Loading...
HomeMy WebLinkAbout1995-11-14; City Council; 13386; Authorization to Advertise for Bids for a Traffic Signal at the Camino De Los Coches La Costa Canyon High School Entrance Project No 34965 v C'QT OF CARLSBAD - AGEWA BILL ~~iT~~ y2 Q ' .& I c? 0 rmc a 9 2 z 0 F: 0 a e 8 2 3 AB # - RECOMMENDED ACTION: CITY I DEPT. ENG CITY i FOR BIDS FOR A TRAFFIC SIGNAL AT THE MTG. 1 1 /14/95 DEPT. TITLE: AUTHORIZATION TO ADVERTISE CAMINO DE LOS COCHES/LA COSTA CANYON HIGH SCHOOL ENTRANCE, PROJECT NO. 3496 Adopt Resolution No. "l--%?$ approving an Agreement between the Cfiy of Q 8an Dleguito Union High Gchool District, and Douglas E. Barnhart, Inc., for cons1 of a traffic signal at the intersection of Camino De Los Coches/La Costa Canyo School driveway and approving the plans and specifications for the construction traffic signal and directing the City Clerk to solicit bids for Project No. 3496. I ITEM EXPLANATION: In September 1996, the new La Costa Canyon High School will be completed and c to high school students. Vehicular access to the new school parking lot will be driveway on Camino De Los Coches. The driveway is directly across from thc entrance to Stagecoach Park. The school driveway on to Camino De Los Coches c a need for a traffic signal at its entrance. It is the intent of the City of Carlsbad to cooperate with the San Dieguito Unior School District in the construction of a traffic signal at the high school driveway. This signal will assign the right-of-way for ingresslegress to the high school and al: I ingress/egress for Stagecoach Park to and from Camino De Los Coches. At the present time, the high school is under construction by Douglas E. Barnhart, Ir contractor hired by the school district. The City of Carlsbad is proposing to compc bid the traffic signal project and enter into a cost sharing arrangement with th Dieguito Union High School District for the construction cost of the traffic signal. Tt Dieguito Union High School District will contribute $45,000 towards the cost of ths signal. Signing and striping revisions to Camino De Los Coches will be required i of the traffic signal construction contract. Staff recommends approval of the agreement and the project plans and specificatior requests that the City Council authorize the Clty Clerk to advertise for bids. ENVIRONMENTAL REVIEW This project is categorically exempt from environmental review under the provisions California Environmental Quallty Act (CEQA). I FISCAL IMPACT: I The total estimated cost of the project is $106,000. The City will act as lead ager construction and bear all costs less $45,000 to be paid by the District through its co with Barnhart. The City's share is $61,000 and shall be paid from the General Contingency balance and appropriated to General Capital Construction Accour approximately $5,000. 300-820-184O-350Oa Annual operating and maintenance costs of the traffic signal \ e 0 Page 2 of Agenda Bill No. 13,386 EXHIBITS: 1 I Location map, 2. Resolution No. ci 5 -3aA approving an Agreement between the City of Ca San Dieguito Union High School District, and Douglas E. Barnhart, In construction of a traffic signal at the intersection of Camino De Los Coches/La construction of the traffic signal and directing the City Clerk to solicit bids for 1 No. 3496. Canyon High School driveway and approving the plans and specifications 1 3. Agreement between the City of Carlsbad, San Dieguito Union High School Distr Douglas E. Barnhart, Inc. STAGECOACH PARK MAIN ENTRY/EXlT FUTURE-LA COSTA CANYOh HIGH SCHOOL MAIN ENTRY /EXIT PROPOSED TRAFFIC SIGNAL LOCATION 1 * /I 0 0 " 1 2 3 4 5 6 7 RESOLUTION NO. 95-322 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAI CALIFORNIA, AUTHORIZING THE CITY COUNCILTO EXECUTE AN AGREEMEb BElWEEN THE CITY