-abo ration or partnership, list the names ant ing more than 10% o the corporation or owning any pannershtp One Queen Street East, Suite 2300 Toronto, Ontario Canada P%C-249 . 4. If any person identified pursuant to (1) or (2) above is a non-profit organization or a trust, list the names and addresses of any person serving as officer or director of the non-profit organization or as trustee or beneficiary of the trust. N/A FRMOOO13 8/W 2075 Las Palmas Drive l Carlsbad. California 92009-4859 - (619) 438-l 161 .- (Over) Disclosure Statement Page 2 5. Have you had more than $250 worth of business transacted with any member of City staff, Scar=: Commlsslons, Csmmittees and Council within the past twelve months? Yes - - No x If yes, please indicate person(s) Der~on rs d&nod as ‘Any mdivrdurl. firm. copartnsrshlp. jornt vontwa. urocistion. social club, frarornal orgamzatlon. corporrf~on. estaw :r,st I 1ete1~8r. syndicrtr, this and any other counry. clfy wd county. cq muf%clpal@y. dl$Irlct or other polR~al 1ubdWllOn. or any 01ner groin 3, I comblnakon actmg ad l unit’ (NOTE: Attach additional pages as necessary.) LLce Nbveii%er 25, l&u Bramalea California, Inc. Print or type name of owner Pres ident x /" ignature Of ajbplicant/date Jack I November 25, 1991 Bramalea California, Inc. Print or type name of applicant Re 'imer , Vice President FRh4ocxI13 8/90 BRAMALEA CALIFORNIAa JNC, CERTIFICATE OF INCUMBENCY I, Bruce J. Varker, Assistant Secretary of Bramalea California, Inc., hereby c&ties that the following persons have been duly elected and/or appointed to the position(s) set opposite their respective names and further certify that said elections and/or appointments are in full force and effect. DIRJXTOR Peter B. Pen-in OFFJCEJtS Peter B. Perrin Bruce J. Varker Bruce Abbey Tim McGinnis Stewart D. Davidson Robert B. Farrell Jack Reimer Michael F. Wintemute Charles Simon - President - Executive Vice-President, Fiance and Administration and Assistant Secretary - Senior Vice-President - Senior Vice-President - Vice-President and Treasurer (Chief Financial Ofticer) - Vice-President - Vice-President, Land Development - Vice-President and Corporate Controller - Secretary ,4U’J”JlORJZED SIGNJNG OFFJCEJtS Randall J. Tipping Pegi DiRienzo David Meadows David Lopez - Authorized Signing Officer - Carl execute and deliver all tax returns and related documents together with an Officer - Authorized Signing Officer - can execute and deliver all documents together with an Authorized Signing Officer or above - Authorized Signing Officer - can ex,ecute and deliver ah documents together with an Officer of Director - Authorized Signing Officer - can execute and deliver all documents together with an Authorized Signing Officer or above IN WITNESS WHEREOF I have hereunto signed my name and affixed the corporate seal of Bramalea California, Inc. DATED this Bruce Jebarker, Assistant Secretary _ , -’ _ /--- .--’ /’ .L *. /-- A’ /’ ,’ . - ! 1 !f f .., ; . j p ; i rt? . : I- ii i h* ! ,‘jY i i i 0 :, : . . :-i ! $8 . . arm = LJJ 3 -1’ - d b -. -t t + !- - t I? 17 i; I= lb j 3 f = 5 I ; i 2 fi .- f x _= 5 N r , {,‘.y; . :: ; .,,y”;. .ie 33 *z “‘, \ _I I : ; >;-; ; ‘ ..,I ‘: i. . : _ N X j ,- 4 t t ! 5 = : 2 z i I m b z W c b 6 r/l - c3 = 0 d w 0 c- L4 - ” x I+ ii ii f i ,. z ? s ‘i I / / I / / I / , / 0 ci Z - d z 0” ul m G u d w, a c < d a - C T- L e t - ,_._ EXHIBIT 4 PLANNING COMMISSION November 17, 1993 PAGE 11 ioner Erwin inquired if the additional finding which Commissioner Schlehuber is suggesting acceptable to the City. Karen Hirata, Deputy City Attorney, replied that it would be acceptable. n stated that he supports the staff recommendation but he thinks the office space use by Rally’s, the lube, and car wash personnel. made by Commissioner Erwin, and duly seconded, to adopt Planning n Resolution No. 3569 approving the Negative Declaration issued by the irector, and adopt Planning Commission Resolution Nos. 3570 and 3571, -01 and CUP 93-01, based on the findings and subject to the d therein, with the following changes: (1) the addition of findings as mo dated November 17, 1993 with a change in the wording for the new condition hall be abated consistent with the requirements of a nting the LCP which set a time limit for conformance with LCP.“; (2) the addition of a new finding to state that under Chapter 50 of the Carlsbad Municipal Code Commercial-Tourist Zone, t ommission finds that the three (3) automobile service stations immediately e site do not provide lube services or full service car washes. Lube services an ervice car washes are part of the uses permitted by Chapter 21.29.050 and service stations that exist.“; (3) the addition of a finding that the fluores g is an attention-getting device which is prohibited by the sign ordinance; ondition which states that the canopies as shown in Exhibit F shall be replace oated canopies consistent with the building exterior subject to approval of rector; and (5) a change to Condition #32 to state that offices within the car was re are restricted to onsite uses by personnel of the car wash, restaurant, and the lu VOTE: 5-l NOES: Commissioner Welshons ABSTAIN: None CT 91-l 2/SDP 9-l 1 /HDP 91-25 - MARINERS POINT - Request for recommendation of approval for a Tentative Tract Map, Site Development Plan, and Hillside Development Permit to subdivide and construct 186 single-family homes, and 176 - one, two, and three bedroom apartment units, all on property generally located east of Paseo del Norte, and north of Camino de las Ondas in the RDM-Q Zone and R-l -10,000-Q Zone in Local Facilities Management Plan Zone 20. Chairman Noble advised the applicant that he had the right to be heard before a full Commission. He was asked if he wished to be heard tonight or granted a continuance. The applicant indicated that he wished to proceed. Jeff Gibson, Associate Planner, reviewed the background of the request and stated that the applicant is requesting to subdivide and construct 186 single family homes on lots ranging in size from 7,500 to 21,670 s.f. and to construct 176 apartment units. The project is located on Camino de las Ondas, east of Paseo del Norte. The property is approximately 68 acres in size. The lot is currently undeveloped and mostly contains disturbed grassland habitat. Access to the project would be provided by future Hidden Valley Road and Camino de las Ondas, which would be extended east to meet future Alga Road. In addition, Alga Road would be extended through the project and connect with Poinsettia Lane to the south. Camino de las Ondas would be widened to 40 ft. of pavement and would have curb, gutter, and sidewalk on both sides. The Alga Road connection to the existing Poinsettia Lane to the south would also provide additional access to the project. Mr. Gibson stated that the City’s inclusionary housing ordinance requires that 55 affordable dwelling units must be provided for low income households. Those affordable units will be located within the apartment MINUTES w’ PLANNING COMMISSION November 17, 1993 PAGE 12 portion of the project. The apartment units are located in the area of the project in which the zoning allows multi-family residential development. They will be located close to the future Poinsettia Park and two non-loaded collector roads. The future Hidden Valley Road would eventually connect with Palomar Airport Road to the north and Camino de las Ondas would connect to Alga Road to the east. This planned roadway network can adequately handle the additional traffic generated by the project. The proposed multi-family land use is compatible with the existing multi-family developments located in the neighborhoods directly south, including condominium townhome and apartment-type developments. The apartment portion of the project would meet all City adopted