CITY OF CARLSBAD - AGENDA BILL Y
AB# 14,575 TITLE: APPROVAL AND ACCEPTANCE OF AMENDMENT DEW- HD.
NO. 1, FROM MALCOLM-PIRNIE, INCORPORATED TO
PROVIDE ADDITIONAL DESIGN SERVICES FOR
VISTAICARLSBAD INTERCEPTOR SEWER REACHES VCSB
CITY ATTY MTG. 03/03/98
DEPT. CMWD TO VC8, CMWD 91 -403, CONTRACT NO. 31821 CITY MGR
c
RECOMMENDED ACTION:
Adopt Resolution No. for approval and acceptance of Amendment No
Malcolm-Pirnie, Incorporated to provide additional design services for Vista/(
Interceptor Sewer, Reaches VC5B to VC8, CMWD Project No. 91-403, Contract No.
ITEM EXPLANATION:
The original agreement between Malcolm-Pirnie, Incorporated and the City of Carls
approved and accepted on the City Council agenda of August 26, 1998 by Agc
14,315 and Resolution No. 97-566.
The Vista/Carlsbad Interceptor Sewer (Reaches VC5B to VC9) consists of appro
2,900 lineal feet of 36-inch diameter pipeline along Jefferson Street and 2,900 line;
42-inch pipeline along Jefferson Street and Oak Avenue. Of this described ali
Malcolm-Pirnie originally contracted with the City of Carlsbad for development of PI
Specifications for Reaches VC5B to VC8. Progression through engineering desigr
lighted several significant issues, for which Amendment No. 1 provides additiona
services in an effort to mitigate social impacts and minimize costs during cons
Amendment No. 1 includes an additional 900 lineal feet of 42-inch pipeline alc
Avenue (Reach VC9), adds micro-tunneling as a bid alternative to the Contract Doc
and includes design of a sewer tie-in at Grand Avenue and Roosevelt Street. The e
construction cost for Reaches VC5B to VC9 is $3,600,000.
Reach VC9 lies between Roosevelt Street and the railroad right-of-way along Oak
This reach connects the new sewer interceptor with the existing interceptor in the
right-of-way. This reach was initially included in the joint design project with th
Carlsbad Village Storm Drain to lump the construction effort into a single event. \
determined that design and construction of this reach with this contract facilitates SI
pass and improves upstream constructability. The additional design services as
with this work include additional surveying, design drawings, connection det;
specifications. The South Carlsbad Village Storm along this reach will also be inc
this contract.
Reach VC9 will also include coordination with the railroad right-of-way officials tl
approval of the design and permission to construct on railroad property. This cool
adds additional pipe jacking or micro-tunneling in order to cross under the railroac
Amendment No. 1 includes design effort to provide these services.
We have also concluded that two separate bid schedules will be the most beneficia
arrangement for the City. The two bid schedules, one for open cut trenching and
micro-tunneling, will allow the City to weigh social impact against increased con
costs after opening bids. The additional design efforts include a second pipeline c
second set of traffic control drawings, The design services associated with develol
the Design, Contract Specifications, coordination, and cost opinions are incl
Amendment No. 1.
98-56
I
4 0 Page 2 of Agenda Bill P 0. 14.575 +
FISCAL IMPACT:
The proposed budget for the additional work is $72,595. The budget includes $2;
work associated with the addition of Reach VC9, and $44,869 for additional work as
with adding the micro-tunneling alternative to the project. Carlsbad will be rei1
$17,384 by the City of Vista for design services associated with Reach VC9. To1
requested are $72,595.
Funds in the amount of $3,920,000 have been appropriated for this project, therefo
are sufficient funds available for this project.
The design services agreement costs are shown below:
TABLE I
EXHIBITS:
I. Location Map Vista/Carlsbad Interceptor Sewer Replacement Project, CMWC
2. Location Map for Vista/Carlsbad Interceptor Sewer Replacement Project, Rea
3. Contract Amendment No. 1 between Malcolm-Pirnie, Incorporated and the
Carlsbad.
4. Resolution N0.98-56for approval and acceptance of Amendment No. 1 from !
Pirnie, Incorporated to provide additional design services for the Vista/( Interceptor Sewer Reaches VC5B to VC8, CMWD Project No. 91-403, Con.
NO. 91-403.
31821.
Page 3 of Agenda Bill 9 o. 14,575 0
EXHl B ITS:
1.
2.
3.
4.
