HomeMy WebLinkAbout1995-03-21; City Council; 13070; APPROVAL OF STATE AND LOCAL PARTNERSHIP AGREEMENT FOR FUNDING THE COASTAL RAIL TRAIL FEASIBILITY STUDY4
4,
Qz
% 2
z 0 L a i z 3 0 0
Cw OF CARLSBAD - AGEWA = BILL ‘- L
AB # ’3- ’” TITLE: APPROVAL OF STATE AND LOCAL Dl
MTG. 3/21/95 PARTNERSHIP AGREEMENT FOR FUNDING THE CI c DER, EN6 COASTAL RAIL TRAIL FEASIBILITY STUDY
RECOMMENDED ACTION:
Adopt Resolution No. Ct S= 3 0 authorizing the Mayor to execute Program Su
Agreement No. 01 8 to Local Agency-State Agreement No, 1 1-5308 providing
the feasibility phase of the Coastal Rail Trail Project.
ITEM EXPLANATION:
The City of Carlsbad has been designated as the lead agency in the 1994-0
Transportation Improvement Program (RTIP) for the development of a feasibilii
the Coastal Rail Trail (CRT). The CRT is a Class I bicycle facility which runs par
within the existing railroad right-of-way from the Oceanside Transit Center to th
Depot in San Diego (approximately 42 miles).
The next phase of this project is to contract with a consulting firm that will e!
compatibility of a multimodal bicycle facility within an existing high speed com
corridor. This study is envisioned to perform such tasks as:
t Evaluate alternative alignments
t
t
t Estimate construct ion costs
Coordination with a number of regulatory agencies is expected as well as CALl
California Public Utilities Commission (CPUC), Metropolitan Transit Developn
(MTDB) and the North County Transit District (NCTD). In addition, the SAND,
Facilities Coordination Committee (BFCC) has appointed a subcommittee cc
representatives from the affected jurisdiction along the railroad corridor to wo
consultant team to ensure that their specific community interests are inch
Feasibility Study. Carlsbad, as lead agency, will administer the contract with tk
consultant team and provide coordination with the subcommittee membei
regulatory agencies affected by this project.
The final document will be used by each jurisdiction within the railway corridc
independently or in conjunction with adjacent cities, make application for a
funding sources to implement this much needed regional bicycle facility.
Identify physical and environmental constraints
Discuss safety and liability concerns
Identify permitting requirements from the affected regulatory agencies
Prepare preliminary design plans and specifications t
FISCAL IMPACT:
Funding for this effort has been guaranteed through the Intermodal Surface Trar
Efficiency Act (ISTEA) program. The adopted ISTEA program has authorized !R
this program: $800,000 in Congestion Mitigation/Air Quality (CMAQ) func
additional $1 60,000 in matching fundsfrom the State’s Transportation System ME
(TSM) program. A provision included in the ISTEA program allows the City
staffs time to this funding source. Therefore, no City funds will be needed to SI
effort.
I
0 e
Page 2 of Agenda Bill No. 13.09 0
Staff further recommends that the Council appropriate $960,000 for the developm
Feasibility Study for the Coastal Rail Trail to Account No. 392-820-821 6-3455.
EXHIBITS:
1. Resolution No. 9 s-Yo authorizing the Mayor to execute Program Supp
Agreement No, 01 8 to Local Agency-State Agreement No. 1 1-5308 providing
for the feasibility phase of the Coastal Rail Trail Project.
2. Program Supplemental Agreement No. 01 8 to Local Agency Agreement No. 1 1
<
1
1
2
3
4
5
6
7
8
9
10
X’
l2
13
14
15
16
17
18
19
, 20
23.
22
23
24
25
26
27
28
e 0
RESOLUTION NO. 95-70
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAC CALIFORNIA, AUTHORIZING THE MAYOR TO MECUTE PRQGRAF
SUPPLEMENTAL AGREEMENT NO, 01 8 TO LOCAL AGENCY-STAT
AGREEMENT NO. 11-5308 PROVIDING FUNDING FOR TH
FEASIBILITY PHASE OF THE COASTAL RAIL TRAIL PROJECT.
