AB# 13,97 3 TITLE: SECOND AMENDMENT TO AGREEMENT
BETWEEN THE CITIES OF CARLSBAD AND
MTG. 12-1 7-96 ENClNlTAS FOR THE CONSTRUCTION OF VARIOUS
DEPT. HD.
CITY ATTY
CIRCULATION ELEMENTS ROADS DEPT. ENG CITY MGR
RECOMMENDED ACTION:
Adopt Resolution No. 96- 74/ authorizing the Mayor to execute the Second Amer
agreement between the City of Carlsbad and the City of Encinitas for the constructil
circulation element roads within the cities of Carlsbad and Encinitas dated June 14, 19! I ITEM EXPLANATION:
On June 14, 1994, the Cities of Carlsbad and Encinitas entered an agreerr
responsibilities for various circulation element roadways of mutual concern to both agc
that time, various refinements to the Circulation Systems have occurred in both cities \n
to the need for the proposed Second Amendment to the agreement which was approvt
1996.
The City of Encinitas has requested that the intersection of Piraeus Street and La Cos
signalized as a part of the current La Costa Avenue Interchange construction project.
design of this intersection blocks northbound to westbound turn movements from F
onto La Costa Avenue. The proposed signalization will provide full access to F
coordinated with access to the Caltrans park-n-ride lot.
Staff has analyzed the proposed modification with Caltrans and finds that the proposec
will have minimal impact on the operational capacity and safety of the interchange
recommends adoption of this Second Amendment to the circulation agreement.
~
Summary of Aareement
0 The agreement modifies Section V (B.) and (C.) to stipulate that Carlsbad will proc
order to the La Costa Avenue/l-5 interchange project to include signalization of Pi
All costs to be borne by Encinitas.
Encinitas will post all funds prior to the execution of the change order.
0 Encinitas agrees to indemnify, hold harmless, and defend Carlsbad from any actio
0 A separate maintenance agreement will be complete within six (6) months of ex(
second amendment.
Carlsbad retains the right to remove the signal after five years and following a I
where the signal is found to represent a detriment to the public health, safety anc
for Traffic on La Costa Avenue.
0 The Second Amendment also deletes provision IV (B.) (3.) and V (B.) (4.) wt
follows:
of the design or construction of the Piraeus Street signalization.
IV B. Carlsbad Agrees:
3. To require that prior to building occupancy subsequent to recordation oi
Tentative Map 92-08, La Costa Avenue shall be completed to full stam
I-5/La Costa Avenue shall be completed to full standards and the
Avenue interchange improved.
,f 0 0
I, L
Page 2 of Agenda Bill No. /3,9 r> 3
V B. Carlsbad Agrees:
4. To require that prior to building occupancy subsequent to recordation of (
Tentative Tract Map 92-08, La Costa Avenue shall be completed to fi
and the "La Costa Avenue interchange improved.
Both of these provisions relate to the original Green Valley Tentative Tract Map
significantly modified subsequent to the approval of the original circulation agreement. I
these provisions will place the Green Valley development in the same position ,
development in the City. Development can proceed unless the Council determines tt-
Management failure exists which would require development to be stopped.
FISCAL IMPACT:
All costs of implementing the provisions of this Second Amendment will be borne b:
Encinitas.
EXHIBITS:
1. Vicinity Map
2. Location Map La Costa Avenue - 1-5 Interchange
3. Resolution No. (?b- vy/ authorizing the Mayor to execute the second amen
various circulation element roads within the cities of Carlsbad and Encinitas da
1996.
agreement between the City of Carlsbad and the City of Encinitas for the co
4. Second amendment to agreement between the cities of Carlsbad and Enci
construction of various Circulation Elements Roads.
5. Original Agreement between the City of Carlsbad and the City of Encir
construction of various circulation element roads within the cities of Carlsbad a
-
'1 ~ VUC-INITY , MAP
CITY OF
gJ\Jql-~~J\rJ
CITY CP
_I m Cll\IlT~\ 5
NOT TO SCALE
PRoJECT NAME 2ND AMENDMENT TO CARLSBAD El
ENClNlTAS CIRCULATION AGREEMENT
DRAWN BY: SCOTT EVANS, CARLSEAD ENGINEERING DEPT.
ST 0 0
LOCATION MAP
1-5 / LA COSTA AVENUE
INTERCHANGE
.1 ~
t
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
I
0 0
RESOLUTION NO. 96 - 4 4 1
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AUTHORIZING THE MAYOR TO
EXECUTE THE SECOND AMENDMENT TO THE AGREEMENT
BETWEEN THE CITY OF CARLSBAD AND THE CITY OF ENCINITAS FOR THE CONSTRUCTION OF VARIOUS
CIRCULATION ELEMENT ROADS WITHIN THE CITIES OF
CARLSBAD AND ENCINITAS.
