AB # a =APPROVAL OF CHANGE ORDER NO. 7 FOR
MTG. 11/15/94
DEPT. ENG
SIDEWALK PROJECT AND MAR Y MONTANAS
REPAIR WORK PROJECT NO. 3391 -2/3413
DEP
CITY
CITY
I
RECOMMENDED ACTION:
Adopt Resolution No. '?7 -y/5 approving Change Order No. 7 in the amount o'
for Sidewalk Project and Mar Y Montanas repair work.
ITEM EXPLANATION;
The City currently has a contract and work is underway to replace various sidewa
the City. It has come to staffs attention that the sidewalks on both sides of P
Norte between Price Club and Alta MirdSeagate subdivisions are in serious need
Staff is recommending that these sidewalks be added to the existing contract il
efficiently complete the work. Cost of the added sidewalk repairs is $28,850. F
currently available to complete this work.
FISCAL IMPACT:
Funds in the amount of $28,850 are available in Account No. 152-820-51 10-24
has an existing balance of $346,248.
EXHISITS:
I 1. Location map.
c3 i'L! 2
E 22- 2
z 0
0 F
a
2. Resolution No. '?Y- 3/5. approving Change Order No. 7 in the i
$28,500 for Sidewalk Project and Mar Y Montanas repair work.
3. Change Order No. 7
1 dl z - s 0
I
0 0
' J, LOCATION AP
4 % %
\
.d m \ r
PALOMAR AIRPORT RD,
\ \ SIDEWALKS T
BE REPLACE1
PROJECT NAME PASEU DEL NORTE t
SIDEWALK REPLACEMENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 ,
26
27
20
I !
0 0
RESOLUTION NO. 94 - 3 15
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING CHANGE ORDER NO. 7
FOR SIDEWALK PROJECT AND MAR Y MONTANAS REPAIR
WORK, CONTRACT NO. 3391-2/3413.
WHEREAS, construction is underway to replace various sidewalk in the Crty I
the Sidewalk Project and Mar Y Montanas Repair Work, Project No. 3391 -a341 3; a1
WHEREAS, it has come to staffs attention that the sidewalks on both sides o
Norte between Price Club and Atta MirdSeagate subdivisions are in serious need of
WHEREAS, it is necessary to initiate contract Change Order No. 7 to
replacement of the Paseo Del Norte sidewalks; and,
WHEREAS, funds in the amount of $28,850 for said change order are availablc
No. 1 52-820-51 10-241 1.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City c
California as follows:
1. That the above recitations are true and correct.
2. That Change Order No. 7 to Project No. 3391-a3413 in the amount (
approved.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad
held on the 15th day of NOVEMBER , 1994 by the following vote, to wik
AYES: Council Members Lewis, Stanton, Kulchin, Nygaard, Finn
NOES: None
ABSENT: None
I
I
ATTEST:
(SEAL)
1
0 0 EXHIBIT 3
CITY OF CARLSBAD
CONTRACT CHANGE ORDER TRANSMITTAL - C/O 7
Project: #3391-2 & 3413 - Sidewalk No. 2 and Mar Y Montanas Units 1 and 2 Repairs
Date Routed: - To:
-
-
-
City Engineer
Engineering Inspection
Community Development Director
Finance Director
City ManagedMayor
Engineering inspection
Reason for Change:
Item 1: Replacement of the subject improvements is necessary to eliminate a potel
hazardous condition.
COST ACCOUNTING:
Original contract amount ......................................... $469’11
Total amount this c/o ............................................ $28’8
Total amount of previous c/o’s ..................................... $52’7
Total c/o’s to date ............................................... $81 ,e
New Contract Amount ........................................... $550,E
Total c/o’s as 76 of original contract ..................................... Or
Contingency monies encumbered ................................... $58’1
Contingency increase or decrease ................................... $28,€
Contingency Subtotal ............................................ $87,C
Total c/o’s to date ............................................... $81 ,E
Contingency Balance ............................................. $5,:
H:YCIB~~NG\~ATA\IN~ff\MONTANAS\MON-7.(31IN
0 0
CITY OF CARLSBAD
PROJECT: Sidewalk 2 and Mar Y Montanas Units 1 and 2 Repairs
CONTRACT CHANGE ORDER NO. 7
CONTRACT NO. 3391 -2 & 341 3 P.O. NO. 18203 ACCOUNT NO. 152-820-51 10-21
CONTRACTOR: Interwest Pacific Ltd.
ADDRESS: 3010 Fifth Avenue
San Dieno CA 92103
The Contractor is directed to make the following changes as described herein. Changes
include all labor, materials, equipment, contract time extension, and all other goods and ser
required to implement this change. Payment stated on this change order includes all cha
direct or indirect, arising out of this additional work and is expressly agreed between the Cit!
the Contractor to be the complete and final costs hereof. The requirements of the specifical
where pertinent and not in conflict with this change order, shall apply to these changes. change order is not effective unless signed by the City Manager and/or the Mayor.
Pursuant to Subsection 2.2.3 Agreed Prices, SSPWC, 1991, perform the following as directc
the Engineer:
Item 1: Provide all labor, materials, and traffic control for the removal and reconstru
of 625 LF of Type 'G' curb and gutter 7,171 square feet of sidewalk on Pase
Norte south of Palomar Airport Road. Precise limits of work will be designatc
the Engineer.
Increase to contract cost ............................... $28,8:
TOTAL ESTIMATED INCREASE TO CONTRACT COSTS ................. $28,8!
H:\UBRARnENG\WPDATA\lNSPECnMONTANAS\MOK7.CHN
0 0
Change Order No. 7
Project Nos. 3391 -2 & 341 3
Page: 2
DATE FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL BE UCTENC
TO NOVEMBER 30,1994.
RECOMMENDED BY: APPROVED BY:
@P.d%PLIh<CTOR r/ A- //”& y-
(DATE) 2, CONTRACTOR PA
I” CITY QJC ENGINEER , /I (DATE) lo/+- -MAYOR (DP
\‘OR- / ( f /++ COMM. DEV. DIRECTOR (DATE)
FINANCE DIRECTOR (DATE)
DISTRIBUTION:
INSPECTION FIE (ORIGIUIV)
PWlCHASlNG (W/P.O. CHANGE ORDER)
FINANCE
CONTPACTOR
H:~IB~~N~~DATA\INS~~~O~ANAS\M