TITLE: APPROVAL OF CONSULTANT AGREEMENT WITH
HUNSAKER &ASSOCIATES FOR THE DESIGN OF
POINSElTIA LANE FROM BLACK RAIL ROAD EASTERLY
TO THE WEST END OF THE ZONE 19 BOUNDARY
PROJECT NC] 3!351
RECOMMENDED ACTION:
Adopt Resolution No. 79-38 approving a consultant agreement with Hunsaker & Associates San Diego Incorporated for engineering services required for the design of Poinsettia Lane from Black Rail Road to a point 1340 feet Easterly at the existing terminus of Poinsettia Lane at the western boundary of Zone 19.
ITEM EXPLANATION:
Poinsettia Lane has a gap of 1340 feet from being a circulation system roadway connecting Interstate 5 to El Camino Real. This gap is between the portion of Poinsettia Lane currently being constructed by Catellus Residential Group and the existing terminus of Poinsettia Lane, which continues through the Aviara development in Zone 19. Completing this gap will allow traffic to utilize Poinsettia Lane and Cassia Road in route to El Camino Real and thereby relieve some traffic congestion on Palomar Airport Road. It will also provide excellent access to the future Zone 19
park site. The remainder of Poinsettia Lane easterly of Zone 19 to El Camino Real, which passes
through Zone 21, is in the planning stage and will ultimately serve as the major arterial roadway for this link in the circulation system. The portion of Poinsettia Lane from Aviara Parkway to El Camino Real was included in Bridge and Thoroughfare District No. 2 formed on July 8, 1997.
The Engineering firm of Hunsaker & Associates designed the portion of Poinsettia Lane immediately west of this segment which is currently being constructed by Catellus Residential Development. The firm has also obtained the topography and performed the preliminary planning of Poinsettia Lane as a part of the tentative map for the DeJong residential project (CT 98-05)
located adjacent to and north of Poinsettia Lane. Therefore, this firm has specific knowledge of this project and is uniquely qualified to prepare the design for this portion of Poinsettia Lane. If another firm were selected, they would have to also obtain the topography resulting in delay and increased design costs. For these reasons, the purchasing officer has waived the requirement for multiple proposals. The proposal from Hunsaker & Associates has been reviewed by staff and is acceptable.
Staff recommends that the City Council approve the attached consultant agreement with Hunsaker & Associates San Diego Incorporated for the design of this project as described in the attached consultant agreement, Exhibit 3.
ENVIRONMENTAL:
This portion of the project involves completing the improvement plans, project specifications, and cost estimates for a portion of Poinsettia Lane. Although the plans and specifications will not have impacts to the environment, the ultimate construction has the potential of having environmental impacts. Those potential impacts have been reviewed consistent with the California Environmental Quality Act (CEQA) and the Environmental Protection Ordinance of the City of Carlsbad through the certified EIR for the Zone 20 Specific Plan (EIR 90-03). In addition, the Mitigated Negative
Declaration for the DeJong residential project (CT 98-05) issued on November 30, 1998, supported the findings of EIR 90-03.
The Planning Director has determined that the environmental effects of this project have already been considered in conjunction with the previously mentioned certified environmental documents, and therefore, no additional environmental review will be required. A public Notice of Prior
Environmental Compliance was published on January 6, 1999, and a Notice of Determination was
I
Page 2 of Agenda Bill No. I 5 0 3 3
filed immediately thereafter. Therefore, in accordance with Carlsbad Municipal Code Section 19.04.160 (b) this project is in prior compliance.
FISCAL IMPACT:
The fee for the attached design contract with Hunsaker & Associates is $85,700. Two items of work,
amounting to $7,000, will be subject to future reimbursement from the developer of the DeJong
residential project prior to the time of construction of these two improvements consisting of sewer
and storm drains. The 1998-99 Capital Improvement Program has appropriated $1 ,OOO,OOO in
Bridge and Thoroughfare No. 2 funds for this project.
EXHIBITS:
I. Location Map.
2. Resolution No. 7 9 c 3 & approving a consultant agreement with Hunsaker & Associates.
3. Consultant agreement for Hunsaker & Associates.
I
PROJECT NAME POINSETTIA LANE EXHIBIT
BLACK RAIL ROAD TO ZONE 19 BOUNDARY I
bN BY $t?!? EVANS, CARLSBAD ENGlNEERlNM L . 3
3
4
5
6
7
8
9
IO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 99-38
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING ENVIRONMENTAL
REVIEW AND A CONSULTANT AGREEMENT WITH HUNSAKER
& ASSOCIATES SAN DIEGO INCORPORATED TO DESIGN A
PORTION OF POINSETTIA LANE FROM BLACK RAIL ROAD
EASTERLY TO THE WEST END OF THE ZONE 19 BOUNDARY,
PROJECT NO. 35951.