WHEREAS, ENCINITAS AND CARLSBAD entered into an AGREEMENT
CONSTRUCTION OF VARIOUS CIRCULATION ELEMENT ROADS (Agreement) or
1994; said Agreement being amended on July 23, 1996; and
WHEREAS, the intensity and character of Circulation Systems anticipate
Agreements have subsequently been refined in both ENCINITAS and CARLSBAD; E
WHEREAS, both cities now find it desirable to revise said Agreements.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City 01
California, as follows:
1. That the above recitations are true and correct.
2. That in the best interests of regional cooperation and to further the imprl
circulation element improvements serving the cities of Carlsbad and Encinitas, the Cit:
the City of Carlsbad hereby authorizes the Mayor to execute the second amenc
Ill
Ill
/I/
Ill
Ill
Ill
Ill
Ill
Ill
111
~ //I
I
.f 0 e
1 '.' r
1
2
3
agreement between the City of Carlsbad and the City of Encinitas for the construction
circulation element roads within the cities of Carlsbad and Encinitas dated June 14,
amended on July 23, 1996.
4 //
5
6
7
8
9
. 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad C
held on the 17th day of December , 1996 by the following vote, to wit:
AYES: Council Members Lewis, Finnila, Nygaard, Kulchin and Hal.
NOES: None
ABSENT: None I/* &L/#&((,,,,~~;~;
//L ('7 , L' lc DE . LEVA ,mayor
ATTEST A
ALWd~iiek\ (SEAL)
I .
I1
.I * .i 0 0
XGUND AF(I€NDFJI€MT TO AGR€€M€NT B€W€€N THE CITY OF CARLSBAD AND THE CITY OF ENClNiTAS
CITIES OF CARLSBAD AND ENCINITAS
FOR THE CONSTRUCTION OF VARIOUS CIRCULATION ELEMENT ROADS WITHIN TI
THIS SECOND AMENDMENT TO AGREEMENT, is made and entered into as of
20th day of DECEMBER 1996, by and between the CITY OF CARLSBAD, a munic
corporation, hereinafter referred to as “CARLSBAD”, and the CITY OF ENCINITAS, a munic
corporation, hereinafter referred to as “ENCINITAS”.
RECITALS
WHEREAS, ENCINITAS AND CARLSBAD entered into an AGREEMENT FOR 1
CONSTRUCTION OF VARIOUS CIRCULATION ELEMENT ROADS (Agreement) on June
1994; said Agreement being amended on July 23,1996; and
WHEREAS, the intensity and character of the circulation systems anticipated by :
Agreement and Amendment has subsequently been refined in both ENCINITAS
CARLSBAD; and
WHEREAS, both cities now find it desirable to revise said Agreements.
NOW THEREFORE, in consideration of the above recitals, CARLSBAD and ENClNll
do hereby mutually and jointly agree that the following sections of the Agreement are ament
as follows:
IV. LA COSTA AVENUE WIDENING
B. CARLSBAD AGREES:
Delete item 3. (Original Agreement)
1
't e e .. -
V. LA COSTA AVENUEhNTERSTATE 5 INTERCHANGE IMPROVEMENTS
8. CARLSBAD AGREES:
Delete item 4. (Original Agreement)
Item 5 is revised to read as follows:
5. Request that Caltrans process a change order to the La Costa Aver
1-5 Interchange construction contract, to construct a traffic signal sys'
to provide full access to Piraeus Street from La Costa Avenue.
C. ENCINITAS AGREES:
To add the following:
7. Pay all costs for design, processing and construction change ordel
accomplish the signalization of La Costa Avenue and Piraeus Strc
Funds to be deposited with the City of Carlsbad prior to execution of
contracts required to accomplish that work.
8. Enter into a maintenance agreement within six (6) months following
effective date of this Second Amendment to Agreement agreeing to mi
annual payments to Carlsbad for all costs to operate the La Cc
Avenue/Piraeus/Park-n-Ride Lot signal system.
9. The City of Encinitas, at its sole expense, agrees to defend and indem
and hold the City of Carlsbad and Carlsbad's officers, offici
employees and agents harmless from and against any and all liabilit
claims, demands, causes of action, losses, damages and costs, incluc
all costs of defense thereof, arising out of, or in any manner connec
directly or indirectly with the design and construction of the traffic sic
at La Costa Avenue and Piraeus Street.
IO. Agrees that five (5) years following the date of execution of this SECO
AMENDMENT TO AGREEMENT, Carlsbad shall have the sole righ
remove the traffic signal at Piraeus Street after it makes findings L
public hearing that said traffic signal represents a detriment to the pul
health, safety and convenience for traffic on La Costa Avenue. Encini
shall be given thirty (30) days notice of any such hearing and
opportunity to present evidence against such action.
2
.. - 'I 4D 1)
COMPLETE AGREEMENT
The foregoing constitutes the full and complete agreement of the parties. There are
oral understanding or agreements not set forth in writing herein. All terms and conditions
the original Agreement not amended by this SECOND AMENDMENT TO AGREEMEI
remain in full force and effect.
