RECOMMENDED ACTION:
CONTRACT AMOUNT FOR CONTRACT 31 66 PALOMAR AIRPORT ROAD/EL CAMINO REAL WIDENING
10/25/94
Adopt Resolution No. '14 -301 approving increase in contract limit by $250,000 to
expenditures for Contract 31 66, Palomar Airport Road and El Camino Real Widenir
ITEM EXPLANATION:
On December 8, 1992, the City Council awarded a contract in the amount of $6,4
to West Coast General, J.V. Council also has authorized a construction continge
$1,047,369. The project is nearing completion and an increase in the contract limit a
is required to meet the final project costs. These cost increases are due primz
change order and bid item quant'ity increases in the area of Recycled Miscellaneou:
and earthwork.
Recycled Miscellaneous Base (RMB) is the reuse of existing pavement and roc1 material in the new roadbed. At the time of bid it was estimated that all of the e
pavement and one half of the existing rock base could be recycled. During consti
West Coast General Corporation, J.V. found it possible to recycle all of the material ii new roadbed. The contract allowed for this option; however, because the cost of !e base exceeds the combined costs for excavation and new base material, additiona
are required.
Maximum utilization of recycled material is consistent with Council policy and aH
somewhat more expensive, results in more efficient use of scarce material resourcl
reduces transport impacts on the community.
The second area of major cost impact is in the area of earthwork. To avoid PC
delays in construction due to gnatcatcher protection, a change order was approved
import of dirt into this project which was not otherwise available in a timely manne
quantity of dirt required to complete the work was in excess of the estimated amo
In addition to the imported earth, unsuitable soils material in the foundation i
roadway exceeded the amount expected under the original contract. These areas, as alluvial fill areas, required excavation and recompaction by the contractor. Inc
in alluvial removals are not uncommon. The work is not visible prior to constructic
the precise extent of removals cannot be known until the actual excavation proceed
increase due to this item of work exceeded original estimates and the precise amoi been a matter of dispute until recently.
During the course of this contract, an unusual number of time and material change
have been processed. The reason for this is the difficulty in deriving a scope of wo
to various unknowns in performing the work and the difficulty in negotiating fair pricc
the contractor. These types of change orders are for estimated amounts whicl
exceeded in some cases.
Staff estimates that the increase in contract limit of $250,000 will be adequate to co
the project. As Council is aware, the contract is in litigation and a number of issues
in dispute. Any judgement found in favor of the contractor and litigation costs
require additional expenditures in the future.
I 0 0
Page 2 of Agenda Bill No. I$! "Ih?
FISCAL IMPACT:
Estimated Contract Costs:
Original Contract $6,454,807
Change Orders (gnatcatcher, import borrow, etc.) 860,106 Bid Item Adjustments (RMB, alluvial, misc) 429,155 Projected Contract Cost $7,744,068
Original Contract $6,454,807
Approved Contingency 1,047,369 Approved Contract Amount $7,502,176
Projected Contract Cost $7,744,068
Approved Contract Amount 7,502.176
Required for Completion $ 241,892
Requested Expenditure Increase $250,000
Funds in the amount of $1,723,363 are available in the project construction ac
from previous appropriations.
EXHIBITS:
1. Location map.
2. Resolution No. 9 q -3' I approving increase in contract limit amount by $25
for contact 3166, Palomar Airport Road and El Camino Real Widening.
ClTY OF VETA
Op'. F CITY OF CARLSBAD
I-
-rl c )$:-
/
PALOMAR A\RP OR ' q3p.o Y\/ ///LA I' -I I \
I \ ri fl[
EUSINEI PARK DRIVE
L 52 --I <
0, v, > z x
0 zi
SJ
PROJECT NUMBER PAR-ECR 3166
PROJECT NAME 1
r
1
2
3
4
5
6
7
8
9
'0
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Exhibit 2 e e
RESOLUTION NO. 9 4 - 3 0 1
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING INCREASE IN CONTRACT AMOUNT FOR
PALOMAR AIRPORT ROAD AND EL CAMINO REAL WIDENING,
CONTRACT NO. 3166
WHEREAS, construction of improvements for Palomar Airport Road and El Camii
widening, Contract No. 31 66, has necessitated increased expenditures: and
WHEREAS, funds in the amount of $250,000 are available in Accou
344-820-1 840-31 66.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of C
California, as f0110ws:
1, That the above recitations are true and correct.
2. That additional expenditures in the amount of $250,000 for Palomar Airport R
El Camino Real Widening improvements specifically identified as Contract No. 3
approved.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City
held on the 25th day of OCTOBER , 1994 by the following vote, to wit: