Loading...
HomeMy WebLinkAbout1996-12-10; City Council; 13948; Amendment #1 with Dokken Engineeringw 13.YY8 TITLE: AMENDMENT NO. 1 TO THE CONSULTANT me. 121101~ AGREEMENT WlTH DOKKEN ENGINEERING FOR THE EL CAMINO REAL BRIDGE IN CANNON ROAD PIANCHECK OF AGUA HEDIONDA CHANNEL BRIDGE AND CITY DEPT*HD* Am. w IEPT. ENG PROJECT NO. 3184 CIMMGR. RECOMMENDED ACTION: Adopt Resolution No. 9 b - 4& 1 approving Amendment No. I to the consultant agreement with Dokken Engineering for the plancheck of Agua Hedionda Channel Bridge and El Camino Real Bridge in Cannon Road. ITEM EXPLANATION: The Local Facilities Management Plans (LFMP) for Zones 8, 13 and 24 require the construction of Cannon Road from its easterly terminus at Armada Drive to El Camino Real. The construction of this segment, known as Cannon Road West, is necassary to provide the acceptable level of service for the arterial street system within those LFMP Zones. Due to economic constraints on the properties within these LFMP zones, the Cannon Road West Fee Program was developed to fund the design and construction of the road. On March 19, 1996, the City Council approved the appropriation of funds for the design of the Cannon Road bridges. The agreement with Dokken Engineering provides the necessary plancheck services to complete the bridge design process. Dokken Engineering was selected and retained as the best qualified Structural Engineering firm to plancheck the bridge for Cannon Road over Macario Canyon. Inclusion of Reach 2 of Cannon Road the two additional bridges added to the Macario Canyon Bridge exceed the limit of funds that can be into the design effort has added bridge planchecking of two additional bridges. The plancheck fees for authorized by staff. Staff recommends that the City approve Amendment No. 1 to the agreement with Dokken Engineering, to provide the plancheck services for the Cannon Road and El Camino Real Bridges. The total fee of $28,300 covers the plancheck of all three bridges and is broken down as follows: Macario Canyon Bridge El Camino Bridge $14,000 $ 4,800 Agua Hedionda Channel Bridge $ 9,500 $28,300 The City has an existing agreement with Dokken Engineering to plancheck Macario Canyon Bridge. This action would initiate Amendment No. 1 to that agreement. ENVIRONMENTAL The project is for the plancheck of the Cannon Road bridges which have no environmental impact. Cannon Road has two certified EIRs that address the road alignment and include the bridges. Cannon Road Reach 1 EIR 87-2 was for Macario Canyon Bridge and Kelly Ranch EIR 83-4 was for Agua Hedionda Bridge. FISCAL IMPACT: The project is funded from CFD #I Special Taxes, Transnet Revenues, and Cannon Road West Fees. Sufficient funds are available from current appropriations. EXHIBITS: 1. Location Map 2. Resolution No. 9b - approving Amendment No. 1 to the consultant agreement with Dokken Engineering for the plancheck of Agua Hedionda Channel Bridge and El Camino Real Bridge in Cannon Road. 3. Amendment No. 1 to Agreement for Bridge Plancheck Services. NOT TO SCALE NAME CANNON ROAD WEST EXHIBIT PROJECT BRIDGE PLANCHECK NUMBER 3 I84 1 1 2 3 4 5 6 7 8 9 ' 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9 6 - 4 21 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, AGREEMENT WlTH DOKKEN ENGINEERING FOR THE PIANCHECK CALIFORNIA, APPROVING AMENDMENT NO. 1 TO THE CONSULTANT OF AGUA HEDIONDA CHANNEL BRIDGE AND EL CAMINO REAL BRIDGE IN CANNON ROAD. WHEREAS, the City Council of the City of Carisbad, California has considered the need to appropriate funds from the Cannon Road West Fee District for the design of the improvement plans for Agua Hedionda Channel Bridge and El Camino Real Bridge in Cannon Road; and WHEREAS, the contractor, Dokken Engineering possesses the necessary skills and qualifications to provide the services required to perform the bridge plancheck; and WHEREAS, sufficient funds are available from current appropriations; and WHEREAS, staff has solicited proposals from qualified civil engineering firms to provide these necessary services to the City; and WHEREAS, an amendment to the consultant agreement with Dokken Engineering has been prepared and submitted hereto. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carisbad, California, as follows: 1. That the above recitations are true and correct. 2. That Amendment No. 1 to the Agreement between the City of Carisbad and Dokken Engineering is hereby approved and the Mayor is authorized and directed to execute said Ill Ill Ill Ill Ill Ill Ill Ill Ill . ! 