WHEREAS, the Planning Director has determined that the environmental effects of this
project have already been considered in conjunction with previously certified environmental
documents, and therefore, no additional environmental review will be required; and
WHEREAS, a public Notice of Prior Environmental Compliance was published on
January 6, 1999, and a Notice of Determination was filed immediately thereafter; and
WHEREAS, in accordance with Carlsbad Municipal Code Section 19.04.160 (b) this
project is in prior compliance; and
WHEREAS, the City Council of the City of Carlsbad has previously appropriated funds
required for this project in the Capital Improvement Program; and
WHEREAS, the Purchasing Officer has waived the requirement for multiple proposals;
and
WHEREAS, a proposal has been solicited for the design of this project from a qualified
engineering firm; and
WHEREAS, Hunsaker & Associates was selected as uniquely qualified to design this
project for a fee of $85,700 and that sufficient funds are currently available in the project account.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the consultant agreement with Hunsaker & Associates San Diego
Incorporated for the design of this project as described in the attached contract is hereby
approved and the Mayor is hereby authorized and directed to execute said agreement.
Ill
Ill
/II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18
17
18
19
20
21
22
23
24
25
26
27
28
i
1
3. Following the Mayor’s signature of the agreement, the City Clerk is further
authorized and directed to forward copies of said agreement to Hunsaker & Associates
San Diego Incorporated, and to the Engineering Division Planning and Design group for their
files.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council
held on the 2nd day of February , 1999 by the following vote, to wit:
AYES: Council Members Lewis, Hall, Finnila, and Nygaard
4TTEST:
4LETHA L. RAUTENKRANZ, City Clerk / (SEAL)
AGREEMENT
THIS AGREEMENT is made and entered into as of the 2 nd day of
February I 1999, by and between the CITY OF CARLSBAD, a municipal
corporation, hereinafter referred to as “City”, and Hunsaker & Associates San Diego, a
corporation, hereinafter referred to as “Contractor.”
RECITALS
City requires the services of a professional engineering Contractor to provide the
necessary professional engineering services for preparation of plans, specifications,
cost estimate and right-of-way documents; and Contractor possesses the necessary
skills and qualifications to provide the services required by the City;
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
‘contained herein, City and Contractor agree as follows:
1. CONTRACTOR’S OBLIGATIONS
The scope of services to be provided is described in Exhibit “A” and “B” as
follows:
l Exhibit “AI - Consisting of Tables 1,2 and 3 shown on 2 pages.
l Exhibit “B” - Proposal from Hunsaker & Associates consisting of 8 pages.
2. CITY OBLIGATIONS
The City shall provide:
rev. 8125198
I -
A. Copies of all existing City reference data as researched and requested by
Contractor.
B. Review of the plans, specifications, cost estimate and right-of-way
documents for the purpose of determining the general conformity to City
Standards and Project Scope.
3. PROGRESS AND COMPLETION
The work under this contract will begin within ten (10) days after receipt of
notification to proceed by the City and be completed in accordance with Exhibit “A”.
Extensions of time may be granted if requested by the Contractor and agreed to in
writing by the City Engineer. The City Engineer will give allowance for documented and
substantiated unforeseeable and unavoidable delays not caused by a lack of foresight
on the part of the Contractor, or delays caused by City inaction or other agencies’ lack
of timely action.
4. FEES TO BE PAID TO CONTRACTOR
The total fee payable for the services to be performed shall be $85,700. No
other compensation for services will be allowed except those items covered by
supplemental agreements per Paragraph 8, “Changes in Work.” The City reserves the
right to withhold a ten percent (10%) retention until the project has been accepted by
the City.
Incremental payments, if applicable, should be made as outlined in attached
Exhibit “A.”
rev. 8/25/98
-2 -
5. DURATION OF CONTRACT
This agreement shall extend for a period of two years from date thereof. The
contract may be extended by the City Manager for one (1) additional one (1) year
periods or parts thereof, based upon a review of satisfactory performance and the City’s
needs. The parties shall prepare extensions in writing indicating effective date and
length of the extended contract.
6. PAYMENT OF FEES
within
7.
Payment of approved items on the invoice shall be mailed to the Contractor
30 days of receipt of the invoice.
FINAL SUBMISSIONS
Within five (5) days of completion and approval of the plans, specifications, cost
estimate and right-of-way documents, via the City Engineer’s signature on the plans,
the Contractor shall deliver to the City the following items:
A.
B.
All items as described in Table 2 of Exhibit “A”
Two (2) copies of all other documents and calculations generated by the
Contractor in the completion and execution of the provisions of this
contract.
-3 -
4
rev. 8125198
8. CHANGES IN WORK
If, in the course of the contract, changes seem merited by the Contractor or the
City, and informal consultations with the other party indicate that a change in the
conditions of the contract is warranted, the Contractor or the City may request a change
in contract. Such changes shall be processed by the City in the following manner: A
letter outlining the required changes shall be forwarded to the City by Contractor to
inform them of the proposed changes along with a statement of estimated changes in
charges or time schedule. A Standard Amendment to Agreement shall be prepared by
the City and approved by the City according to the procedures described in Carlsbad
Municipal Code Section 3.28.172. Such Amendment to Agreement shall not render
ineffective or invalidate unaffected portions of the agreement.
9. COVENANTS AGAINST CONTINGENT FEES
The Contractor warrants that their firm has not employed or retained any
company or person, other than a bona fide employee working for the Contractor, to
solicit or secure this agreement, and that Contractor has not paid or agreed to pay any
cqmpany or person, other than a bona fide employee, any fee, commission,
percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting
from, the award or making of this agreement. For breach or violation of this warranty,
the City shall have the right to annul this agreement without liability, or, in its discretion,
to deduct from the agreement price or consideration, or otherwise recover, the full
amount of such fee, commission, percentage, brokerage fees, gift, or contingent fee.
-4-
rev. 8125198
10. NONDISCRIMINATION CLAUSE
The Contractor shall comply with the state and federal laws regarding
nondiscrimination.
11. TERMINATION OF CONTRACT
In the event of the Contractor’s failure to prosecute, deliver, or perform the work
as -provided for in this contract, the City Manager may terminate this contract for
nonperformance by notifying the Contractor by certified mail of the termination of the
Contractor. The Contractor, thereupon, has five (5) working days to deliver said
documents owned by the City and all work in progress to the City Engineer. The City
Engineer shall make a determination of fact based upon the documents delivered to
City of the percentage of work which the Contractor has performed which is usable and
of worth to the City in. having the contract completed. Based upon that finding as
reported to the City Manager, the Manager shall determine the final payment of the
contract.
This agreement may be terminated by either party upon tendering thirty (30)
days written notice to the other party. In the event of such suspension or termination,
upon request of the City, the Contractor shall assemble the work product and put same
in order for proper filing and closing and deliver said product to City. In the event of
termination, the Contractor shall be paid for work performed to the termination date;
however, the total shall not exceed the lump sum fee payable under paragraph 4. The
City Manager shall make the final determination as to the portions of tasks completed
and the compensation to be made.
rev. 8125198
-5 -
12. CLAIMS AND LAWSUITS
The Contractor agrees that any contract claim submitted to the City must be
asserted as part of the contract process as set forth in this agreement and not in
anticipation of litigation or in conjunction with litigation. The Contractor acknowledges
that if a false claim is submitted to the City, it may be considered fraud and the
Contractor may be subject to criminal prosecution. The Contractor acknowledges that
California Government Code sections 12650 et seq., the False Claims Act, provides for
civil penalties where a person knowingly submits a false claim to a public entity. These
provisions include false claims made with deliberate ignorance of the false information
or in reckless disregard of the truth or falsity of information. If the City of Carlsbad seeks
to recover penalties pursuant to the False Claims Act, it is entitled to recover its
litigation costs, including attorney’s fees. The Contractor acknowledges that the filing of
a false claim may subject the Contractor to an administrative debarment proceeding
-wherein the Contractor may be prevented to act as a Contractor on any public work or
improvement for a period of up to five years. The Contractor acknowledges debarment
by another jurisdiction is grounds for the City of Carlsbad to disqualify the Contractor
from the selection process. W (Initial)
The provisions of Cartsbad Municipal Code sections 3.32.025, 3.32.026,
3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference.
& (Initial)
rev. 8125198
-6 -
13. STATUS OF THE CONTRACTOR
The Contractor shall perform the services provided for herein in Contractors own
way as an independent Contractor and in pursuit of Contractor’s independent calling,
and not as an employee of the City. Contractor shall be under control of the City only
as to the result to be accomplished, but shall consult with the City as provided for in the
request for proposal. The persons used by the Contractor to provide services under this
agreement shall not be considered employees of the City for any purposes whatsoever.
The Contractor is an independent Contractor of the City. The payment made to
the Contractor pursuant to the contract shall be the full and complete compensation to
which the Contractor is entitled. The City shall not make any federal or state tax
withholdings on behalf of the Contractor or its employees or subcontractors. The City
shall not be required to pay any workers’ compensation insurance or unemployment
contributions on behalf of the Contractor or its employees or subcontractors. The
Contractor agrees to indemnify the City within 30 days for any tax, retirement
contribution, social security, overtime payment, unemployment payment or workers’
compensation payment which the City may be required to make on behalf of the
Contractor or any employee or subcontractor of the Contractor for work done under this
agreement or such indemnification amount may be deducted by the City from any
balance owing to the Contractor.
The Contractor shall be aware of the requirements of the Immigration Reform
and Control Act of 1986 and shall comply with those requirements, including, but not
rev. 8/25/98
-7 -
+
limited to, verifying the eligibility for employment of all agents, employees,
subcontractors and Consultants that are included in this agreement.
14. CONFORMITY TO LEGAL REQUIREMENTS
The Contractor shall cause all drawings and specifications to conform to all
applicable requirements of law: federal, state and local. Contractor shall provide all
necessary supporting documents, to be filed with any agencies whose approval is
necessary.
The City will provide copies of the approved plans to any other agencies.
15. OWNERSHIP OF DOCUMENTS
All plans, studies, sketches, drawings, reports, and specifications as herein
required are the property of the City, whether the work for which they are made be
executed or not. In the event this contract is terminated, all documents, plans,
specifications, drawings, reports, and studies shall be delivered forthwith to the City.
Contractor shall have the right to make one (1) copy of the plans for its records.
16. REPRODUCTION RIGHTS
The Contractor agrees that all copyrights which arise from creation of the work
pursuant to this contract shall be vested in City and hereby agrees to relinquish all
claims to such copyrights in favor of City.
17. HOLD HARMLESS AGREEMENT
Contractor agrees to indemnify and hold harmless the City of Carlsbad and its
officers, officials, employees and volunteers from and against all claims, damages,
losses and expenses including attorneys fees arising out of the performance of the
-8 -
rev. 8125198
work described herein caused by any willful misconduct, or negligent act, or omission of
the contractor, any subcontractor, anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable.
18. ASSIGNMENT OF CONTRACT
The Contractor shall not assign this contract or any part thereof or any monies
due thereunder without the prior written consent of the City.
19. SUBCONTRACTING
If the Contractor shall subcontract any of the work to be performed under this
contract by the Contractor, Contractor shall be fully responsible to the City for the acts
and omissions of Contractor’s subcontractor and of the persons either directly or
indirectly employed by the subcontractor, as Contractor is for the acts and omissions of
persons directly employed by Contractor. Nothing contained in this contract shall
create any contractual relationship between any subcontractor of Contractor and the
City. The Contractor shall bind every subcontractor and every subcontractor of a
subcontractor by the terms of this contract applicable to Contractor’s work unless
specifically noted to the contrary in the subcontract in question approved in writing by
the City.
20. PROHIBITED INTEREST
No official of the City who is authorized in such capacity on behalf of the City to
negotiate, make, accept, or approve, or take part in negotiating, making, accepting, or
a,pproving of this agreement, shall become directly or indirectly interested personally in
this contract or in any part thereof. No officer or employee of the City who is authorized
rev. 8125198
-9 -
C
in such capacity and on behalf of the City to exercise any executive, supervisory, or
similar functions in connection with the performance of this contract shall become
directly or indirectly interested personally in this contract or any part thereof.
21. VERBAL AGREEMENT OR CONVERSATION
No verbal agreement or conversation with any officer, agent, or employee of the
City, either before, during or after the execution of this contract, shall affect or modify
any of the terms or obligations herein contained nor entitle the Contractor to any
additional payment whatsoever under the terms of this contract.
22. SUCCESSORS OR ASSIGNS
Subject to the provisions of Paragraph 17, “Hold Harmless Agreement,” all
terms, conditions, and provisions hereof shall inure to and shall bind each of the parties
hereto, and each of their respective heirs, executors, administrators, successors, and
assigns.
23. EFFECTIVE DATE
This agreement shall be effective on and from the day and year first written
above.
24. CONFLICT OF INTEREST
The Contractor shall file a conflict of interest statement with the City Clerk in
accordance with the requirements of the City’s conflict of interest code incorporating
Fair Political Practices Commission Regulation 18700 as it defines A consultant. The
disclosure category shall be those categories determined by the City.
-10 -
rev. 8125198
25. INSURANCE
The Contractor shall obtain and maintain for the duration of the contract and any
and all amendments insurance against claims for injuries to persons or damage to
property which may arise out of or in connection with performance of the work
hereunder by the Contractor, his agents, representatives, employees or subcontractors.
Said insurance shall be obtained from an insurance carrier admitted and authorized to
do business in the State of California. The insurance carrier is required to have a
current Bests Key Rating of not less than “A-:V” and shall meet the City’s policy for
insurance as stated in Resolution No. 91403.
A. Coveraaes and Limits.
Contractor shall maintain the types of coverages and minimum limits
indicated herein, unless a lower amount is approved by the City Attorney or City
Manager:
1. Comprehensive General Liability Insurance. $1 ,OOO,OOO combined
single-limit per occurrence for bodily injury, personal injury and property damage. If the
submitted policies contain aggregate limits, general aggregate limits shall apply
separately to the work under this contract or the general aggregate shall be twice the
required per occurrence limit.
2. Automobile Liability (if the use of an automobile is involved for
Contractor’s work for the City). $1 ,OOO,OOO combined single-limit per accident for bodily
injury and property damage.
rev. 8125198
-11 -
3. Workers’ Compensation and Employer’s Liability. Workers’
Compensation limits as required by the Labor Code of the State of California and
Employer’s Liability limits of $1 ,OOO,OOO per accident for bodily injury.
4. Professional Liability. Errors and omissions liability appropriate to
the contractor’s profession with limits of not less than $1 ,OOO,OOO per claim. Coverage
shall be maintained for a period of five years following the date of completion of the
work.
8. Additional Provisions.
Contractor shall ensure that the policies of insurance required under this
agreement contain, or are endorsed to contain, the following provisions.
1. The City shall be named as an additional insured on all policies
excluding Workers’ Compensation and Professional Liability.
2. The Contractor shall furnish certificates of insurance to the City
before commencement of work.
3. The Contractor shall obtain occurrence coverage, excluding
Professional Liability which shall be written as claims-made coverage.
4. This insurance shall be in force during the life of the agreement and
any extension thereof and shall not be canceled without 30 days prior written notice to
the City sent by certified mail.
5. If the Contractor fails to maintain any of the insurance coverages
required herein, then the City will have the option to declare the Contractor in breach, or
may purchase replacement insurance or pay the premiums that are due on existing
rev. 8125198
-12 -
C
policies in order that the required coverages may be maintained. The Contractor is
responsible for any payments made by the City to obtain or maintain such insurance
and the City may collect the same from the Contractor or deduct the amount paid from
any sums due the Contractor under this agreement.
26. RESPONSIBLE PARTIES
The name of the persons who are authorized to give written notices or to receive
written notice on behalf of the City and on behalf of the Contractor in connection with
the foregoing are as follows:
For City: Title; City Engineer
For Contractor:
Name: Lloyd B. Hubbs, P.E
Address: 2075 Las Palmas Drive
Carlsbad, CA 92009-l 576
Title President
Name David Hammar
Address 10179 Huennekens Street
San Dieao. CA 92121
Registered Civil Engineer’s License Number: 34757
27. BUSINESS LICENSE
Contractor shall obtain and maintain a City of Carlsbad Business License for the
duration of the contract.
rev. 8125198
-13 -
-
28. ENTIRE AGREEMENT
This agreement, together with any other written document referred to or
contemplated herein, embody the entire agreement and understanding between the
parties relating to the subject matter hereof. Neither this agreement nor any provision
hereof may be amended, modified, waived or discharged except by an instrument in
writing executed by the party against which enforcement of such amendment, waiver or
discharge is sought.
Executed by Contractor this 19 day of Januarv ,19 99 . .- CONTRACTOR:
Hunsaker & Associates San Dieoo..lnc. (name of Contractor)
By: .
were)
a-
David A. Hammar. President (print name/title)
By: 5 - /;& (sign here)
ATTEST:
John W. Hill, Assistant Secretarv (print name/title) ALETHA L. RAUTENKRANZ City Clerk I
(Proper notarial acknowledgment of execution by Contractor must be attached.)
(President or vice-president and secretary or assistant secretary must sign for
corporations. If only one officer signs, the corporation must attach a resolution certified
by the secretary or assistant secretary under corporate seal empowering that officer to
bind the corporation.)
APPROVED AS TO FORM:
RONALD R. BALL City
BY
rev. 8125198
-14 -
-
MFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California
On
personally appeared
. - v-+nN\or e T&In \~ul\L\r. Nari~e(s) of Signer(s) ,
3 personally known to me
to be the person(s) whose name(s) e
subscribed to the within instrument and
acknowledged to me that m e xecuted
the same in w authorized
capacity(ies), and that by f&fhem
signature(s) on the instrument the person(s), or
the entity upon behalf of which the person(s)
acted, executed the instrument.
WITNESS my hand and official seal.
Place Notary Seal Above
OPTIONAL
Though the information below is nof required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer
Signer’s Name:
!Il Individual
E Corporate Officer - Title(s):
El Partner - El Limited 0 General
Cl Attorney in Fact
Z Trustee
Cl Guardian or Conservator
Cl Other:
Signer Is Representing:
0 1997 NalioMl Notary Association l 9350 De S&o Ave.. P.O. Box 2402 - Chatswonh. CA 91313-2402 Prod. No. 5907 Reorder Call Toll-Free l-600-876-6827
EXHIBIT “A” FOR CONTRACT
Table 1 through Table 3 define Ute City Milestones, the time and requirements of each submission, and the fee allocation per submittal
milestone.
