HomeMy WebLinkAbout1997-12-16; City Council; 14493; Revised Master Fee Schedule. .- -. - 74 0 18
CITY OF CARLSBAD, CARLSBAD MUNICIPAL WATER DISTRICT AND
HOUSING AND REDEVELOPMENT COMMISSION -AGENDA BILL
AB# m T’TLE: REVISED MASTER FEE SCHEDULE FOR DEPT HD. C&
MTG. 12/l 6197 CITY SERVICES AND INTRODUCTION OF CITY ArrV.‘MRB,
DEPT. FIN ORDINANCE TO AMEND MUNICIPAL CODE
SECTION 18.04.040 RELATING TO BUILDING FEES CITY MGR.-&&
RECOMMENDED ACTIONS:
1. City Council, Housing and Redevelopment Commission and Carlsbad Municipal Water
District Board accept the Cost Allocation Plan and Cost of Services Study reports and
adopt Resolutions No. 93 -17-y , /a06 , and 3 90 , respectively, establishing
the Master Fee schedule and adopting new and revised fees.
2. Introduce Ordinance
F
o. NJ- ~38 amending section 18.04.040 of the Carlsbad
Municipal Code relati g to building fees.
ITEM EXPLANATION: \, \,
BACKGROUND
In August 1996, the City entered into a consultant agreement with Management Services
Institute (MSI) to update its cost allocation plan and cost of services study (or fee study)
for general and development-related service fees. During fiscal year 1996-97, MSI
completed the cost allocation plan which determined the overhead and administrative
expenses to be allocated to each department. In the early part of fiscal year 1997-98,
MSI completed a Cost of Services Study which reviewed all significant development-
related and general service fees.
Development-related service fees include all fees charged to developers by the
engineering, planning, building, and other departments for the filing, accepting, reviewing,
approving, or issuing of an application, permit, or entitlement to use. These fees do not
include impact fees which are those fees charged to developers for the purpose of
defraying all or a portion of the cost of public facilities related to the project. Development
impact fees were not reviewed as part of this consultant agreement. General fees
represent all other charges for services that are not related to development, such as
disturbance responses by the Police department and Fire use permits.
MSl’s report recommended setting service fees to recover the total cost of providing those
services. In addition, staff from affected departments has reviewed the report and made
subsequent recommendations on the proposed service fees.
It is important to note that the recommended fee structure is based on the cost of
providing the service. With more experience and better technology, each fee study refined
the process of determining the costs of providing a service. The current fee is based on
the last fee study. The City of Carlsbad typically revises its fees during the budget
process; however, during the 1997-98 budget adoption, the fee review was underway and
no fee revisions were proposed.
/
PAGE TWO OF AGENDA BILL NO. t Y; Y 01 3
OVERVIEW OF THE PROCESS
The process began with a Cost Allocation Plan (CAP). The CAP identifies support
departments and allocates their costs to other departments. Overhead costs were first
allocated to other support departments and then allocated to user departments. The
result is an overhead rate for each department. This is used in the Cost of Services
Study to calculate a fully burdened hourly rate for each position in the City.
The fully burdened hourly rate is the sum of:
l the average hourly salary for a position
l plus the appropriate overhead from the CAP
l plus all benefits (i.e. PERS, health insurance, etc.)
l plus a proportionate share of a department’s direct maintenance and
operation expenses.
The federal government established the cost allocation process to determine overhead
reimbursement for grant programs. A fully burdened hourly rate determines the “costs
reasonably borne” in accordance with Article 13B of the California Constitution. In
addition, Proposition 4 states that overhead and administration are part of the “costs
reasonably borne” in charging for a service. This is important because a fee in excess
of the “costs reasonably borne” is considered to be a tax.
The fee study calculates the cost of providing one unit of service by multiplying the fully
burdened hourly rate times the number of hours expended to provide a service. The
hours required to provide one unit of service were derived from: (1) interviews with staff
in each department, (2) data extracted from the City’s permits system, (3) department
review of the time per unit for reasonableness, and (4) an interdepartmental team
review of the final product.
The last step was to compare the cost of providing a service to the current fee. A
philosophy, or set or principles, was developed to determine the recommended fee for
each service. MSI recommended setting fees to recover the total cost of services.
GENERAL FEES
Not every general fee was reviewed by the City’s consultant. Fees that were excluded
were generally minor amounts or were fees that are typically set at the market rate. For
example, library fines and recreation fees were excluded from the consultant’s review.
Fee recommendations made by staff for general fees are generally based on the lower
of cost or market rate.
2.
PAGE THREE OF AGENDA BILL NO .lu
The most significant changes in general service fees can be found in the ambulance,
fire use permits, and recreation fees. Ambulance fees are proposed to increase, based
upon a survey of fees charged by other agencies. Changes in the fire use permit fees
are recommended based upon the cost of providing the service. Annual fees for
residents using the Agua Hedionda Lagoon are proposed to decrease to make the
lagoon use more attractive and affordable for Carlsbad residents. “Learn to Swim”
lessons are proposed to increase by $3.00 for residents and non-residents, based upon
a survey of swim lesson fees in San Diego County.
A complete listing of the current and proposed general service fees and charges are
shown in Exhibit 3.
DEVELOPMENT-RELATED SERVICE FEES
General PhilosoDhv
The fee study’s changed methodology revised the process of calculating costs,
resulting in modified costs to provide development-related services. The philosophy
applied to developing recommendations for development-related service fees is as
follows:
l Fees currently determined to be greater than the cost of providing the service were
reduced to cost.
l Fees currently determined to be less than cost were brought up to 85% of cost.
l Fees determined to equal cost were left at the current fee.
l Where costs vary dramatically, dependent upon the type of project, a base fee is
applied and additional hours will be billed.
Under the development-related service fee philosophy, the following changes are
recommended from the current fee structure. Discounts for single family lots and non-
profit agencies were removed from the fee schedule. Fees are proposed for single
family lots only if the time to provide the service is different from multiple lots. A 25%
discount is proposed for development-related service applications with duplicative work.
In cases where the time varies for a service, a base fee is proposed plus a charge for
the actual hours expended.
Excedions
There are some exceptions to the philosophy. When the City wants to gain
compliance, the fee may be subsidized to encourage use of a service. Some fees are
set at a certain amount to achieve consistency with similar fees in other departments.
For instance, the sign permit fee in Planning is the same as the fee in Redevelopment.
Also, a different methodology was applied to building department and Redevelopment
fees which are discussed in more detail below.
> Buildina Permits and Plan Checks
Building department fees were reviewed on an overall level as opposed to the cost of
providing one unit of service. Their services vary in size and complexity making it
difficult to determine the cost of one unit of service.
3
PAGE FOUR OF AGENDA BILL NO Jv=-
The revenues and costs for the building department were reviewed over the last ten
years (since the Growth Management Plan went into effect) and for the most recent
construction cycle (defined as a peak in activity through a valley back up to
acceleration). Both of these comparisons showed that revenue collections are close to
the total cost of providing the service. Over a construction cycle, revenues are 91.5%
of total cost. This verified that the existing fees are appropriate.
Staff is requesting to update the two documents used to calculate a building permit fee:
the valuation table and the Uniform Building Code (UBC) table. The valuation tables
determine the value of construction per square foot based on the occupancy and type
of building. This accounts for the complexity of the permit. The UBC table provides a
graduated fee schedule based upon the total valuation which provides ease of
administration for determining building permit fees. In order to keep the fees at
approximately the same level, and at or below the cost of providing the services, staff
suggests using 70% of the fees shown in the UBC table.
In addition to revising fees, staff recommends introducing an ordinance to amend
Section 18.04.040 of the Carlsbad Municipal Code. Currently the Uniform Building
Code fee table is adopted into the text of the ordinance in Chapter 18 of the Carlsbad
Municipal Code. Staff recommends revising the ordinance to state that building permit
fees will be set forth in a resolution adopted by the City Council. This will make it
simpler for Council to update the table in the future.
P RedeveloDment Fees
Staff determined a subsidy was appropriate for Redevelopment fees for two reasons:
1) the purpose of the Redevelopment Agency is to encourage development and a
subsidy would make development in the Redevelopment Agency more attractive
and affordable, and
2) much of the Redevelopment Agency’s costs are supported by property taxes
through the property tax increment. Therefore, part of the Redevelopment Agency
personnel expenses are supported through taxes.
The methodology applied to Redevelopment fees was to set the fee at 25% of the total
cost. Under this approach, most of the costs from outside departments are recovered.
A larger subsidy is currently in place, thus most of the Redevelopment fees will increase
compared to the current fee.
A complete listing of the current and proposed development-related service fees are
shown in Exhibit 3.
DEVELOPMENT IMPACT FEES
Development impact fees were not reviewed by the consultant. Development impact
fees that are subject to the annual change in the Engineering News Record have been
adjusted and are recommended to increase as shown on the following page.
PAGE FIVE AGENDA BILL NO. 14; yQ7
h
Sewer benefit area fees show the largest percent increase of 13% since these fees
have not been adjusted since 1991.
Sewer Benefit Areas - various
Traffic Impact Fees:
Residential (Out of CFD) 84.00
Non-Residential (Out of CFD) 34.00
Residential (In CFD #I) 54.00
Non-Residential (In CFD #I I 22.00
Planned Local Drainage Area Fees:
Area A - Base Rate - Low
Area A - Base Rate - Hiah
1,572 1,587 15 1%
2.574 2.598 24 1%
Area B - Base Rate - Low 3,380
Area B - Base Rate - High 5,532
Area C - Base Rate - Low 2.528
Area C - Base Rate - High 4;136
Area D - Base Rate - Low 34
Area D - Base Rate - High 56
85.00 1 .oo
34.00 0.00
55.00 1 .oo
22.00 0.00
57 I 1
Fee
Change
%
1%
13%
1%
0%
2%
0%
1%
1%
1%
1%
3%
2%
IMPLEMENTATION
The ordinance and resolution will be in effect sixty days after the adoption of the new
development service fees. In the interim, anyone applying for development services will
pay the current fees. There is a 120 day statute of limitations to challenge or set aside
those fees following Council adoption.
Staff will continue to review fees on an annual basis with the goal of gradually
increasing fees to get closer to full cost recovery. The difference between the fee and
the actual cost of providing a service will be subsidized by the General fund.
The proposed development-related service fees were distributed to the Building
Industry Association and other developers within the City for review and comment on
October 10, 1997. In addition, developers and interested citizens were invited to attend
a “Fee Study Workshop for Developers” on November 3, 1997, where MSI and City
staff presented the results of the study and explained how the costs were calculated.
Staff solicited questions and comments and asked that outstanding issues be brought
forward by the end of November.
A Master Fee Schedule of all fees charged by the City is on file with the City Clerk.
PAGE SIX AGENDA BILL NO. 4 q93
FISCAL IMPACT
The proposed fees are estimated to reduce General fund revenue by approximately
$79,000 per year, based on the average activity over the past three years. General
City revenues are estimated to increase by $201,000 per year while development-
related service revenues are estimated to decrease by $280,000 per year.
The top eight development-related service fees account for 85% of current
development-related revenues. Each of these fees were reviewed separately and fee
structures were developed to recover the total cost of providing the service. These fees
are:
l Building Permit and Plan Check
l Grading Permit Application and Permit
l Improvement Plan Check and Inspection
l Landscape Plan Check and Inspection
The estimated fiscal impact for development-related fees is shown in the following
table:
EXHIBITS:
1. City of Carlsbad Resolution No. 9 9 - ‘?a(f adopting new and revised fees.
2. Ordinance No. NS c rl3& amending section 18.04.040 of the Carlsbad
Municipal Code.
3. Comparison of current and proposed fees dated December 1997.
4. Carlsbad Municipal Water District Resolution No. l&?b adopting new and revised
fees.
5. Housing and Redevelopment Resolution No. 270 adopting new and revised
fees.
6. City of Carlsbad Cost of Services Study dated September 1997 (on file with the City
Clerk and Secretary).
7. City of Carlsbad Master Fee Schedule (on file with the City Clerk and Secretary).
G
December 1 I, 1997
TO: CITY MANAGER
VIA: FINANCE DIRECTOR
FROM: Senior Management Analyst ; Finance
EFFECTIVE DATES FOR REVISED FEES
The fee study which will be presented Tuesday, December 16”, includes language that the
development fees will become effective 60 days after Council adoption. This is standard
language we have incorporated as part of the City’s fee revisions based on the California
Government Code section 66017(a) which states:
“Any action adopting a fee or charge, or increasing a fee or charge adopted, upon a development
project...shall be effective no sooner than 60 days following the final action on the adoption of the fee or charge or increase in the fee or charge.”
Anattomey from Continental Ranch has requested that the Landscape Plan Check, Landscape
Inspection, and Improvement Inspection fees go into effect immediately because they,are being
reduced. The Attorney’s office agrees with the attorney for Continental Ranch that the delayed
effectiveness is only required if the fees are new or increased. We wanted to make sure that
the Council is aware that this request will arise on Tuesday evening.
Fee decreases are not specifically mentioned in the Government Code, so the decision of when
to implement the reduced fees is up to the Council. Staff is going forward with the agenda bill
and resolution including the 60 day delay. This approach keeps all development fees effective
at the same time for ease of administration. It is often times difficult to implement the
decreased fees without implementing the increased fees. Many services have a rate table with
a fee based on cubic yards or value. Within these rate tables some fees increase while others
decrease. Also, some services require a plan check and an inspection. For improvement
construction, the plan check fee table is a mixture of fee increases and decreases while the
inspection fees are decreasing. Consequently, early implementation of decreased fees would
require implementing the improvement inspection fees but delaying the revisions to the
improvement plan check fees. Since we are raising some fees and lowering others, it seems
that these changes should happen simultaneously. Development activity should pay their fair
share on the aggregate and this would encourage that all fee revisions become effective
simultaneously.
If the reduced fees become effective sooner, staff recommends implementing all fees that are
being reduced, as opposed to the select ones requested by Continental Ranch. The list of fees
attached are the fees that are being reduced and could potentially go into effect sooner than the
new or increasing fees. However, staff would recommend a two week delay to allow for the
systems to be updated and the new fee schedules to be distributed.
If you have any questions or comments, please let me know.
SANDY It&GEE
1
2
31
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 97-724
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, ADOPTING THE MASTER
FEE SCHEDULE AND ESTABLISHING THE FEES
FOR GENERAL CITY SERVICES, DEVELOPMENT-RELATED
SERVICES AND DEVELOPMENT IMPACT FEES.
I WHEREAS, the City Council of the City of Carlsbad has the authority to
establish fees for City services; and
WHEREAS, from time to time said fees are reviewed and evaluated to
maintain an adequate fee structure recovering costs for City services; and
WHEREAS, the City Council has determined the cost of providing general
and development-related services; and
WHEREAS, the City Council finds it necessary to recover the costs for City
services; and
WHEREAS, the City Council has determined that the fees shown in Exhibit 3
attached hereto and the Master Fee Schedule (on file with the City Clerk) are fair and
reasonable in relation to and do not exceed the cost of providing the services received;
and
WHEREAS, the statute of limitations applicable to any action to challenge or
set aside the fees adopted or amended by this resolution is 120 days from its adoption.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California:
1. That the Master Fee Schedule is hereby adopted as the official Fee
Schedule for development-related services, general City services, and development
impact fees for the City of Carlsbad.
2. All prior fee schedules are rescinded and superseded upon the effective date
of the fees adopted herein.
3. All new and increased development-related service fees and development
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
k -
impact fees shall become effective on February 14, 1998. All new and increased
general City service fees shall become effective on January 15, 1998. All reductions in
fees shall be effective on January 5, 1998.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
Council on the 16th day of December , 1997, by the following vote, to wit:
AYES: Council Members Lewis, Finnila, Nygaard, Kulchin, and Hall
NOES: None
ABSENT: None
ATTEST:
’ ALETHA L. RAUTENKRANZ, City Clerk (SEAL)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4
ORDINANCE NO. N8-438
AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF CARLSBAD, CALIFORNIA, AMENDING
SECTION 18.04.040 OF THE CARLSBAD MUNICIPAL
CODE RELATING TO BUILDING PERMIT FEES.
The City Council of the City of Carlsbad, California, does ordain as follows:
SECTION 1: That Section 18.04.040 of the Carlsbad Municipal Code is
amended to read as follows:
18.04.040.Section 107.2 amended - Permit fees. Section 107.2 of the
Uniform Building Code is amended to read:
PERMIT FEES. The fees for each permit shall be the amount set forth in a
resolution adopted by the City Council. .
EFFECTIVE DATE: This Ordinance shall be effective thirty days after its
adoption, and the City Clerk shall certify to the adoption of this ordinance and cause it to
be published in a newspaper of general circulation within the city within fifteen days after
its adoption.
OPERATIVE DATE: The Ordinance and the fees established thereby shall
become operative sixty days from its introduction and first reading.
INTRODUCED AND FIRST READ at a regular meeting of the Carlsbad City
Council held on the 16th day of December , 1997 and
thereafter
Ill
Ill
Ill
III
Ill
Ill
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
-
PASSED AND ADOPTED at a regular meeting of said City Council held on the
day of , 1997, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ATTEST:
CLAUDE A. LEWIS, Mayor
.
ALETHA L. RAUTENKRANZ, City Clerk (SEAL)
Exhibit 3
CITY OF CARLSBAD
CARLSBAD MUNICIPAL WATER DISTRICT
CARLSBAD HOUSING AND
REDEVELOPMENT COMMISSION
Comparison
of l
Current and Proposed
Fees
December 1997
CITY OF CARLSBAD
GENERAL CITY SERVICE FEES
Comparison
of l
Current and Proposed
Fees
December 1997
Cln OF CARLSBAD
FEE SCHEDULE -
GENERAL CITY FEES AND CHARGL
DECEMBER 1997
Fee Description
tiandoned Vehicle Abatement - Actual Administrative Cost
idministrative Fee for 1915 Act Bond Call - 1% of principal being repaid
Mministrative Fee - DUI
rmbulance Fees
Base Rate - Resident
Base Rate Non-Resident
Mileage Charge - per mile
Supplies Charge
Night Charge
Oxygen Charge
Code - 3 Charge
appeal City Council - Miscellaneous
licyde Licenses
licyde Licenses - Replacement or Transfer
land Search
:abaret Dance Permit
:ampaign Sign Permit (plus a $200 refundable deposit)
iii Clerk - Audio Tape Copy
Sty Clerk - Municipal Code Books (Cost for Each)
:ity Clerk - Municipal Code Supplement service (per year)
:i Clerk - Full Council Agenda Packets (per year)
Xy Clerk - Certification Charge (per document)
Xy Council Agenda Subscription - Set by City Manager - Cost per year
:i Council Minutes Subscription - Set by City Manager - Cost per year
opies - each
timinal Justice Administration (per person)
mergency Fire Response Billings - DUI
Iearing Disposition Services for Pafldng Citations
Personal Hearings
Written Review
‘tanning Commission Agenda Subscription - per year
lanning Commission Minutes &I Agenda Subscrlptlon - per year
lanning Commission Full Packet (+ postage) - per year
ublications - As Determined by the City Manager
:eturnerJ Check Fee
in
ire - Nuisance Alarm
ire Use Permit Fees
Public Assembly
- Candles or Other Open Flame
. Assembly
Temporary Use
. Tents (Minor)
. Tents (Major) .
. Carnivals and Fairs
. Fireworks Display or Speclal Effects
-lazardous Materials and Processes
Welding
Compressed Gases
Dust Productlon
Note
(1)
current
Fee
COS
500.00
14.00
Proposed
Fee
$30 ($55 off road
;50 min/$5W ma
6.00
250.00
500.00
7.00
340.00
540.00
9.00
25.00
25.00
25.00
120.00
3.00
1.00
30.00
200.00
30.00
15.00
150.00
18.00
40.00
0.00
120.00
3.00
1.00
30.00
200.00
35.00
. 50.00
350.00
2.00
40.00
70.00
0.15
154.00
Actual Coa
15.00
150.00
50.00
350.00
5.00
40.00
70.00
0.15
154.00
Actual Cos
0.00
0.00
30.00
60.00
200.00
0.00
0.00
30.00
60.00
200.00
15.00 15.00
llo.w 130.00
40.00
80.00
90.00
90.00
80.00 1w.w
60.00 200.00
240.00 200.00
240.00 240.00
40.00
80.00
160.00
90.00
90.00
140.00
Amt %
(8.00: -57%
90.00
40.00
2.00
36%
8%
29%
(7.001 -28%
15.00 60%
(25.00 -100%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
5.00 17%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
3.00 150%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00
0.00
0.00
0.00
L 20.00
50.00
10.00
20.00
120.00
(40.00
0.00
50.00
10.00
(20.00
0%
0%
0%
0%
18%
125%
13%
25%
150%
-17%
0%
125%
13%
-13%
D.cemtlu16.1997
CITY OF CARLSBAD
FEE SCHEDULE -.
GENERAL CITY FEES AND CHARGL,
DECEMBER 1997
ee Dascrtptton
- Combustible Fiber Usa and Storaga
- Flammable Finishes
- Haz-Mat Use and Storage
- Dry Cleaning
- Motor Vehicle Repair
lazardous Installations
- Medical Gas Dispensing System
- industrial Ovens
- Combustible Storage Factlity
- High-f i&d Combustible Storage
- Refrigeration Equipment
Flammable and Combustible Liquids, Gases and Aerosols
- Use Permtt
- Dispensing
- Storage
- Tanks
0
ike - Failed Business InspecttonlZnd Reinsp.
in, - Hydrant Water Flow Test
Ire - Weed Abatement (per parcel)-plus actual costs if lot is daansd by the City
ire- Waed Abatement Compliance Certltlcate
btary Borrowing - Audio Visual Equipment (par item, per day)
brary Borrowing - Audio Visual lnsuranca fee - Per Vie0 Tapa
brat-y Fines (.lO per day per item)
braty Fines - Juvenile (05 per day per item)
brary Fines - Video (Sl.00 par day par item)
brary Interlibrary Loan
brary Lost or Damaged Items:
3arcode
.ibrary Card
3ook or Audit Item - List Price
Videotape - 20% of list prica (covered by insurance)
brary Online Searching Fees (Actual Cost for Dkadt tine Charges)
braty Prwsearch Fee for Dnkne Saarchaa (Per Search)
bay Book Resarvo
2ka
slice - Alarm Per-ml
flica - Audio Tape Copy - CAD Copy
flice-AudioTapeCopy-DtharCopy
dice - Copy of Acc%nt InmU@on IMeta Tapas
,lica - DUI Arrest
slice - False Alan Fee - Swond Ddduranca (no charge for 1st response)
)lica - False Alarm Fee - Each Addltlonal Dccumnce
slice - False Alarm Fee - Businesses - During Business Hrs
slice - Fingerprinting Fees
ralth Practtoner License Fees:
- Holtstlc Health Practktoner - license faa
- Massage Technictan - license fea
- lnvestigation fae
- Appeals of the City Manager’s da&ton
Current
Fee
160.66 14o.w (20.00:
160.66 90.00 (70.00
160.06 2W.W 40.00
160.00 140.00 (20.00:
160.00 140.00 (20.00:
ie
%
-13%
44%
25%
-13%
-13%
160.06 185.00 25.00 16%
120.00 125Oc 5.00 4%
120.06 12o.w 0.00 0%
240.00 240.00 0.00 0% .