OF CARLSBAD, SAN DIEGUITO UNIFIED HIGH SCHO( DISTRICT AND DOUGLAS E. BARNHART, INC., AND APPROVING PLANS Ah SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FC BIDS FOR THE CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTIC OF CAMINO DE LOS COCHES AND THE LA COSTA CANYON HIGH SCHO( ENTRANCE, PROJECT NO. 3496. WHEREAS, the Ci Council of the City of Carlsbad has determined it n 8 /1 desirable, and in the public interest to construct a traffic signal at the intersection of C 9 11 Los Coches and the La Costa Canyon High School entrance; and 10 11 12 13 14 15 16 1. That the above recitations are true and corred. 18 California, as follows: 17 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of WHEREAS, the plans, specifications, and contract documents for completing tt have been prepared and are on file in the Engineering Department of the Ci of Carl! WHEREAS, the Crty Council of the Ci of Carlsbad has agreed to participate wi Dieguito Union High School District to facilitate construction of the traffic signal at the in of Camino De Los Coches and La Costa Canyon High School entrance. 10 2. That the plans, specifications, and contract documents as presented a 20 (1 approved. 21 ll 3. That the Finance Director is hereby authorized to transfer $61,OOO from tt 22 // Fund Contingency to the General Capital Construction (GCC) Account 23 24 25 26 27 28 300-820-18403500. The balance of $45,OOO will be received from Douglas E. Barnhal the terms of the Agreement. The Finance Director is authorized to appropriate $106, General Capital Construction (GCC) Account Number 300-820-1 840-3500. //I ~ 111 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 \ 19 20 21 22 23 24 25 26 I 27 28 e 8 4. That the Clty Council of the City of Carlsbad authorizes the Mayor to agreement between the Ci of Carlsbad,. San Dieguito Union High School Di: Douglas E. Barnhart, Inc. 5. The City Clerk of the City of Carlsbad is hereby authorized and directed t in accordance with State law, a Notice to Contractors Inviting Bids for the construction signal at the intersection of Camino De Los Coches and the La Costa Canyon Hi! entrance, Project No. 3496, in accordance with the plans, specifications, and contract d referred to herein. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad C held on the 14th day of NOVEMBER s 1995 by the following vote, to w AYES: Council Members Lewis, Nygaard, Kulchin, Hall NOES: None ABSENT: Council Member Finnila ATTEST: &TH&WUT NZ, City Clerk (SEAL) KAREN R. KUNDTZisfant City Clerk ~ 1 I 1. . 0 a txnlblt 5 AGREEMENT BETWEEN THE CITY OF CARLSBAD, SAN DIEGUITO UNION HIGH SCHOOL DISTRICT AND DOUGLAS E. BARNHART, INC. FOR THE COI'STRUCTION OF A TRAFFIC CONTROL SIGNAL SYSTEM A'S THE INTERSECTION OF CAMINO DE IDS COCHES AND LA COSTA CANYON HIGH SCHOOL DRIVEWAY ENTRANCE WHEREAS, San Dieguito Union High School District has entere into a contract with Douglas E. Barnhart, Inc. for the construction of the La Costa Canyon High School in the City of Carlsbad, and WHEREAS, San Dieguito Union High School District and the City of Carlsbad agree that a traffic control signal system, safety lighting and signing and striping, referred to herein as the 9tSystem'1, is needed at the intersection of Camino De Los Coches and the High School, and WHEREAS, the San Dieguito Union High School District's contract with Douglas E. Barnhart, Inc. is to be partially funde by the State of California, and WHEREAS, the San Dieguito Union High School District is bound by its contract with Douglas E. Barnhart, Inc. and must process payments for construction of La Costa Canyon High School in accordance with that contract in order to receive partial funding from the State, and WHEREAS, the San Dieguito Union High School District's contract with