TO: MAYOR LEWIS
COUNCILMEMBERS FINNILA, NYGAARD, KULCHIN, & HALL
CITY MANAGER
CITY ATTORNEY
ASSISTANT CITY MANAGER
COMMUNITY DEVELOPMENT DIRECTOR
ADMINISTRATIVE SERVICES DIRECTOR
CITY CLERK
PLANNING DIRECTOR
ASSISTANT PLANNING DIRECTOR
PURCHASING OFFICER
FINANCE DIRECTOR
LIBRARY DIRECTOR
ASSISTANT LIBRARY DIRECTOR
FROM: MUNICIPAL PROJECTS MANAGE
SUBJECT: REVISED FINAL REPORT: T
GEORGINA COLE LIBRARY FEASIBILITY STUDY
Attached please find a copy of the revised final report of the Georpina Cole Library Feasibilil
Study dated August 3, 1998. Please discard the previously distributed report dated June 5, 1998
Two important changes have been made to the Feasibility Study which have been included in tl
attached report; first, the inclusion of a fourth project development alternative (labelt
Alternative “D”), and second, an expanded discussion of the City’s Growth Manageme
Standards specific to library facility needs both currently and at build-out.
Staff will be processing an agenda bill in the near future for the City Council’s review of tl
study including the various project development alternatives described therein. Both the City
project architects and City staff are recommending Alternative “C” be considered.
If you have any questions regarding the report, please give Cliff Lange or myself a call.
2075 Las Palmas Dr. - Carlsbad, CA 92009-1 576 - (61 9) 438-11 61 - FAX (61 9) 438-08C
(-
(
/-
f
(
i
/
/- L
F
i
i
(
,,
r
i
r
i
(
I Feasibility Study
/ Georgina Cole Library
i
I August 3, 1998
i
l,
i
i
,
/
i
I
i
t
i
I
(
<
CardweWMcGraw Archifecfs
<
e e e 0 e a
e e
* a Georgina Cole Library a Feasibility Study
0 0 0 a City of Carlsbad
7250 Carfsbad Village Drive
Carfsbad, California 92008
(619) 434-2870 ext. 2875
0 Cardwell/McGraw Architecfs
e
1221 Second Avenue, Suite 300
Seattle, Washington 98 101 e a e 0 * 0
0 * a
0 e e
e
0 e
a 0
(206) 622-23 I I
701 B Street, Suite 200
San Diego, California 92101
(619) 231-0751 i
e David Smith, Consulting Librarian
130 Ho//y Road
Hopkins, MN 55343
(612) 933-0199
t3laylock Engineering Group
1775 Hancock St., Suite 250
San Diego, California 92110 a (619) 543-4719
0 Sevier Siskowic Engineers
4375 Jutland Dr., Suite 100
San Diego, CA 92117
(619) 581-2167 e
Van Buuren Kimper & Associates
5030 Camino de la Siesta, #301 a San Diego, CA 92108 a (619) 291-9980 e
e
e
e e.
Construction Analysts, Inc.
2225 Faraday Ave., Suite A
Carfsbad, CA 92008
e
I)