160.00 i4o.oa (20.001 -13%
80.00
80.00
80.00
80.w
oloo
40.00
0%
13%
0%
0%
25%
. 80.00
60.W
90.W
80.00
80.W
QRQ
50.w
50.w
125.W
70.00
5.00
0.75
0.10
0.05
1.00
0.50
5.w
0.75
0.10
0.05
1.00
0.50
1.00
1.00
l.w
l.w
5.00
0.50
5.00
0.50
30.00
50.00
Actual Cos
25.00
50.00
lw.w
10.00
0.w
25.00
15.w
50.00
Actual Cot
25.W
50.00
lw.w
lo.w
50.00
lw.w
50.w
50.00
50.00
lw.w
50.00
50.00
0.00
10.00
0.00
0.00
10.00
45.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
-100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Proposed
Fee T FeeCha
Amt
oearnbu 16.1667 2
CITY OF CARLSBAD
FEE SCHEDULE -
GENERAL CITY FEES AND CHARGE,
DECEMBER 1997
+e Descrtptlon
‘bike - Historical Searches par month saarched
>olica - Hourly Cost per Police Gfkar - Determined by Finance Dir
)olice - Hourly Cost per Police Dfttwr With Vehicle - Determined by Fin Dir
Jolice - Impounded Vehicle Administrative Charge
Bolioe - Photograph Copy (fee plus reproduction costs)
‘olice - Report Fee (Free to Victim)
police - Second Call per Police Ofhoer per hour
Bolice - Second Call par Police Sergeant per hour
‘olice - Special Event Permit (fee plus services rendered)
Jolice - Veritication Letter
special Events - Minimum Filing Fee - One Street
special Events - Traffic Variance (Minor or Major) - Dfttcer per hour
special Events - Traffic Variance (Minor or Major) - Oflker and Patrol Car/hour
‘ublic Dump Permit - Fee per acra
3eeScheduleA
iewer Service Charges
Minimum Monthly Charge
Group I - Residential - Single Family Residence (Flat Rate)
Group I - Residential - Multi-Family Restdence rate per unit, 90% of water used
Group I - Residential - Mobile Home rata per unit, 90% of water used
Group II - Commercial - Rate per hundred cubic feet, min S15.00 per month
Group Ill - Commercial - Rate per hundred cubic feet, min 915.00 per month
Group IV - Commercial - Rate per hundred cubic feet, mln $15.00 per month
Group V - lnstltutions/Schools
- Elementary School - rate per student per month, min $15.00 per month
- Junior High School - rate per student per month; min $15.00 per month
- High School - rate per student per month; min $15.00 per month
- Boarding School - rate per student per month: min $15.00 per month
Group VI - Large Volume Users
- Beckman Micro Operations - Rate per hundred cubic feet, min $15.00 per mont
- Culligan - Rate per hundred cubic feet, min 515.00 per month
lpecial City &vices - Billed at Cost
-
;oltd Waste Fee (ANN) - 2.0% of Bask Trash Rata
rash Collection Fees
- Residential - par month
- Commercial per bin - ona pickup par week
- Commercial per bin - two pick-ups per week
- Commercial per bin - three pickups per week
-Commerdalperbin-fourpickupsparwaek
- Commercial per bin - Ba pick-ups per wwk
- Commercial per bin - six pica-ups per week
pecial Pick-ups of Solid Waste .
- DeNely charge for roll-off boxes (par box)
- Service charge for all classes of roll-off boxes (per collection + landfill disposal fe
on-resident Fee - Insbuctlonal Classes and Daytrippers
on-resident Fee - Open Play Basketball, Volleyball, Badminton
on-resident Fee - Youth Sports (per person) I
Note
(3)
(3)
(3)
(2)
0
Current Proposed
Fee Fee
25.OC 30.00
At Car At Cos
At Co: At Cos
15.w 40.00
1o.w 35.00
lo.w 10.00
41 .oa Actual Cos
56.00 Actual Cos
25.OC 25.00
8% 8.50
25.OC 25.00
3o.w 30.00
35.oc 35.00
2OO.OC 200.00
15.w 15.00
. 15.w 15.00
2.05 2.05
2.05 2.05
1.69 1.09
2.22 2.22
3.51 3.51
0.22 0.22
0.43 0.43
0.65 0.65
3.23 3.23
4.6C
1.31
4.60
1.31
14.52 14.52
74.92 74.92
137.19 137.19
199.49 199.46
261.73 261.73
324.W 324.00
386.27 386.27
42.W 42.00
255.59 255.56
4.w
3.w
1o.w
4.00
3.00
10.00
Amt %
5.w 20%
25.00 167%
25.09 250%
0.00 0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.w
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.00
0.w
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.w
0.00
0.w
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
oewmbr 16.1697 3 ,
cm OF CARLSBAD
FEE SCHEDULE -
GENERAL CITY FEES AND CHARGLJ . DECEMBER 1997
:ee Description
land See Schedule B
Annual Fee - Resident - Power Boats i3 Jet Ski Sailboats Over 8
Annual Fee - Non-Resident - Power Boats 8 Jet Skis Sailboats over 8
Annual Fee - Resident -Board/Sail Boats under 8’ & Passives
Annual Fee - Non-Resident - Board/Sail Boats under 8’ & Passives
Annual Fee - Board Sail - Additional Decal
Annual Fee - Additional Decal - Power Boats 8 Jet Ski Sailboats Over 8
Annual Fee - Additional Decal - Board/Sail Boats under 8’ 8 Passhres
Replacement Lagoon Permit Decal
Daily Fee - Resident - Power Boats 8 Jet Skis Over 8
Daily Fee - Non-Resident - Power Boats & Jet Skis Over 8’
Daily Fee - Resident - Passive Use 8 Vessels under 8’
Daily Fee - Non-Resident - Passlve Use 8 Vessels Under 8’
Per Admission - Youth 8 Teen
Per Admission - Adult - Resident
Per Admission - Adult - Non-Resktent
Season Dtscount - Adult - Resident
Season Discount - Adult - Non-Resident
Season Discount - Family - Resident
Season Discount - Family - Non-Resident
City Classes - Beginner - Learn to Swim - Res
Cii Classes - Beginner - Learn to Swim - Non-Res
Cii Classes - Adult/Teen - Learn To Swim - Res
City Classes - Adult/Teen - Learn To Swim - Non-Res
Clty Classes - Parent/Infant thru Pm-School Ill - Res
Cii Classes - Parent/Infant thou Pm-School Ill - Non-Res
Contract Classes - Adapted Aquatics - Res
Contract Classes - Adapted Aquatks - Non-Res
Contract Classes - Aqua X I Masters Swim (Daily Fee) - Res
Contract Classes - Aqua X I Masters Swim (Daily Fee) - NokRes
Contract Classes - Diving, Synchro Swim - Res
Contract Classes - Diving. Synchro Swim - Non-Rw
Contract Classes - Masters Swim Workouts - Res (Monthly Fee)
Contract Classes - Masters Swim Workouts - Non-Res (Monthly Fee)
lndivtdualtted lnstr - Basic Swimming - Res (per hour)
lndividualized lnstr - Basic Swimming - Non-Rea (per hour)
lndivkkraliied lnstr - Advanced InaWcoaohing - Res (per hour)
lndivtdualized lnstr - Advanced IneWcoaching - Non-Rea (per hour)
Rental - Exclusive Use - Cam- (Per Hr)
Rental - Exdusive Use - ComnnmityWmProgt (Per l-k)
Use Agreements - C.U.S.D. (per lane per hr)
Use Agmements - N.C.A. - (per laneper hr)
Staff Costs - City provided senrices (Ltfe Guard I Superviakn etc. - Per Hr)
,pproved Badmow Tester
iackftow Preventer Charge (per month, each account)
blueprinting of Standard Size (24” x 88”) Improvement Plan Sheet (Cost for each)
umper Connection
‘otable. Reclaimed and Sewer Standards and Speciftcatlons (Cost for each)
Current
Fee
Proposed
Fee Amt
e
%
75.00
87.50
37.50
43.75
25.00
70.00
87.50
30.00
43.75
seebelon
50% WIT. fet
50% WK. fee
7.50
12.00
18.00
5.00
9.00
(5.W -7%
0.00 0%
(7.50 -20%
0.00 0%
(25.00 -100%
7.50
12.00
18.00
5.25
9.00
0.00 0%
0.00 0%
0.00 0%
(0.25 -5%
0.00 0%
1.00
2.00
3.00
60.00
. 70.00
72.00
82.00
20.00
26.00
25.00
32.00
25.00
32.00
17.00
25.00
3.25
4.25
22.00
30.00
32.50
42.50
17.00
25.00
25.00
33.00
80.00
32.00
1.80
2.00
11.00
1.00 0.00 0%
2.00 0.00 0%
3.00 0.00 0%
60.00 0.00 0%
70.00 0.00 0%
72.00 0.00 0%
82.00 0.00 0%
23.00 3.00 15%
31.00 3.00 11%
25.00 0.00 0%
32.00 0.00 0%
25.00 0.00 0%
32.00 0.00 0%
17.00 0.00 0%
25.00 0.00 0%
3.25 0.00 0%
4.25 0.00 0%
22.00 0.00 0%
30.00 0.w 0%
‘32.50 0.00 0%
42.50 0.00 0%
17.00 0.w 0%
25.00 0.00 0%
25.00 0.w 0%
33.00 0.w 0%
80.00 0.w 0%
32.00 o.oa 0%
1.90 0.10 6%
2.w 0.w 0%
ll.cla 0.w 0%
25.00 25.00 0.w 0%
3.00 3.00 0.00 0%
5.00 5.00 0.w 0%
15.00 15.w 0.W 0%
20.00 0.00 (20.0( -100%
Dacamk 16.166? 4
CITY OF CARLSBAD
FEE SCHEDULE -
GENERAL CITY FEES AND CHARGt,
DECEMBER 1997
Current
Fee Fee Description
Reclaimed Water Use - Base Rate Par Unit
Wastewater Permit Application
Potable Water Use - Base Rate Per Unit (standard water rate)
Conservation Rate (cost per unit) - 518” meter (1 - 7 units of water)
Conservation Rate (cast per unit) - 3/4” meter (1 - 10 units of water)
Conservation Rate (cost per unit) - 1” meter (1 - 16 units of water)
Conservation Rate (cost per unit) - 1 l/2” meter (1 - 30 units of water)
Conservation Rate (post per unit) - 2” mater (1 - 45 units of water)
Conservation Rate (cast per unit) - 3” meter (1 - 79 units of water)
Conservation Rate (cost per unit) - 4” meter (1 - 123 units of water)
Conservation Rate (post per unit) - 6” meter (1 - 228 units of water)
Conservation Rate (cost per unit) - 8” meter (1 - 336 units of water)
Cost of Delivery Charge (per month) Fire Protection Maters
Cost of Delivery Charge (par Month) Multi-Family Unit
Cost of Delivery Charge (par month) - 518” meter
Cost of Delivery Charge (par month) - 3/4’ meter
Cost of Detivary Charge (per month) - 1” mater
Cost of Delivery Charge (per month) - 1 l/2” meter
Cost of Delivery Charge (per month) - 2” meter
Cost of Delivery Charge (per month) - 3” meter
Cost of Delivery Charge (per month) - 4’ mater
Cost of Delivery Charge (per month) - 6. mater
Cost of Delivery Charge (par month) - 8” meter
Watar Service Fee - Per Naw Account - Service Turn on
Water Service Fee - Continuity of Service
Water Servica Fee - Door Hanger
Water Sarvtca Fee - Accounts scheduled for terminatkm for non-payment
Water Service Fw - Same Day Turn-on (Not Scheduled for That Day)
Water Sarvica Fee - After Hour Turn-on
Water Meter Deposit - Construction Meters
Water Meter - Consbuction Meter rental fee
Water Meter - Construction Mater Relocation
Notes:
1.62
25.00
1.70
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
20.80
0.00
9.25
11.75
16.75
29.25
44.25
. 79.50
129.50
254.50
404.50
25.00
10.00
10.00
20.00
20.00
60.00
560.00
50.00
20.00
(1) - Charge is cost of suppties plus additkrnal60%.
(2) - Nonresidential sewer rates are calculated based on llow, strength and pretreatment requirements.
(3) - Sac Cartsbad Munidpal Coda Sactbn 8.17.056
Proposed
Fee
1.62
25.00
1.70
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
1.52
20.80
0.00
9.25
11.75
16.75
29.25
44.25
79.50
129.50
254.50
464.50
25.00
10.00
10.00
20.00
20.00
60.00
560.W
50.00
20.00
l- Fee Chr
Anlt
0.00
0.00
0.00
0.w
0.w
0.00
0.00
0.00
0.w
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.w
0.w
CITY OF CARLSBAD
DEVELOPMENT IMPACT FEES
Comparison
of -
Current and Proposed
Fees
December 1997
CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT IMPACT FEES
DECEMBER 1997
:w Description
:ws Subject to Bectlon 66000 of the Callfomla Government Code:
3ridge 8 Thoroughfare - per Single Family Unit (Outside CFD)
3ridge & Thoroughfare - per Condominium Unit (Outside CFD)
3ridge 8 Thoroughfare - per Apartment Unit (Outside CFD)
3ndge 8 Thoroughfare - all other - per Avg. Daily Trip (Outside CFD)
.ocal Facilities Mngt Plan/Amendment - fee + deposit in min. increments of $5,QW
)lanned Local Drainage Few
‘ublic Facilities Fws - 3.5% of Bldg Permit Value (Outside CFD)
‘ublic Facilities Fees - 1.82% of Btdg Permit Value (Inside CFD)
jewer Benet% Area Fws
‘raffrc lmpad Fee - Residnt’l Cost Per Trip (Out of CFD)
?affic Impact Fee - Commrc’Vlndust Cost Per Trip (Out of CFD)
?afftc Impact Fee - Residnt’l Cost Per Trip (Inside CFD)
‘raffic Impact Fee - Commrc’l/lndust Cost Per Trip (Inside CFD)
Wa Subject to Soction 66012 of the Califomk Govemmont Codw
‘ark In-Lieu Few
bwer Conrtactlon
lajor Fadltty Fee - Potable Water per EDU
dajor Fadlii Fee - Potable and Redaimed Water Connection Fees:
Meter Size 5/8” - Displacement
Meter Biie 314” - Displacement
Meter Size 1” - Displacement
Meter Sue 1-1M” - Displacement
Meter Size l-1/2” - Turbine
Meter Size 2” - Displacement
Meter Sue 2’ - Turbine
Meter S&e 3” - Displacement
Meter Sue 3” - Turbine
Meter Sue 4. - Displacement
Meter Size 4” - Turbine
Meter Sue C - Turbo
Meter Size 6” - Displacement
Meter S&e 6” - Turbine
Meter Sue 6” - Turbo
Meter Sie 8” - Displacement
Meter Size 8” - Turbine
Meter Sue 8” - Turbo
Note
(1) (2)
(1) (2)
(2)
(2)
(2)
(2)
(1)
(1 w
Curren
Fet
Propowc
Fw
530.00 530.00
424.00 424.00
318.00 318.00
22.w 22.00
Dep. Cos 10,Wo.w
84.00 85.W
34.00 34.W
54.00 55.w
22.00 22.00
.
1,810.W 1,824.W
(see below
2,400.W 2.400.w
3,420.W 3.420.00
5.4w.w 5.400.w
10,2w.w 10.2w.00
11,975.w 11.975.00
15.866.w 15,366.oo
19,2w.w 19,2W.W
27,000.W 27,000.W
42.000.W 42.000.W
42,000.W 42.000.W
72,000.W 72.000.W
120,OOO.w 120,WtY.w
78,000.W 78,ooO.OO
156,ooo.w 150.Wo.w
240,OOO.W 240.000.W
115,2W.W 115,200.W
216,000.W 216,W0.W
420,OOO.W 420.000.W
Iotas:
I) - See attached schedules and rate tabbs.
!) - Fee Increaws bawd on Annual Change in Engineering News Record as Established by Council by Ordinance.
Fw Change I
Amt
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.w
0.00
0.00
0.w
0.00
%
0%
0%
0%
0%
1%
0%
2%
0%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
December 16,19Q7
PLANNED LOCAL DRAINAGE AREA FEES
_~~
Fee acre per gross
Area / Basin Name
CURRENT AND PROPOSED s(
1996-97 1997-98
Low High Low High
Runoff Runoff Runoff Runoff
A Buena Vista Lagoon
B Agua Hedionda Lagoon
C Encinas Creek
D Batiquitos Lagoon
$1,572 $2,574 $1,587 $2,598
3,380 5,532 3,412 5,584
2,528 4.136 2,552 4,176
34 56 35 57
1edule #A
Change
Low High
Runoff Runoff
$15 $24
32 52
24 40
1 1
SEWER CONNECTION FEES
CURRENT
General Capacity Fee All Areas
Plus Sewer Benefit Fees shown below
I
PROPOSED
Schedule #B
$1,810
Schedule #B
I General Capacity Fee All Areas $1,824
Plus Sewer Benefit Fees shown below I
.
SEWER BENEFIT AREA FEES
I CURRENT SdWdUkRc
Sewer Benefit Area Fee
Area A 279
Area B 491
Area C 407
Area D 785
Area E 803
Area F 879
Area G 76
Area H 514
Area I 285
Area J 982
Area K 1,981
Area L 776
Area M 38
.:.i&!$ iJlBmc@m: z:: i”i:‘S .j. stifredulem
Sewer Benefit Area Fee
Area A 316
AreaB- 556
Area C 461
Area D 889
AreaE 910
Area F 996
Area G 86
Area H 582
Area I 323
Area J 1,113
Area K 2,244
Area L 879
Area M 43
December16,1997
- PARK IN-LIEU FEES
- CURRENT AND PROPOSED FEES Schedule ID
Value Fee
Quadrant Per Acre Per Unit
District I- NW $195,000
Single Family Detached & Duplex $1,755
Attached (4 units or less) 1,463
Attached (5 units or more) 1,170
Mobile Home 1,034
District 2 - NE 175,000
Single Family Detached & Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 919
District 3 - SW 175,000
Single Family Detached 8 Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 919
District 4 - SE 175,000
Single Family Detached 8 Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 919
The Park Fee ordinance establishs a method of
determining park land values in each quadrant
.
December 16,1997 ,
CITY OF CARLSBAD
DEVELOPMENT-RELATED SERVICE FEES
Comparison
of l
Current and Proposed
Fees
December 1997
CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Description Note
Additional Planning Inspections (first Insp included in plan chack fee)
Adjustment Plat
Affordable Housing Credit Per Unit
Appeal - City Council (+ noticing costs) - fee rafundad if appeal is won
Appeal - Housing and Redevelopment Commission (+ noticing costs) - fea
refunded if appeal is won
Appeal - Planning Commission (+ noticing costs) - fee refunded if appeal is won
. pr
Appeal - Redev. Design Review Board (+ noticing costs) - fea refunded if
appeal is won
Building Permit Fees (1)
Building Plan Check - 65% of Btdg Permit (8% discount on repathlve plan checks)
Building Cpde Enforcement
Certiicate of Compliance
Certificate of Compl. in lieu of Parcel Map
Certitkate of Correction
Community Facilities District Annexation
Construction Change Review - Minor (fea plus $165 par sheat)
er
Construction Change Review - Major (fee plus $165 per sheet)
Coastal Development Permit (CDP) - Single Family Lot
Plll)rlf .
-f . .
CDP - 2 - 4 unit or lot subdivision (per permit)
COP 2 . . ?! r)
CDP - 5 or more unit or lot subdivision (per permit)
(‘3)
(8)
(8) . . . SO
CDP Amendment = 50% of current permit cost
CDP Emergency Penit
CDP Exemptton
CDP Extensions = 25% of current permit cnst
CDP - Non-Redevelopment Area - Minor Permit (8) 175.00 53o.oc 355.00 203%
CDP Non-Residential= 10 cents per aguam foot
CDP - Redevelopment Area
CUP
(8)
-’
CUP - Amendment
CUP - 810 Habit Preserve
CUP - Extension
Curren
FM
50.00
340.00
30,100.00
see belov
da949
4a9790
120.00
see belov
c&&99
49949
230.00 .
1,580.Otl
150.00
480.00
seebetov
Beebelov
aeo?w
Bee below
69949
SWbdOV
cl6&9e
seebelov
-
2W.W 26o.oc 60.00
No Charge 14O.OC 140.00
2,500.W
400.00
4W.oa
4oo.oa
4w.oc
court cost
62O.OC
2,250.oc
49o.oc
82O.OC
29o.oc
4lO.Oc
74o.oc
1.35o.Oc
2.12o.ot
4w.oc
2.68osn
1,440.Ot
5w.w
54o.w
FeC
SO.00
760.00
30.1 w.oc
6W.W
Fee Change
Amt
0.00
420.00
0.00
%
0%
124%
0%
280.00 233%
390.w 17041
670.00 42W
340.00 227%
340.00 719(
30%
180.00
505.00
140.00
79(
54?4
35%
December 18,1997 1
C CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Description
DayCare Permit
DayCare Permit - Extension
Design Review - Preliminary Review - Major
Design Review - Preliminary Revtew - Minor
Developer Agreements - Deposit $lO.OW increments
Duplicate Tracing Fees - Final Parcel Maps (fae plus $24 per sheet)
at
Duplicate Tracing Fees - Final Tract Maps (fae plus $24 per sheet)
at
Easement Document Processing and Recording
EIA - All Others
EIA - Single Family Lot
EIR Review (base fee + deposit in $5.000 increments after the first 160 hrs of
project planner and 40 hn project engineer)
EIR - Addendum (+ deposit in $1.000 increments after 1st 10 hrs of project planner)
EIR - Focusad/Supptemental (Requiring a Pubtic Hearing) - (fae + deposit in $5,000
inwments after the 1 st 100 hn of pmjact planner and 20 hrs of pmjact engineer)
Encroachment Agreement Procasaing
Environmental Monitoring Fee
Fire Protection System Inatallatton
Fish 8 Game Fee - Negative Declaration - Set by Department of Fish and Game
Fish & Game Fee - EIR - Sat by Dapartmant of Fish and Game
Future Improvement Agreements
GIS 1 - 500 Parcels (per parcal + labor and plottar usage)
GIS 501 - 5,000 Parcels (par parcal + labor and plotter usage)
GIS More than 5,000 Par&s (par parcel + labor and plotter usage)
GIS Technidan Labor (per hour)
GIS Pen Plotter Usage Rate (per hour)
General Plan Amendment - 0 - 5 Acraa
General Plan Amendment - Over 5 Acraa
Grading Permit Application
Grading Penntt
Grading Permit Invastigatttlon Faa
Grading Permit Extension Fw
Growth Management Fees - As m by Ccrundl
Hillside Dev Permit - Single Family Lot
Hillside Dev Permit - Other (Mulpla Lots)
Hillside Dav Permit Amendment - Siita family Lot
Hillside Dav Permit Amendment - Other (Muttlpta Lots)
p see Secured Agreement Prod. Ext.
Improvement Construdion lnspactton Faa
Improvement Plan Review (Plan Chack)
lndusionary t-touslng Impact Fee (per unit)
lndusionary Housing In-Lieu Fee (par market rate unit)
December 16.1997
(5)
(5)
(5)
(5)
(5)
(1)
(6)
(6)
(1)
(1)
(8)
(8)
(1)
(1)
Cunen
Fel?
66799
125.00
55.00
275.00
55.00
Actual cos
Bee belov
5949
see balov
6949
2w.w
220.00
220.00
see below
275.00 .