Douglas E. Barnhart, Inc. provides an allowance of ninety-five thousand dollars ($95,000) for the installation of a traffic signal at the intersection of Camino De Las Los Coches and the entrance to the High School, and WHEREAS, the City of Carlsbad, the San Dieguito Union High School District and Douglas E. Barnhart, Inc. desire to cooperatc to provide for the construction of the System by the City of Carlsbad through its authorized contractor after public bid, so that funds for the construction of the System are processed in accordance with the District's contract with Douglas E. Barnhart Inc. , and WHEREAS, the San Dieguito Union High School District (hereafter "DISTRICT") has provided the City of Carlsbad (hereafter '*CITY99) an executed grant deed of easement that allow! the CITY to construct, operate, maintain, and repair the System, including traffic signal detector loops and equipment located upon District property: and WHEREAS, construction of such a system usually requires three to four months after award of bid for the construction, an( WHEREAS, all parties desire the System to be fully operational before the opening of school at the La Costa Canyon 0 0 LA COSTA CANYON HIGH SCHOOL TRAFFIC SIGNAL AGREEMENT High School in September, 1996, NOW THEREFORE I CITY I DISTRICT and DOUGLAS Et BARNHART, INC 4 (hereafter llBARNHART1*) do hereby agree as follows: 1. CITY, having approved construction plans for the Systen will act as the lead agency for construction of the System and will bear all costs of construction less forty-five thousand dollars ($45,000.) to be paid by DISTRICT through its contract with BARNHART as provided herein. 2. Within thirty (30) days of execution of this Agreement, CITY will proceed to go to bid for construction of the System ar within ninety (90) days of execution of this Agreement, CITY wil use its best efforts to award the bid for the System. 3. Upon CITY'S determination, at is sole discretion, of tt contractor to be recommended for award of the bid for the Systen CITY will notify both DISTRICT and BARNHART of the recommended award and bid price. 4. Within five (5) working days of final award of the bid for the System, CITY will provide a copy of the bid documents tc both DISTRICT and BARNHART. 5. Upon receipt of Notice of Award from CITY, BARNHART wil prepare an invoice (on the regular progress payment request) in the amount of the contract for payment by DISTRICT to BARNHART t be applied to the contract allowance for construction of the System, as provided for in the contract entered into with DISTRICT and BARNHART for construction of the La Costa Canyon High School. DISTRICT will promptly process the invoice for payment and will pay on the invoice from BARNHART within thirty (30) days. 6. Within five (5) working days of issuance of a Notice t Proceed to the CITY'S contractor for the System, CITY will provide copies of the Contract (agreement document only) and Notice to Proceed to both DISTRICT and BARNHART. 7. Upon issuance of the Notice to Proceed, CITY will provide BARNHART an invoice for construction of the System in th amount of the contract. 8. Within five (5) working days of receipt of the CITY'S invoice, BARNHART shall issue a check in that amount to CITY. 9. Within sixty (60) days from receipt of payment from BARNHART, CITY will reimburse to DISTRICT the bid award amount minus forty-five thousand dollars ($45,000.). The $45,000. contribution towards the System by the DISTRICT shall constitute e 0 LA COSTA CANYON HIGH SCHOOL TRAFFIC SIGNAL AGREEMENT full payment of DISTRICT'S share, to inciude future change order issued on the project, inspection asts, and any and all other costs associated with this project. 