2 z 4 c 6 ? 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 agreement. The City Clerk is authorized and directed to forward copies of the signed Amendment No. 1 to Agreement for Bridge Plancheck Services, as well as the Engineering Department for processing. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the =day of December , 1996 by the following vote, to wit: AYES: Council Members Lewis, Nygaard, Kulchin, Hall and Finnila NOES: None ABSENT: None ATTEST: i- (.- AMENDMENT NO. 1 TO AGREEMENT FOR BRIDGE PLANCHECK SERVICES This Amendment is entered into and effective as of the 23rd day of DECEMBER , 1996, amending the agreement dated June 4, 1996 by and between the City of Carlsbad, a municipal corporation, hereinafter referred to as "City", and DOKKEN ENGINEERING, hereinafter referred to as, "Contractor" for the necessary bridge plancheck services for preparation of a bridge plancheck report; and Contractor possesses the necessary skills and qualifications to provide the services required by the City. RECITALS WHEREAS, the initial agreement, dated June 4, 1996 identified a scope of work detailing the requirements of the bridge plancheck and associated report for Macario Canyon Bridge; and WHEREAS, the parties to this aforementioned agreement desire to alter the scope of work as follows: provide the same plancheck services and report for the plancheck of Agua Hedionda Creek Bridge and the El Camino Real bridge; and WHEREAS, Contractor possesses the necessary skills, experience, professional expertise, financial abilities, and other qualifications to provide said services required by City; and WHEREAS, a supplehental scope of work and fee schedule have been negotiated and agreed to between the parties hereto, and as shown on Exhibit "A Scope of Services and Fee; and WHEREAS, the City of Carlsbad, California, hereby finds it necessary, desirable, and in the public interest to proceed with this Amendment No. 1 for said additional work. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor hereby agree as follows: 1. Contractor shall provide services as outlined on the attached Exhibit "A". 2. City shall pay Contractor for all work associated with Paragraph 1 above, on a lump sum basis not-to-exceed $14,300.00. Contractor shall provide City invoices, as detailed in Exhibit "A", Table 5 and 6, for approval by City. , (-- (- 3. All other provisions of the aforementioned agreement entered into on June 4, 1996, by and between City and Contractor shall remain in full force and effect. 4. All requisite insurance policies to be maintained by the Contractor shall include coverage for the amended assignment and scope of work. Acknowledged and Accepted: / CONTRACTOR: DOKKEN ENGINEERING ATTEST: ?sign h6rq \ (Proper notarial acknowledgment of execution by Contractor must be attached.) only one officer signs, the corporatioh must attach a resolution certified by the secretary or (President or vice-president and secretary or assistant secretary must sign for corporations. If assistant secretary under corporate seal empowering that officer to " bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL City Attorney BY - Q#puty City Attorney Y Attest: llw&L4. L ALETHA L. RAUTENKRANZ, City Clerk (SEAL) Date: December 23, 1996 c - -CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT d+'&wsonally known to me - OR -0 proved to me on the basis of satisfactory evidence to be the person(s) whose name(@ idare subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the penon(s). or the entity upon behalf of which the person@) acted, . ~*"- - ". h.2 " KRRY ERN pker countj :J L" .- -.~. - -.--.I.- ~ corn. It 984713 .: executed the instrument. NOTffiY PUBUC. WoRNu\ I- t.?+ corn. tares ~pb. 15.1357 ; WITNESS my hand and official seal. OPTIONAL Though the infomation below is not required by law, it may pmva valuable to persons relying on the dacumRnt and could prevent ffaudulent removal and reanachment of this lam to another document. U I Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer@) 0 Trustes 0 Guardian or Conservator 0 Other: ". I , 0 Attorney-in-Fact Trustee 0 Guardian or Conservator U Other: I I Signer Is Representing: I EXHIBIT “A” SCOPE OF WORK TASK 2: AGUA HEDIONDA CREEK BRIDGE 30% PS&E Review Data and Layout Check Dokken will perform initial review of plans and all documents, paying special attention to data and criteria affecting bridge layout, such as high water elevation and freeboard requirements, right-of- way, easements and scour requirements. The purpose of the initial review is to understand design-related issues prior to starting the full review. Dokken will perform Layout check. As a first step in checking the bridge plans, a review of the layout will be completed. Review of the profile and superelevation will be performed. Dokken will perform Typical Section Check. Coordination with Designer During the review process, Dokken Engineering will work closely with the Designer and City to clarify important issues. 