5.5oO+uM
140.00
150.00
80.00
2.00
1.50
1.00
80.00
20.00
see balon
-
-
2,500.W
-
Pmposec
Fet
Fee Change
Amt %
125.00
55.00
275.00
55.00
Actual co8
10.00
0.00
0.00
0.00
0.00
0%
0%
0%
0%
10.00
390.00
1,030.w
560.00
12,OOO.Oc
190.00 95%
810.00 368%
340.00 155%
1,500.w
8,4W.W
1,225.W 445%
200.00
200.00
60.00
50.00
43%
33%
280.00 200.00 250%
2.00 0.00 0%
1.50 0.00 0%
1.00 0.00 0%
40.00 (40.00: -50%
20.00 0.00 0%
2,550.W 1,350.oo 113%
3.680.00 1,180.W 47%
Actual car
25% permit k
740.w 620.00 517%
1,610.W 1,210.w 303%
420.00 340.00 425%
1.29O.w 940.00 269%
2,925.w
4,515.w
0.w
0.00
0%
0%
1
P CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
I
Fee Description
Inspection Overtime-per Hour (On Request) - each additional hour at $55
Landscape Plan Check
Landscape Inspection
License Tax on New Construction - Mobile Homes
Local Coastal Plan - Amendment
pr
Ir
Master Plan (+ deposit in $5.000 increments after 1st 200 hrs of project planner
and 100 hn project engineer)
Llrr)r.Plrn
Master Plan Pm-Submittal
Master Plan Amendment - Minor - fee + deposit in min. increments of $1,000
Master Plan Amendment - Major (+ deposit in increments of $5,000 after 1 st 100
hours of project planner and 40 hrs of project engineer)
Llrrb.1
Oversize Load Permit - 1 trip (fee set by State)
Oversize Load Permit - Annual (fee set by State)
PD Res. Amendment - 4 or less
PD Res. Amendment - 5 to 50
PD Res. Amendment - 51 or more
PD Amendment- Non-Res - 4 or less
PD Amendment - Non-Res - 5 to 50
PD Amendment - Non-Res - 51 or more
PD Res. - 4 or less
PD Res. - 5 to 50
PD Res. - 51 or more
PD - Non-Res - 4 or less
PD - Non-Res - 5 to 50
PD - Non-Res - 51 or more
Permit Amendments Not Specifkalty ldentifted
Planned Industrial Permit
Planned Industrial Permit -Amendment
Planning Commission Determination - Single Family Lot
Planning Commission Determination - Dther
Planning Commission Dlscusston Item
Planned Development Final Map - Mjno~ (4 or less)
Planned Development Final Map - Mejor (50 or tess)
Planned Developemnt Final Map - Major (51 or more)
Precise Development Plan
Precise Development Plan - Amendment ’
Pm-Grading Request
Preliminary Plan Review - Major
Preliminary Plan Revlew - Minor
Preliminary Review - Redevelopment (minor or major)
Public Fadlttles Fees Agreement
Note
(1)
(1)
(8)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(2)
(4)
Curren
Fee
loo.w
Proposer
Fe#
70.00
1,150.oo
See belov
-
wJao9
see belov
1,378.W
3,900.w
25.0W.W
3.750.00 4,250.OO
1,7w.w 1 ,ow.oo
Bee belov 20.5W.W
-
6991
15.00
60.W .
250.00
2.000.00
5,510.w
575.00
3.000.00
6.000.W
440.00
4.000.w
11.022.w
440.00
5.510.w
10,504.w
15.00 0.00 0%
60.00 0.00 0%
970.00 720.00 288%
3,700.w 1.7w.w 85%
4.QQ0.w (520.00 -9%
l.llo.w 535.00 93%
3.970.00 970.00 329(
5,380.w (620.00 -10%
1,800.w 1,360.w 309%
5,000.w l,ow.w 25%
7,900.w (3,122.W -289
1,800.W 1,360.w 309%
5,000.w (5lO.W -9%
7900.00 (2,604.W -25%
8W.W 2.780.00
400.00 1,250.w
220.00 600.00
830.00 1,050.w
see belov 400.00
25.00
70.00
70.00
1.7w.w
l.lw.w
120.00
120.00
0.00
50.00
25.00
70.00
70.00
4.550.00
2.470.00
480.00
420.00
120.00
0.00
50.00
I r Fee Change
Amt
(30.00:
56
-30%
228.00 20%
500.00
(700.00
13%
-41%
2,180.W 363%
850.00 21351
380.00 173%
220.00 27%
0.w
0.00
0.00
2,850.w
1,370.w
300.W
0.00
0.w
0%
0%
0%
1680,
1259
2500,
09
09
1
December 16,1997
CITY OF CARLSBAD ?
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Description
Cluitdaim of Easement
Reapportionment Fees for 1911 Act Assessment Districts - (plus $50 per parcel)
Redevelopment Permit (Admin.)
Redevelopment Permit (Minor) - plus noticing costs
Redevelopment Permit (Major) - plus noticing costs .
Redevelopment Permit Amendment (Admin)
Redevelopment Permit Amendment (Minor) - plus noticing costs
Redevelopment Permit Amendment (Major) - plus notidng costs
Research and Design Time (By Written Request) - Per Hour - Minimum $25.00
based on hours to completion.
Reversion to Awage - $3,000 deposit
Right of Way Permit - Minor
rJ;*rsa Minor Category
Right of Way Permit With Encroachment - Sea Encroachment Agreement Processing
Right of Way Permit - LRitii (Fee + actual costs for Insp. and Sr. Insp. time)
Right of Way Permit - Litllity (By Contract)
Satellite Antenna Permit
School Faas - (Sat by School Districts. State Mandates Limits)
Second Dwelling Unit Permit
Secured Agreement Proc. Extension
Secured Agreement Prop. Raplace - fee + improvement plan revision faes if required
Segregation of Assessments - 4 tots or less
Segregation of Assessments - 5 lots or more - fee plus $20 per tot
Crl
Cpr.,l)
8)
a)
CIlr)
$5)
65)
-51
C)
er(
Sewer Lateral Installation (DarNsbad/) Deposit)
Sign Permit
Sin/Outdoor Display Permit, Redevelopment Area
Sin Program, Non RDA
Sin Program Amendment, Non RDA
Sign Program Permit, Redewtopment Area
Sign Program Permit Amendment, Redevelopment Area
Site Development Plan (Minor) - Res. <= 4 units/lots
Site Development Plan (Major)
Note
(7)
(7)
Curren
Fe
280.00
450.00
6949
150.00
1.4w.w
80.00
800.00
80.00
500.00
see below
a640
Beebeh
l&w
e&99 .
40.00 250.00 210.00 5259
250.00
175.00
lw.w
2.775.00
5.530.00
260.00
980.00
1,800.OO
lw.w
350.00
860.00
Actual ws
Actual ws
210.00
440.00
630.00
250.00
480.00
1,3w.w
2.3W.W
2,500.W
30.00
30.00
650.00
500.00
175.00
40.00
2.670.00
6.770.00
Fee Ghan!
Amt
469
09
830.00 5539
400.00 299
270.00 3389
60.00 69
380.00 152?
0.00
0.00
O?
09
475.00 2714
400.00 4009
(105.00 44
1.240.00 22:
9e
%
December 16,1997 4 .
- CITY OF CARLSBAD
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Description
Site Development Plan Amendment (Mlnor)
Site Development Plan Amendment (Major)
Special Use Permit - Scenic Corridor
Special Use Permit - Flood Plain
Special Use Permit - Flood Plain, Coastal High Hazard Area
Special Use Permit Amendment - Flood Plain
Special Use Permit Amendments - All Other
Specific Plan Amendment - fee + deposit in $1,000 min. increments
CIlriffrPlrr
PPlrr
Specific Plan (+ deposit in $5.000 increments after 1st 200 hrs project planner or
60 hrs project engineer)
Street Light Energlzlng Fee
Street Name Change
Street Sign Deposits (As Required)
Street Vacation - Regular
Street Vacation - Summary
Substantial Conformance Exhibit Rev&w
Tentative Map Revision - 5- 49 Lots or Units
$2.500 + $4O/lot or unit over 5 (whichever is greater)
Tentative Map Revision - 50 or More Lots or Units
$4,550 + Sl5Ilot or unit over 50 (whichever is greater)
Tentative Parcel Map Processing Fee (Minor Subdiision)
Tentative Parcel Map Extension (Minor Subdivision) - per application
Parcel Map (Minor Subdivision) - Final
Tentative Tract Map Litigation Stay
Tentative Tract Map - 5 -49 Lots or Units
84,900 base + SllOilot or unit over 5 (whichever is greater)
C9LM
Tentative Tract Map - 50 or Mw Lob or Units
$9.850 base + S15Itot or unit OII# 50 (whichever is greater)
a).
Tentative Tract Map Extension
Final Tract Map (Base fee + $5 per Aw)
Third Party Review - fee plus consultant cost
Note
(1)
4,590.w
2.09O.w
2.310.00
1.670.00
2.000.w
1,450.w
1 .OOO.oo
21 ,wo.w
980.00
2,460.W
1,870.W
800.00
2,270.W
880.w
2.250.w
25%ofor&fe
1,720.OC
4.47O.M
44o.w
Fee Ct
Amt
1,305.w
3,440.w
1.810.W
1,180.w
1,370.w
1,180.W
1.225.00
w %
275%
299%
646%
101%
4579
1440,
5449
860.W 7170,
2,0W.w 4089
3w.w 1009
659.w 419
74.Oc 99
67O.M 429
1.71o.M: 629
1
December 16,1997 5 \.
CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Current Proposed Fee Change
Fee Description Note Fee Fee Amt %
Variance - Administrative Redeveloprnant ’ 110.00
Variance - Redevelopment 250.00
tiariance - Engineering see below 450.00
8649
48949
i/ariance - Planning Bee below 1,690.OO
-1 as&w
C 67&w
Jariance - Administrative (Planning) Bee below 450.00
!one Change - 5 or fewer aws
!one Change - 5.1 or more aws
4a949
(9) 280.00 2,930.w 2.650.00 946’
(9) see below 3,970.w
86949
!one Code Amendment
s above
(Use Improvement Plan Review Fees)
psa Improvement Plan Revlew faes
Clnduded in Improvement Plan Review Fees
Mer Installation Fees:
518”
Fira Protection
3l4”
1”
1 l/2’ - Turbo
1 l/2” - Displacement
1,150.w 3.780.00 2.630.00 224
.
80.00 80.00 0.00 0’
65.00 80.00 15.w 23’
llo.w 90.00 (20.00) -18’
150.00 120.00 w.w -20’
275.00 540.00 265.00 98’
275.00 280.00 5.00 2’
Decembar 18.1997
CITY OF CARLSBAD -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Current Proposed Fee Change
‘ee Description Note Fee Fee Amt x
2” -Turbo 420.W 670.00 250.00 60%
2” - Displacement 420.00 350.00 (70.00) -17%
3” 900.00 1 ,ow.oo 100.00 11%
4’ 1,620.W 1,780.oo 160.00 10%
6” 2,700.W 3,250.W 550.00 20%
lotable. Redaimed and Sewer Improvement Plan Review - Use Improvamant Plan Ravlaw Faeu
IS 4owQ
GconnMns 8994o
$ts -
-tS %M=QQ
eanrl
‘otable, Reclaimed and Sewer Standards and Specifications (Cost for each) 20.00 0.00 (20.00) -100%
;an Diago County Water Auth. Capacity Charge - Set by SDCWA
&vice Installation Fees
1” Water 8W.W 1.230.w 430.00 54%
2” Water l,OOO.w :1.54o.w 540.00 54%
2” Lateral with two 1” Services (baaa fee $100 + tlma and materials) 1500.00 Tlma 8 Matl
.
Fira Hydrant Lateral and Assambly 5.000.w 4,300.w (7W.W) -14%
Fire Detector Lateral 4,590.w 3,800.w (700.00) -16%
taste Water Diicharge peftwt 25.00 25.00 0.00 0%
Jaste Water Pretreatment:
Class I (par month) - Existing user 250.00 200.00 (50.00) -20%
Class II (par month) - Existing user 150.00 190.00 40.00 27%
Class Ill (per month) - Existing user 25.00 30.00 5.00 20%
Class I - One time fee for naw users 270.00
Claaall-Onatiifaafornewuaara 270.00
Class Ill - Ona time fae for new users 80.00
otes:
) - See attached schedules and rata tables.
!) - Based on number of unlta or lots whiivar is grwtar
I) - Fee lnwasas bawd on Annual Change in Engineering News Record as Established by Coundl by Ordinance.
,) - Any Permit Amendmant not identtftad asawsad at 50% of original cost.
i) - Plus fish and game department fae, H any. Currangy set at $1,250 for Negative Declaration and $850 for EIR.
i) - Feea set by State Statute.
‘) - For all Assawment Dtstrldts uabtg 1915 Act Banda.