a
e (760) 431-9555
a e
0
0
e
0 0 0 a e
0 0 * * e 0 0
@
e 0
GEORGIMA COLE LIBRARY FEASIBILITY STUDY
I. Executive Summary ................................................................................. I
11. Library Program Summary 6 ......................................................................
Planning Background
Growth Management Requirements
Public Library Trends
Summary of Existing and Proposed Library System Resources
e
a Summary of Program Areas 0 Program Layout Diagram
0
0 Code Analysis 8 Program Analysis
Building Envelope Analysis
Structural System 0
HVAC, Plumbing and Fire Protection Systems e
Power, Lighting arid Communications Systems e
Summary of Renovation Potential 0 e
a
a
Ill. Analysis of Existing Facility.. .................................................................. IO
*
a
0 Lot Consolidation and Subdivision a Topography e Adjacent Land Uses
0
IV. Site Analysis ............................................................................................ 16
Extent of City Owried Property
Planning, Zoning and Entitlement Requirements
Site Access
Parking
Realignment of Laguna DriveElmwood Street Intersection
Street Improvements at Laguna Drive
Vacation of Right of Way Spur at Carlsbad Village Drive
Relocation of Utilities
Relocation of Carlsbad Arts Office Structure
* e 0 a
0 a e Ir
e a
0 0 0
0 8
a
CardweWMcGraw Archjtects
0 e e a e e *
1) e 0
V. Alternative Planning Concepts .............................................................. .20
Alternative A: Renovation for Future Expansion
Alternative B: Renovation and Addition to Meet Program
Alternative C: New Construction to Meet Program
Alternative D: Interim Improvements e 0
0 e
Vi. Cost Analysis (Construction Analysts, Inc.) .23
Vii. Recommendations. .25
Viii. Project Drawings: ................................................................................ .26
......................................... e
............................................................................
0
0 Site Analysis: a
Existing Utilities and Topography 0 Proposed Off -Site Work e e a
0
a
Existing Buildings, Boundaries, Parking and Land Use
Site Development Alternatives:
Alternative A: Renovation for Future Expansion
Alternative 5: Renovation and Addition
Alternative C: New Construction
Alternative D: Interim Improvements
0 IX. Appendices: ......................................................................................... .2 7
0 1. Building Program David Smith, Consulting Librarian
2. Structural Systems Report Blaylock Engineering Group a 3. Mechanical Systems Report Sevier Siskowic Engineers 0 4. Electrical Systlems Report Van 5uuren Kimper & Associates
0 5. Cost Analysis Construction Analysts, Inc.
0 6. Planning Analysis City of Carlsbad Planning Department
e
e 0 * a a
(I,
0 0 0 0
0 0 a
0
0 8
e CardwelVMcGraw Architects
6 0 e *
a
0 a a
*
a
GEORGINA COLE LIBRARY FEASIBILITY STUDY
I. EXECUTIVE SUMMARY
Background: The Carlsbad Library Master Plan, completed in 1986, provides the
framework for implementation of the City of Carlsbad’s Growth Management
Standards for Library Services. The Growth Management Plan Standard for
libraries is 800 square feet per 1,000 population. According to Planning
Department analysis, maximum build-out to the Growth Management Plan Limit
WOI i!d require 101,620 square feet of library space. The Library Master Plan calls
for the development of library resource centers in both the north and south areas of
the City to achieve geographical parity in access to resources.
The construction of the new Carlsbad City Library, scheduled for completion in
summer 1999, represents the first phase of this plan and will create 64,000 square
feet of library space, including central technical services and administrative
facilities for the two-library system.
The second step in the implementation of this plan involves renovation and addition
or new construction at the Georgina Cole Library site. An initial feasibility study for
the Georgina Cole Library site was prepared in 1990. That study defined the library
program and proposed alternatives for implementation in 1998. The purpose of the
current study is to update the building program and to look more closely at
alternative approaches to meeting the City of Carlsbad’s long term library service
needs at the Georgina Cole Library site.
Building Program: The Building Program developed by Consulting Librarian
David Smith and appended to this report provides for a scope of public library
services at the Georgina Cole site commensurate with the public library services to
be provided at the new Carlsbad City Library. The building program reflects
current trends in planning for public libraries including:
e e e e 0 e
a *
0 e 0
0 * e 0 e 8 0
e
0
0
0
I) 0
0
0
0
Increased space needs for information technology user stations and
related growth in published materials.
Overall growth nationwide in use of computers, bookstores and
Libraries’ increasing role as civic destination points, and growth in
use by both young families and seniors.
An overall trend in declining school library resources: K-12 students
are increasingly relying on public libraries to support their studies.
0 a libraries. a e
0 0 0 0 e e
e e e
0 8
e
Cardwell/McGraw Architects
I
6 0 e e a
0 a
a
0
e Recent surveys indicate public priorities are larger print collections,
access to information technology, and improved library facilities. e
0 e
0
0 a 0
e
In addition to the core library services the Cole Library buiiding program provides
for the City’s Genealogy and Local History collections, for the Adult Learning
Center and for Public Meeting and Conference Rooms. The building program
indicates that a facility of 45,155 square feet is required. Together with the new
64,000 square foot Carlsbad City Library this will meet the City’s Growth
Management Standards for library services.
Building Analysis: The existing library building was visited and construction
drawings reviewed by a project team of architects, structural, mechanical, and
electrical engineers. The findings are as follows: 0
0 The structural system requires substantial reinforcement to meet a
a e
current building code life safety standards.
The original mechanical system is still in place and incurs high
operating costs in terms of maintenance and system efficiency.
The building is not in conformance with current energy codes. It is
minimally insulated, also contributing to high operating costs.
The electrical system is at full capacity and will not allow for
increased loads.
The building lacks communications infrastructure to support current
and proposed library information networks.
The building does not have an automatic fire sprinkler system and
the fire protection system does not meet current code requirements.
walls which impose constraints to the layout and efficient delivery of
Existing floor to floor and floor to roof heights are minimal in several
areas, and render the addition of new concealed ductwork and
0
0
0
0 e 0 0 e 0
0 0 Reinforcement of the existing structure requires additional shear 0
0 library services. 0 0
0 e sprinkler systems infeasible.
The extent of renovation required to allow for the implementation of the library
program is comprehensive. To provide a facility capable of meeting the library’s
operational requirements over a projected 30 year life span will require demolishing
the bulk of the existing structure and making limited use of existing slabs and
foundations.
While incremental steps of renovation may allow interim use of the existing facility,
this does not represent a feasible approach to meeting the building program.
Incremental renovation will incur substantial penalties of 1) duplication of
construction effort in subsequent phases, 2) repeated interruption of library
0 0 m
0 * 0 0 e 0 0 e 0
e
0
@
Cardwell/McGraw Architects
2 a
e
0
0 a 0 e e 0
0
0 library services.
services for construction activity and associated relocation costs, 3) higher
construction costs and extended schedules associated with phased work, and 4)
the creation of an end product that does not allow the most effective provision of
The extent of renovation required to meet the City’s long term objectives indicates
that replacement of the building with new construction is a strongly competitive
option. This is borne out in the cost analysis which follows.
Site Analysis: The existing site is well located and is very visible. The extent of
City-owned lots allows suifficient site area to accommodate the building program
and required parking. A proposed facility of 45,155 square feet will require 226
parking spaces at the City’s ratio of 1 space per 200 square feet of library.
Preparation for library site development should address the following:
e
e
e
0
a e 0
e
0 e e
0 e 0
0 e
m
0
0
Consolidate adjacent City owned legal parcels and make General
Plan amendments to consolidate the R-P-Q zoning.
Construct cul-de-sacs at Laguna Drive and Elmwood Street and
vacate existing right-of-way at the Carlsbad Village Drive driveway.
Relocate utilities main lines on the site remaining from the previous
vacation of Elmwood Street.
Relocate the structure housing the Carlsbad Arts Office to an
adjacent lot or find an alternative location for this function.
e 0
0
0
Projecf Alfernatives and Cost Anafysis: Three site development approaches
meeting the goal of constructing the library program on this site are analyzed, as
well as an interim improvements alternative.
Project Budgets for each Alternative are presented by cost consultant Construction
Analysts Incorporated. Estimates are based on engineers’ reports, site plan
drawings, and construction specifications similar to those used for the Carlsbad
City Library currently under construction. Off-site work for street improvements
and utilities relocation are included as a separate line item. Related project costs
including library furnishings and equipment, testing, permit and design fees,
owner’s management costs, public art program, and owner’s project contingency
are included. Construction costs are escalated to reflect a July, 1999 bid date.