70% PS&E Plan Review Independent Structural Calculations calculations. As the checker verifies each detail or note, the plan is either highlighted if Dokken will perform Superstnrcture and Substructure Check by preparing independent adequate, or redlined if found inadequate. The result of the review will be a set of highlighted and redlined plans to be used as the basis for review with the designer, plus one set of indexed, bound and sealed structural calculations. Dokken Engineering will use the following bridge design software includes BDS, SEISAB and YIELD. In addition to calculations and comparison of details to other checked bridge plans, tables and nomographs from Caltrans’ Bridge Design Manuals will be utilized. Details and Notes will be performed for constructability and clarity. Special attention will be paid to the item list in During the structural review, Dokken will prepare a separate review of the plan details and notes the Estimate and Special Provisions to ensure that all work required to construct the bridge is covered as an item of work or covered by other items as described in the Special Provisions. The results of this review will be incorporated into the plan set returned to the City, as well as the Report for suggested changes or corrections. 90% PS&E Special Provisions Review verification that all items of work are covered and there is a method of payment for each item. Dokken will review the Special Provisions will be reviewed for conformity to the plans and We understand the Special Provisions may be a combination of Caltrans and Green Book. Estimate Review of quantities, Quantities should agree with the original quantities within 55%. Larger differences Dokken will review the clarity and constructability of bridge plans is preparing an independent set in quantities usually indicate a plan clarification is necessary. Independent quantities will be prepared and compared to the estimate. Foundation Report Review Dokken will perform Soils Engineering and Seismic Criteria Review to ensure conformance and consistency throughout documents, especially foundation types and capacities, pile types, tip elevations and constructibility issues. Standard Drawings Review Dokken will perform Drawing Review to ensure that appropriate Standard Drawings are correctly called out on plans. Report or corrections will be provided to the City along with a redlined set of documents, including the Dokken will prepare a Letter Report of findings and recommendations suggesting PS&E changes bridge plans. The Report will be updated with each review and the Final report will include the Certification. Findings Meeting Dokken will attend and participate in a findings meeting between involved parties, including the City and Project Designer. The purpose of this meeting is to clarify all comments and resolve issues resulting from the review. A list of issues will be provided in advance of the meeting. 100% PS&E Follow-up Review After the designer has made revisions to the PS&E package, Dokken will perform a follow-up review will be performed to ensure that all changes have been adequately incorporated. This process may take up to two iterations prior to the package being ready for Certification. Certification At the conclusion of the plan review and revision process, Dokken Engineering will provide written "Design Certification" that the bridge PS&E package was prepared to and meets current applicable standards. INFORMATION PROVIDED BY THE CITY a. Road Plans, including Horizontal and Vertical Control b. Bridge Plans C. Hydraulics Report d. Foundation Report f. e. . Special Provisions Estimate (Road, Bridge, Combined), Including Quantities and Price Backup g. Permits, Right-of-way Maps and Easement h. Top0 Maps a " I- z z X W a a 3 0 c ln 6 .- e! E 3 0- e! hl .. .