plans, policies, and standards, including the City’s height and parking ordinances. To appropriately fit into the existing community, the apartment buildings would be designed with pink tile roofs, varied roof lines, textured stucco exteriors, architectural accent features, and a variety of building facades. Using an architectural rendering, he reviewed the features of the project. The proposed project complies with all City ordinances and requirements and staff recommends approval. Commissioner Welshons inquired who would maintain the landscaping behind the homes where they back up to one another. Mr. Gibson replied that this open space area would be maintained by the homeowner’s association. Commissioner Welshons inquired how the gardener would access that open space area behind the homes. Mr. Gibson replied that if the homeowner puts up a fence, he must provide a gate for access. The homeowner’s association would be required to pay for and install the irrigation system. Commissioner Welshons inquired where the pedestrian trail leads to that is located in the corner between the single family units and the apartment project. Mr. Gibson replied that this trail will be used as pedestrian access to the City park which will be located on Hidden Valley Road. Commissioner Welshons inquired if this project will create access problems for existing homes in the area. Mr. Gibson replied that the homes are currently accessed by a driveway easement similar to what they are now using. The project should not create any access problem for the existing homeowners. Commissioner Savary inquired who will be responsible for the maintenance and care of the apartment project. Mr. Gibson replied that the multi-family units will be located on one large lot which has one owner. The owner will be responsible for maintaining the slopes. Commissioner Savary inquired where this project would be located in relation to Costa do Sol. Mr. Gibson replied that Costa do Sol is located directly west of this project. Costa do Sol is a condominium development whereas here there will be affordable units located within the apartment project. Commissioner Erwin requested staff to indicate where the buildings pads are being reduced by 3 ft. Mr. Gibson replied that there is split zoning on the property. The zone line travels down J Street. The land east of J Street is considered R-l -10,000 zoning. Of the 37 lots in that area, 15 would have reduced lot widths but would still range between 70-75 ft. (75 ft. being the required minimum width). The reduced lot widths will provide additional single family units which will help offset the costs for the affordable housing. Commissioner Erwin inquired why densities were increased in the single family units and not the apartment project. Mr. Gibson replied that densities in the apartment complex were also increased. Commissioner Erwin requested staff to comment on the letter from Aviara which states that they feel other developments in this area should pay their fair share towards the new Poinsettia/l-5 interchange. Bob Wojcik, Principal Civil Engineer, replied that the agreement regarding the Poinsettia interchange was voluntary on Hillman’s part. They were not required to do this and their signed agreement does not include any other property owners. PLANNING COMMISSION November 17,1993 PAGE 13 Commissioner Welshons noted that H Street was stubbed to the south and she inquired what was happening to the north. Mr. Wojcik replied that H Street was stubbed south to serve the existing resident. There are no existing homes to the north which is why H Street was not extended north. There is a condition to extend Alga south to Poinsettia for additional circulation for that area. Mr. Wojcik noted that there is a project in process to the north which will be gaining access off Alga Road and Hidden Valley Road. However, this project is being proposed as a gatecl community. If we required a street be extended north from this project to that one, it would be gated. The developer to the north stated that he would prefer not to have another gate to deal with. Commissioner Welshons requested staff to review the cul-de-sac policy, which Mr. Wojcik did. Commissioner Welshons’inquired about the fee referred to in Condition #lOO as a special development tax. Mr. Wojcik replied that Condition #lOO refers to the CFD. The fee for Alga and Poinsettia is not included in the CFD. Commissioner Welshons inquired why H Street or some other street is not going to connect with Poinsettia. Mr. Wojcik replied that it can’t connect because of the intersection distance which needs 1,200 ft. spacing. Chairman Noble opened the public testimony and issued the invitation to speak. Dorian Johnson, Vice President of Bramalea California, applicant, addressed the Commission and stated that he agrees with the staff report and conditions of approval. He has seen the errata sheet and agrees with it also. Mr. Johnson stated that he believes Alga Road is an important connection and his company will be contributing to Alga Road as part of the CFD which is being established. He doesn’t believe that the implementation or bonding requirement for the Alga Road extension should be a requirement of the entire project, although it is necessary to meet the cul-de-sac requirement for a part of the project. Mr. Johnson would like to see that particular condition drafted so that the acquisition of the right-of-way and the necessary bonding for Alga Road will be required for those units necessary to meet the cul-de-sac policy. He stated that he has worked very closely with the property owner to the north for access purposes. At one time, there was access to the north, but in the course of working with staff and the other developer, it has been eliminated. Regarding the landscaping on the slope behind the homes, there will be no grass or need for heavy equipment. Nonetheless, they plan to provide an access approximately every 300 ft. Commissioner Welshons requested more information on the homeowner’s association. Mr. Johnson replied that there will be a homeowner’s association for the single family detached homes to take care of the landscaping. Separate and apart from that association, will be the ownership and management of the multi-family affordable project. They will be responsible for the maintenance of their area. They will not be responsible for maintenance of the common slopes behind a particular unit further up the hill. That will be under the authority of the association for the single family homes. Commissioner Welshons inquired if these are two different entities. She would also like to know if the single family people can use the recreation center. Mr. Johnson replied that the recreation center is for the- sole use of the apartment project. Commissioner Welshons inquired about the small pocket park. She cannot envision people crossing Camino de las Ondas to go to this park. Mr. Johnson replied that this is a difficult corner. It is not large enough for a lot and it won’t be an active park. It will probably be more of a landscape amenity. Commissioner Welshons stated that even though there are community parks here and there, people still like having a tot lot close by. Mr. Johnson replied that perhaps when the property to the south develops, there may be an opportunity to expand that corner and develop it. PLANNING COMMISSION November 17, 1993 PAGE 14 Commissioner Erwin noted that there are no individuals named on the disclosure statement. Mr. Johnson replied that Bramalea California is a public corporation. It is a wholly owned subsidiary of Bramalea Ltd., which is a Canadian corporation. There are no single individuals owning more than 10%. Arto Nuutinen, 4920 Campus Drive, Newport Beach, representing Bowie, Arneson, Kadi, Wiles & Giannone, attorneys for