HomeMy WebLinkAbout1998-11-17; City Council; 14946; AWARD OF THE CONTRACT FOR THE CONSTRUCTION OF THE VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC5B THROUGH VC9, OAK STREET STORM DRAIN AND PAVEMENT OVERLAYI
,
0 d
.rl u ;
u a, 5
$4
w =I
0 FI
2
$
u 0
a
Ifl a
P .rl
4 4 rd
a a, u
L) ar ‘T
$4
rl .rl 2 3
V 0
03
\
o\
h rl \ 4 4
.. 2 O
0
A
z 3 0 0
F
a
G
@ 0 (731 45p I1 -
I CITY OF CARLSBAD -AGENDA BILL
AB# 4446
MTG. 1 1 /I 7/98
DEPT. CMWD
-.
TITLE: AWARD OF THE CONTRACT FOR THE
CONSTRUCTION OF THE VISTNCARLSBAD INTERCEPTOR
SEWER REACHES VCSB THROUGH VC9, CMWD PROJECT
DRAINICONTRACT NO. 3528, AND PAVEMENT OVERLAY,
CONTRACT NO. 35581
91 -403,CONTRACT 31 821 B, OAK STREET STORM I DEPT. HI
CITY AT1
CITY MG
RECOMMENDED ACTION:
Adopt Resolution No. 98-387 for award of the contract for the constructi
Vista/Carlsbad Interceptor Sewer Reaches VC5B through VC9, CMWD Project N
Contract No. 31821B, Oak Street Storm Drain, Contract No. 3528, and Pavemer
Contract No. 35581.
ITEM EXPLANATION:
On May 5, 1998, the City Council authorized the advertisement of bids for construc
Vista/Carlsbad Interceptor Sewer Reaches VCSB through VC9, CMWD Project N
Contract No. 31821 B, Oak Street Storm Drain, Contract No. 3528, and Pavemer
Contract No. 35581. Seven (7) sealed bids were received, four (4) bids for the 01
method of construction and three (3) bids for the microtunneling method of con
Contractor No. 1 and Contractor No. 3 withdrew their bids on October 7, 1998. Th
summarized below in TABLE 1.
TABLE 1
SCHEDULE OF BIDS
I Conventional Open Trenching
Schedule A Schedule C Schedule D
Contractor(*) Open Trench Storm Drain Pavement
Excel Commercial $3,617,783 $223,722 $201,007
Colich & Sons $3,967,891 $246,108 $21 5,576
Vido Artukovich & $4,393,448 $279,186 $234,890
Construction
SonsNidmar Inc. (JV)
Microtunnelinq
Schedule B Schedule C Schedule D
Contractor(*) Microtunnelinq Storm Drain Pavement
BRH-Garver $4,497,033 $204,478 $297,740
Vadnais Corporation $4,665,791 $324,085 $243,086
I
* Four Bids were received for the open trench method, but one of the contractor:
his bid from further consideration. Also, three bids were received for the micr
method, but one of the contractors withdrew his bid from further consideration.
Page 2 of Agenda Bill Q 0. IY. 'i Y 6 0
This project replaces Reaches VC5B through VC9 of the Vista/Carlsbad lntercepi
constructs the Oak Street Storm Drain, and includes an asphalt pavement c
Jefferson Street and Oak Street. Reaches VCSB through VC9 include 36-inch ar
diameter interceptor sewer pipelines in Jefferson Street from Las Flores Drive SOL
Street, and in Oak Street from Jefferson Street to the railroad right-of-way. Tht
jointly owned by the Cities of Vista and Carlsbad. The existing sewer manholes t
severely corroded due to hydrogen sulfide, and the daily flow rate now exceec
design capacity. The existing sewer pipeline will be abandoned along this re
recommends proceeding with the proposed construction to replace the intercept0
meet capacity requirements and preclude potential pipeline failure resulting from c(
The Oak Street Storm Drain is a portion of the new South Carlsbad Village St
Project. The Oak Street Storm Drain extends along Oak Street from Roosevelt St
railroad right-of-way. This new storm drain will collect storm water flows within (
and mitigate the flooding which occurs during storm events. In an effort to
construction impacts, Staff recommends proceeding with construction of the C
Storm Drain in conjunction with Reaches VC8 and VC9 of the Vista/Carlsbad I
Sewer.
Plans and specifications for the Vista/Carlsbad Interceptor Sewer Reaches VC5
VC9 Project, Oak Street Storm Drain Project and the Pavement Overlay Prc
Code, an invitation to Bid was published. Seven (7) responses were receivec
witnessed and recorded on July 9, 1998. On November IO, 1998, the City Counci
the method of construction to be used for installation of the interceptor sewer, 1
open trench construction. The Project Manager and purchasing staff have rei
complete bid documents from all parties in detail and concluded that the ove
responsive, responsible bidder is Excel Commercial Construction for a contract
$4,042,512.
ENVIRONMENTAL REVIEW:
The project is in compliance with the Negative Declaration approved by the
Commission on April 1, 1998, for the project's Coastal Development Permit 9t
construction of the project would not create any additional environmental impacts
not otherwise been evaluated and considered in the EIA Part II and the approvec
Declaration that covers the entire project.