- EXHIBIT “A” AGUA HEDIONDA CHANNEL BRIDGE DESIGN REVIEW EXHIBIT "A" SCOPE OF WORK TASK 3: EL CAMINO REAL BRIDGE 30% PS&E Review Data and Layout Check Dokken will perform initial review of plans and all documents, paying special attention to data and way, easements and scour requirements. The purpose of the initial review is to understand criteria affecting bridge layout, such as high water elevation and freeboard requirements, right-of- design-related issues prior to starting the full review. Dokken will perform Layout check. As a first step in checking the bridge plans, a review of the layout will be completed. Also, a review of the profile and superelevation. Dokken will perform Typical Section Check. Coordination with Desig-ter During the review process, Dokken Engineering will work closely with the Designer and City to clarify important issues. 70% PS&E Plan Review Independent Structural Calculations calculations. As the checker verifies each detail or note, the plan is either highlighted if Dokken will perform Superstructure and Substructure Check by preparing independent adequate, or redlined if found inadequate. The result of the review will be a set of highlighted and redlined plans to be used as the basis for review with the designer, plus one set of indexed, bound and sealed structural calculations. Details and Notes During the structural review, Dokken will prepare a separate review of the plan details and notes will be performed for constructability and clarity. Special attention will be paid to the item list in the Estimate and Special Provisions to ensure that all work required to construct the bridge is covered as an item of work or covered by other items as described in the Special Provisions. The results of this review will be incorporated into the plan set returned to the City, as well as the Report for suggested changes or corrections. 90% PS&E Special Provisions Review Dokken will review the Special Provisions for conformity to the plans and verification that all items of work are covered and there is a method of payment for each item. We understand the Special Provisions may be a combination of Caltrans and Green Book. Estimate Review Dokken will review the clarity and constructability of bridge plans is preparing an independent set of quantities. Quantities should agree with the original quantities within +5%. Larger differences in quantities usually indicate a plan clarification is necessary. Independent quantities will be prepared and compared to the estimate. Foundation Report Review Dokken will perform Soils Engineering and Seismic Criteria Review to ensure conformance and consistency throughout documents, especially foundation types and capacities, pile types, tip elevations and constructibility issues. Standard Drawings Review Dokken will perform Drawing Review to ensure that appropriate Standard Drawings are correctly called out on plans. Report or corrections will be provided to the City along with a redlined set of documents, including the Dokken will prepare a Letter Report of findings and recommendations suggesting PS&E changes bridge plans. The Report will be updated with each review and the Final report will include the Certification. Findings Meeting Dokken will attend and participate in a findings meeting between involved parties, including the City and Project Designer. The purpose of this meeting is to clarify all comments and resolve issues resulting from the review. A list of issues will be provided in advance of the meeting. 100% PS&E Follow-up Review After the designer has made revisions to the PS&E package, Dokken will perform a follow-up review to ensure that all changes have been adequately incorporated. This process may take up to two iterations prior to the package being ready for Certification. Certification written "Design Certification" that the bridge PS&E package was prepared to and meets current At the conclusion of the plan review and revision process, Dokken Engineering will provide applicable standards. INFORMATION PROVIDED BY THE CITY a. Road Plans, Including Horizontal and Vertical Control b. Bridge Plans C. Hydraulics Report d. Foundation Report e. Special Provisions f. Estimate (Road, Bridge, Combined), Including2uantities and Price Backup g. Permits, Right-of-way Maps and Easement h. Top0 Maps a " L 2 W m Y v) I- .. a c- 0 in in .- '5 n 3 in I in c E .- E! 3 0- E! UI C '5 .- I .- - EXHIBIT “A” EL CAMINO REAL BRIDGE DESIGN REVIEW