HomeMy WebLinkAbout1997-01-07; City Council; 13990; APPROVAL OF ARTWORK FOR THE ACCESS AREAS OF THE SHORE PROTECTION WALL8
FOR THE ACCESS AREAS OF THE SHORE PROTECTION WALL
Adopt Resolution No. q9-l' approving the tile artwork for the access areas of the Shore 0 u
u Protection Wall.
PLd *m a, ITEM EXPLANATION
a 2x3
On !3d
u am *ii
a, .rl m
c) a,
su m The Mayor requested that all artwork placed in the beach area be brought to City Council 1 final approval. The Arts Commission voted to recommend approval at its December meetii
The proposed artwork for the Shore Protection Wall access areas is a mosaic tile in variou colors. The design consists of 10 squares of tile widely spaced in the access areas to gi a highlight of color to the overall design and a continuity of motion created in the wall patter The areas will be recessed in the concrete so that the finished tile will be flush with the wa This is the final portion of the artwork to be approved. The wall design was approved b) City Council on August 13, 1996. The process began in 1990 with the selection of artist Raul Guerrero. (See Exhibit 2 for background and process.)
&I
uo
:g uo V a, Ldm uu $2 .r( a, FISCAL IMPACT
Funding was appropriated and the contract with the artist was signed in 1990. The total amount of the contract is $30,000 which includes the design development, public meetings creating models for display and the implementation of the artwork. No additional funding fo the implementation of the artwork is expected.
k5 &I a- ac) d .rl 4
+a
ha, as u
03, ZP
Flm Ob -ri 0 u4 30 dc) 0 VJrl a)a
-dW a, ua,
ac) a4-I d os 40 .rl gv UaJ c -4 h 1 >u 0 a,-rl u &Iv
0s -9
I
1. Resolution No. 7 3 - 19
2. Exhibit 2, Shore Protection Wall Background.
p? .z
E5 :
h a
\
h
\ 4 .. z 0
I- O
A
Z 3 0 0
I
a
G
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
l7
18
EXHIBIT 1 e e
RESOLUTION NO. 97-10
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE ARTWORK FOR THE ACCESS AREAS OF THE SHORE PROTECTION WALL
WHEREAS, artist Raul Guerrero designed tile artwork for the Shore Protection '
areas: and
WHEREAS the Mayor requested that all artwork placed in the beach area bc
City Council for final approval; and
WHEREAS, the Carlsbad Arts Commission approved the design of the tile art
access areas as shown on the drawing on file in the Arts Office and directed that SUI
forwarded to the City Council recommending approval; and
WHEREAS, funding was appropriated in 1990, which includes design develop
meetings, creating models for display and implementation of the artwork.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of (
follows:
1. That the above recitations are true and correct. 2. That the tile artwork for the access areas of the Shore Protection Wall a approved.
PASSED, APPROVED AND ADOPTED, at a regular meeting of the City Coun
, 1997, by the foll City of Carlsbad, California, held on the 7th day of January
to wit:
23
24
25
26
27
28
I,
EXHIBIa of Agenda Bill No ._ a
SHORE PROTECTION WALL PROJECT - BACKGROUND
Background Information * 1. Selection of Artist
The selection process used in selecting an artist for the Shore Protection Wall
Project (Seawall) was a juried limited competition. Eight artists submitted
application materials in response to the Request for Qualifications.
The jurors for this Selection Panel met May 17, 1990, and were asked to consider
the function of the Shore Protection Wall, the neighborhood context and the
aesthetics of the site. The meeting was open to the public. The Selection Panel
consisted of
A) Mario Monroy, Carlsbad Beach Erosion Committee, Carlsbad resident
B) Patra Straub, Carlsbad Arts Commissioner
C) Richard Keely, artist and teacher, Carlsbad resident
D) John Cahill, Municipal Projects Manager
E) Pat Entezari, Engineering Department
The Selection Panel met May 30, 1990 to interview the three Wsts.
meeting was open to the public. The Panel selected artist Raul Guerrero.
The
'2. Arts Commission Approval
The Arts Commission approved the selection of Raul Guerrero as the finalist for
the Shore Protection Wall Project on June 7, 1990. The meeting was open to the
public with opportunity for public input.
3. ArtistDesign Review Committee
A design review committee was formed by adding two community members to
provide community input to the Selection Panel (cornunity representatives live
near the site.) The Design Review Committee met on July 3 1, 1990. The purpose
of the design review meetings are to advise the artist on community context. The
two residents added to the Panel were:
Ophie Escobedo and Sarah Marquez
The Design Review Committee discussed the importance of relating the artwork to
the ocean environment, the multicultural nature of the neighborhood, and the need
to embellish the "function" of the boardwalk area. Also discussed was safety and
resistance to vandalism.
"4. Arts Commission Review
a 0
The Arts Commission voted to accept the preliminary drawings and concept of the
artwork for the shore protection project as presented by the artist. The meeting
was held on December 6, 1990 at the City Council Chambers. The meeting was
open to the pubk
The artist Raul Guerrero met with the Design Review Committee on December 19,
1990 to discuss design requirements for the artwork in relationship to the Carlsbad
Boulevard Shore Protection Project. Raul Guerrero reviewed his design concept
with the group.
The Design Review Committee met on January 4, 1991 to review preliminary
designs as discussed in the prior meeting. The Committee agreed to approve the
design at this stage and to recommend the design to the Arts Commission.
5. Working Drawings Comdeted:
Engineering Department and project consultants completed working drawings.
US Army Corps of Engineers Approval
Obtained on July 27, 1990.
6.
7. Planning Commission Approval
Obtained on January 3 1,1991.
8. Coastal Commission ApDroval
Obtained on July 1, 1991 and November 15, 1994.
9. Artist’s Model
The artist constructed project models accurately illustrating the appearance and
scale of the project. The models include:
A) Drawings of the shore protection wall
B) Models of 2 access areas
C) Section of wall, actual size, 5’x4’ section, showing concrete color and
texture
D) Drawings of tile work for the bench backs (to be presented to the Arts
Cornmission 8/1/96)
* 10. Arts Commission Review
The Arts Commission reviewed the artist’s design proposal for the tile to be placed
on the backs of benches and around the planter areas, on August 1, 1996 at its
e e
regularly scheduled meeting. The artist gave a presentation and opportunity for
public input was encouraged. The meeting was publicized in advance. In addition
to the Arts Commission, the Design Review Committee attended and participated
in the discussion prior to approval.
1 1. Public Display
* A. The models were displayed at the City Library and the Branch Library for a
total of five weeks. 96 comments were received. Approximately two-thirds of the
comments indicated that 1) the art should be more relevant to Carlsbad or %)they
disliked one or more of the eight images to be depicted in mosaic tile.
* B. Public Information
The Arts Office
through press releases and photographs distributed to the media.
publicized both the artwork and public display information
* 12. Arts Commission Review
In response to public comments, the Arts Commission directed the artist to submit
a second proposal at its October meeting. The Commission appointed a sub-
committee to meet with the artist to discuss the comments and various alternatives.
* 13. Arts Commission Approval
The artist presented his second proposal at the December 12 Arts Commission
meeting. It was approved unanimously.