10. CITY shall maintain construction records and provide copies of such records to BARNHART or DISTRICT upon request. Such records shall show progress made on completion of the Syste and payments disbursed to the contractor of the System. 11. CITY, DISTRICT, and BARNHART will each use their best efforts and will each cooperate to the fullest extent possible i the fulfillment of this Agreement to achieve the goal of the parties to have the System complete on or before August 1, 1996, before the opening of the La costa Canyon High School. 12. All notices provided for in this agreement shall be sent by facsimile and first class mail postage prepaid as follows: For CITY to: -. Mr. Robert T. Johnson, Jr., P.E. Traffic Engineer City of Carlsbad 2075 Las Palmas Drive Carlsbad, California 92009-1576 Facsimile Number: 438-0894 Telephone Number: 438-1161 Ext. 4394 For DISTRICT to: Mr. Eric J. Hall San Dieguito Union High School District 710 Encinitas Blvd., Suite 207 Encinitas, California 92024 Facsimile Number: 943-1542 Telephone Number: 753-6491 Ext. 5573 Assistant Superintendent, Business For BARNHART to: Mr. Stephen Nishimuta Construction Manager Douglas E. Barnhart, Inc. 16981 Via Taxon, Suite H San Diego, California 92127 Facsimile Number: 487-3595 Telephone Number: 487-1101 "A "V" A'. "&A*. 4. VI. "0' YIIIVVY LAWLA A+ UAUAVALI ClL- ULIIILIIVI e Parties transmitting notice by facsimile shall use their best efforts to confirm receipt of the facsimile on the day of transmission by telephone call to the office of the recipient. 13. This Agreement contains the entire agreement between CITY, DISTRICT and BARNHART for construction of the System. Any agreements or representations not expressly set forth in this instrument are null and void. 14. This Agreement shall be subject to modification only with the written consent of all parties. SAN DIEGUITO UNION HIGH SCHOOL CITY OF CARLSBAD, a Municipal DISTRICT, a California 9 Public School Diskrick ATTEST: (print name here) Assistant Superintendent/Business San Dieguito Union High School Dist. Douglas E. Barnhart, Inc. General Contractor for La Costa .anyon High School ./4/fA>LXF KAREN R. KUNDTZ, Assic'cant City Cle By : &A* A?;" (si n here) &X46 LA5 i!x .@/i'.M&'//Hfl (print name here) CEO D&&y94S E. &z4wi!!iAzr //v't (title and organization of signatory) APPROVED AS TO FORM: City Attorney By : O&? Q. L "y City Attorney RONALD R. BALL //- f C" 9T w 95-01324.K e , x% A$k9d e &&g&!!g fj., j jq uk Unto2 High SchosZ Zstdct 8 7'10 Encinitas Blvd. Encinita~, Gk 92024-3357 61 9/753*9? -7". ,: -, 4;-\ - " r "-<- "-":." " T I --e '4 -?..i.& !, ," ,. , * 51: ? ,~ ' $s:;<2,".=2{ ::,.,* . ;;-!;.;- '5? F, .:' l: October 23, 1995 u~ :e - rn e" i e- ..n ',=* u L k! h +J y-;:,;:.j ~~~~~,~~~~,.,~-,;''.:~~~~, . ,m .. : , :. ..I . . i'. ~ ., . .. '., , , ..'~.. . -1 , ,. ,. Mr. Robert T. Johnson, Jr., P.E. Traffic Engineer Cipj of CJarl&zd 2075 La Palmas Drive Carlsbad, CA 92009-1576 AGREEMENT/TRAFFIC SIGNAL SYSTEM FOR LA COSTA CANYON HIGH SCHOOL Per our previous correspondence, enciosed are three original copies of the agreement for constmctil of a traf€ic control signal system at the intersection of Camino De Los Coches and La Costa Cany~ High School driveway entrance signed by Douglas E. Barnhart, Inc. and San Dieguito Union Hie School District. It is our understanding that you will be bringing this item to City Council fi consideration on November 14 and that the District will be in receipt of an executed document ail this action. ?. q., kh p. i \ \,- 4;- \?x \x p?u&*,.y SIMONETTA "NETTIE" MARCH BUSINESS SERVICES ASSISTANT nm Encls. cc: Jane Mobaldi Stephen Nishimuta John McKinley Fred Snedeker Harvey Rau ~iegueno JH B bar! warren jH 8 Oak Crest ]H @ North Coast Alternative HS SM gisguito HS 5 San Dieguito Adult Education @ Sunset HS @ Torrey Pines HS