Elapsed Time 28 calendar days after approval of contract. 28 calendar days after return of 30 percent
plancheck from all city departments.
Milestones
PLANS ’ I 30 Percent 70 Percent
Schematic design. Full and comolete plans.
l Grading and Improvement ptans showing that the most important elements of design are worked out in some detail.
l Grading and Improvements plans showing all proposed improvements inctuding utility relocations.
l 12 codes
SPECIFICATIONS
NOTE
0 12copies
None First muah draft of entire set of Soecific Provisions.
1. Green Book format used throughout document for each milestone.
2. Use MS Word format throughout.
OPINION OF COST
NOTE:
Use Excel format
L
None DETAILED OPINION OF COST
.Accuracy=lOpercent
0 12copies
- 90 Percent
17 calendar days after return of 70 percent
plancheck from all city departmenk.
90 Percent
Full bid-ready plans with corrections and plan-check set 2.
Final draft of entire set of specific ProVisiiS.
l Sameas 100percent except MS Word disk.
FINAL OPINION OF COST
. Drafting Bii Set Format.
l Accuracy=1opercent
l 12 copies
100 Percent
17 calendar days after return of 90 percent
plancheck from all city departments.
100 Percent
. Photo or ink on mylar ready for City
Engineer signature and 3.6’ disks in AutoCAD v. 14.
l 8 copies
f3if~3iny text of the
l MS Word disk.
l Special Provisions to Standard
SpecitIcations for Pubtic works Construction.
l Standard Reference Drawings andior Utility Company Drawings.
l 12copies
SAME AS 99 PERCENT
l One (1) Excel disk.
RM:kd k:@Q99i1998@44.doc
W.O. 9999-7259
POINSETTIA LANE, REACH 3
BLACK RAIL ROAD TO EXISTING AVIARA IMPROVEMENTS
Task Fee I . I l
I I
.
I
.
District Improvements
Subdivision Improvements
Sewer Imp. $3,500 40% %I.400 30% $1,050 20% $700 10% $350
Storm Drain $3,500 40% $1.400 30% fl.050 20% $700 10% $350
TOTAL FEE $85,700 34.01% $29,150 37.03% $31,730 19.98% $17,120 8.99% “S7,700
Legend l Percentage of Fee Allocated .t Upon City Engineer’s Signature of Plans
RM:kd k~1998\p44.&c W.O. 9999-7259
- mw/ig r 73 HUNSAKER &ASSOCLA’TES RECEIVED s A N D I E C 0. I N c. JAN 13 1999 PLANNING
ENCINEERINC
SLJR\‘EYI~C ENGINEERING January 11.1999 DEPARTMENT
IRVINE
LAS VEGAS
RIVERSIDE Mr. Galen Peterson
SAN Dwo City of Carlsbad . 2075 Las Palmas
Carlsbad, CA 92008
RE: Proposal for Poinsettia Lane Improvements, Black Rail Road to Existing
Aviara Improvements
Dear Galen:
Hunsaker & Associates San Diego, Inc. is pleased to offer the following fee
estimate for furnishing the civil engineering required for the development of
Poinsettia Lane improvements from Black Rail Road to the existing Aviara
improvements.
We propose to provide the engineering as detailed in Exhibit ‘B” for a total fee of
$78,700. Invoicing would be monthly based on the percentage of work
completed for each item shown in Exhibit ‘B”, not to exceed the percentages for
project milestones in Exhibit -K. We would expect to receive payment within
thirty (30) days after your receipt of our invoice.
Per your request, we have included a budget for blueprints, reproducibles and
deliveries. The budget is anticipated to cover the deliverable identified in Exhibit
“A”. This proposal is based on our current office rate of $87.00 per hour and our
current field rate of $166.00 per hour for a two-man survey party.
Should this proposal meet with your approval, please sign the standard form of
agreement and return it to our office.
Should you have any questions, please do not hesitate to call.
Very truly yours,
Hunsaker & Associates DAVE HAhlMAR
10179 Huennekenr St. David A. Hammar, R.C.E.
Suite 200 President
San Dlego. CA 92121
1619) 558-4500 PH
(619) 558-1414 FX
www.hunsaker.com
Inlo@HunsakerSD.com Dthkd mswmW:\p999\199Q43,doc ~099997260
•! City of Carlsbad
Poinsettia Lane Improvements (W.O. 9999-7260)
~ , gnugi~ 11,1999
EXHIBIT “B”
SCOPE OF WORK
POINSETTIA LANE
BLACK RAlL ROAD TO EXISTING AVIARA IMPROVEMENTS
OFFICE ENGlNEERlNG
DlSTRICT IMPROVEMENTS H&A
Line No. Description
3390 1.
6520 2.
6030 3.
3460 4.
3490 5.
65a0 6.
6!MJ 7.