IN WITNESS WHEREOF, this SECOND AMENDMENT TO AGREEMENT is execut
by the CITY OF CARLSBAD and by the CITY OF ENCINITAS pursuant to action taken by I
City Council.
CITY OF ENCINITAS,
a municip orporation s Y*, &=cz
DAVIS, Mayor
fke: 4 - b Date: December 19, 1996
ATTEST: ATTEST:
I
A
DEBORAH CERVONE \
2 City Clerk City Clerk
APPROVED AS TO FORM:
RONALD R. BALL
City Atto
BY: > City Attorney
DATE: /2"-/ 8 .- 96.
3
't ,. c 0 a Exhi
AGREEMENT BETWEEN
THE CITY OF CARLSBAD AND THE CITY OF ENCINITAS
FOR THE CONSTRUCTION OF VARIOUS CIRCULATION ELEMENT ROADS
WITHIN THE CITIES OF CARLSBAD AND ENCINITAS
I+
THIS AGREEMENT, made and entered into as of the * day ' + , 1994, by and between the CITY OF CARLSBAD, a municip
corpgation, hereinafter referred to as "CARLSBAD", and the CITY OF ENCINITAS,
municipal corporation, hereinafter referred to as "ENCINITAS.
RECITALS
WHEREAS, CARLSBAD and ENCINITAS share a common city limit boundary; an
WHEREAS, said city limit boundary crosses, runs along or otherwise divides ti
established and/or future right-of-way of La Costa Avenue, El Camino Real, Leucac
Boulevard, Olivenhain Road and Rancho Santa Fe Road; and,
WHEREAS, said roads are integral to the circulation element plans for Carlsba
Encinitas and the North County Region in general; and,
WHEREAS, traffic impacts from development along and adjacent to said roal
within the Cities of Carlsbad and Encinitas will adversely impact the proper functionil
and level of service standards of said roads unless certain major street and highw
infrastructure improvements are installed prior to or concurrent with the needs creatl
by said development; and,
WHEREAS, the Cities of Carlsbad and Encinitas acknowledge the importance
maintaining established minimum level of service standards on said roads for the prop
functioning of the local and regional circulation network; and,
1 REV. 6/22
I. T ‘1 m e
WHEREASI the Gities of Garlsbad and EnGinitas desire ts establi$h mutual
agreed upon responsibilities for the funding, design, construction and maintenance of tt
major street and highway improvements ne.cessary to maintain the established minimul
level of service standards on said roads.
NOW THEREFORE, in consideration of the above recitals, CARLSBAD ar
ENClNlTAS do hereby mutually and jointly agree to participate in the funding, desig
construction and maintenance of said street and highway infrastructure improvements i
follows:
1. ENCINITAS AND CARLSBAD MUTUALLY AGREE:
To participate in a joint San Diego Association of Governments (SANDA(
coordinated traffic study to determine the traffic impactsfissues between the tvl
jurisdictions. The study will focus on Circulation Element roads (El Camino Rei
Olivenhain Road, La Costa Avenue, Leucadia Boulevard, Via Cantebria, ar
’ Rancho Santa Fe Road) shared by the two cities, and address existing, plannc
and proposed land uses.
This study will provide the basis to evaluate areas of mutual concern and potent
significant adverse traffic impacts created by future development and mitigatic
measures which may be required beyond those identified specifically in tt
agreement.
II. EL CAMINO REAL ROAD WIDENING AND INTERSECTION IMPROVEMENTS
A. PROJECT DESCRIPTION
1. The El Camino Real road widening and intersection improvemer
referenced in this section are more particularly described as falloM
a. The widening and improvement of El Camino Real betwe1 Garden view Road and Olivenhain Road to augmented prir arterial road standards including three through lanes and o auxiliary right turn/through lane in each direction, bikelam raised landscaped median, curbs, gutters, sidewalks a1 streetlights exclusive of the intersection and bridge/culvl improvements described in Section VIII.
..
2 REV. 6/22 -
. , .< -1 0 0
b. The widening and improvement of El Camina Real betwc
La Costa Avenue and Oliienhain Road to prime art€ standards including three through lanes in each direct
bikelanes, raiscd landscaped median, curbs, guttc sidewalks and streetlights exclusive of the intersed
improvements described in Section VIII.
other appurtenant improvements at the El Camino F intersections with Garden view Road, Woodley Road, C Barcelona, Levante Street and La Costa Avenue.
C. The construction 0.: traffic signals, additional turn lanes i
d. The construction of traffic signal modifications, additional t lanes and other appurtenant improvements to the intersed of El Camino Real and Olivenhain Road exclusive of the r( improvements described in Sections VI and VIII.
e. All environmental mitigation measures, utility and drain; improvements necessary to construct the aforementior improvements.