0
0 e e e
a
0 e
e
0 0
0
Alternative A: Renovation for Future Expansion (30,680 Square Feet). This
alternative represents a limited first phase of 30,680 square feet which will
enable future expansion of approximately 15,000 square feet to meet the
building program. The anticipated final configuration of the site after future 0 e 0 e 0 e 0
Cardwell/McGra w Architects
3
6
e
e
e
e
0 e
e 0 e
e 0
0 a
addition would be similar to Alternative B. Alternative A requires temporary
relocation for construction, and also for the subsequent addition. The scope of
renovation work is extensive, including demolition of all superstructure down to
the level of existing slabs and foundations. The future addition will remove and
reconfigure some of this work at the point of connection.
Total Project Budget: $7.9 M
Alternative B: Renovation and Addition to meet the Budding Program
(45,155 Square Feet). This alternative requires temporary relocation of the
library during construdion. The scope of renovation work includes demolition of
all superstructure down to the level of existing slabs and foundations. The
costs of this work are equal to that of new construction, and additional costs
are incurred for temporary relocation.
e 0
e a a
0 *
Total Project Budget: $1 1.9 M
0 Alternative C: New Construction to meet the Building Program (45,155 Square
Feet). This alternative has the advantages of minimal interruption of library
operations and the fewest constraints to the site design and layout of the
library. The project can be phased to create interim parking and access to the
existing library during construction. Demolition of the existing building and
remaining site improvements occur as a final phase.
0 *
0 0 a Total Project Budget: $1 1. 6 M
e
0
0 a 0
e
0 Alternative D: lnterim lmprovements (24,352 Square Feet). This alternative
will address the following in order of priority as far as the existing 1998-1999
and 1999-2000 Capital Improvement Projects budget of $1.6 million allows:
1) highest priority life safety improvements, 2) reallocation of staff and public
meeting spaces, and 3) minor improvements to building finishes. This
alternative represents a ‘holding action’ approach to defer the major program
improvements outlinedl in this study. The improvements will require
temporary closure of the library and will be demolished in the course of future
library expansion or replacement.
Total Project Budget: $1.6 M
e e e a Recommendations
Library Site Development:
0
0
0 e 0
0
0 0
Consolidate adjacent parcels into a single parcel for Library use.
Subdivide the existing parcel between the Library and City Hall.
Amend the General Plan for R-P-Q zoning on the entire Library site.
Vacate the right-of-way spur at Carlsbad Village Drive and vacate
the right-of-way at the corner of Laguna Drive and Elmwood Street. e 0 e
0
0 4
0 e
a Cardwell/McGraw Architects
0 * e e 0 0
0
0 0 0 0 0
a
0
0 Construct off-site improvements including cul-de-sacs at Laguna
Implementing the Library Master Plan:
Drive and Elmwood Street. Relocate existing utilities and the
Carlsbad Arts Office to prepare for library site development.
Construct a new library structure to meet the full program
(Alternative C) adjacent to the existing library, allowing uninterrupted
operations in the existing building until the time of move-in.
Phase the new construction to create parking and access to the
library during construction, and to demolish the existing building and
complete site improvements after move-in.
0 a
0 0 e
0 0 e @ e
0 a a e e 0 0 e
0 0 0 0 0 0 e 0 0 e 0 e e 0 e
0 0
e 0 0
Cardwell/McGraw Architects
5
6
0
0 e e e e a 0
II. LIBRARY PROGRAM SUMMARY
Planning Background
The Georgina Cole Library has served as the City of Carlsbad’s primary location
for library resources for the last 31 years. The construction of the new Carlsbad
City Library, scheduled for completion in summer 1999, implements the first step of
a library services plan which addresses the City of Carlsbad’s Growth Management
Standards for Library Services. The Library’s Master Plan, completed in 1986,
calls for the development of library resource centers in both the north and south
areas of the City to achieve parity in access to resources. The second step in the
implementation of this plan involves renovation and addition or construction of new
facilities at the Georgina Cole Library site. A feasibility study for the Georgina Cole
Library site was prepared in 1990 and defined the library program and alternatives
for projected implementation in 1998. The purpose of the current study is to
reassess the building program and to analyze alternative approaches to meeting
the City of Carlsbad’s long term library service needs at the Georgina Cole Library
site.