Carlsbad Unified School District, addressed the Commission and stated that correspondence has previously been forwarded to the Commission regarding school impacts. The school district is requesting that any future City Council action be conditioned upon mitigation of these identified impacts. He requested that this correspondence be included with this application. Mr. Nuutinen stated that the school district is projecting a shortfall of $1 ,113,OOO to meet the school facilities costs for the Mariner’s Point development. He requested that the Commission condition this application upon execution of appropriate mitigation agreements with the school district providing for full mitigation of school facilities impacts from buildout of this project prior to any action by the City Council. He stated that the school district is in the process of developing agreements with the various developers within Zone 20, including this applicant, which are expected to be entered into sometime in the future. Commissioner Erwin inquired if the school district is asking that this be incorporated into this application package tonight. Mr. Nuutinen replied that this is correct and that when the package is forwarded to the City Council they will have an opportunity to address these school impacts. Terence W. Pomeroy, 6847 Batiquitos Drive, Carlsbad, addressed the Commission and stated that he is representing himself. He is a concerned resident of the Las Playas development and he is worried about the additional traffic which will be traveling along Batiquitos Drive as a result of this development. There are many children in his development. He is very concerned about the high density of this project. He moved here to get away from a congested city to the north. He has lived here six years and is concerned about the heavy influx of development which is moving into Carlsbad. He would like to see the density of this development reduced. He understands that the schools are overloaded now and this will only make it worse. Every Carlsbad resident will have their property taxes increased just to pay for new schools to accommodate the new residents. Chairman Noble advised Mr. Pomeroy that he believes everyone who ever moved to Carlsbad did so because of the rural nature of the area. He moved here many years ago and now he, too, feels hemmed in. Density increases are being required in order to provide affordable housing. Even with the high densities, Carlsbad still has a cap on the densities in each zone. Commissioner Schlehuber advised Mr. Pomeroy that Proposition 13 protects property owners from having their property taxes increase more than 2% per year. There is always a shortage of tax revenues but we will have a 2% annual tax increase regardless of whether this development is built or not. Jeannie Hough, 6820 Briar-wood, Carlsbad, addressed the Commission and stated that she is concerned about the size of the development. The street she lives on, Briar-wood, is a private street. She inquired how the City can prevent motorists from traveling down this private street. Her greatest concern is traffic but she is also concerned about the additional noise. Ms. Hough is also concerned that affordable housing will be so close to the single family homes. She doesn’t think people will want to live next to affordable housing. If they don’t sell the homes because of the affordable housing, what will happen to them. Will they stand vacant? She would like to know who will be living in the affordable housing and how the tenants will be screened. Commissioner Erwin advised Ms. Hough that the people living in the affordable housing might be her children. Chairman Noble commented that it will also be secretaries, teachers, and other professionals with incomes of less that $43,000 a year. We are required to provide this housing for people. There will be many first time buyers. He thinks she would be surprised to see who will live there. MINUTES 4 PLANNING COMMISSION November 17, 1993 PAGE 15 Mrs. Hough would also like to know how it will be possible to maintain the privacy of Briarwood and Alderwood. Howard Hough, 6820 Briarwood, Carlsbad, addressed the Commission and stated that his major concern is also traffic. He calculates that this development will generate 800 additional cars traveling to and fro each day. It looks to him like they will all be coming down Camino de las Ondas to Batiquitos Drive. He thinks the Commission should seriously consider the additional traffic this development will generate. Ronald McKinney, 6525 El Camino Real, Carlsbad, addressed the Commission and stated that he lives to the east of Alga Road. It appears to him that he will be landlocked because Alga Road is blocking the existing access to his property. Paul Klukas, the Planner for Aviara, 2011 Palomar Airport Road, Carlsbad, addressed the Commission and stated that he is in favor of the Mariner’s Point development. However, his biggest concern is the $1 million which Aviara fronted to the City which is allowing this project to go forward. Mr. Klukas stated that the agreement to fund the Poinsettia/l-5 interchange was not voluntary. It was a requirement for the Aviara project approval. Now this project is going forward and is getting off scat free. Development in Zone 9 and Zone 20 is moving forward. He feels these developers should be paying their fair share of the Poinsettia interchange. Aviara thought they would be reimbursed in September 1993 and now it looks as though they might not get their money until September of 1996. He would like a condition placed on this project requiring them to pay their fair share. There being no other persons desiring to address the Commission on this topic, Chairman Noble declared the public testimony closed and opened the item for discussion among the Commission members. Dorian Johnson, Vice President of Bramalea California, applicant, was given an opportunity for rebuttal. He stated that he looks forward to working with the school district regarding the school impacts. He know that the City Council is working on this situation and he thinks it will be resolved soon. Regarding density, he stated that Bramalea has not requested any density bonus on this development; it is consistent with the general plan. Regarding the Aviara request, he stated that Bramalea plans to pay their fair share under the City’s CFD and during that time frame. This affects all of Zone 20 and not just this specific project. Regarding traffic, he is sure that staff will respond to those comments. Commissioner Erwin inquired if the improvements for Poinsettia/l-5 are a requirement for this project. Mr. Wojcik replied that they are only a requirement as far as the CFD is concerned. Commissioner Erwin inquired if Poinsettia must be improved before Aviara can develop their property. Mr. Wojcik replied no. Poinsettia is not a failing point at this time. Jeff Gibson, Associate Planner, responded to the access comment by Mr. McKinney. Condition #62 States that prior to final map, an infrastructure plan must be submitted to the City. At the end of Alga Road, there is an access connection which will allow traffic to flow further to the east. Access will be maintained for those properties to the east of La Costa Boulevard, although it is a dirt access road. Bob Wojcik, Principal Civil Engineer, responded to Mr. Pomeroy’s comment regarding the traffic which will be diverted to Batiquitos Drive. As part of the review process, a traffic report was done on all of Zone 20 to make sure there would be no failures. Regarding Mr. Hough’s comment about the traffic coming down Briarwood, which is a private road, Mr. Wojcik stated that traffic will take the route of least resistance. He doesn’t think Briarwood will be impacted. If Briarwood is, in fact, a private street, the