B. CARLSBAD AGREES:
1. To require Carlsbad developers to fully mitigate for buildout imp;
to the El Camino Real intersections with Calk Barcelona and Leva
Street. Improvements necessary to serve a particular projed
phase to be in place prior to occupancy.
2. To require Carlsbad developers to share in the cost for the fund
of the traffic mitigation improvements to the El Camino F
intersections with La Costa Avenue with the Encinitas developers
a fair share basis as determined from the combined traffic stud;
3. To require Carisbad developers to construct full improvements tc
Camino Real within the City limits of Cartsbad.
C. ENClNlTAS AGREES:
1. To require the Encinitas developers to fully mitigate for build impacts to the El Camino Real intersections with Woodley Road i
Garden View Road. Improvements necessary to serve a partic1
project or phase to be in place prior to occupancy.
2. To require the Encinitas developers to share the cost for the func
of the traffic mitigation improvements to the E. ':amino F
intersections with La Costa Avenue with the Carlsba .leveloper$
a fair share basis as determined from the combine. :raffic stud
3 REV. Si2
., -i
0 0
3. To require Encinitas developers to construct full improvements to l
Camino Real south of Olivenhain Road.
4. To require Encinitas Ranch developer to improve the west half of t
Camino Real adjacent to the Encinitas Ranch open space propefl
north of Olivenhain Road.
111. RANCHO SANTA FE ROAD WIDENING - SOUTH OF OLlVENHAlN ROAD
A. PROJECT DESCRIPTION
1. The Rancho Santa Fe Road widening improvements referenced i
this section are more particularly described as follows:
a. The widening and improvement of Rancho Santa Fe Roa
from Olivenhain Road to approximately 400 feet south of Call
Acervo/Avenida La Posta to secondary arterial standarc
including two lanes in each direction, bikelanes, curb!
gutters, sidewalks, streetlights, a painted median, an
associated transitions.
b. All environmental mitigation. measures, utility and drainas
improvements necessary to construct the above mentione
improvements.
B., CARLSBAD AGREES:
1. To require CARLSBAD developers to fund and construct fL
improvements to Rancho Santa Fe Road south of Olivenhain Roa
as described above.
2. To act as lead agency in the review and processing of environment;
documents.
C. ENCINITAS AGREES:
1. To expeditiously review and approve required permits to allo
construction within jurisdictional boundaries.
IV. LA COSTA AVENUE WIDENING
A. PROJECT DESCRIPTION
1. The La Costa Avenue widening improvements referenced in th
section are more particularly described as follows:
4 REV. 6/22/! 0
. & .I '* 0 0
a. The widening and improvement of La Costa Avenue from
Camino Real to Piraeus Street to modified major arte
standards including two lanes in each direction, bikelane:
8 foot wide raised landscaped median, curbs, gutte
sidewalk along the north side only and streetlights.
b. All environmental mitigation measures, utility and drgjna
improvements necessary to construct the above mention
improvements.
8. CARLSBAD AGREES:
1. To act as Lead Agency in design, construction, and permitting.
2. To provide full funding for project with no funding participation frl
ENClNlTAS or from property owners within the jurisdiction
ENClNlTAS unless such property is proposed for development PI
to construction of La Costa Avenue.
3. To require that prior to building occupancy subsequent
shall be completed to full standards and the I-5/La Costa Aver
interchange improved.
recordation of Green Valley Tentative Map 92-08, La Costa Aver
C. ENClNlTAS AGREES:
1. To accept roadway right-of-way for widening within their jurisdictio
boundaries.
2. To cooperate in obtaining dedication of rights-of-way.
3. To consent to condemnation, if required, within their jurisdiction,
4. To cooperate in efforts to obtain appropriate permits to compl
project.
5. To expeditiously review and approve any required permits
construct within jurisdiction.
6. To require any proposed development abutting La Costa Avenuc
cmstrxt frontage improvements if the proposed developmen
prcr ?d and approved prior to the construction of ! 7 Cc
Aver This requirement would be a condition on projec Jpro
5 REV. Si2 ..
.I
I . '( '9 e e
V. LA COSTA AVENUEIINTERSTATE 5 INTERCHANGE IMPROVEMENTS
A. PROJECT DESCRIPTION
1. The La Costa Avenuehterstate 5 interchange improvemen
referenced in this section are more particularly described as follow
a. Widening and seismic retrofitting of the existing La Cos
Avenue overpass to accommodate four through lanes, dL
southbound left turn lanes, bikelanes and sidewalks. Widenir
and improvement to the La Costa Avenue bridge approach
accommodate two through lanes in each direction, 01
additional right turn lane onto the on-ramps in each directic
bikelanes, curbs, gutters, sidewalks and streetlights.