The Library Trends and Library Program Summary were developed by Consulting
Librarian David Smith in team with the Carlsbad City Libraries staff. Interpretation
of the Growth Management Plan was provided by the Carlsbad Planning
Department. The entire Program Document is appended to this report.
e 0 0
0
0 e a 0 e e e 0 e
0
0 e e e
0 e 0 Growth Management Requirements
The Growth Management Plan standard for library construction as amended by the
City Council on April 22, 1997 reads: “800 square feet per 1,000 population must
be scheduled for construction within a five year period or prior to construction of
6,250 dwelling units, beginning at the time the need is first identified.” The library
floor area demand generated from this standard as calculated by the Planning
e
a *
0 0
0 * Department is as follows:
0 July 1, 1998 Population: 60,000 Square Feet e Build-out (SANDAG 1998 estimate): 92,960 Square Feet e Build-out (Growth Management Plan Limit): 101,620 Square Feet
0 e
e
Neither SANDAG nor the City of Carlsbad has adopted population growth forecasts
more recent than the SANDAG Series 7 forecasts based upon 1985 assumptions.
SANDAG is currently preparing a Series 9 2020 Forecast. A Planning Department
analysis of build-out estimates is appended to this report. 0 * e
0
0 0 e e e
CardweWMcGraw Architects
6
e
0
0 e 0 e 0 e 0 0 0 a
Public Library Trends
Over recent years a number of trends have been noted in both local and national
studies which must be taken into account in planning for new public library
facilities.
1. The impact of information technology on public library space has resulted in
substantial increases in square footage needed over space planning formulas
in general use just a decade ago.
0 e
0 0 publication of materials. 0 0
0
Computer technology has allowed for an unprecedented increase in the
Electronic databases which reduce the amount of space required for
‘hard storage’ require substantially more space for user access -
whereas a number of individuals can access a print set of an
encyclopedia, (only one person per computer station can access the
same database reference tool.
0
0 a 0 0 a
0
2. There is a high correlation between computer ownership, purchase of books
and other materials, and library use. These activities serve to complement and
enhance one another: mega-bookstores and libraries are growing and e flourishing side by side.
0 a 0 e 0 citizens is increasing.
3. Public libraries are “destination points” for many people seeking a place to
spend their time productively in a safe and hospitable environment. In many
communities the library has become a major social, informational and
recreational center for all age groups. Use both by young families and mature
4. School library resources are in a serious decline - collections, trained staff and
adequate space. Students, particularly K-12, are relying more heavily on the
public library for both print and non-print materials to support their studies.
5. Recent public surveys conducted on both a local and national basis find that
the library user’s highest priorities are for improved, larger collections of print
materials, access to computers, other new technologies and improved larger
0 * e 0 0
0 0
0 library buildings.
e 0 e 0
0
These trends have been taken into account in the updating of the library building
program requirements for the Cole Library, and point to a library size larger than
that required by the Growth Management Standard. The provision of adequate
library space and a functional, flexible layout will permit the new or expanded Cole
0 0 e 0 0 0
0 0
CardwelVMcGraw Architects
7
a a e a e 0 a 0 a a a a
Library to respond satisfactorily to the needs of the northern residents of the City of
Carlsbad, both now and well into the future.