Location Map Vista/Carlsbad Interceptor Sewer Replacement Project, CMWC
Location Map for Vista/Carlsbad Interceptor Sewer Replacement Project, Real
Contract Amendment No. I between Malcolm-Pirnie, Incorporated and the
Carlsbad.
Resolution No. 98-5901. approval and acceptance of Amendment No. 1 from I\
Pirnie, Incorporated to provide additional design services for the Vista/(
Interceptor Sewer Reaches VC5B to VC8, CMWD Project No. 91-403, Coni
31 821.
NO. 91-403.
LOCATION MAP
VISTA / CARLSBAD INTERCEPTER SEWER
LOCATION MAP
VISTA / CARLSBAD INTERCEPTER SEWER
REPLACEMENT PROJECT
REACH VC9 I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e 0
RESOLUTION NO. 98-56 EXHll
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, FOR APPROVAL AND
ACCEPTANCE OF AMENDMENT NO. 1 FROM
ADDITIONAL DESIGN S ERVl CES FOR
VISTA/CARLSBAD INTERCEPTOR SEWER REACHES
CONTRACT NO. 31821
MALCOLM-PIRNIE, INCORPORATED TO PROVIDE
VC5B TO VC8, CMWD PROJECT NO. 91-403,
WHEREAS, the City Council of the City of Carlsbad, California
determined it necessary and in the public interest for approval and acceptanc
Amendment No. 1 from Malcolm-Pirnie, Incorporated to provide additional c
services for VistalCarlsbad Interceptor Sewer Reaches VCSB to VC8, C
Project No. 91-403, Contract No. 31821; and *
WHEREAS, funds appropriated in the amount of $2,664,281 have
appropriated in the 1997-98 budget for the Vista/Carlsbad Interceptor Sewe
the project cost estimated for Amendment No. 1 is $72,595, therefore, the1
sufficient funds available.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the (
Carlsbad, California, as follows:
1. That the above recitations are true and correct; and
2. That the attached Amendment No. 1 between Malcolm
Incorporated and the City of Carlsbad be approved and accepted; and
...
...
...
...
...
i
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That the Mayor is authorized and direched to execute the propc
Amendment No. 1 between Malcolm Pirnie, Incorporated and the City of Carlsb:
PASSED, APPROVED AND ADOPTED at a regular meeting of the
Council of the City of Carlsbad, California, held on 3rd day of March
1998, by the following vote to wit:
AYES:
NOES: None
Council Members Lewis, Nygaard, and Kulchin
ABSENT: Council Member Finnila
ABSTAIN: Council Member Hall
ATTEST:
- AAle.44-
ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)
0 0
AMENDMENT NO. 1 TO AGREEMENT
+4- This Amendment is entered into and effective as of the y-3 day c
/&pup */./ , 1998, amending the agreement dated Auaust 26, 1997 by and betwee
the City of Carlsbad, a municipal corporation, hereinafter referred to as "City", and Malcolr
Pirnie, lncoroorated , hereinafter referred to as, "Contractor" for providing additional desig
services for Vista/Carlsbad Interceptor Sewer Reaches VC5B throughVC8, CMWD Project Nc
93-401, Contract No. 31821.
RECITALS
WHEREAS, the initial agreement, dated Auaust 26. 1997 identified a scope
work to Drovide desicln services for Reaches VCSB to VC8 bf the VistdCarlsbad InterceDti
Sewer
; and
WHEREAS, the parties to this aforementioned agreement desire to alter tt
scope of work as follows: to Drovide additional desian services for VistalCarlsbad InterceDt
Sewer Reaches VCSB to VC8. CMWD Proiect No. 91-403, Contract No. 31821; and
WHEREAS, a supplemental scope of work and fee schedule have bec
negotiated and agreed to between the parties hereto, and as shown on Exhibit "A" Scope
Services and Fee;
NOW, THEREFORE, in consideration of these recitals and the mutual covenar
contained herein, City and Contractor hereby agree as follows:
1. Contractor shall.provide services as outlined on the attached Exhibit "A".
2. City shall pay Contractor for all work associated with Paragraph 1 above,-
$72,595. Contractor shall provide City on a montl **f
B 2/21
e e
basis, copies of invoices sufficiently detailed to include hours performed, houriy rates, an
related activities and costs for approval by City.
3. Contractor shall complete all work outlined on the attached Exhibit “A t
Auaust 26. 1998 or by expiration of the agreement amended hereby.
4. All other provisions of the aforementioned agreement entered into on AUQU!
27, 1997, by and between City and Contractor shall remain in full force and effect.
5. All requisite insurance policies to be maintained by the Contractor sh:
include coverage for the amended assignment and scope of work.
Acknowledged and Accepted:
CONTRACTOR:
MALCOLM PIRNIE. INCORPORATED
ATTEST:
6mL 2 ‘.:+
ALETHA L. RAUTENKRANZ
City Clerk
&J&f%# t. <,, Ld v P r/td 4 ,I ?Lr DATE I
(print namehitle)
(Proper notarial acknowledgment of execution by Contractor must be attached.)
(President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer sigr
the corporation must attach a resolution certified by the secretary or assistant secretary under corporate st
empowering that officer to bind the corporation.)
APPROVED AS TO FORM:
R0NA.LD R. BALL
2/21!
e 8
STATE OF ##BRWA- W-jk 1
On 6%. 19, '99y before me, q?om et%-, /boh-&f p U&i€/
personally appeared t @;e4&3
1 ss.
COUNTY OF h?h%lmk J
NAME AND TITLE OF OFFPER DATE
I NAME@) OF SIGNER(S)
Npersonally known to me - OR - proved to me on the basis of satisfactory evidence to be the person
name(s) islare subscribed to the within instrument and acknowledged to me that he/she/they executed thf
hislherltheir authorized capacity(ies), and that by hislherltheir signature(s) on the instrument the person@), or
upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
(This area for official notary seal.)
SIGNATURE OF NOTAM
Title or Type of Document ctPfudt5 c.44h-d
Date of Document No. of Pages B
Signer(s) other than named above
CMWD 91-403
06
0 e
1 h-mmu4- STATE OF -
COUNTY OF i ss* 1
/a l94f before me, Qw cw.k k fhk On & NAME AND TlnEOF OFFICE
&/ SPJw- personally appeared I!@#*
$
NA)VIE(S) OF SIGNER(S)
personally known to me - OR - 0 proved to me on the basis of satisfactory evidence to be the person
name(s) idare subscribed to the within instrument and acknowledged to me that he/she/they executed the
hislherltheir authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or
upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
(This area for official notary seal.)
Title or Type of Document
Date of Document NO. ofpages 8
Signer(s) other than named above
0
CMWD 91-403
061
0 EXHIBIT "A
Scope of Work
e
Project Manngemcnt:
Tad I IO - lkk l~oj~cll9~~g~~.w crrd .Yte}wthik
The design schwluk is being extended by appmxhatdy 6 weeks to allow for the c)llulyes
discussed in rhc Dccanbcr 12, 1997 wiiig. However. since the project has not progrcsscd
as quickly as ori~tlally wnirjpad, 110 additiuttd cotttpisatioti is rquustd ror tlio exlend&
schdula
Td 120 - Month& Pqrc.c: Mwiitip
Two additional pmgrcss nwcting will k ncccssary due to the extended schcciulc. It is
anticipated that this effort will be incltided in Tak 130, Coordination Meetings.
Tad 130 - Ct~dlfioii Mwtiiigs
&mal meeting an ilnfitipirtrrl to mrdii~~e will1 milway aficids for ihe new 42" diameter
sewer crossing mar Oak Avmuc. Additional cwrdination with the CMWU is ab
anticipated as the ndt dthe 3 bid alternatives that will be prepared and to discuss the now
diversion to thc existing uillector system in Grand Avenue in uoda to compktdy abandon
the acisting interceptor. Additional meetitlys or latiger duration nwcings are anticipated to
dim the addiiionsl tranic control rcquircd far thc jacking and receiving pit locations for
ilre iuicrotuiudittg altcnlativc.
lad 140 - SlrhLururJlllrctrrr Miuiagcmtwt
The expanded scope will rcquirc additional managmcnt and coordination of thc project
slihconsultants idding dificationr to the existing engineering vents ainently in- Pl=
Tusk I50 - PmyW ikmirneirzaiiwr
This task includes prepastian and diWhutioa of writtan project correspondmco to the design leam and CMWD staff in ordcr to maintain continuity withim the pq-ed team.
Ttcknicrl Strvccct: rcUt 230 - fitwy .%micv.v
Additional survey senticen will be required io verify the invert of the existing interceptor at
the mholc in thc Vicinity of thc proposal connection at Oak hwrmt and the railroad right-
d-wy, and pick-up field iqgraphy d - invw in Grrnd Avunuc at Rmwdt Street
and Hcm#ssey's alley. Also itdud is the prcpararion of a plat and lcgal ddption far the
poflmn of the serm that will be tocated in the milrod right-of-way. It is assumed that the
e 0
processing of thc plat and legal description with the NCTL) wilt be the responsibility of tho
CMWD.