B.
b. Widening and improvement to the existing on-ramps q
accommodate two lanes of traffic. Widening and irnproveme
to the off-ramps to accommodate three traffic lane
installation of two traffic signals at each of the on/off-ran
intersections including a traffic signal interconnect.
c. All environmental mitigation measures, utility and drainah
improvements necessary to construct the above mentionc
improvements.
CARLSBAD AGREES:
1. To act as Lead Agency with Caltrans for environmental revie
permits, and construction including all administration and inspectio
2. To provide full funding for the La Costa Avenue/lnterstate
interchange improvements.
3. To negotiate and acquire necessary rights-of-way.
4. To require that prior to building occupancy subsequent
recordation of Green Valley Tentative Tract Map 92-08, La Cos
Avenue shall be completed to full standards and the WLa Cos
Avenue interchange improved.
5. To cooperate with ENCiNITAS in the realignment and signalizatic
of the intersection of La Costa Avenue and Piraeus Street as
separate project.
*
6 REV. 6/22
. , .a 11 e 0
C. ENClNlTAS AGREES:
1. To act as responsible agency in the review and processing
environmental documents.
2. To expeditiously review and recommend approval of appropri environmental documents,
3. To cooperate in the acquisition of required rights-of-way i
clearance of utilities.
4. To consent to condemnation of rights-of-way as required.
5. To cooperate with CARLSBAD and Cattrans in efforts to sec
required permits.
6. To expeditiously review and approve required permits ' to al
construction within jurisdiction.
VI. LEUCADIA BOULEVARD EXTENSION AND WIDENING
A. PROJECT DESCRIPTION
1. The Leucadia Boulevard extension and widening improvemc
referenced in this section are more particularly described as folic
a. The widening and improvement of Leucadia Boulevard fl
interstate 5 to Sidonia Street to majcr arterial stand;
including two through lanes in each direction, bikelal
raised iandscaped median, curbs, gutters, sidewalks
streetlights.
b. The extension of Leucadia Boulevard from Sidonia Strec
El Camino Real to major arterial standards including
through lanes in each direction, bikelanes, raised landsca
median, curbs, gutters, sidewalks and streetlights
including additional through, turn lanes and right-of-way ai
intersection with El Camino Real.
c, improvement of the Leucadia Boulevard/lnterstate
interchange including bridge widening, ramp signaliz; ramp widening and appurtenant improvements as require(
Cakrans.
7 REV. 61;
I;?
~ I* 'I e 0
d. All environmental mitigation measures, utility and drainagc
improvements necessary to construct the above mentionec
improvements including any traffic signal modification at tht
intersection with El Camino Real.
6. ENClNlTAS AGREES:
1. To act as Lead Agency for environmental review, permits, desigl
and construction.
2. To secure funding for construction of all roadway improvements we:
of El Camino Real to and including the interchange with Interstate
with no funding participation from CARLSBAD or from propert
owners within the jurisdiction. of CARLSBAD.
3. To require that concurrent with the occupancy of the first phase (nc
to exceed 475,000 sq. ft. of commercial uses) of the Encinitas Ranc
project, Leucadia Boulevard shall be required to be improved to th
following standards:
a. Full improvements from El Camino Real to Via Cantebria; an
b. Full width grading and two (2) lanes of improvements from vi
Cantebria to Sidonia Street.
Prior to the completion of the remainder of the Encinitas Rand
Leucadia Boulevard shall be developed to full improvements (fol
lanes to 1-5) and M/Leucadia Boulevard interchange improved.
The above requirements to be conditions of the tentative maps fc
Encinitas Ranch.
C. CARLSBAD AGREES:
1. To cooperate with ENCINITAS in environmental review and approv;
2. To cooperate in obtaining required permits to construct Leucad Boulevard,
3. To act as responsible agency in the review and processing
environmental documents.
4. To expeditiously review and recommend approval of appropria
environmental documents.
a REV. 61221
.I . . 1' 0 0
5. To condition Green Valley Tentative Maps or subsequ
development approvals fronting Leucadia Boulevard to dedic
appropriate rights-of-way to allow for construction of Leuca
Boulevard.
6. To cooperate in acquisition of rights-of-way, if required.
7. To consent to condemnation of rights-of-way, if required.
8. To expeditiously review and approve required permits to a~
construction within jurisdictional boundaries.
VII. VIA CANTEBRIA ROAD EXTENSION
A. PROJECT DESCRIPTION
1. The Via Cantebria Road extension improvements referenced in
section are more particularly described as follows:
a. The extension of Via Cantebria from its current nod-
terminus to Leucadia Boulevard to secondary art
standards including a minimum of two through lanes in E
direction, bikelanes, curbs, gutters, raised landsw
median, sidewalk along the west side only and streetligt
b. The extension of Via Cantebria from Leucadia Boule
northerly into the Green Valley area of Carlsbad to mod
secondary arterial standards including curbs, gut
bikelanes, sidewalks and streetlights. The road width
number of through lanes shall be as determined
CARLSBAD and ENClNlTAS after completion of the comb
traffic study.
c. AI1 environmental mitigation measures, utility and drair
improvements necessary to construct the above mentic
improvements including any new traffic signals.