Summary of Existing and Proposed Library System Resources
Georgina Cole Library (existing): 24,352 Square Feet a Centro (existing) 900 Square Feet e Adult Learning Program (existing) 1,359 Square Feet a Carlsbad City Library (summer 1999): 64,000 Square Feet a Georgina Cole Library* (proposed): 45,155 Square Feet
a (*Note: replaces both the existing Cole Library and the Adult Learning Program)
a
a a a e a a a a a
Summary of Program Areas
The Building Program totals 45,155 square feet including a 200 square foot Police
Department Office, and will require 226 parking spaces at the City's ratio of one
space per 200 square feet of library space. The following table summarizes
program areas and capacities.
a Library-Related Public Areas Square Feet a Public EntranceILobby unassigned
@ Meeting and Conference Rooms 1,850 * Library Public Areas
a Friends Book Sales Area 100
a
e a a a a a a a
@
a a * e 0 0
0 a a 01
Circulation Services 1,735
Children's Services 4,370
Young Adult Area 565
Copy Center - Public 300
Reference Services 2,435
Magazines/Newspapers 875
Popular Browsing/Paperbacks 225
Public Shelving - Adult 7,105
Public Seating - Adult 1,720
Computer Lab 320
Adult Learning Program 3,055 a Genealogy and Local History 6,230
e
Cardwell/#cGraw Architects
8
0 0 0
0
0 0 0 0 Staff Areas
0 Administrative Staff Offices 750
0 Staff Facilities 500
0 Delivery/Mail/Copying 650 a Non-public Shelving/Storage 700
0 Maintenance 230
0 Total Assigned Area (ASF) 33,715 a Total Unassigned Area (25%) 11,240 0 e a
0
0 0
0 0
0 0 0 a
0
0
0
Total Library Area (GSF) 44,955
Police Department Office 200
Total Building Area (GSF) 45,155
Program Layout Diagram
The Building Program recommends that all library public services with the
exception of independently staffed areas such as Genealogy and Local History and
the Adult Learning Center be located on one floor level for most effective staffing.
The total area of these functions on the main level is approximately 32,000 square
feet. This means that roughly 13,000 gross square feet will be the maximum
desired on the second level. This space should be in one contiguous area for
staffing and flexibility in use over time.
The program layout diagram indicates the relative size and preferred adjacency of
the primary elements of the building program. The diagram indicates the desired
zoning of the program by floor level and with respect to public access. This
diagram defines the basic areas used in the analysis of alternatives in this report.
0
0
0
0 0 0 0
0
0 0 e
0
0
0 0
0
0 e 0 0 *
e
a
CardwelVMcGraw Architects
9
0
0
0
0 e
0 0
0
0 0
0
0
a a a
0 e
0 LEVEL 1 0
0 0
0
0
0
0 a 0 0
0
0
0
0
0
6
0 0
6
0
0 0 a
a
--...+----+-----+---
+ENTRANCE 0 REFERENCE
0 SHELVING 8 SEATING
LEVEL 2
Georgina Cole Library Program Diagrai e
0 Cadsbad, Callfornia
0 0 North August 3,19
RenoMtiai &Expansion
Feasibility Study 0
0 0 CanhVellMcGraw Archifeds 03080 1
0
0 0
0
1 1 1
0
0
0 0
0 0
0 e
0
0 0 Code Analysis
0 0
0
0
0
111. ANALYSIS OF EXISTING FACILITY
Construction Type and O~scupancy Group: The building construction type would
be best classified as Type Il-Non Rated under the current code. (Title 24 1995
California Building Code). The first level has an area of 16,280 Gross Square Feet
(GSF) inclusive of the enclosed outdoor reading court. The second level totals
8,072 GSF, for a total of 24,352 GSF. Library use is typically classified as a Group
B occupancy. Meeting rooms within the library housing less than 300 occupants
are classified as a Group A-3 occupancy, and typically total less than 10% of the
total area. The allowable area for the Type Il-N construction type given a Group B
occupancy and allowances for two stories and 40’ separation from other structures
on all sides is 48,000 square feet.
An automatic fire sprinkler system is not required if the building is less than 48,000
GSF but it is recommended for library occupancies for the protection of building
contents.
Exiting: The second level areas each have two exits as required, however the exit
stairways do not conform to current standards and do not provide areas of refuge
for evacuation assistance as required.
Accessibility: Public toilet rooms have been remodeled to meet the requirements
of Title 24 and the ADA. Vertical circulation including stairs and elevators do not
conform to current standards and will require replacement.