WHEREAS, the City of Carlsbad has been designated as the lead agency ir
Regional Transportation Improvement Program (RTIP) for the development of a fet
for the Coastal Rail Trail; and
WHEREAS, the City and State have previously entered into Local-Statc
No. 11-5308; and
WHEREAS, the California Transportation Commission has adopted the lis
projects eligible for funding through the 1992 Intermodal Surface Transportation
(ISTEA) program; and
WHEREAS, 1992 ISTEA program has allocated funding to support the dc
a feasibilrty study evaluating the alignment alternatives and resulting impacts fron
construction of a Class I bike path parallel to and within the existing northh
right-of-way; and
WHEREAS, the Crty of Carlsbad will act as project adm@istrator and chair c
SANDAG Bicycle Facilities Coordinating Committee subcommittee staffed by mc
affected Cities along the railroad corridor; and
WHEREAS, the Crty Council finds that receipt of supplemental funding is b
transportation system of the State of California, County of San Diego and the Ci
NOW, THEREFORE, BE IT RESOLVED by the City Council of the Cit
California, as follows:
1. That the above recitations are true and correct.
Ill
Ill
I
t
1
2
3
4
5
6
5'
8
9
10
11
12
13
14
15
3.6
17
18
19
a 0
2. That the City Council authorizes the Mayor to sign both Program :
Agreements No. 01 8 to Local Agency-State Agreement No. 11 -5308 providing fi
feasibility phase of the Coastal Rail Trail Project.
3. That the City Clerk's office forward the two (2) executed Program
Agreements No. 18 to Local Agency-State Agreement No. 1 1-5308 and a copy (
bill and signed Council resolution to the California Department of Transportation, Di:
Assistance Office, attention Mr. Don Pope, P.O. Box 85406, San Diego, California
4. That the Finance Director is authorized to appropriate $96o,OOO to
392-820-8216-3455 upon receipt of the Program Supplemental Agreement No.
Agency-State Agreement No. 1 1-5308 with properly executed signature for the Stat
Department of Transportation.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbac
held on the 21st day of MARCH , 1995 by the following vote, to wit:
AYES: Council Members Lewis, Nygaard, Kulchin, Finnila, Hal
NOES: None
ABSENT: None
I
20!
21
22
23
24
25
26
27
28
ATTEST:
A!%%!?b$EN6S/S (SEAL)
I
PETE \ 0 a STATE OF CALIFORNIA -BUSINESS, TRANSPORTATION AND HOUSING AGENCY
t DWARTMENT OF TRANSPORTATION
DISTRICT 11, P.O. BOX 85406, SAN DIEGO, 92186-5406 (619) 688-5424 TDD Number (619) 688-6778
January 9, 1995
EcEIve
Mr. Lloyd Hubbs JAN t 0 19%
City Engineer
City of Carlsbad ENGINEERING
2075 Las Palmas OEPA RTM ENT Carlsbad, CA 92009
Attention: Mr. Steve Jantz
Dear Mr. Hubbs:
Prosram SuDDlement No. 018
Enclosed for execution are two originals of Program
Supplement No. 018 to Local Agency-State Agreement No. 11-5308
Please execute and return both original copies of the pro(
supplement with a copy of the authorizing resolution attached. Also, please twe in vour date of a?mroval and the authorizinq
resolution number in the mace Drovided on the first page of t'
program supplement. Upon return of the originals, Caltrans wi then execute them and send one original back to you for your
records.
Should you need additional information, please contact
Christine Carrington at (619) 688-6775.
Sincerely,
L4- d2-7
JERRY W. LOVE k District Local
Assistance Engineer
Enclosures
JWL/CAC : kp