B. CARLSBAD AGREES:
I. To require the developer to realign and constnrct, to the city lim
CARLSBAD, Via Cantebria (Street "A") in the general configur
shown on Exhibit "A". This would not, however, preclude reloc
Street "A" (on Exhibit A) further west should the developer finc
beneficial to the land use planning of Green Valley Master PIa
9 RW, 6,
; c:
. . 19 .* 0 0
C. ENCINITAS AGREES:
1. To require the developer to realign and construct, to the city limits c
ENCINITAS, Via Cantebria (Street ''A'') in the general configuratic!
shown on Exhibit "A". This would not, however, preclude relocatill
Street "A (on Exhibit A) further east should the developer find th
beneficial to the land use planning of Encinitas Ranch.
VIII. OLIVENHAIN ROAD WIDENING - EL CAMINO REAL TO 1,400 FEET EAST
A. PROJECT DESCRIPTION
1. The description of the Olivenhain Road widening improvement
hereinafter referred to as "PROJECT", shall be as follows:
a. The widening and improvement of Olivenhain Road from
Camino Real to 1,400 feet east to Carlsbad's prime arteri
standards including three through lanes in each directio
bikelanes, curbs, gutters, an 18-foot wide raised landscapc
median, sidewalks and streetlights.
b. Modifications to the intersection of El Camino Real ar
Olivenhain Road including traffic signal modificatior
appurtenant roadway and drainage improvements and ti
extension of the existing bridge/culvert, exclusive of ti
improvements described in Sections II and VI.
c. All environmental mitigation measures, utility and draina!
improvements necessary to construct the above mentionc
including the construction of a major offsite retention baz
necessary to mitigate potential flooding of the El Carnil
Real/Olivenhain Road intersection.
6. CARLSBAD AGREES:
1. To act as lead agency for the purpose of design and environmen
review and to provide all labor, materials, tools and equipment '
PROJECT including permit acquisition, advertising, award, contn
administration, Resident Engineer, material source inspectic
independent assurance and specialty testing, and such ott
construction engineering as may be required for satisfactr
completion of PROJECT.
2. To construct PROJECT by contract in accordance with plans a
specifications prepared by CARLSBAD and approved
ENCINITAS. said plans being referred to as Improvement Plans
Olivenhain Road and Improvement Drawing No. 336-5.
10 REV. 6/2;
.* 7' ' e 0
3. To establish separate PROJECT accounts to accumulate charges f
all costs to be paid for by ENCINITAS pursuant to this Agreernel
4. To submit initial billing in the amount of $ 100,OOO to ENCINITI
within thirty (30) days of the execution of a design agreement.
5. To receive from ENCINITAS' designated PROJECT representati
prior approval of all change orders before implementation, exce
when necessary for the Safety of motorists and/or pedestrians or 1
the protection of property.
6. Upon completion of PROJECT and all work incidental thereto,
furnish ENClNtTAS with a detailed statement of the total actual COI
of construction and SERVICES for PROJECT, including the costs
any contract claims which have been allowed to the constructic
contractor. SERVICES shall include cost of providing personr
resources (direct salaries and benefits). CARLSBAD thereafter sh
refund to ENCINITAS any amount of ENClNITAS' deposits pl
accrued interest and payments CARLSBAD is holding after act1
costs to be borne by CARLSBAD have been deducted, or to I
ENCINITAS for any additional amount required to compk
ENCINITAS' financial obligations pursuant to this Agreement.
7. To designate a project Resident Engineer who shall represt.
CARLSBAD as the single point of contact for PROJE(
administration.
8. To consult with ENCINITAS in resolution of any contract clair
associated with work.
9. To acquire necessary right-of-way to allow construction of PROJE(
north of roadway centerline.
10. To fund one-half of the total PROJECT costs.
11. To fund one-half of the uti1.W relocation costs associated with t
road construction.
C. ENCINITAS AGREES:
I. Ta designate a single project representative authorized to act
behalf of ENCINITAS in relation to contract change orders a
overall PROJECT coordination. Said representative and CARLSBAl
Engineer will cooperate and consutt with each other, but 1
decisions of CARLSBAD's Resident Engineer shall prevail as fir
binding and conclusive in all matters concerning PROJE
construction contract.
11 REV. 6/22
.L ). '
2.
3.
4.
5.
6.
7.
0.
e 0
To relinquish to CARLSBAD rights in the maintenance and operatic
of the construction zone within the boundaries of ENCINITAS for tt
duration of construction and authorizes CARLSBAD to act as I
authorized agent to direct contractor for traffic control, signal timin and other measures deemed neGessary for construction ar
administration of the PROJECT.
