Loading...
HomeMy WebLinkAbout1998-08-04; City Council; 14810; AUTHORIZATION TO ADVERTISE FOR BIDS FOR DEMOLITION AND REMOVAL OF THE SPLIT PAVILION PROJECT NO. 3615R 9 0 77/:*3-<-.: fi CI OF CARLSBAD -AGENDA ILL u N a0 2% P AB# 14. 8 1 0 CITY MGF DEPT. ENG 0 L, CITY ATT DEMOLITION AND REMOVAL OF THE SPLIT PAVILION MTG. 8/04/98 k ld DEPT. HD TITLE: AUTHORIZATION TO ADVERTISE FOR BIDS FOR a s PROJECT NO. 3615 tJ -4 m 5 gE -4 I uu UaJ -4 k w -4 0 uu aJ aw mu ld aJu 5" a CtJ Mal *rl 0 aaJ fih al TI Ea ld -c a rlcd h N- coo IC m -rl n vi 9) uv) 203 orlu c z.2 oafi .A ;&a, 7 Ia, l-l om 0 s- mc, a, *ri d 3; amcd alNv) tJa0 as a a al -4 om ldsa u rlk .rl q_( .rl uoar cs 340 old U3M oc co ala fi -4 \a CnNN *NOD \Oa, COWN RECOMMENDED ACTION: Adopt Resolution No. "Is2?/ approving plans and specifications and authorizing tt Clerk to advertise for bids for the demolition and removal of the Split Pavilion, Project No. 36' ITEM EXPLANATION: This project will remove all improvements in the Split Pavilion including a small portion sidewalk on Carlsbad Boulevard next to the Split Pavilion. The north wall along the Split F will remain, however. Included in this project will be the replacement of the existing steel railing on the beach blufftop with anodized aluminum railing. Plans and specifications to r the stated portions of the Split Pavilion and to install new railing have been prepared. It is intended that the demolition and removal of materials from the Split Pavilion \ competitively bid and that work completed by a contractor. The contractor would a responsible to replace sidewalks, railing and flat grade the site. Installation of minimal replac City forces. A portion of the Ocean Street parking lot adjacent to the Split Pavilion will be ust ' material such as turf and a sprinkler system at the Split Pavilion location would be compk 1 staging area during construction. Although competitive bids will be solicited, the Notice to Proceed to the low bidder, once the of the demolition contract is authorized by the City Council, will not be issued until all perm received. Staff is preparing a Coastal Development Permit (CDP), Land Use Review Applica accompany the CDP, Negative Declaration and will send the plans to the State of Ca Department of Parks and Recreation (DPR) for review and issuance of an amendment. It M about 10 weeks to concurrently process the Coastal Development Permit and Negative Decl through the Planning Commission. Once the plans are received by the State DPR they h days to review the plans. ENVIRONMENTAL REVIEW: A Negative Declaration will be processed for this project, including a Coastal Development PI I FISCAL IMPACT: z 0 0 I- 1 z 2 0 0 - a G The Engineer's Estimate for demolition and removal of the Split Pavilion and replacement 0' railing is $1 00,000. Construction inspection, administration, design, landscapinc contingencies will be about an additional $40,000. Funds are available from the General Construction (GCC) account. EXHIBITS: 1. Location Map. 2. Resolution No. 98 -2 7 / approving plans and specifications and authorizing t Clerk to advertise for bids for removal of the Split Pavilion, Project No. 3615. PROJECT NAME E PROJECT DEMOLITION AND REMOVAL OF THE NUMBER SPLIT PAVILION 3615 <RAW BY: scorr EVANS. CARLSBAD ENGINEERING OEPT. 0 e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 RESOLUTION NO. 98-271 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE DEMOLITION AND REMOVAL OF THE SPLIT PAVILION, PROJECT NO. 3615. WHEREAS, the City Council of the City of Carlsbad, California has deterr necessary, desirable, and in the public interest to demolish and remove the Split I Project No. 3615; and WHEREAS, the plans and specifications for furnishing of all labor, materii equipment, transportation, and other expenses necessary or incidental of said project h; prepared and are on file in the Engineering Department of the City of Carlsbad incorporated by reference herein; and WHEREAS, funding from the General Capital Construction (GCC) fund includes funds to demolish the Split Pavilion and said project is included in the 199819s Improvement Program. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of ( California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents as presented ar approved. Ill 20 21 22 23 24 25 Ill Ill Ill Ill Ill Ill 26 Ill 111 Ill 27 28 0 e 1 3. That the City Clerk of the City of Carlsbad is hereby authorized and direct 2 specifications, and contract documents referred to herein. 4 and removal of the Split Pavilion, Project No. 3615, in accordance with the F 3 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the demc 5 6 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad Cit! 7 held on the 4th day of August , 1998 by the following vote, to wit: 8 AYES: Council Members Lewis, Finnila, Nygaard, Kulchin and Hall NOES: None 9 ABSENT: None 10 11 12 13 14 ATTEST: 15 16 (SEAL) 17 18 19 20 21 22 23 24 25 26 27 28