homeowner’s association can take measures to restrict access. Regarding the comments from Aviara, Mr. Wojcik stated that he has discussed the reimbursement with Jim Elliott, Finance Director, and the City will be working on a reimbursement agreement with Aviara. Any reimbursement is a policy issue and not just something which should be conditioned on projects. MINUTES 4 PLANNING COMMISSION November 17, 1993 PAGE 16 Commissioner Welshons inquired if there will ever be a traffic signal where Camino de las Ondas intersects with Paseo del Norte. Mr. Wojcik replied that there will be a light but it should be taken care of with the park. Mr. Gibson reminded the Commission that the apartment portion of this project will not be entirely affordable. There will be 55 affordable units out of 176. Qualifying for low income would be 80% of the median County income. This would calculate to approximately $30,000 a year for a family of three. The monthly income for one of these restricted units would be approximately $700 a month. These units are for working people and $700 a month is a substantial amount. The quality of this multi-family project will be similar to many condominium projects that staff has reviewed recently. Gary Wayne, Assistant Planning Director, responded to the comments by the school district and the letter that was received today. In regards to the CEQA issue, he stated that staff does not necessarily agree with the assumptions used in the finding of inadequacy of school facilities. The school district even admitted in their letter that there are alternative sources of funding which have not been tapped. As with the LFMP for Zone 24, the City is working on a compromise for a school facilities condition. Staff does not agree with the school district contention that the CEQA document is inadequate. Commissioner Erwin stated that the project meets our standards, although he has a problem with the setbacks. In the last project, there was only one unit with side setbacks of less than 20 ft. In this project there is approximately 100 such spots and it still meets our standards. He believes that the standards are defective. Commissioner Erwin is also concerned about the lack of carports in the multi-family project. Again, he feels that is a deficiency on our part not to require carports or garages for the multi-family units. Nevertheless, he will support it. ACTION: Motion was made by Commissioner Welshons, and duly seconded, to adopt Planning Commission Resolution Nos. 3556 and 3557, recommending approval of CT 91-l 2, SDP 91-l 1, and adopt Planning Commission Resolution No. 3558, approving HDP 91-25, based on the findings and subject tq the conditions contained therein, including the five changes set forth in staff memo dated November 17, 1993. VOTE: 6-O AYES: Chairman Noble, Commissioners Betz, Erwin, Savary, Schlehuber and Welshons NOES: None ABSTAIN: None ADJOURNMENT: By proper motion, the Regular meeting of November 17, 1993 was adjourned at 9:42 p.m. BETTY BUCKNER Minutes Clerk MINUTES ARE ALSO TAPED AND KEPT ON FILE UNTIL THE WRITTEN MINUTES ARE APPROVED. MINUTES + EXHVT 5 NB-ITEM 1 APPLICATION DATE: 12/29/93 STAFF PERSON: Evan Becker a- STAFF REPORT DATE: JANUARY 13, 1994 TO: HOUSING COMMISSION FROM: HOUSING AND REDEVELOPMENT DEPARTMENT SUBJECT: AFFORDABLE HOUSING PROJECT/MASTER PLAN - MARINER’S POINT - Request for recommendation of approval of a proposed 176 unit Affordable Housing Project known as Mariner’s Point Apartments. The project is part of the development for Tentative Tract Map # 91- 12 and SDP #91- 11. I. RECOMMENDATION That the Housing Commission ADOPT Resolution No. 94-001 RECOMMENDING APPROVAL of the development of the proposed 176 multifamily unit affordable housing project known as Mariner’s Point Apartments with no commitment at this time to providing the requested financial assistance for the project. II. PROJECT BACKGROUND AND DESCRIPTION On November 17, 1993, Bramalea California, Inc. received a recommendation from the Planning Commission for approval of a Tentative Tract Map, Site Development Plan and Hillside Development Permit to subdivide and construct 186 single-family homes and 176 one, two and three bedroom apartment units. The project is subject to the Inclusionary Housing Requirement which means that the applicant/developer would be required to provide a minimum of 55 units of housing affordable to low income households. The applicant’s affordable housing proposal indicates that all 176 of the apartment units will be restricted to lower income households at 40%, 50% and 60% of the county median. Therefore, the applicant’s actual inclusionary housing requirement is only 28 units. If the proposal is approved by the City Council, the applicant will exceed the project’s affordable housing obligation by 148 units; there will be excess affordable housing units available to either the City or other private developers. In addition, the project is required to provide at least 10% of lower income units in three (3) bedrooms. The applicant is proposing that 30% (or 54 total) of the affordable units be 3 bedroom units. 13 MARINER’S POINT APARTMENTS HOUSING COMMISSION - l/13/94 PAGE 2 III. APPLICANT/DEVELOPER TEAM INFORMATION The development team for the proposed affordable housing project is as follows: Annlicant: Bramalea California, Inc. Develoner: American Housing Producers Architect: Dorms Architects Engineer(s): Hunsaker and Associates (Civil) Iv. AFFORDABLE HOUSING PROJECT DESCRIPTION/LOCATION The project will be located on the north side of the intersection of Camino De Las Ondas and Alderwood Road, approximately l/2 mile east of Paseo De Norte in Specific Zone Area 20. The parcel number for the property is 214-140-42. The project will provide 176 garden style apartments which will include 48 l-bedroom units (approx. 650 sq.ft. each), 74 2-bedroom units (approx. 950 sq.ft. each) and 54 3-bedroom units (approx. 1100 sq.ft. each). Special amenities of the project will include a clubhouse, pool and spa, playground with tot lot equipment, outside family areas with BBQs and picnic tables, patios and laundry rooms. The design and quality of the affordable housing project will be consistent with that of the proposed market rate product. The applicant has attached a portfolio of the developer’s, American Housing Producers, most recent development activity in the affordable housing market for information of the Housing Commission. V. TERMS OF AFFORDABILITY The applicant has proposed that the units remain affordable for 55 years for families at the following income levels: 0 37 (21%) of the units will be affordable to households at 40% of the county median; 0 52 (30%) of the units will be affordable to households at 50% of the county median; and, l 87 (49%) of the .units will be affordable to households at 60% of the county median. - MARINER’S POINT APARTMENTS HOUSING COMMISSION - l/13/94 PAGE 3 The following chart provides a breakdown of bedroom sizes by income levels: Bedroom Size 40% of median 50% of median 1 10 14 2 15 22 3 12 16 Total 37 52’ 60% of median 24 37 26 87 The applicant intends to begin construction on the units in October, 1994 and complete construction by October, 1995. Construction of the affordable housing units will commence in the initial phase of construction for the single family homes. VI. FINANCIAL INFORMATION ON AFFORDABLE HOUSING PROJECT The applicant will apply for tax credits from the California Tax Credit Allocation Committee. In addition, the applicant is requesting local financial assistance in the amount of $3,600,000 in return for the additional 148 units of excess affordable housing within the subject project. At this time, staff is not making a recommendation to commit financial assistance to the proposed affordable housing project. Staff will