. 7ksk 310 - Pnnd I'fiuis 1c. ,~)mifiim/iim
The cfforl indtded ;I; this tnsk iitcliidcs thc additioii i)ra iicw plan dk profile diet and a new
dotail shcct for partial ptnns arid Jcctioiis a1 Ciraird Avtnw/Roosevclt and Grand
AvcnuJHenncssey's alley. It is assunted that the cidditional aerial topo will he provided tO
MPI by thc CMWI) and that thc top will retpire sonic CADD laycr manipulation so that
the line type is consisterit with ~lle other. design di*tiwings. Additiotial utility research and
preliminary des& will be pcrthrnied undcr thk tnsk. Also included under this task is the
addtion df 2 dnccturally dc&yredjuiictian bows in tlrc nilroad right-of-way. Also included is the preparation of rnilrouci loadiiig cakitlahm on the pipe for submittal and approd by
the railmd. WI'U rcquirctncllts will also bc incorpoi.ated into the Gencral Rcquirancnts of
the Contract Spccitications and subiititted for {heir approval.
Tark 3 I I - Microhititdiitg 1 kvig~t i.,OiKI
A substantial eftirrt is anticipated in crrder to prepare 2 sepmtta bid w:heduleu and to
coordinate the Contract Specifiwtioii laagiiiige with CMWD StaITand the City oTCarlsbad
le@ staff Additionally, both B micratunneling spwiticatian and pipe jacking speciflation
will now he clccemary it$ the remit uf this additional wcirk. It was oriljdly anticipated that
only one trenchless mctliod woiild bc uscd to cross Carisbad Villagc Drive Additionally.
bemuse of tlis 2 wmplctcly different mtthods of constniction beins proposed, it is apparent
that 2 diffcrent profiles should be desi@ and hwn on the contract drawings in order to
obtain the most mtptitive bid form& mcrho<t of cmstnicrbn. Ahhori@~ the base drawings
and utility rcsmrch iirc alrvidy wlnpide. a .ui&q;hcant amount of lime will be necessary 6r
prdirnirtzuy Clesig~i ai~t cnyjtleeriiry )dits shuwing the a{tditiotral information on the drawings.
Om additional detail drawing is Hnkiprleci to ~lk? !he connttcliom of the existing Metson
Street adteetor sysletn at Ciraiid Avaw and trrpwui Drive to thc new interceptor with the
lower microtunnclcd profilc. Table I indicates the proposed fee fix incorporating thc 2
profiles onto I set of dcqign diawings snd TRbk 2 is the altwnativt: fm pmpod for prcparing
new drawings for the niicmhiiirxkd pmfile. We anticipate a significant effbrt to dearly
idcntifj. the required work for acli nltcmutive if the iafonacrrion is combid onto 1 set of
drawings. Wc recommend tlrat II separate set of design drawings be prepared for the
miwot\mntl bid ahmate. Approximakty 10 additional sheets of traffic control plans will be
ncc;cssary for the microtiin~teling altemativc tho. In ctTcct, this is now a 2 design project.
Sincx thc propod nrimrimiidins qpait is siyilictlntly longs than ari@xdly acopocl. and
has become more coinplex wilh ilie ciwssiiig balearh the railroad tracks with a 42" diameter
'sewer, we would like to oVcr thc scntices afMr, Grey Raincs with Halcy and Aidrich fir
technical review, cost review and attendance at ineetings with railway oficiafs. Mr. hints'
tunneling cxpcrtiso would complti~ient the pipe material clrpwtise provided by Mr. Ttm
Kanyiilian of cwr cumit desi&% tuin. Mr. Kaiins is currcntly providing the same servicc for EarthTcch on the Reach t 0 lnlerceptiu Project.
.
0 e
lbk 320 - PII~KWL* ( i,sl ILvtiinule
This task indudcs quantity take-offs and development of tinit prices for thc extra work
identified in Task 320 above.
kLI325W I\PYOI~~Al.~X1WI~Z~~~W
,
0 0
?-?
Pi.
ds
X 8 f m u3 I
#% OgW
!$!I :as
f q s
%&
3b e a
i- 6”
“0.P -
v- I
sf80
ZSU
9
a
5
c- v1