;) - A 25% discount may apply whan aubmMad wtth another application
1) - A 25% d&count will apply when dmitted wtth a Genaral Plan Amandment
December 16.1997
FIRE PROTECTION SYSTEM IN.Q^‘LATION FEES -,
Automatic Sprinkler Systems
- Commercial System
- Tenant improvement
- Residential System
Fire Alarm Systems
- 1 to 10 Devices
- 11 or more Devices
Other Fixed Fire Systems
- Hood and Duct
- Halon
- Special Chemical Agent
- Standpipe
- Paint Spray Booth
Repeated Inspection on new construction
/
Automatic Sprinkler Systems
- Commercial System
- Tenant Improvement
- Residential System
Fire Alarm Systems
- 1 to 10 Devices
- 11 or more Devices
Other Fixed Fire Systems
- Hood and Duct
- Halon
- Special Chemical Agent
- Standpipe
- Paint Spray Booth
IRepeated Inspection on new constructicn
QENT FEES Schedule #I
Plan
Review
Inspection Fees Total
No. I cost Fee
$80 +.75/spklr
40
40
6 at
1 at
3 at
$40 each
40 each
40 each
$320 +.75/spklr
80
160
40 minimum 1 at 40 each 80
40 +Sl.OO/device 2 at 40 each 120 +l .OO/device
40
60
40
40
40
WED FEES
Plan
Review
$70 +.75/spklr
40
40
1 at 40 each 80
2 at 40 each 140
1 at 40 each 80
2 at 40 each 120
2 at 40 each 120
1 at 40 each 40
SChdUle#l
.
Inspection Fees Total
No. I cost Fee
6 at $50 each $370 +.75/spklr
1 at 50 each 90
3 at 50 each 190
40 minimum 1 at 50 each 90
40 +$l.OO/device 2 at 50 each 140 +I .OO/device
40 1 at 50 each 90
60 2 at 50 each 160
40 1 at 50 each 90
40 2 at 50 each 140
40 2 at 50 each 140
1 at 50 each 50
December 16. 1997
33
GRADING PERMIT APPLICATIC- EES
CURRENT Schedule #2
I-
100 CY* or less
101 to 1,000 CY
1,001 to 10,000 CY
10,001 to 100,000 CY
100,001 to 200,000 CY
200,001 CY or more
l CY = Cubic Yards
Base
Fee Plus Per
$100 -
500 80.00 1OOCY
1,300 80.00 1,000 CY
2,100 80.00 10,000 CY
2,900 80.00 10,000 CY
3,700 300.00 100,000 CY
Amount
100 CY* or less
101 to 1,000 CY
PROPOSED Schedule AC?
Fee
$250.00
$500.00
for the first 100 cubic yards plus $100.00 for each additional 100
cubic yards or fraction thereof.
1,001 to 10,000 CY
10,001 to 100,000 CY
$1,500.00
for the first 1,000 cubic yards plus $100.00 for each additional 1,000
cubic yards or fraction thereof. .
$2,600.00
for the first 10,000 cubic yards plus $150.00 for each additional 10,000
cubic yards or fraction thereof.
100,001 to 200,000 CY $4,000.00
for the first 100,000 cubic yards plus $200.00 for each additional 10,000
cubic yards or fraction thereof.
200,001 CY or more
CY = Cubic Yards
$6,100.00
for the first 200,000 cubic yards plus $110.00 for each additional 100,000
cubic yards or fraction thereof.
1
December 16,1997
- GRADING PERMIT FEES
CURRENT Scheduie #3 I
Grading Permit - 100 CY’ or less
Fee Plus
$25 -
Per -
Grading Permit - 101 to 1,000 CY
Grading Permit - 1,001 to 10,000 CY
Grading Permit - 10,001 to 100,000 CY
Grading Permit - 100,001 to 200,000 CY
Grading Permit - 200,001 CY or more
* CY = Cubic Yards
75 10.00 100 CY
175 52.50 1,000 CY
700 60.00 10,000 CY
1,300 180.00 10,000 CY
3,100 300.00 100,000 CY
P
1
1
1
1
1
2’
41
1,
t L
PROPOSE0 Schedule #a
kmount
00 CY* or less
Fee
$250.00
01 to 1,000 CY $250.00
for the first 100 cubic yards plus $50 for each additional 100 cubic
yards or fraction thereof.
,001 to 10,000 CY
0,001 to 100,000 CY
$700.00
for the first 1,000 cubic yards plus $50 for each additional 1,000 cubic
yards or fraction thereof. .
$1,150.00
for the first 10,000 cubic yards plus $100 for each additional 10,000
cubic yards or fraction thereof.
00,001 to 200,000 CY $2,050.00
for the first 10,000 cubic yards plus $100 for each additional 10,000
cubic yards or fraction thereof.
00,001 to 400,000 CY $3,050.00
for the first 10,000 cubic yards plus $150 for each additional 10,000
cubic yards or fraction thereof.
00,000 to 1 ,ooo,ooo CY $6,050.00
for the first 100,000 cubic yards plus $750 for each additional 100,000
cubic yards or fraction thereof.
,OOO,OOl CY or more $10,550.00
for the first 100,000 cubic yards plus $540 for each additional 100,000
cubic yards or fraction thereof.
CY = Cubic Yards
December 16.1997 r
7&
IMPROVEMENT CONSTRUCTIOPr 9PECTION FEES
CURRENT Schedule #4
Cost of Improvements
$0 to $250,000
Fee
5% - $250 Minimum
$250,001 to $750,000 ’ 4.5% - $12,500 Minimum
$750,001 to $2,000,000 4.0% - $33,750 Minimum
. $2,000,001 to $5,000,000 3.5% - $80,000 Minimum
$5,000,001 and Over 3.0% - $175,000 Minimum
PRCWUSFD
Cost of Improvements
$0 to $20,000
$20,001 to $50,000
. -.-- v--w --..---.- . . .
Fee
5% - $250 Minimum
$1 ,ooo.oo
for the first $20,000 plus $200 for each additional $10,000 or fraction
thereof
$50,001 to $100,000 $2,000.00
for the first $50,000 plus $100 for each additional $10,000 or fraction
thereof
$100,001 to $250,000 $2,500.00
for the first $100,000 plus $80 for each additional $10,000 or fraction
thereof
$250,001 to $500,000 $3,700.00
for the first $250,000 plus $80 for each additional $10,000 or fraction
thereof
$500,001 to $1,000,000 $5,800.00
for the first $500,000 plus $80 for each additional $10,000 or fraction
thereof
61 ,OOO,OOl or more $9,900.00
for the first $1 ,OOO,OOO plus $80 for each additional $10,000 or fraction
thereof
December 16. 1997
4’: J .’
6 IMPROVEMENT PLAN REVIEW -3
CURRENT Schedule iyB
Cost of Improvements
$0 to $20,000
$20,000 to $50,000
$50,000 to $100,000
$100,000 to $250,000
$250,000 to $500,000
$500.000 to $1 ,ooo,ooo
Fee
6.00% - $200 Minimum
5.00% - $1,200 Minimum
4.00°h - $2,500 Minimum
3.50% - $4,000 Minimum
2.75% - $8,750 Minimum
2.25% - $13,750 Minimum
Over $1 ,OOO,OOO 1.50% - $22,500 Minimum
(Improvement Plan Check Fees are based on the current City of San Diego unit
prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete
paving, storm drains, etc.)
PROPOSED Schedule #s
Cost of Improvements
$0 to $20,000
Fee
$800 plus 5% of value of improvements
$20,001 to $50,000 $1,020 plus 4% of value of improvements - $2,020 minimum
$50,001 to $100,000 $1,310 plus 3% of value of improvements - $3,380 minimum
$100,001 to $250,000 $1,480 plus 2.5% of value of improvements - $5,170 minimum
$250,001 to $500,000 94,460 plus 2% of value of improvements - $11,070 minimum
$500,001 to $1 ,ooo,ooo $7,900 plus 1.5% of value of improvements - $17,175 minimum
Over $1 ,OOO,OOO $8,100 plus 0.75% of value of improvements - $27,000 minimum
(Improvement Plan Check Fees are based on the current City of San Diego unit
prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete
pavina. storm drains. etc.)
Deambar 16,1997 y-i
- - BUILDING PERMIT FEES
r CURRENT schedule #6
(100% of the 1991 Uniform Building Code table 3-A fee schedule)
Fees are based on the July 1,1994, Building Valuation Multipliers published by the
San Diego Area Chapter of the International Conference of Building Officials.
Total Valuation Fee
$1 .oo to $500.00 $15.00
$501.00 to $2,000.00 $15.00 for the first $500.00 plus $2.00 for I each additional $100.00, or fraction thereof,
to and including $2,000.00
$2,001 .OO to $25,000.00 $45.00 for the first $2,000.00 plus $9.00 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $25,000.00
$25,001 .OO to $50,000.00 $252.00 for the first $25,000.00 plus $6.50 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $50,000.00
$50,001 .oo to $100,000.00 $414.50 for the first $50,000.00 plus 94.50 for
each additional $1 .OOO.OO, or fraction
thereof, to and including $1 OO,OOO.OO
$100,001 .oo to $500,000.00 $639.50 for the first $100,000.00 plus $3.50 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $500,000.00
$500,001 .oo to $1 .ooo,ooo.oo $2.039.50 for the first $500,000.00 plus $3.00
for each additional $1 ,OOCLOO, or fraction
thereof, to and including $1 ,OOO,OOO.OO
$1 ,OOO,OOl .OO and up $3,539.50 for the first $1 ,OOO,OOO.OO plus
$2.00 for each additional $1 ,OOO.OO or
fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours $30.00 per hour’
(minimum charge - 2 hours)
2. Reinspection fees assessed under provisions of Section 305 (g) $30.00 per hour’
3. Inspections for which no fee is specifically indicated $30.00 per hour’
(minimum charge - one-half hour)
4. Additional plan review required by changes, additions or revisions to
approved plans $30.00 per hour
(minimum charge - one-half hour)
l Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
Notwithstanding other provisions of this section, the building permit fee for factory built housing
shall be twenty-five percent of the fee shown in Schedule #9, and the plan check fee shall be
sixty-five percent of the building permit fee
,
December 16,1997
. ‘, . ,
,- - BUILDING PERMIT FEES
. PROPOSED Schedule #6
(70% of the 1994 Uniform Building Code Table I-A fee schedule)
Fees are based on the July 1,1997, Building Valuation Multipliers published by the
San Diego Area Chapter of the International Conference of Building Officials.
Total Valuation
$1 .oo to $500.00
$501 .oo to $2,000.00
1 Fee
$14.70
$14.70 for the first $500.00 plus $1.93 for
each additional $100.00. or fraction thereof, I
$2,001 .OO to $25,000.00
$25,001 .OO to $SO,OOO.OO
$50,001 .oo to $100,000.00
$100,001 .oo to $500,000.00
$500,001 .oo to $1 ,ooo,ooo.oo
$1 ,OOO,OOl .OO and up
Other Inspections and Fees:
1. Inspections outside of normal business hours
to and including $2,000.00
$43.58 for the first $2.000.00 plus $8.75 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $25,000.00
$244.83 for the first $25,000.00 plus $6.30 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $50,000.00
$402.33 for the first $50,000.00 plus 94.38 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $100,000.00
$621.08 for the first $1 OO,OOO.OO plus $3.50 for
each additional $1 ,OOO.OO, or fraction
thereof, to and including $500,000.00 ’
$2,021.08 for the first $500,000.00 plus $2.98
for each additional $1 ,OOO.OO, or fraction
thereof, to and including $1 ,OOO,OOO.OO
$3,508.58 for the first $1 ,OOO,OOO.OO plus
$1.93 for each additional $1 ,OOO.OO or
fraction thereof
$30.00 per houP
(minimum charge - 2 hours)
2. Reinspection fees assessed under provisions of Section 305 (g) $30.00 per hour’
3. Inspections for which no fee is specifically indicated $30.00 per hour’
(minimum charge - one-half hour)
4. Additional plan review required by changes, additions or revisions to
approved plans $30.00 per ho&
(minimum charge - one-half hour)
* Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
Notwithstanding other provisions of this section, the building permit fee for factory built housing
shall be twenty-five percent of the fee shown in Schedule #9, and the plan check fee shall be
sixty-five percent of the building permit fee
December 16. 1997 c
; L
LANDSCAPE INSPECTION FEES
CURRENT Schedub#
Cost of Improvements
$0 to $250,000
$250,001 to $750,000
$750,001 to $2,000,000
$2,000,001 to $5,000,000
$5,000,001 and Over
Fee
5% - $250 Minimum
4.5% - $12,500 Minimum
4.0°k - $33,750 Minimum
3.5% - $80,000 Minimum
3.0% - $175,000 Minimum
PROPOSED Scheduk W
ICast of lmarovements Fee
$20,001 to $50,000 $500.00
for the first $20,000 of improvements plus $15 for each additional
$10,000 or fraction thereof
$50,001 to $100,000 $700.00
for the first $50,000 of improvements plus $15 for each additional
$10,000 or fraction thereof
$100,001 t0$250,000 $1 ,ooo.oo .
for the first $100,000 of improvements plus $130 for each additional
$100,000 or fraction thereof
$250,001 to $750,000 $1,200.00
for the first $250,000 of improvements plus $130 for each additional
$100,000 or fraction thereof
$750,001 to $2,000,000 $1,900.00
for the first $750,000 of improvements plus $130 for each additional
$100,000 or fraction thereof
$2,000,001 and Over $3,600.00
for the first $1 ,OOO,OOO of improvements plus $1,300 for each additional
$1 ,OOO,OOO or fraction thereof
December 16.1997 1 < ; -/ .