6210 8.
3530 g*
50’0 10.
Prepare a one phase rough grading plan at a scale of 1”=40’.
Grading plans will be provided for full width right-of-way
improvements, and access ramps to the SDG&E access roads in their
easement. $
Prepare erosion control plans and NPDES Permit per City of
Carlsbad requirements. $
Prepare one estimate of earthwork quantities based on final 40 scale
grading plans. $
Prepare street improvement plans at a scale of 1”=40’, including
1O”xlO’ intersection paving detail at Black Rail Road. (5 sheets). $
Prepare striping plans for the proposed improvements. $
Prepare storm drain improvement plans at a scale of 1”=40’. Plans
will be provided for all storm drain crossing the proposed grading and
appropriate street catch basins. $
Prepare master hydrology study for the project site in accordance
with the requirements of City of Carlsbad. $
Prepare one quantity and cost opinion per City of Carlsbad
requirements at 70% submittal. Estimate to be updated at 90% and
1 OOK submittals. $
Prepare One traffic signal plan for the intersection of Poinsettia Lane
and Black Rail Road. (Linscott, Law and Greenspan) $
Horizontal calculation of right-of-way and easement lines. $
slls 11. Prepare dedication plats for right-of-way slope, temporary
construction and drainage easements. This proposal does not
include negotiating with land owners or condemnation support.
Consultant shall provide title reports for affected properties. $
Amount
3,500
2,400
1,200
15,500
2,600
2,100
1,700
3,200
5,000
900
9,500
-
Poinsettia Lane Improvements (W.O. 9999-7260)
H&A Line
No. Description
8700 12. Project Coordination and processing. $
3460 13. Prepare project specifications in City Standard Specification format. $
3090 14. Equipment Rental budget for potholing of existing utilities at points of
connections. $
1180 15. Prepare Landscaping and Irrigation plans for manufactured slopes.
(lvie Landscape) $
8700 16. Provide Soils Engineering services in conjunction with the Road Design, including providing updates for the existing soils investigation
prepared in conjunction with the proposed Tentative map, for the
DeJong property and review and approval of the proposed grading
plans. (Geocon) $
9270 17. Field survey for ties to roadway points of connection and office note
reduction. Field verify bottom of SDG&E conductors at tower
connections. $
. . 3-0 18. Prepare cross section Exhibits to depict the existing and proposed ground elevations under the SDG&E conductors, and provide to
SDG&E and Client for use in negotiating the Letter of permission to
grade and joint use agreement. Provide reduced grading plans as
exhibits for the letter of permission to grade. Prepare one plat and
legal description for the joint use agreement. $
Amount
5,000
3,500
1,500
9,000
5,000
1,500
3,600
19. Reproducible budget. $ 2.000
TOTAL &-J&ZQQ
City of Carlsbad
Poinsettia Lane Improvements (W.O. 9999-7260)
ggry 11,1999
SUBDIVISION IMPROVEMENTS (REIMBURSABLE TO THE Cl) HbA Line No. Description
3420 1. Prepare sewer improvement plans for the sewer main to serve the
DeJong project, connecting to the existing sewer line at the Aviara
subdivision boundary.
Amount
$ 3,500
6~0 2. Prepare storm drain improvement plans for the storm drain system
stubbing out to sewe the Dejong project, connecting to the proposed
storm drain system crossing Poinsettia Lane near the easterly
subdivision boundary. $ 3.500
DISTRICT IMPROVEMENTS TOTAL $ 78,700
SUBDlVlSlON IMPROVEMENTS TOTAL $ 7.000
TOTAL S 85.700
0H:kd -:\p999\193.doc
wo 9999-7260
City of Carlsbad
Poinsettia Lane Improvements (W.O. 9999-7260)
January 11,1999
Page 5
INSURANCE COVERAGES
The following is a summary of the insurance wverages that Hunsaker 8 Associates San Diego,
Inc. provides and are included in our offer of this proposal:
General Liability $2,000,000
Personal Liability $1 ,ooo,ooo
Auto Liability $1 ,ooo,ooo
Professional Liability $1 ,ooo,ooo
Valuable Papers $1,500,000
Upon request we will provide a certificate of insurance for the insurance wverages listed above.
If you require additional coverage, the costs that we incur from our insurance carriers will be
invoiced to you at their direct costs and are not included in our fee quoted within this proposal.
-
City of Carlsbad
Poinsettia Lane Improvements (W.O.9999-7260)
Jpaag;ar 1X1999
GENERAL UNDERSTANDINGS AND ASSUMPTIONS
GENERAL
1. The fee estimate is based upon bridge and thoroughfare fee district surface
improvements (full width grading, two l&foot travel lanes, median curb and drainage
facilities).
