HomeMy WebLinkAbout1997-12-02; City Council; 14453; AUTHORIZATION TO ADVERTISE FOR BIDS CANNON ROAD WEST WETLAND MITIGATION CONSTRUCTION PROJECT NO. 3184r 0 CITY OF CARLSBAD - A&A BILL 47 4 -1
AB# F TITLEI
AUTHORIZATION TO ADVERTISE FOR BIDS
CONSTRUCTION PROJECT NO. 3184
MTG. 12/02/97
CITY MGR. 'tr DEPT. PW
CITY ATTY. 4 CANNON ROAD WEST WETLAND MITIGATION -
Q
Q L3s
Y
2 4
z 0 F 0 d
1 Ts z 3 0 0
RECOMMENDED ACTION:
Adopt Resolution No. 73- 3oAapproving plans and specifications and authorizing the
to advertise for bids for the construction of Cannon Road West Wetland Mitigation Cor
Project No. 3184.
ITEM EXPLANATION:
Staff recommends approval of the plans and specifications to create a wetland mitigatic
Macario Canyon for the construction of Cannon Road. This project involves the plant
acres of land within Macario Canyon that is owned by the City of Carlsbad. The land USE
is agricultural. The location was selected because of its proximity to existing wetland ha
its proximity to the area of wetland impact for the construction of a bridge spannins
Canyon. This wetland mitigation area is required by the conditions of the Biological Opi
the United States Fish and Wildlife Service to mitigate wetland impacts made necessi
construction of Cannon Road West from LEG0 Drive to El Camino Real and is a condii
Army Corps of Engineers 404 Permit. The construction of the wetland mitigation are:
fencing and a one year maintenance program.
ENVIRONMENTAL REVIEW:
It has been determined by the Planning Department that sufficient study has been undc
as evidenced in the following documents on file with the Engineering Department
Planning Department: Final EIR for Kelly Ranch: August 1983; Final EIR for Reac
Cannon Road: March 1989; USFWS Biological Opinion: April 1992; City of Carlsbad
EIR: September 1994; Biotechnical Report for Cannon Road Reach 2: January 1996;
Pocket Mouse Assessment Cannon Road Reach 1: September 1996; Del Mar Mal
Biological Survey: April 1997; Wetland Delineation: April 1997; least Bell's vireo Bit
Survey: July 1997; Endangered Species Field Surveys at Cannon Road: July 199i
Check for Pacific Pocket Mouse: July 1997; Mitigated Negative Declaration for Cannol
Reach 2: October 1997. The original environmental documents updated by subs
studies and surveys are the basis for a determination that the potential environmental i:
created as a result of implementing the mitigation measures required for the construc Cannon Road Reaches 1 and 2 have been previously reviewed with previously c
environmental documents and, therefore, no additional environmental review will be r(
and a notice of determination will be filed.
FISCAL IMPACT:
The Engineer's Estimate for the construction of this project is $300,000. This project i!
the Cannon Road West project and is funded from Bridge and Thoroughfare fees, CFD
TransNet taxes. Sufficient funds are currently available.
EXHIBITS:
1. Location map.
2. Resolution No. 9 'I c '7 0 a approving plans and specifications and authorizing t
Clerk to advertise for bids for the Cannon Road West Wetland Mitigation Constr
Project No. 3184.
F
MITIGA TlON SITES
STA 65+00
r 2 1
3
4
5
6
7
8
9
10
11
12
0 0 Exhibit 2
RESOLUTION NO. 97 - 702
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE
PROJECT NO. 31 84.
I CANNON ROAD WEST WETLAND MITIGATION CONSTRUCTION,
WHEREAS, the City Council of the City of Carlsbad, California has determir
necessary, desirable, and in the public interest to construct the wetland mitigation arc
Cannon Road West ; and
WHEREAS, the City Council has found that this project was described in the MElR 9
EIR 87-02, and EIR 83-04 as within their scopes; AND there will be no significant unmiti!
effect, not analyzed therein; AND that therefore this project is within the scope of the prior E
and 11 WHEREAS, the City Council of the City of Carlsbad has reviewed, analyzed
13
considered the Mitigated Negative Declaration EIA 96-02, the environmental impacts th
identified for this project and said comments thereon, and the Mitigation Monitoring
Reporting Program, on file in the Planning Department, prior to APPROVING the project; anc
14
15
16 11 WHEREAS, based on the EIA Part II and comments thereon, the City Council finds 17
there is no substantial evidence the project will have a significant effect on the environment
the implementation of the mitigation measures identified and described in MElR 9;
18
19 11 EIR 87-02, EIR 83-04 and the Mitigated Negative Declaration EIA 96-02; and 20 11 WHEREAS, the plans and specifications for furnishing of all labor, material, t 21
22
23
equipment, transportation and other expenses necessary or incidental for said project have
prepared and are on file in the Engineering Department of the City of Carlsbad and
24 incorporated by reference herein.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carls 25
California, as follows: 26
1. That the above recitations are true and correct.
2. That the plans, specifications, and contract documents as presented are he
27
28
approved.
L ~_
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
i
\
I
0 0
3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publi
xcordance with State law, Notice to Contractors Inviting Bids for the Cannon Road
wetland mitigation construction, Project No. 31 84.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City CI
held on the 2 nd day of December , 1997 by the following vote, to wit:
AYES: Lewis, Kulchin, Finnila, Nygaard & Hall
NOES: None
ATTEST:
ALETHA L. RAUTENKWNZ, City Clerk (SEAL)