To bear fifty (50) percent of the actual cost of SERVICES 1
PROJECT. Said costs of SERVICES shall include costs of providil
personnel resources and including the cost of any furnish1
materials, supplemental work, change orders and contract clair
paid to the construction contractor, and the defense of all projt
related claims which may be filed by the contractor or portion
SERVICES attributed to such work applied in accordance w
standard accounting procedures. The actual cost of SERVICES
PROJECT shall be determined after completion of all work and up
final accounting of costs. The total amount due shall be reduced
one-half of the cost of ENCINITAS personnel resources (dirr
salaries and benefits) attributable to the project.
To deposit with CARLSBAD wrthin thirty (30) days of award of 1
construction contract, one-half of total PROJECT costs, to co1
ENCINITAS' share of construction costs, including utility relocati
and environmental mitigation measures and a ten percl
contingency fund.
To pay CARLSBAD upon completion of all work and within twer
five (25) working days of receipt of a detailed statement made UF
final accounting of costs, therefore, any amount over and above 1
aforementioned deposits and payments required to compll
ENCINITAS' financial obligation pursuant to this Agreement.
To provide all rights-of-way required for construction and necess,
mitigation within ENCINITAS' jurisdiction.
To fund one-half of the util'v relocation costs associated with '
road construction.
To approve PROJECT plans and specifications within ten (10) di
of final submittal by CARLSBAD.
1 2 REV. 6i2
1
.., S* 0 0
9. Within ten (1 0) days of completion of the PROJECT and notificai
by CARLSEAD, ENCINITAS shall inspect all work performed on
PROJECT and determine whether the work was completed
accordance with ENCINITAS’ approved plans and specifications
by the end of this ten (10) day pdriod, ENClNlTAS has not notii
CARLSBAD in writing through the City Engineer that the w
materially varies from the approved plans, ENClNlTAS shall
deemed to have accepted the PROJECT in accordance with
approved plans and specifications.
10. To cooperate in obtaining required permits.
11. To expeditiousty review and approve any required permits
construction of PROJECT within jurisdiction.
C. ENCINITAS and CARLSBAD mutually agree that:
1. CARLSBAD shall not advertise a construction contract until it
received written approval from ENClNlTAS approving pl:
specifications, and estimates.
2. If, after opening bids for PROJECT, the lowest responsible bid is
more than the Engineer’s Estimate, CARLSBAD may award
contract.
3. If, upon opening of bids for PROJECT, it is found that the lov
responsible bid exceeds the Engineer’s Estimate, CARLSBAD
ENCINITAS shall consult and agree upon a course of action.
4. If, after thirty (30) days, no agreement is reached CARLSBAD z
reject all bids.
IX. BOUNDARY ADJUSTMENTS
A. CARLSBAD and ENClNlTAS mutually agree to pursue jurisdictil
boundary adjustments through Local Agency Formation Commis
(IAFCO) upon completion of roadway improvements as follows:
1. Along La Costa Avenue from approxjmately 400 feet west c
Camino Real to Interstate 5, move the city limit boundary to coin1
with the south right-of-way line of La Costa Avenue.
2. Along Leucadia Boulevard, west of El Camino Real where
roadway enters Cartsbad city limits, move the city limit bounda
coincide with the north right-of-way line of Leucadia Boulevard.
13 REV. 61:
.,.
.* ** e 0
3. Along Olivenhain Road from El Camino Real to approximately 4,01
feet east of El Camino Real, move the city limit boundary to coincic
with the construction centerline of Olivenhain Road.
4, Along Rancho Santa Fe iload from approximately 1,200 feet no1
of Calle AcewolAvenida La Posta to approximately 400 feet south
Calle Acervo/Avenida La Posta, move the city limit boundary to ti
construction centerline of Rancho Santa Fe Road.
X. FUTURE PROJECT REQUIREMENTS
CARLSBAD and ENClNlTAS agree that, to the degree allowed by law, if a projf
within the land use jurisdiction of either city will cause a significant adverse tral
impact on either or both cities, the responsible city shall condition the approval
such project to contribute its fair share of costs to mitigate or otherwise constn
appropriate mitigation measures to relieve such adverse traffic impacts.
XI. REGIONAL FUNDING
CARLSBAD and ENCINITAS agree to actively pursue regional funds to ass
construction of regional arterial roadway and freeway interchange projects.
XII. QWNERSHIP AND MAINTENANCE
A. ROAD IMPROVEMENTS
Upon completion of all work under this Agreement, ownership and title
materials, equipment, and appurtenances which are installed witt
CARLSBAD’s right-of-way will automatically be vested and maintained
’ CARLSBAD. Materials, equipment, and appurtenances which are install
within ENCINITAS’ right-of-way will be vested and maintained
ENCINITAS.