-
LANDSCAPE PLAN CHECK FEEa
-
CURRENT Soheduie #S I
Cost of Improvements Fee
$0 to $20,000 . 6.00% - $200 Minimum
$20,000 to $50,000
$50,000 to $100,000
$100,000 to $250,000
$250,000 to $500,000
$500,000 to $1 ,ooo,ooo
Over $1 .OOO.OOO
5.00% - $1,200 Minimum
4.00% - $2,500 Minimum
3.50% - $4,000 Minimum
2.75% - $8,750 Minimum
2.25% - $13,750 Minimum
1.50% - 322.500 Minimum
PROPOSED Soheduk #8
Cost of Improvements
$0 to $20,000
$20,001 to $50,000
$50,001 to $100,000
$100,001 to $250,000
$250,001 to $500,000
$500,001 to $1 ,ooo,ooo
Over $1 .OOO.OOO
Fee
$350
$500 plus 3.0% over $20,000
$1,450 plus 1.5% over $50,600
$2,200 plus 0.2% over $100,000
$2,700 plus 0.15% over $250.000
$3,300 plus 0.1% over $500,000
$5.000 DIUS 0.07% over $1 .OOO.OOO
.
STREET LIGHT ENERGKING FEES
I CURRENT AND PROPOSED Schedule#B
watts
70
Lumens
5,800
Fee
60.00
100 9,500
150 16,000
200 22,000
250 30,000
Above fees are the cost for energizing each street light for 18 months
and includes a $15.00 charge per light for connecting the light to an
SDG&E service point.
78.00
101 .oo
125.00
165.00
December 16,1997 ’ $7
CITY OF CARLSBAD -.
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Descriptfon Note
Duplicate Tracing Faea - Final Pwed Maps (fee plus $24 per sheet)
mt
Duplicate TracMg Fees - Final Tract Maps (fee plus $24 per sheet)
bt
GIS Technkfan Labor (per hour)
Grading Pemtit Extension Fee
Improvement Constmction Inspection Fee
inspection Cvertime-per Hour (On Request) - each additional hour at $55
Landscape Plan Check
Landscape lmpectfon
Master Plan Amendment - Minor - fee + deposit in min. inwmenta of $1,000
PD Res. Amendment - 51 dr mom
PD Amendment - Non-Rea - 51 or moru
PO Res. - 51 or mom
PO-Non-Res-5to50
PD-Non-Res-51 ormom
(1)
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(3)
(3)
segregationof- -4totaorbas
.f%m!ll-of Awaamerlts-5lotsdrmore-feepluss2Operlot
6)
Cur)
Cur)
-1
#I
45)
Cru.1
CIlr)
0)
C)
Site Development Plan (Minor) - Rw. <- 4 unibuldts
Specific Plan Amendment - fee + deposit in $1.000 mtn. incmments
-1
-1
futeter Installatkrn Fees:
3t4”
1”
2’ -Displaoement
Potabfe. Redaimed and Sewer Stand&& and v (Cost for each)
Sarvioe Instalfatfon Fees
Firr, Hydrant Lateml and AaserMy
Fire Detector Lateral
Wa8te Water Pr8trestment:
Claw I (par mdnfh) - Existfng uaer
Notes:
(1) - Sea attached sdhedubs and rate tabbs.
(2)-B~onnumkHofunltsor~~isg~~
(3) - For all Aswwnam DMrfcts uafng 1915 Ad Bonds.
Fe
see baloc
6&a
seebelol
694
60.W
50% pelmll fe
loo.w
1,700.Oc
5,510.Oc
6.OOO.OC
11.022.Of
5,510.w
10,504.Oc
saetmhn
seebeh .
2,775.W
seebebv
110.05 90.00
15Q.w 120.00
420.06 350.00
20.00 0.00
5,060.00
4.500.w
250.00
IO.00
40.00
25% permit fe
70.00
1.006.w
4.9Q0.w
5.360.w
7.960.w
5,000.w
7.900.w
1300.00
2.300.w
2.670.00
1 .OOO.w
4.300.w
3,600.w
200.00
Fee Cl
Amt
(4Q.W
(30.00
(700.06
(520.06
(620.00
(3.122.00
(510.00
(2,604.W
-5m
-305
414
-99i
-10%
-25%
-9%
-25%
4m
-16%
-20%
-t?n
-100%
.
Dadember 16.1937 1
IMPROVEMENT CONSTRUCT1 - 1NSPECTlON FEES ?
. CURRENT Schedulea I
Cost of Improvements
$0 to $250,000
$250,001 to $750,000
$750,001 to $2,000,000
$2,000,001 to $5,OOO,OW
$5.000.001 and Over
Fee
5% - $250 Minimum
4.5% - $12.500 Minimum
4.0% - $33,750 Minimum
3.5% - $80,000 Minimum
3.0% - $175,000 Minimum
PROPOSED ; Scheduktt4
Cost of Improvements
$0 to $20,000
Fee
5% - $250 Minimum
$20,001 to $50,000 $1 ,ooo.oo
for the first $20,000 plus $200 for each additional $10,000 or fraction
thereof
650,001 to $100,000 $2,000.00
for the first $50,000 plus $100 for each additional $10,000 or fraction
thereof
6100,001 to $250,000 $2,500.00
for the first $100,000 plus $80 for eachaddiinal $10,000 or ffaction
thereof
i250,OOl to $500,000 $3,7W.O0
for the first $250,000 plus $60 for each additional $10,000 or fraction
thereof
i500,001 to $1 ,ooo,ow $5,8OO.W
for the first $500,000 plus $80 for each addiional SlO,OW or fraction
tJlereof
A ,OOO,OOl or more $9,9OO.W
for the first $1 ,OOO,OOO plus $80 for each additional $10,000 or fraction
thereof
December16,1997
LANDSCAPE INSPECTION FL
I CURRENT Schedule #I
Cost of Improvements
$0 to $250,000
Fee
5% - $250 Minimum
$250,001 to $750,000
$750,001 to $2,000,000
$2,000,001 to $5,000,000
$5,000,001 and Over
Cost of Improvements
$0 to $20,000
$20,001 to $50,000
4.5% - $12,500 Minimum
4.0% - $33,750 Minimum
3.5% - $80,000 Minimum
3.0% - $175,000 Minimum
PROPOSED schedule #7
Fee
$350.00
$500.00
for the first $20,000 of improvements plus $15 for each additional
$10,000 or fraction thereof
S50,OOl to $100,000 $700.00
for the first $50,000 of improvements plus $15 for each addiinal
$10,000 or fraction thereof
6100,001 to$250,000 $1 ,ooo.oo
for the first $100,000 of impmvements’plus $130 for each additional
$100,000 or fraction thereof
6250,001 to $750,000 $1,200.00
for the first $250,000 of improvements plus $130 for each additional
$100,000 or fraction thereof
b750,OOl to $2,000,000 $1,900.00
for the first $750,000 of improvements plus $130 for each additional
$100,000 or fraction thereof
i2,000,001 and Over $3,600.00
for the first $1 ,OOO,OOO of improvements plus $1,300 for each additional
$1 ,OOO,OOO or fraction thereof
LANDSCAPE PLAN CHECK FEES
CURRENT Schedule #S
Cost of Improvementq
$0 to $20,000
$20,000 to $50,000
$50,000 to $100,000
$100,000 to $250,000
$250,000 to S500,OOO
$500,000 to $1 ,ooo,ooo
Over $1 .OOO.OOO
Fee
6.00% - $200 Minimum
5.00% - $1,200 Minimum
4.00% - $2,500 Minimum
3.50% - $4,000 Minimum
2.75% - $8,750 Minimum
2.25% - $13,750 Minimum
1.50% - $22.500 Minimum
I PROPOSED schedukm
Cost of Improvements
$0 to $20,000
~$20,001 to $50,000
$50,001 to $100,000
$100,001 to $250,000
$250,001 to $500,000
S5W,OOl to $1 ,ooo,ooo
Over 01 .OW.OOO
Fee
$350
$500 plus 3.0% over $20,000
$1,450 plus 1.5% over $50,000
$2.200 plus 0.2% over $lOO,OW $2,700 plus 0.15% over $250,000
$3,300 plus 0.1% over $500,000
S5.000 dus 0.07% over Sl .OW.OOO
.
nmnmhn, 11 1007
;
:
L
c .
f
I
E
6
1C
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
20
Euw%-q- .-
RESOLUTION NO. 1006
A RESOLUTION OF THE BOARD OF DlRECTORS OF THE
CARLSBAD MUNICIPAL WATER DISTRICT, CALIFORNIA,
ADOPTING THE MASTER FEE SCHEDULE AND ESTABLISHING
THE FEES FOR GENERAL SERVICES, DEVELOPMENT-RELATED
SERVICES AND DEVELOPMENT IMPACT FEES
WHEREAS, the Board of Directors of the Carlsbad Municipal Water District,
California has the authority to establish fees for District services; and
WHEREAS, from time to time said fees are reviewed and evaluated to
maintain an adequate fee structure recovering costs for District services; and
WHEREAS, the Board of Directors has determined the cost of providing
general and development-related services; and
WHEREAS, the Board of Directors finds it necessary to recover the costs for
District services; and
WHEREAS, the Board of Directors has determined that the fees shown in
Exhibit A attached hereto and District fees listed in the Master Fee Schedule (on file with
the Secretary) are fair and reasonable in relation to and do not exceed the cost of
providing the services received; and
WHEREAS, the statute of limitations applicable to any action to challenge or
set aside the fees adopted or amended by this resolution is 120 days from its adoption.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the
Carlsbad Municipal Water District:
1. That the Master Fee Schedule is hereby adopted as the official Fee Schedule
for development-related services, general District services, and development impact fees
for the Carlsbad Municipal Water District.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2. All prior fee schedules are rescinded and superseded upon the effective date of
the fees adopted herein.