FISCAL IMPACT:
Funds in the amount of $4,400,000 have been appropriated and are availat
Vista/Carlsbad Interceptor Sewer Replacement Reaches VC5B through VC9 Func
the amount of $500,000 have been appropriated and are available in the Soutt
Village Storm Drain Fund. Funds in the amount of $412,900 have been appropriat
available in the Pavement Management Fund. The Engineer's estimate for to
project construction was $4.1 5 million.
prepared by Malcolm-Pirnie, Inc, In accordance with Section 3.28.120 of the
Page 3 of Agenda Bill q 0. /4, ?Yb e
The distribution of City appropriation of funds for construction of the sewer, storm
pavement overlay are shown below in Sewer Cost-Table 2, Storm Drain Cost-Tat
Pavement Overlay Cost-Table 4, respectively.
Interceptor Sewer Construction
$400,0C Construction Contingencies
$3,617,78
$200,0C Inspection
Storm Drain Construction
$20,0( Construction Contingencies
$233,7;
Inspection $1 5,0(
- Pavement Overlay Construction
$20,01 Construction Contingencies
$201,01
Inspection $1 5,01
Page 4 of Agenda Bill q 0. 1 9; 9 q 6 0
Carlsbad will be billing the City of Vista for progress payments for their share of co
of the Interceptor Sewer by Vista in accordance with the agreement on joint o
Carlsbad's and Vista's share of the construction cost is summarized in Table 5. C
responsible for 27.3% of the cost for Reaches VC5B through VC8 and 37.3% of th
Reach VC9. Reaches VC5B through VC8 consist of 87.5% of the total project
linear foot basis. Reach VC9 consists of the balance which is 12.5%.
TABLE 5
1 1 I 'Project Name:
VISTA / CARLSBAD INTERCEPTER SEWER Project
91-403
E>
. REPLACEMENT PROJECT No.
REACHES VC5B THROUGH VC9
'I LOCATION MAP.
4
@ M@
Project Name:
SOUTH CARLSBAD VILLAGE Project
3528 OAK STREET STURM DRAIN
No,
E
STORM DRAIN PROJECT
ll 0 0
1
2
3
4
5
6
RESOLUTION NO. 98-384
A RESOLUTION OF THE CITY COUNCIL OF
CARLSBAD, CARLSBAD, FOR AWARD OF
CONTRACT FOR THE CONSTRUCTION OF THE
VISTNCARLSBAD INTERCEPTOR SEWER REACHES
CONTRACT 31821B, OAK STREET STORM
DRAIN,CONTRACT NO. 3528 AND PAVEMENT
OVERLAY, CONTRACT NO. 35581
VC5B THROUGH VC9, CMWD PROJECT 91-403,
1
7
WHEREAS, the City Council of Carlsbad, California has previously autt
the advertisement for bids for the construction of the Vista/Carlsbad lnte
10 Sewer Reaches VC5B through VC9, CMWD Project No. 91-403, Contrs
11 31821 B, Oak Street Storm Drain, Contract No. 3528, and Pavement 0
12 Contract No. 35581; and
a
9
13 11 WHEREAS, four (4) sealed bids were received July 9, 1998, for said
14
15
16
17
18
trench method of construction for installation of the interceptor sewer; and 19
WHEREAS, on November IO, 1998, the City Council approved the
by the open trench method of construction, but one was withdrawn; and
WHEREAS, three (3) sealed bids were received July 9, 1998, for said
by the microtunneling method of con&ction, but one was withdrawn; and
20 WHEREAS, all bid documents received from all bidders for the open
21 method have been reviewed in detail and the City Council does hereby find t
22 overall lowest responsive, responsible bid received for the open trench met
23
construction of said project was submitted by Excel Commercial Construction 24
25
26
amount of $4,042,512 of which the sewer interceptor replacement portion
project is $3,617,783, the storm drain pipeline portion of the project is $223,7i
27 the pavement portion of the project is $ZOI,OO7; and
28
II
0 e
1 WHEREAS, funds in the amount of $4,400,000 to include $3,617,783
2 sewer interceptor replacement by open trenching; $400,000 for const
3 contingencies; $200,000 for inspection, and $132,217 for surveyingisoils t
4 have been appropriated in the VistaiCarlsbad Interceptor Sewer Replat
5 Reaches VC5B through VC9 budget and are available; and
6
7
WHEREAS, funds in the amount of $500,000 to include $233,722
storm drain construction as associated with open trenching; $20,000 for const
contingencies; $15,000 for inspection, and $21,278 for surveyingisoils testin{
a
9
10 been appropriated in the South Carlsbad Village Storm Drain budget a1
11 available.
12
13
14
15
16
17
WHEREAS, funds in the amount of $412,900 to include $201 ,O
pavement overlay as associated with open trenching; $20,000 for const
contingencies; $15,000 for inspection, and $20,000 for surveyingisoils testin{
been appropriated in the Pavement Overlay budget and are available.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the
18
I. That the above recitations are true and correct. 19
Carlsbad, California, as follows:
2o /I/
21 //I
22
23
24
25
26 111
//I
ill
111
27 1) ill
28 //I
Ii (b 0
1
2
3
6
agreement therefor a copy of which is on file in the Office of the City Clerk. 5
accepted, and the Mayor is hereby authorized and directed to execu 4
bid amount of $201,007 submitted by Excel Commercial Construction is
9
8
7
2. That the bid in the amount of $3,617,783 for the interceptor
replacement, the bid amount of $223,722 for the storm drain construction, a
PASSED, APPROVED AND ADOPTED at a regular meeting of th
Council of Carlsbad, California, held on the day of
19-, by the following vote to wit:
10
11 NOES:
AYES:
12
13
14
1
ABSENT:
CLAUDE A. LEWIS, Mayor
I
15 11 ATTEST:
16
17
18
19
ALETHA L. RAUTENKRANZ, City
(SEAL)
20
21
22
23
24
25
26
27
28