2. This fee estimate includes normal processing of all plans and documents which
consultant prepares. Additional processing which may be required due to changes in
design criteria, agency standards or regulations or for any cause which is not under the
direct control or directly resulting from consultant’s actions will be performed on a time
and material basis or under a separate contract.
3. Construction or design changes resulting from field conditions differing from available
plans and documents of public record used as reference drawings will be prepared on a
time and material basis.
4. This fee estimate does not include construction management, field construction
inspection or staking other than document clarification.
5. This fee estimate does not include landscaping and irrigation design for the median.
6. This fee estimate does not indude work of a general or promotional nature (e.g. sales
maps, wlored renderings; etc.) This type of work will be prepared on a time and
materials basis or under a separate contract.
7. This fee estimate indudes only that work detailed in Exhibit “K. All additional work will
be performed on a time and material basis or under a separate contract.
8. This fee estimate does not include aerial topographic surveys. Existing aerial
topography shall be used.
9. This Fee Estimate does not include professional services during construction. These
services, including field staking, soils engineer supervision of grading, Paleontological
review of grading operations, if required will be provided by separate contract.
Dttkd mswordh\p999\1998\p43.doc
wo 9999-7260
City of Carlsbad
Poinsettia Lane Improvements (W.O. 9999-7260)
GRADING
1. This fee estimate does not include design for an offsite borrow site. If a borrow site is required, work to design this grading will be covered under a separate agreement for an
additional fee.
2. Consultant will coordinate with the soils engineer and geologist during grading plan . design to provide economical solutions for buttressing and stabilization.
3. This fee estimate does not include the preparation or negotiation of offsite letters of
permission to grade. Except for providing exhibits to client for use in obtaining a joint
use agreement and letter of permission to grade from SDG&E.
STREETS AND UTILITIES
1. This proposal includes drainage for the facilities required for the road. Downstream
drainage studies and offsite sewer and water analysis are not included in this fee
estimate unless specifically included in Exhibit “A”.
2. This fee estimate does not indude as-builts because the scope of work required to as-
built this project can not be determined at this time.
3. Utilities within the limits of work required to serve adjacent properties (sewer, storm
drain) are included as “subdivision improvements.”
4. ‘. Consultant will coordinate work with water design consultant retained by Carlsbad
Municipal Water District and provide one set of reproducible base maps for their use.
Design of potable or reclaimed water is not included. .
1. This fee estimate indudes the preparation of twelve easement dedications. These
plats will be prepared and submitted to the City of Carlsbad concurrently. Additional
plats, phases or change of phasing will be provided on a time and material basis.
2. This fee estimate does not include negotiation of Joint Use Agreements, if any, between
the City of Carlsbad and utility companies. Exhibits for the agreements are included as
noted.
3’. This fee estimate does not indude an overall exhibit map for appraisal purposes.
4. City shall prepare and obtain necessary subordination agreements.
DH:kd mawoMk:\p999\1~3.doc
wo 9999-7260
Poinsettia Lane Improvements (W.O. 9999-7260)
January 11,1999
PROJECT SPECIFIC UNDERSTANDINGS AND ASSUMPTIONS
1. This proposal assumes easements are acquired by client without use of eminent domain.
Additional work to support condemnation actions will be provided for an additional fee.
2. City shall provide Standard City Specification Boiler Plate in MSWord format concurrent with
return of 30% plan check.
DH:kd -:\9999\1998\p43.&c
wo 99997260
City
February IO, 1999
Hunsaker & Associates
Attn: D. Hammer, President
10179 Huennekens Street
San Diego, CA 92121”
RE: DESIGN OF POINSETTIA LANE , PROJECT NO. 35951
Enclosed for your records are copies of Carlsbad City Council Agenda Bill No. 15,033
and Resolution No. 99-38. These documents were approved by Council on February 2,
1999. Also enclosed is one original and fully executed agreement for the above
referenced project.
In accordance with Section 24 of enclosed agreement, you are required to file a Conflict of Interest Statement with the Carlsbad City Clerk. Anyone in the company who is
working on this City project must file a Form 700, Statement of Economic Interests, and
must report all Disclosure Categories which includes 1,2, 3, and 4.
Enclosed for your use are the following documents, which you may copy if necessary:
1. Form 700 1998-l 999 Statement of Economic Interests
2. Amended Appendix to the Local Conflict of Interest Code
3. Limitations and other Restrictions on Gifts, Honoraria, Travel and Loans
Your completed Assuming Office Statement is due in the City Clerk’s Office no
later than 500 PM on March 4, 1999.
If you have questions regarding this process, please call
Karen Kundtz. Assistant Citv Clerk. at (760) 434-2917.
KATHLEEN D. SHOUP
Sr. Office Specialist
1200 Carlsbad Village Drive l Carlsbad, CA 92008-l 989 - (760) 434-2808 a9