3. All development-related service fees and development impact fees shall
become effective on February 14, 1998. All general District service fees shall become
effective on January 15, 1998.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Board of
Directors of the Carlsbad Municipal Water District on the 16th day of December ,
1997, by the following vote, to wit:
AYES: Board Members Lewis, Finnila, Nygaard, Kulchin and Hall
NOES: None
ABSENT: None
ATTEST:
ALETHA L. RAUTENKRANZ, Secretary
CARLSBAD MUNICIPAL WATER DISTRI&T c’/Mr..dD as. MO. I &%
FEE SCHEDULE EXHIBIT A
GENERAL WATER DISTRICT FEES AND CHARGES
DECEMBER 1997
Fee Description
Approved Backflow Tester
Backflow Preventer Charge (per month, each account)
Blueprinting of Standard Site (24” x 36”) improvement Plan Sheet (Cost for each)
Jumper Connection
Potable, Reclaimed and Sewer Standards and Specifications (Cost for each)
Reclaimed Water Use - Base Rate Per Unit
Wastewater Permit Application
Potable Water Use - Base Rate Per Unit (standard water rate)
Conservation Rate (cost per unit) - 518” meter (1 - 7 unik of water)
Conservation Rate (cost per unit) - 3/4” meter (1 - 10 units of water)
Conservation Rate (cost per unit) - 1” meter (1 - 16 units of water)
Conservation Rate (cost per unit) - 1 l/2” meter (1 - 30 units of water)
Conservation Rate (cost per unit) - 2” meter (1 - 45 units of water)
Conservation Rate (cost per unit) - 3” meter (1 - 79 units of water)
Conservation Rate (cost per unit) - 4” meter (1 - 123 units of water)
Conservation Rate (cost per unit) - 6” meter (1 - 228 units of water)
Conservation Rate (cost per unit) - 8” meter (1 - 336 units of water)
Cost of Delivery Charge (per month) Fire Protection Meters
Cost of Delivery Charge (per Month) MUM-Family Unit
Cost of Delivery Charge (per month) - 518” meter
Cost of Delivery Charge (per month) - 3/4” meter
Cost of Delivery Charge (per month) - 1” meter
Cost of Delivery Charge (per month) - 1 l/2” meter
Cost of Delivery Charge (per month) - 2” meter
Cost of Delivery Charge (per month) - 3” meter
Cost of Delivery Charge (per month) - 4” meter
Cost of Delivery Charge (per month) - 6” meter
Cost of Delivery Charge (per month) - 6” meter
Water Service Fee - Per New Account - Servtce Turn on
Water Service Fee - Continuity of Service
Water Service Fee - Door Hanger
iWater Service Fee - Accounts scheduled for termination for non-payment
Water Service Fee - Same Day Turn-on (Not Scheduled for That Day)
Water Servtce Fee - After Hour Turn-on
Water Meter Deposit - Construction Meters
Water Meter - Construction Meter rental fee
Water Meter - Construction Meter Relocation
Note Current Proposed
Fee Fee
25.CN 25.Ot
3.oc 3.ot
5.oc 5.Ot
15.oc 15.Ot
2o.oc O.o(
1.62 1.62
25oc 25.Ot
1.70 1.7c
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
1.52 1.52
20.80 20.8(1
0.00 0.00
9.25 9.25
11.75 11.75
16.75 16.75
29.25 29.25
44.25 44.25
79.50 79.50
129.50 129.50
254.50 254.50
404.50 404.50
25.00 25.00
10.00 10.00
10.00 10.00
20.00 20.00
20.00 20.00
60.00 60.00
560.00 566.00
50.00 50.00
20.00 20.00
I Fee Ch
Amt
O.o(
o.oc
o.oc
o.oc
(2O.OC
O.OC
o.oa
0.00
0.00
0.00
0.00
0.00
0.00
0.W
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3e
%
0%
0%
0%
0%
-100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
- CARLSBAD MUNICIPAL WATER DISTF -
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
:ee Description Note
S above
(Use Improvement Plan Review Fees)
-se Improvement Plan Review fees
Clnctuded in Improvement Plan Review Fees
Aeter Installation Fees:
5/8”
Fire Protection
3i4"
1”
1 l/2”-Turbo
1 l/2” - Displacement
2" -Turbo
2* - Displacement
3"
4"
6"
‘otable, Reclaimed and Sewer Improvement Plan Review - Uw Improvement Plan Rt tview Fee
StS
oclnnnnns
SCLnns
bE
lotable, Redaimed and Sewer Standards and Specifications (Cost for each)
;an Diego County Water Auth. Capacity Charge - Set by SDCWA
iervice Installation Fees
1” Water
2” Water
2” Lateral with two 1” Services (base fee $100 + time and materials)
Fire Hydrant Lateral and Assembly
Fire Detector Lateral
Vaste Water Discharge Permit
Jaste Water Pretreatment:
Class I (per month) - Existing user
Class II (per month) - Existing user
Class Ill (per month) - Existing user
Class I - One time fee for new users
Class II - One time fee for new users
Class Ill - One time fee for new users
currel PropOSe
Fe Fe
80.M 8O.M
65.M: 80.0(
llO.O( w.o(
15O.M 12O.OC
275.OC 54o.oc
275.OC 28O.OC
42O.OC 670.00
42O.OC 35o.oc
9WOC 1 ,ooo.o(
1,620.0( 1.78O.OC
2.7OO.OC 3,250.OC
800.00
1 ,ooo.oa
1,500.w
-
5.0w.w
4.5w.00
25.00
250.00
150.00
25.00
0.00
i ,230.oa
1,540.oo
Time & Mal
4,300.w
3,BW.W
25.00
200.00
190.00
30.W
270.00
270.00
80.00
Fee Change
I ’ 0.0
15.0
(20.0
(30.0
265.0
5.0
250.0
(70.0
loo.0
160.0
550.0
(20.01
430.01
540.01
(700.0(
(7W.o(
0.01
(50.0(
40.01
5.0(
0
23
-18
-20
96
2
60
-17
11’
lo’
20’
-100’
54’
54’
-147
-165
0:
-204
279
203
December 16,1997
-
IMPROVEMENT PLAN REVIEW FL
I
~~#iJ@gy ‘Y’. siheilruse~
Cost of Improvements
$0 to $20,000
Fee
6.00% - $200 Minimum
$20,000 to $SO,OW 5.00% - $1,200 Minimum
$50,000 to $100,000 4.00% - $2,500 Minimum
$100,000 to $250,000 3.50% - $4,000 Minimum
$250,000 to S500,WO 2.75% - $8,750 Minimum
$5OO,OW to $1 ,ooo,ooo 2.25% - $13,750 Minimum
Over $1 ,OOO,OOO 1.50% - $22,500 Minimum
(Improvement Plan Check Fees are based on the current City of San Diego unit
prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete
paving, storm drains, etc.)
PROMSED ‘. .. E&lmhlks :
Cost of Improvements
$0 to $20,000
$20,001 to $50,000
$50,001 to $100,000
$100,001 to $250,000
$250,001 to S500,WO
$500,001 to $1,000,000
Fee
$800 plus 5% of value of improvements
$1,020 plus 4% of value of improvements - $2,020 minimum
$1,310 plus 3% of value of improvements - $3,380 minim&
$1,480 plus 2.5% of value of improvements - $5,170 minimum
$4,480 plus 2% of value of improvements - $11,070 minimum
$7.900 plus 1.5% of value of improvements - $17.175 minimum
Over $1 ,OW,WO $8,100 plus 0.75% of value of improvements - $27,000 minimum
(Improvement Plan Check Fees are based on the current City of San Diego unit
prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete
paving, storm drains, etc.)
%S
December16.1997
CARLSBAD MUNICIPAL WATER DISTF -.
FEE SCHEDULE
DEVELOPMENT IMPACT FEES
DECEMBER 1997
‘ee Description Note
Current
Fee
Proposed Fee Change
Fet? Amt 96
:ws Subject to Section 66012 of the California Government Code:
major Facitii Fee - Potable Water per EDU
najor Facility Fee - Potable and Reclaimed Water Connection Fees:
Meter Size 5/8” - Displacement
Meter Size 3/4” - Displacement
Meter Size 1” - Displacement
Meter Size l-112” - Displacement
Meter Size l-112’ - Turbine
Meter Size 2” - Displacement
Meter Size 2” -Turbine
Meter Sue 3” - Displacement
Meter Size 3” - Turbine
Meter Sue 4’ - Displacement
Meter Sie 4” - Turbine
Meter Size 4” - Turbo
Meter Sire 6” - Displacement
Meter Size 6” - Turbine
Meter Sue 6” - Turbo
Meter Sue 8” - Displacement
Meter Size 6” -Turbine
Meter Size 8’ - Turbo
(See below)
2,400.W
3,420.OO
5,400.oo
10,200.00
11.975.00
15J60.00
19.2oo.w
27,000.W
42,0W.W
42,OW.OO
72,000.W
120.060.00
78.000.00
150,000.00
24O.OW.00
115.200.00
216,OOO.OO
42O.WO.00
(See below)
2.400.00
3.420.00
5.4w.w
10.2w.00
11.975.00
15.360.00
19.2w.w
27,000.W
42,000.W
42,OOO.OO
72,WO.OO
120,wo.w
78,OOO.OO
150,000.00
240.0W.W
115,200.W
216.OW.00
420,OW.OO
0.00 09
0.00 09
0.00 09
0.00 09
0.00 09
0.00 09
0.00 09
0.w 09
0.00 09
0.00 09
0.00 09
0.00 04
0.00 001
0.00 00,
0.00 09
0.w 09
0.00 OS
0.00 0%
&
6
6
c
c
6
6
6
b
16
6
b
b
b
b
b
b
b
Decembar 16.1997
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
20
h Eiu-M3r-i- 5 .__cL_
RESOLUTION NO. 290
A RESOLUTION OF THE HOUSING AND REDEVELOMENT
COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA,
ADOPTING THE MASTER FEE SCHEDULE AND ESTABLISHING
THE FEES FOR GENERAL SERVICES, DEVELOPMENT-RELATED
SERVICES AND DEVELOPMENT IMPACT FEES
WHEREAS, the Housing and Redevelopment Commission of the City of
Carlsbad, California (the Commission) has the authority to establish fees for Carlsbad
Housing Authority (Authority) and Carlsbad Redevelopment Agency (Agency) services;
and
WHEREAS, from time to time said fees are reviewed and evaluated to
maintain an adequate fee structure recovering costs for services; and
WHEREAS, the Commission has determined the cost of providing general
and development-related services; and
WHEREAS, the Commission finds it necessary to recover the costs for
services; and
WHEREAS, the Commission has determined that the fees shown in Exhibit A
attached hereto and Authority and Agency fees listed in the Master Fee Schedule (on file
with the Secretary) are fair and reasonable in relation to and do not exceed the cost of
providing the services received; and
WHEREAS, the statute of limitations applicable to any action to challenge or
set aside the fees adopted or amended by this resolution is 120 days from its adoption.
NOW, THEREFORE, BE IT RESOLVED by the Housing and
Redevelopment Commission of the City of Carlsbad, California:
1. That the Master Fee Schedule is hereby adopted as the official Fee Schedule
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
26
! 1. That the Master Fee Schedule is hereby adopted as the official Fee Schedule
for development-related services, general services, and development impact fees for the
Authority and Agency.
2. All prior fee schedules are rescinded and superseded upon the effective date of
the fees adopted herein.
3. All development-related service fees and development impact fees shall
become effective on February 14, 1998. All general Authority and Agency service fees
shall become effective on January 15, 1998.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Housing
and Redevelopment Commission of the City of Carlsbad on the December, 16th day of
1997, by the following vote, to wit:
AYES: Commissioners Lewis, Finnila, Nygaard, Kulchin and Hall
NOES: None
ABSENT: None
ATTEST:
(SE=)
t-t d R Resa&&fl m. 290 i. - CA’ BAD HOUSING AND REDEVELOPMENT ( IMISSION EXHIBIT A
FEE SCHEDULE
DEVELOPMENT RELATED SERVICE FEES
DECEMBER 1997
Fee Description Note
Appeal - Housing and Redevelopment Commission (+ noticing costs) - fee
refunded if appeal is won
Appeal - Redev. Design Review Board (+ noticing costs) - fee refunded if
appeal is won
CDP - Redevelopment Area
Preliminary Review - Redevelopment (minor or major)
Redevelopment Permit (Admin.)
Redevelopment Permit (Minor) - plus noticing costs
Redevelopment Permit (Major) - plus noticing costs
Redevelopment Permit Amendment (Admin)
Redevelopment Permit Amendment (Minor) - plus noticing costs
Redevelopment Permit Amendment (Major) - plus noticing costs
Sign/Outdoor Display Permit. Redevelopment Area
Sign Program Permit, Redevelopment Area
Sin Program Permit Amendment, Redevelopment Area
Variance - RedeveloDment
Cullen Proposec Fee Cl
Fee Fet Amt
120.00 400.06 28O.Oc
0.00
150.00
1,400.oo
80.00
800.00
400.06
400.00
0.00
260.06
980.00
1 ,aoo.oo
100.00
350.00
860.00
30.00
175.06
40.00
250.00
830.00
400.00
5539
29:
270.00 3384
60.00 89