continue to work with the applicant/developer to determine the level of financial participation that can be provided by the City of Carlsbad. It is staff’s preference to have private developers collaborate on their own in such a manner that “Combined Projects” result in a source of outside equity needed in order to allow an affordable project or more affordable units to be feasible. Participation in Combined Projects will be governed by the Inclusionary Housing Ordinance which requires the City to be a party to an Affordable Housing Agreement. The agreement will include provisions related to the purchase and sale of credits for the purpose of satisfying an inclusionary obligation through a Combined Project. In this way, the City will be approving the transactions but will not own or collect funds for the credits; the transaction will occur between two private developers. Although staff is not eliminating the possibility that the City may need, or desire, to assist the subject affordable housing project, staff will first encourage the applicant to work with other local private developers/builders who also have an inclusionary housing requirement to produce a Combined Project. MARINER’S POINT APARTMENTS HOUSING COMMISSION - l/13/94 PAGE 4 VII. FINANCIAL FEASIBILITY OF THE PROPOSED PROJECT It is staff’s opinion that the proforma presented by the applicant fairly presents a preliminary project financing plan and identification of the potential subsidy requirements given the level of affordability for the project. Staff will work with the applicant to refine the development cost figures and the sources and uses of funds. Also, staff will indicate to the applicant/developer that other “outside” sources of subsidy, in addition to the tax credit equity, must be explored. V1J.I. CONSISTENCY WITH HOUSING ELEMENT AND CHAS The proposed affordable housing project is consistent with the policies and programs of the Housing Element and the affordable housing requirements of the approved Zone 20 Specific Plan. The applicant has proposed to provide 176 units of affordable housing which exceeds the 15 %.Inclusionary Housing Requirement for the market rate units and the number of 3 bedroom units (30%) in the project exceeds the City’s 10% requirement. Carlsbad’s Comprehensive Housing Affordability Strategy, or CHAS, indicates that families in the very low income category represent the greatest population of need for affordable housing. The City’s first priority, as outlined in the CHAS, is to provide housing affordable to very low income (50% or below of county median) renters. The applicant proposes to provide a total of 89 units affordable to households at 50% or below the county median. The applicant is ,also proposing a satisfactory mix of 1, 2, and 3 bedroom units at the very low income levels. The City’s second priority related to renters, as outlined within the CHAS, is for low income small and large families. The proposed project is consistent with the top priorities of the City as related to new construction of affordable housing units. IX. SUMMARY The Mariner’sPoint Apartment Affordable Housing Project, as proposed, is consistent with the Housing Element and meets the needs of lower income small and large families. Therefore, staff is recommending that the Housing Commission adopt a recommendation to the City Council for approval of the subject affordable housing project. As stated previously, staff is not recommending any financial assistance to the project at this time. Staff may, at a later date, return to the Housing Commission with a recommendation related to financial assistance once the project plans have been refined in more detail with the applicant. MARINER’S POINT APARTMENTS HOUSING COMMISSION - l/13/94 PAGE 5 X. EXHIBITS l- Housing Commission Resolution No. 94-001 adopting a recommendation to the City Council to approve the Mariner’s Point Affordable Housing Apartment Project. 2- Housing Commission Review Application submitted by Bramalea California, Inc. ’ 3- American Housing Producers Portfolio of recent affordable housing projects. 4- Planning Commission Staff Report dated November 17, 1993. 5- Site Development Plan for proposed Affordable Housing Project. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 EXHlBiT 6 HOUSING COMMISSION RESOLUTION NO. 94-001 A RESOLUTION OF THE HOUSING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA TO RECOMMEND APPROVAL OF THE DEVELOPMENT OF A PROPOSED 176 UNIT AFFORDABLE HOUSING PROJECT KNOWN AS MARINER’S POINT APARTMENTS ON PROPERTY GENERALLY LOCATED EAST OF PASEO DEL NORTE AND NORTH OF CAMINO DE LAS ONDAS. APPLICANT: BRAMALEA CALIFORNIA, INC. CASE NO.: AHP 94-1 (CT91 -12 And SDP #92-l 1) WHEREAS, an Affordable Housing Project (AHP) Application (No. 94-l) has been submitted to the City of Carlsbad’s Housing Commission for review and consideration; WHEREAS, said Housing Commission did, on the 13th date of January, 1994, hold a public meeting to consider said application; and WHEREAS, at said public meeting, upon hearing and considering all testimony, if any, of all persons desiring to be heard, said Commission considered all factors relating to the application. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Housing Commission of the City of Carlsbad, California, as follows: 1. The above recitations are true and correct. 2. That based on the information provided within the application and testimony presented during the public meeting of the Housing Commission on January 13, 1994, the Commission recommends APPROVAL of Affordable Housing Project (AHP) No. 94-l containing 176 apartment units to be affordable to lower income households for a period of at least fifty-five (55) years subject to the findings and conditions outlined herein. 3. That the Commission’s recommendation for approval of said affordable housing project does not include support for any financial assistance for the project at this time. Financial Assistance for the project will be considered under separate action. , . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 16 1s 2c 21 22 2: 24 25 26 27 26 FINDINGS: 1. 2. 3. The project is consistent with the goals and objectives of the City of Carlsbad’s Housing Element and Comprehensive Housing Affordability Strategy, the lnclusionary Housing Ordinance and the affordable housing requirements of the approved Zone 20 Specific Plan. The project will provide a total of 89 units affordable to renter households at 50% or below the county median which meets the number one priority as outlined within the City of Carlsbad’s 1993-1998 Comprehensive Housing Affordability Strategy (CHAS). The project will also provide 87 units affordable to renter households at 51% to 60% of the county median which meets the number two priority of the City of Carlsbad as outlined in the 1993-98 CHAS. The project, therefore, has the ability to effectively serve the City’s housing needs and priorities as expressed in the Housing Element and CHAS. The project appears to be financially feasible based on review of the prospective sources of subsidy and projected costs, COhlDITIONS: 1. Recommendation of approval is granted for AHP No. 94-1, as shown on Site Development Plan 91-l 1, dated July 24, 1992, incorporated by reference and on file in the Housing and Redevelopment Department. Development shall occur substantially as shown unless otherwise noted in the conditions of project approval by the City Council. 2. Recommendation of approval is granted for AHP No. 94-l subject to the condition that the required ratio of income restricted units shall be constructed concurrent with the project’s market rate units. . . . . . . . . . . . . . . . . . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. Upon final approval of said affordable housing project and prior to final map approval, the applicant shall enter into an Affordable Housing Agreement with the City of Carlsbad. The agreement shall be binding to all future owners and successors in interest. The Affordable Housing Agreement shall include all terms and conditions of said project approval and outline the incentives (financial or other) to be provided by the City of Carlsbad. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Housing Commission of the City of Carlsbad, California, held on the 13th day of January, 1994, by the following vote, to wit: AYES: AVIS , ROMBOTIS, NOBLE, SAT0 PETERSON , WELLMAN, ESCOBEDO, SCARPELLI NOES: NONE ABSENT: CALVERLY, NANCY ABSTAIN: NONE ATTEST: EVAN BECKER, Housing and Redevelopment Director 0 0 . MARCH 7, TO: FROM: 1994 MAYOR LEWIS COUNCIL MEMBERS Planning Department & MARINERS POINT - CT 91012/SDP 910ll/HDP 91-25 Upon further consideration, staff has determined that the City Council will need to take action on the Hillside Development Permit that accompanies this project. Therefore, the recommended action should be revised to read as follows: The Planning Commission, Housing Commission, and staff are recommending that the City Council direct the City Attorney to prepare documents APPROVING HDP 91-25, as approved by the Planning Commission, and APPROVE_ CT 91-12, and SDP 91-11. . - - - % - .ZEF!T p’;‘:,; IT, IF y=l-=-;[ ; i- f-G-: 1: ’ Z’%-i’ I Z 9-_,-,- ( :=\-‘z.=-- Z-Z -2!3 >L$i,i;s - . MARCH ?,I984 TO: CI’W MANAQER FROM: A$~~~TANT PLANNING DIRECTOR -&iw SUBJECTi WVISED CONDITION - CT 81-12~ MARINERS POINT cc staffbr ecammendlng that Conditbn M. 55 of Plan&g Commksbn ReWAlon No. 355Q be amended to read QP follows: 65, To offset the conversion of non-prlmo agricultural land to urban land us498 per the tequlremsnta of the Mello II Lo4 Coastal Program (UP) the applicant ehall Implement one of the following thr 88 mftigatlon options prior to approval ef the final map: & Preserve pftma 8grWtutal prapefty wkhln the Coastal Zone consistent with the provislons of the Cabbad LCP; or b. Itlurtrute that co&usd or renewed agrkubral uue b not hasible per the guideliner of Mtigatlon Optlon 2 of the Local Chstal Program; or c. Provkb payment of an a~rlcultwtl mltigath fee, the amount of which 8hAl not be leas than $5,000 nor more than $1 O,ooO for each net owrvcrrtod BDTB. The amount of the fee ahall be determined prior to approval tithe final map and shall be consistsnt with the proWone of CarWad’ LCP, The modlfisd wording daes not atter the intent of the original conditbn, however, it doe8 provide better canslstency with Cartsbad’s Local CoaW Program. arb t 2 n E 2 -A a 4 80 Ei s !$ s 5 v) IL 6 0 Qk’ a 2 u ul 01Y4Hdb~Y W\ut-LI I lLkFi 342 Wl btb 23 '54 uy:yj NOTICE OF PUBLIC HEARIN CTB1-12118Dp81-11MDp91-e5-~$PomcT NOTICE IS HEREBY GtVEN that the My Council of the City of C&&ad will hdd & public hearing at the city Council Chamber& 1200 Cwbbad Wage Drive, CM&ad, ~ahrnia, at 6:OO P.M., on Tuesday, March 8,1994, to cdder an applicatiin for a Tentative Tract Map, Situ Development Plan, and Hillside Development Permt to subdii and construct 186 single-family homes and f 70 one, two and three bedroom apartment units, all on property generally located east of Pasea Dei Nmte, and north of Camino del Ias Or@?& in the RDM-Q Zone and R-l -IO,MlO-6 Zone in Local Facititiss Managemcti Plan Zone 25, and nwrft paflkulatly ckwibed as: Sbutheast quarlef of Swtiin 21, TowWig . 12 Stwth. Rarge 4 West, San Bernardino r MaMan, in the County 91 San Diego, State wt California aacordii tw the U.S. Govemm%nf Survey approved OcWef 25, 1875. If yw have any questions regwdlng this matter, phase call Jeff Gibn In the Planning Departmnt, at 438-l 181, ext, 4455. H you challenge the Tentative Tract Map, Sle Dwelopment Ran ahdm Hilkii Devebpment PerriM in court, you may be limited tt3 raising only those issues raised by you or someww else at the puMc hearing descritsd in this r&ii. or in wrtlten COmapondenoe deliired to the City bf Cart!Wd City Clerk’s OUii at, or f.wbr to, the pubtii hearhg, APPLICANT: Bramalea CWtmia, Inc, 4 kllta CARLSBAD CITY COUNCtL I : -rolrc Pws 1 abw LtQal44W Feb. 25,1094 “’ ‘, ‘,’ :;.. r. SouthCoast Newspapets, Inc. P.O. f3ax 90 l Oceantide, CA 92049 (819) 433-7333 BladeGitizen * Preview + FAX W: 439-6659 ’ Advertising Fax #: 439-8669 Editorial Fax #: 757-2072 Composing Fax #: 439-8430 Preview Fax R: iW42617 To: _, Lee Rnaktwkranz . No. of pages: - .‘J (Including Cover) Chnm44nts: r.m thcr legal naticw yuu fnx~r?. the wt.&r dny te rLart g;hticat.io~ vi Friday tha 25th frW both publicnt$nns, you regun.stnd a 3x$ umnl ad. 411 copy plus map ancl logo vouid lrvt hnvn fit in the 3 x 5 and baen rondpb2.e at all: I. sumi Ltcd iL tu art. for UIU 5x6 which il; the nnrmal Ir$sl uizc ad IL-41 papc. ,, .L aa faxing n c4py 4 tIzn ad p1:us the ~tizc! Of a 3x5 to lhnw yor; what I ; rnpn I q pmivns, cormnents, etc, pledse ” . . call, ,/ A : , I ‘: ~ .’ ,, 1 .,, -_ _- -- r- C-J‘ .-laJ TW. .., ,’ : f ‘45o -- . --.-... .” NOTiCE OF PUBUC HEAWN c~a1-~~pw-iitlllpal~pti-~swIM NUUCXtSHHER&BYGtVENlhatthcCt Camt1lo(th~CItyolCMibadwl2ho#apr#k hw&g at the Cily Carm;l C~KUV&WL 1 &lo C&bad v#tasle Drive, Ctulsbml, Callforrda, at 6:~ P.M., on 1 uway. Mm 8,lQBA, to w&w an appkatbn tbr a Tewurtive Trau Map, me nevelapmeiv PMn, nn[( Hiwdd ncwnloprrwm Permit to wtrMde end asww 126 slqlc htnlly homct and 176 ono, two and thrim bwdmom apartment unH6, all on pmparty gtwwelly IIJGHI~~ wwal d Parrw Owl Nile. and nwUu1 of Camino del bs Or&s+ In Ihe RDM-Q lonr and R-l-lO,OOO4 &ne in Local Faciliiies Man;rgemerrI Plan Zone 20, and rrwre piutiiufty uctibeu as: SoultleaslquUPrdSucliOn21.~~rsbp 12 9~41, Range 4 West, San Bernardino MeNlicm. in the Cxwy of San IX&o. Slme of calllomb rltxmlhg 10 the U.S. Govemrrm Survey awtvvecl Ouobor 22, II875 II you have any quesllorw repardinp Lois miIllef, #a# Carl Jefl GWon in ihe PlannirQ Department,a143&1161,sxt.44&. II you challwngs the Tmtatiie Tract Map, Site Devbtopfnem Plan awor iMsM0 U~vblwnm PerTnir in uwt, you may be limited to raiairg only those 1nnl1nl; wkKl by you or .Ram akFl m the public hearing dewibed In thk notIce, or In writlen corrwpor*llce delved lu 019 cily of carbbau my aewi Office at, w wior lo, the public heM!g. APPLICANT: FfrarrKllwa Cdiionfa, hn. 9 cd- GAI-KSBAD CtTY CWWIL I Lugal 4462 F&z 26,1094 j:w ‘,4 ‘t : 5; , I 5T:m PC, re 8u xd TP5 1 I ;,i-jy- 1.. * *“.L-’ :. ‘i.- -i-i .I i ! --i-j.- i .1 : .,]I j- , .:_-.- .I , .’ ,, * “‘--f- i ‘-------~- .‘.‘: ._-- ---, ,.&_A - y - .C-9 ,a .-- L-’ , -y- - “- ‘,,.A--+ - 1 i. - -&-L~ : ; _... T”- ..i,+- i _-- . ..“_. a-.: _ I .,.....-. “,i _ , : / _ .C / ‘-- ._.- ., ,,.. ---., ..- _ ,-.. -., . . . . .-m.-., . . -. .-.- ---*-. .., . . ., ,-. --. . my-.?. i “, ._-- :_.. --.I “______.,. .- .---- --““A I.%-,, ,.A-- ,.. . ._-..... -‘-T-F . . ,.*sr-- - . . ___ .._,. _“. - . . -. . ” . . .- . .,.-.. ;- .,~. _ ._-. - .._,.._.- ----*L,, -I- s - __.-.m. -. ; . . . . . .,1( .‘. ._...- . .‘. .I . ..- “_. .,- I_ “, ,_, ,” . . , . . _ . . . . . . .,, ..- - ..- . .- --. ,_. _ . ..-. -. . ,, . -“... * _,.._ .- . . ,.- . . .- . _ . .~ . .L _. - .* ‘: . .,_,, .?P- - .- ., ,’ * ‘V I , ,t ;’ : ” ,, ) (,:I .