Upon completion of any jurisdictional boundary adjustment betwe
ENCINITAS and CARLSBAD, the road improvements affected by 1
boundary adjustment shall automatically become vested and be maintain
by the respective City having jurisdiction over the improvement. No furtl
agreement will be necessary to transfer ownership as hereinabove statc
B. TRAFFIC SIGNAL IMPROVEMENTS
Traffic signal improvements shall be owned and maintained by the C
located.
having jurisdiction over the intersecting streets at which the traffic signa
14 REV. 6/22
,’ <.*
.+ .- . 0
Where the jurisdictional boundary bisects one or both of the intersec
streets, maintenance responsibility for the traffic signal shall be administe
by the City which has jurisdiction of the traffic signal controller. The cot
maintain a multi-jurisdictional traffic signal shall be shared by both Ci
based upon a ratio of each Cities jurisdictional control of the corresponc
comers of the intersection.
CARLSBAD and ENCINITAS may alternatively enter into a separate tr; signal maintenance agreement based on any mutually agreed upon ter
X111. LIABILITY AND INDEMNIFICATION
Pursuant to Section 895.4 of the Government Code, CARLSBAD and ENCINll
agree that each will assume the full liability imposed upon it or any of its offici
agents, or employees for injury caused by a negligent or wrongful act or omis5
occurring in the performance of this agreement, and each party agrees
indemnify and hold harmless the other party for any loss, cost, or expense 1
may be imposed upon such other party by virtue of Sections 895.2 and 895.r
the Government Code.
The indemnity provisions are not limited in any way by the extent of any polic
insurance currently in force and held by either party. All construction contra-
any project which spans the jurisdictional baundary between CARLSBAD
ENClNlTAS shall include indemnrty provisions and insurance provisions, wher
the contractor indemnifies both CARLSBAD and ENClNlTAS and adds both Ci
as additional insured on Insurance Policy.
XIV. NOTIFICATIONS
Unless othennrise specifically provided in this Agreement, all notices, demands
other communications given hereunder will be in writing and will be deemec
have been duly delivered upon personal delivery or as of the second business I
after mailing by United States mail, retum receipt requested, postage prepa
and addressed as follows:
if to ENCINITAS: Alan Archibald
Director of Engineering Services
CRY OF ENClNITAS
505 S. Vulcan Avenue
Encinitas, CA 92024-3633
If to CARLSBAD: Lloyd Hubbs City Engineer
CITY OF CARLSBAD
2075 Las Palmas Drive
Carlsbad, CA 92009-4859
15 REV. 6i2
e' 4 */ ..
* .- .. 0 0
XV. MODIFICATIONS
This Agreement may not be modified, amended, or otherwise changed unless t an amendment, in wfiting, executed by the pmes hereto.
XVI. TERMINATION
This Agreement shall terminate after all the street and highway improvemer;
contemplated by this agreement have been constructed, after all paymer:
required under this agreement have been made, after all city bounda
adjustments have been accomplished and, after all maintenance responsibilitil
for the respective street and highway improvements have been assumed by ti
respective cities in accordance with the terms of this agreement.
XVII. COUNTERPARTS
This agreement may be executed by the cities in separate counterparts, each
which when so executed and delivered shall be an original, but all su
counterparts shall together constitute one and the same instrument.
XVIII. CHOICE OF LAW
XIX.
This agreement shall be governed by the laws of the State of California and ven
shall be proper in the San Diego Superior Court, North County Branch or su
other venue as provided by law.
SEVERABILITY
If one or more clauses, sentences, paragraphs, provisions or terms of tl
agreement shall be held to be unlawful, invalid, or unenforceable, it is here
agreed by the cities that the remainder of this agreement shall not be affect
hereby.
XX. HEADINGS
The headings of articles and paragraphs of this agreement are for convenier
only, and no presumption or implication of the intent of the parties as to
construction of this agreement shall be drawn therefrom.
....
....
....
....
I
16 REV. 6/Z
.. > .
* .4 *I e e
XXI. COMPLETE AGREEMENT
The foregoing constitutes the full and complete agreement of the parties. Tt are no oral understandings or agreements not set forth in wilting herein.
IN WITNESS WHEREOF, this Agreement is executed by the CITY OF CARLS€
and by the CITY OF ENClNlTAS pursuant to action taken by the City Council.
CITY OF ENCINITAS, a municipal
corporation a GAI HANO, Mayor
DATE: 619 ?/Y F. DATE: 74'4 /
A'ITEST: AlTEST: * City E. JANE Cler OOL, KAREN R. KUNDTZ, Assistant City Cler
APPROVED AS TO FORM: APPROVED AS TO FORM:
ROGER KRAUEL RONALD R. BALL
City Attorney City Attorney
By: By: L (2.0-
City Attorney City Attorney 7. /v..~v,
17 RRI. 6/22
I ,+ 1- CANTEBRIA EXT
( STREET "A" I
1 i li
VIA
scu 1' - 300
St,
I I m I I
j I.& *
EL 'TF-$ CAM0 REAL i
"~,""""""---
I EXHIBIT
".
L