‘:f; ,( j. . . c ” ‘$ . ’ ‘I ‘.. , . NOTICE OF PUBLIC HEARING CT 91-12/SDP 91-ll/HDP 91-25 - MARINERS POINT NOTICE IS HEREBY GIVEN that the City Council of the City of Carlsbad will hold a public hearing at the City Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 P.M., on Tuesday, March 8, 1994, to consider an application for a Tentative Tract Map, Site Development Plan, and Hillside Development Permit to subdivide and construct 186 single-family homes and 176 one, two and three bedroom apartment units, all on property generally located east of Paseo De1 Norte, and north of Camino de1 las Ondas, in the RDM-Q Zone and R-1-10,000-Q Zone in Local Facilities Management Plan Zone 20, and more particularly described as: Southeast quarter of Section 21, Township 12 South, Range 4 West, San Bernardino Meridian, in the County of San Diego, State of California according to the U.S. Government Survey approved October 25, 1875. If you have any questions regarding this matter, please call Jeff Gibson in the Planning Department, at 438-1161, ext. 4455. If you challenge the Tentative Tract Map, Site Development Plan and/or Hillside Development Permit in court, you may be limited to raising only those issues raised by you or someone else at the public hearing described in this notice, or in written correspondence delivered to the City of Carlsbad City Clerk's Office at, or prior to, the public hearing. APPLICANT: Bramalea California, Inc. PUBLISH: February 25, 1994 CARLSBAD CITY COUNCIL -.__- - I MARINERS POINT f- (Form A) TO: FROM: RE: CITY CLERK’S OFFICE PLANNING DEPARTMENT PUBLIC HEARING REQUEST Attached are the materials necessary for you to notice CT 91-12/SDP 91-l l/HDP 91-25 - MARINERS POINT for a public hearing before the City Council. Please notice the item for the Council meeting of Thank you. MARTY ORENYAK FEBRUARY 4, 1994 Assistant City Manager Date Attachments (- -- l - _ NOTICE OF PUBLIC HEARIN, NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Carlsbad will hold a public hearing at the Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Wednesday, November 17, 1993, to consider a request for recommendation of approval for a Tentative Tract Map, Site Development Plan, and Hillside Development Permit to subdivide and construct 186 single-family homes, and 176 - one, two, and three bedroom apartment units, all on property generally located east of Paseo de1 Norte, and north of Camino de las Ondas in the RDM-Q Zone and R-l -10,000-Q Zone in Local Facilities Management Plan Zone 20 and more particularly described as: Southeast quarter of Section 21, Township 12 South, range 4 west San Bernardino Meridian, in the County of San Diego, State according to the &%@$la+ flTdmp- Those persons wishing to speak on this proposal are cordially invite hearing. Copies of the staff report will be available on and after November 12, 1993. If you have any questions, please call Jeff Gibson in the Planning Department at 438-l 161, ext. 4455. If you challenge the Tentative Tract Map, Site Development Plan and/or Hillside Development Permit in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City of Carlsbad at or prior to the public hearing. CASE FILE: CT 91-12/SDP 91-ll/HDP 91-25 CASE NAME: MARINERS POINT PUBLISH: NOVEMBER 4, 1993 :. : i . ‘.. ..a’ ,., . ,. .;. ,,.. .’ ,I.,. I ;. .y,, ’ I 1 I I 1 I i. I I : ..’ r:,/ ; .’ / I I ; j -_- .* - --+--.- , ‘. . . . 1 _ a. 1 ;.. - . . . ,’ : , ’ . _’ ‘ ., ‘. ,, ‘.’ . , Sunbelt Planning Co, Inc ’ 8641 Firestone Blvd * Downey CA 90241 Tabata Noboru & Evelyn Trust P 0 Box 943 Carlsbad CA 92018 Engler William E Star Rte 1 Box 30 Niland CA 92257 Tabata Family Trust 01-14-83 P 0 Box 1338 Carlsbad CA 92108 Thompson David B & Karen R Revocable T.rust P 0 Box 1487 Carlsbad CA 92108 Lincoln Seascape c/o James Kent Con Am Management 1764 San Diego Ave San Diego CA 92110 Aken Joseph D De Cresceqzo Helen 6845 Alderwood Dr Carlsbad CA 92009 Larsen Eric C & Dawn S 6839 Alderwood Dr Carlsbad CA 92009 Booth James C & Carol A P 0 Box 3512 Orange CA 92665 Peterson Dorothy M Durbeck M M Rose 683 1 Alderwood Dr Carlsbad CA 92009 Abada Aharon 6 12 1 Romany Drive San Diego CA 92120 Tabata Noboru & Evelyn Trust 2353 La Costa Blvd P 0 Box 943 Carlsbad CA 92108 Engler William E Star Rte 1, Box 30 Niland CA 92257 Tabata Noboru & Evelyn Trust P 0 Box 943 Carlsbad CA 92108 Lincoln Seascape c/o James Kent/ Con Am Management 1764 San Diego Ave San Diego CA 92110 Lincoln Seascape c/o James Kent Con Am Management 1764 San Diego Ave San Diego CA 92110 Fry Eldon L & Cynthia H 6841 Aldexwood Dr Carlsbad CA 92009 Rethy V. B. Living Trust 07-16-92 6837 Alderwood Dr Carlsbad CA 92009 Fidler Judie 420 N Acacia Ave Solana Beach CA 92075 McNatt Robert F 6827 Alderwood Dr Carlsbad CA 92009 * , . Donnelly Audrey L * 985 Escondido Ave #llO Vista Ca 92083 Ritter Julie 6821 Alderwood Dr Carlsbad CA 92009 Watson Elton 0 & Nellie M. Trust 6817 Alderwood Dr Carlsbad CA 92009 Prentis Cynthia B. Trust 68 11 Alderwood Dr Carlsbad CA 92009 Camou Rene J & Marian L. 6807 Alderwood Dr Carlsbad CA 92009 Fitzpatrick Claire B. Trust 08-22-90 1732 Catalpa Road Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 920 18 Wood Jacalyn P Trust 905 Hawthorne Ave Carlsbad CA 92009 Hutter Timothy M 909 Hawthorne Ave Carlsbad CA 92009 Jude Valerie Jude Simon & Nancy 9 15 Hawthorne Ave Carlsbad CA 92009 Labbe Patricia A 6823 Aldetwood Dr Carlsbad CA 92009 Schneider Carol A 4 Valley Circle Mill Valley CA 94941 Troup Cathryn H Trust 68 13 Alderwood Dr Carlsbad CA 92009 Soper Charles N & Barbara J. Nerra, PSC 817 Box 28 Carlsbad CA 92009 Broton Eugene F & Barbara J 6805 Alderwood Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Hahn Family Trust 1 l-23-92 P 0 Box 2009 Ranch0 Santa Fe CA 92037 Gannon Michael F & Margaret R Trust 907 Hawthorne Ave Carlsbad CA 92009 Powell Tony 913 Hawthorne Ave Carlsbad CA 92009 Rivera Marta Takarni Steve 9 17 Hawthorne Ave Carisbad CA 92009 ‘ , . Caroncino Joseph C * 919 Hawthorne Ave Carlsbad CA 92009 Bokemper Sharon L Fehlman Robert E 119 E Armsley Square Ontario CA 91762 Heynen Rodney L & Diana L 929 Hawthorne Ave Carlsbad CA 92009 Pearson G Sidney & Joan L 935 Hawthorne Ave Carlsbad CA 92009 Dell Patricia A 939 Hawthorne Ave Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Stewart John F II 6861 Pear Tree Dr Carlsbad CA 92009 Cave Camille J Trust 6835 Pear Tree Dr Carlsbad CA 92009 Romaine David A & Julia R 683 1 Pear Tree Dr Carlsbad CA 92009 Molina Steven J 6827 Pear Tree Dr Carlsbad CA 92009 Urick James J & Berry Sandra K 770 Washington Road Pittsburgh PA 15228 Hayden Mark & Joann 929 Hawthorne Ave Carlsbad CA 92009 Alkhas Jacquelyn R 4747 Bryce Circle Carlsbad CA 92008 Giusti Jean M 937 Hawthorne Ave Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Magowan Claire P 0 Box 7451 Berkeley CA 94707 Reinoehl Shirley M 6859 Pear Tree Dr Carlsbad CA 92009 Van Egmond Peter J & Clasina A 6833 Pear Tree Dr Carlsbad CA 92009 Sebestyen Helen E Trust 6829 Pear Tree Dr Carlsbad CA 92009 Eischen Marilyn V 6825 Pear Tree Dr Carlsbad CA 92009 . . . Schulz Thomas E . Schulz Horst G & Elizabeth 6823 Pear Tree Dr _ Carlsbad CA 92009 Ouderkirk Alice C 912 Hawthorne Ave Carlsbad CA 92009 Jones William S & Nancy B 3007 Azahar St Carlsbad CA 92009 Stater Melba Trust 2173 Bolero Ln Vista CA 92084 Eckels George Jr Trust 07-21-90 903 Hickory ct Carlsbad CA 92009 Amstein Michael 907 Hickory Ct Carlsbad CA 92009 Disanto Norbert & Magdalena 911 Hickory Ct Carlsbad CA 92009 Holt James N & Elizabeth A 6830 Alder-wood Dr Carlsbad CA 92009 Grech Joseph Trust 6834 Alderwood Dr Carlsbad CA 92009 Grogan Harry B & Cecilia E 6838 Alder-wood Dr Carlsbad CA 92009 Hunter Charlotte L 6821 Pear Tree Dr Carlsbad CA 92009 Reyes Luis & Joyce 9 10 Hawthorne Ave Carlsbad CA 92009 Iredale Leonard W & Joan 6762 Worsham Dr Whittier CA 90602 Strawbridge Robert T & Marian M 902 Hawthorne Ave Carlsbad CA 92009 Mah Melanie P 90.5 Hickory Ct Carlsbad CA 92009 Cohen Philip H & Kathleen A 909 Hickory Ct Carlsbad CA 92009 Omelas Norma E Seals Lauren M Ramsey Norma A 913 Hickory Ct Carlsbad CA 92009 Sanchez Rosaure Pita Beatrice 6832 Alderwood Dr Carlsbad CA 92009 Thompson Janet L Trust 12-1 l-92 6836 Alderwood Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Carpenter William H ‘e P 0 Box 1662 Oceanside CA 92051 Warren Diane L 6845 Batiquitos Dr Carlsbad CA 92009 Matthews Donald C & Elizabeth J 6841 Batiquitos Dr Carlsbad CA 92009 Wan Linda Y 6837 Batiquits Dr Carlsbad CA 92009 Tortorici Liberato D & Roberta A 6833 Batiquitos Dr Carlsbad CA 92009 McGuire William J & Mary Ann 6829 Batiquitos Dr Carlsbad CA 92009 Kraut Benjamin 8c Renee T Trust 416 Mendoza Terrace Corona De1 Mar CA 92625 Reidt Dean 0 & Barbara M 932 Hawthorne Ave Carlsbad CA 92009 Touros David B & Donna M 18800 Still Lake Dr Jupiter FL 33458 Fobian Stina 924 Hawthorne Dr Carlsbad CA 92009 Pomeroy Terence W & Leda T Revocable Trust 6847 Baliquitos Carlsbad CA 92009 Klein Philip H & Baker Catherine M 14691 Danberry Circle Tustin CA 92680 Pletcher Robert A & Mikele H 6839 Batiquitos Dr Carlsbad CA 92009 Bell Angus T & Madeleine B 2107 Niblick Ter Oceanside CA 92056 Smith Arville H & Joann R 683 1 Batiquitos Dr Carlsbad CA 92009 Sprague Edward D & Diane E Revocable Family Trust 1123 Portola St Vista CA 92084 Michaels Vincent Michaels Joseph 3917 Riverside Dr #9131 Burbank CA 91505 Taylor Peter F & Mary M Trust 930 Hawthorne Ave Carlsbad CA 92009 Martens John D 926 Hawthorne Dr Carlsbad CA 92009 Williams Doris M 6830 Pear Tree Dr Carlsbad CA 92009 . I Torre Frank M ,6832 Pear Tree Dr Carlsbad CA 92009 Peters Christopher D P 0 Box 1662 Oceanside CA 92051 Stuemke John 6840 Pear Tree Dr Carlsbad CA 92009 Burnett Juliet 6861 Pear Tree Dr Carlsbad CA 92009 Tackabery Richard E & Ella A 6856 Pear Tree Dr Carlsbad CA 92009 Vergne J Pierre & Jacqueline 6803 Maple Leaf Dr Carlsbad CA 92009 Booth James C & Carol A P 0 Box 3512 Orange CA 92665 Mistry Jamshed N & Prochi J 6811 Maple Leaf Dr Carlsbad CA 92009 Antonson Jonathon J & Debbie L 6817 Maple Leaf Dr Carlsbad CA 92009 Linton Brian Linton Russell K & Bemice A 6821 Maple Leaf Dr Carlsbad CA 92009 Mackler Family Trust 11-14-86 (Trust A) 68 12 Watercourse Dr Carlsbad CA 92009 Gene1 Gilbert T 6838 Pear Tree Dr Carlsbad CA 92009 Beardeaux Martin & Francis A 6850 Pear Tree Dr Carlsbad CA 92009 McLaughlin Kathleen M Johnson Betty Louise 6854 Pear Tree Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Hassler Warren W & Peggy M 1990 Revocable Trust 6805 Maple Leaf Dr Carlsbad CA 92009 Saltzman William E & Florence C 6809 Maple Leaf Dr Carlsbad CA 92009 Brooks Richard 0 & Diane M 68 13 Maple Leaf Dr Carlsbad CA 92009 Foster Corky R 8c Bolton-Foster Barbara A P 0 Box 182 Cedar City UT 84721 Miter Victor & Tatjana 6823 Maple Leaf Dr Carlsbad CA 92009 . ‘Johnson Gary Paul , 6825 Maple Leaf Dr Carlsbad CA 92009 . McDonough James C & Rita A 6831 Maple Leaf Dr Carlsbad CA 92009 Anderson Robert & Nancy L 1929 Leucadua Scebuc Ct Keycadua CA 92024 Tullus Osvald & Leida 6839 Maple Leaf Dr Carlsbad CA 92009 Schneider Family Living Trust 12-1 l-90 11202 Lynrose Street Arcadia CA 91006 Las Playas Homeowners Assn c/o Grg Mgmt Co P OBox 1186 Carlsbad CA 92018 Soldwedel Joseph E & Pamela C Trust 02-01-82 1309 W 20th St Yuma AZ 85364 Hamilton Jane W. 68 16 Maple Leaf Dr Carlsbad CA 92009 Oliver Joan 6820 Maple Leaf Dr Carlsbad CA 92009 Olivas Gerald W & Bloom Carole S 6832 Maple Leaf Dr Carlsbad CA 92009 Bach Theodore F & Rosanne A 3 Capshire Dr Cherry Hill NJ 08003 Richards John D & Janis I 2713 Shoal Creek Circle Plano TX 75093 Schryver Earl R & Patricia M 6837 Maple Leaf Dr Carlsbad CA 92009 Gorzegno Trust 06-13-90 7177 Tern Place Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Virant Patrick J & Deborah B 68 10 Maple Leaf Dr Carlsbad CA 92009 Brannigan Carolyn T 6814 Maple Leaf Dr Carlsbad CA 92009 Lear Fred W & Sharon A 10520 Arbor Park Pl San Diego CA 92131 Olivas Gerald W & Carole S 6832 Maple Leaf Dr Carlsbad CA 92009 Strickland Gary L & Carol J Trust 99 Tunapuna Ln Coronado CA 92118 . I Loundy Donald J & Sandra l , 6836 Maple Leaf Dr Carlsbad CA 92009 Morgan Anna L 6342 Maple Leaf Dr Carlsbad CA 92009 Radford Henry F & Mary T 6846 Maple Leaf Dr Carlsbad CA 92009 Elich Louis F & Helena 2042 Ridgeline Vista CA 92083 Las Playas Homemowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Mitchell E Douglas 6805 Briarwood Dr Carlsbad CA 92009 Eng S La Verne & Mary M 6809 Briarwood Dr Carlsbad CA 92009 Tyson Lawrence W & Jean S 12 Sandbar Dr Corona De1 Mar CA 92625 Beachler Family Trust 05-06-88 292 11 Stonecrest Road Pales Verdes Peninsula CA 90274 Drumm David R 6823 Briarwood Dr Carlsbad CA 92009 Wright Gary G & Elizabeth 6840 Maple Leaf Dr Carlsbad CA 92009 Cerkanowicz Jerome C & Grace D 6844 Maple Leaf Dr Carlsbad CA 92009 Wojcik Linda S 6848 Maple Leaf Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Seecs Mary E Paganelli Perry M 17 10 Oneida Place Oxnard CA 93030 Cassapakis Constantine G 6807 Briarwood Dr Carlsbad CA 92009 Halcom Jack L & Linda T 3015 Clear-water Park Dr Katy TX 77450 Schaub Leroy M & Dolores Y Trust 758 E Navilla Place Covina CA 91723 Walsh Norma G Trust 08-01-90 Gonzales Joe Y 2 18 15 Ticonderoga Ln El Toro CA 92630 Cameron Don T & Kathy L 6827 Briarwood Dr Carlsbad CA 92009 Goad Jean-Paul A 8c Marilyn S . 6829 Briar-wood Dr ‘P 0 Box 9030 Carlsbad CA 920 18 Curtius Michael D & Mary B 6833 Briarwood Dr Carlsbad CA 92009 Bodas Wilma T Bodas Leroy C 6837 Briarwood Dr Carlsbad CA 92009 Hoover Family Trust 08-l l-89 1655 W Citracado Pky Escondido CA 92029 Taylor Linda 22915 E Colombard Ln #3 Diamond Bar CA 91765 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Cervino Anthony C & Rita M 6802 Briarwood.Dr Carlsbad CA 92009 Carrington Orin F & Jo Ann 6806 Briarwood Dr Carlsbad CA 92009 Hough Howard A & Jeanne E 3480 Lillian St Riverside CA 92504 Schinhofen Timothy L & Nancy T 6826 Briarwood Dr Carlsbad CA 92009 B&ton Jack P & Jewel M 27 13 Socorro Ln Carlsbad CA 92009 Hoover Family Trust 08-l l-89 1655 W Citracado Pky Escondido CA 92025 Penniston Priscilla Heam Trust 12-21-90 2 Wetstone Irvine CA 92714 Nikolai James A & Joan L Trust 25234 Steinbeck Ave #A Stevenson Ranch CA 91381 Barend William D & Mary J Trust 05-l I-90 2945 Verda Ave Escondido CA 92025 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Allsup Meldoy 6804 Briarwood Dr Carlsbad CA 92009 Johnson Barbara E Trust 10-3 l-89 193 1 Hampton Ln Glendale CA 91201 Knauer Michael 216 Dickenson Ave Newbury Park CA 91320 Ratledge Thomas L & Nancy T 6826 Briarwood Dr Carlsbad CA 92009 i ’ Kopitz Jeffrey S & Beverley A , 6828 Briarwood Dr Carlsbad CA 920092 Tipton Karen D Trust 6834 Briar-wood Dr Carlsbad CA 92009 Blankenship Paul R & Cheryl L 6838 Briarwood Dr Carlsbad CA 92009 Elliott Donald E 6846 Briarwood Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 920 18 Las Playas Homeowners Assn c/o Grg Mgmt Co POBox 1186 Carlsbad CA 92018 Schindler Family Trust 04-26-90 648 Marsolan Ave Solana Beach CA 92075 Aviara Land Assn LMT Partnership c/o Hillman Properties 450 Newport Centre Dr #304 Newport Beach CA 92660 Herbert Douglas W 6860 Pear Tree Dr Carlsbad CA 92009 Livingston Steven J & Meryl 6852 Maple Leaf Dr Carlsbad CA 92009 Nicholas Francisco J & Olga - 6830 Briarwood Dr Carlsbad CA 92009 Brodsky Edward & Patricia 6222 E Driver Rd Palm Springs CA 92264 Nisbet George T & Concetta 319 New York Ave Jersey City NJ 07307 Leong AH Wai & Bong Hee 6848 Briar-wood Dr Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P OBox 1186 Carlsbad CA 92018 Sarkaria Daljit S & Elaine P 0 Box 5986 Orange CA 92613 Roesch Ronald L 2800 Neilson Way #708 Santa Monica CA 90405 Aviara Land Assn LMT Partnership c/o Hillman Properties 450 Newport Centre Dr #304 Newport Beach CA 92660 Caldwell Banker Relocation 27271 Las Ramblas Mission Viejo CA 92691 Collins Karen 1629 Watson Way Vista CA 92083 Peterman Mary 6850 Briarwood Dr ’ Carlsbad CA 92009 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 Las Playas Homeowners Assn c/o Grg Mgmt Co P 0 Box 1186 Carlsbad CA 92018 . * I * c - FACILITYLABELS&INTPARTIES MARINERS POINT CARLSBAD UNIF SCHOOL DIST CMWD 801 PINE AVENUE CARLSBAD CA 92008 ENGINEERING UTILITIES&MAINTENANCE SANDIEGOCOUNTY DEPTOF PLANNING 5201 RUFFIN RD,STE "B SAN DIEGO CA 92123 BRAMALEA CALIFORNIA INC. ONEPARKPLAZA STE 1100 IRVINE CA 92714