0 e
0 e e
0
0
e
0
0
0
0
a
e 0
0
0
e
0
0
0 e *
e
0 Program Analysis
Column Grid and Shear IValls: The building has a 25’x40’ column grid which
allows a fair degree of flexibility for library layout. For planning new facilities a grid
in the range of 30’x35’ is recommended for greatest flexibility and space efficiency
in laying out shelving and seating to ADA standards. Shear walls were located in
response to the initial library functions and now limit the ability to open up
contiguous spaces.
Floor to Floor Height: The existing floor to floor height and floor to roof heights
severely constrain the ability to renovate or add to this building. Existing floor to
floor heights are IO’ at the south end and 13’ at the north end. Existing floor to roof
heights are 9’ at the soutlh end and 11’ at the north end. This results in ceiling
heights of 7’-6” and 8’ in some areas. This is inadequate for public library areas.
Ceiling heights will be further reduced by the need for additional structural
0
0
0
0
0
0 0
0
0
CardweWMcGraw Architects
IO
6
0
0 0 e e e a e supports, larger ductwork to meet current ventilation and duct insulation
requirements, and the addition of a fire sprinkler system.
Recommended floor to floor height for a new multistory library is 14’ to 15’. This
will accommodate building systems and allow a ceiling height of 9’-6” to 10’ as
recommended for visibility, lighting and air distribution in large spaces.
Second floor Areas: The second floor of the existing library is composed of two
separate areas with no connection between. The 4,400 square foot north
mezzanine is 13’ above the first floor slab, the 3,000 square foot south staff work
area is IO’ above the first floor slab. The isolation of these relatively small areas
limits their potential use. Currently the north mezzanine contains the Genealogy
collection which has dedicated staff but is constrained by the available space. The
building does not allow for consolidation of the upper floor areas due to the
0 a 0 0
0
0 a e
0 e e differipg structural heights.
0 0 e
0
0
0
Building Envelope Analysis
The Library building was constructed in 1966 to the plans of architect Robert
Melvin. The design is derivative of late International Style institutional architecture
as manifested by practitioners such as Edward Durrel Stone and Minoru Yamasaki.
The building is lightly decorated with tile fascias and masonry screen walls.
Expansive glazing and a well maintained landscape contribute to an integration of
0 0
0 interior and exterior environments.
0 0 e
0
Thermal Assemblies: The construction drawings indicate 2” rigid roof insulation
(R-6) but do not indicate insulation at exterior wall assemblies of concrete masonry
units (R-I to 1.5) and at exterior wall assemblies of steel studs with exterior stucco
and interior portland cement plaster (R-I to 4). These values are fairly typical for
the date of construction aind represent a significant addition to operating costs.
Glazing: The glazing indicated on the construction drawings varies from 5/16” to
3/16” depending on the opening sizes. Several of the openings are very large. All
glazing is single pane and is neither tinted nor filmed for reduction of heat gain.
The glass does not appear to be tempered as would be required by current codes
given the existing opening sizes. It is strongly recommended that the existing
glazing strength be identified and replaced or reinforced as necessary in future
maintenance or renovation of the building.
Roof Membrane: The roof membrane is an aggregate-ballasted multi-ply built-up
roof installed in approximately 1983. It has been repaired intermittently since then.
There are no apparent leakage problems currently but the installation is
approaching the limit of its expected life cycle.
a e *
0 * e
0
0 a
0 e
0
0 0 e
0
e
0
Cardwell/McGraw Architects
11
e
0 0 a
0
e Structural System e 0 a
e
The letter from Blaylock Engineering Group attached in the Appendices describes
the updated structural analysis of the existing building. The structural analysis
expands upon the following key points:
Current seismic force level requirements are 38% higher than the force
levels required in the code in effect (1966 UBC) when the building was
constructed.
Current code lateral force levels greatly exce-,d the capacity of the
cantilever column system at the raised roof areas. 0 The north mezzanine floor diaphragm and system of seismic collector e beams and drag connections is inadequate by current standards. * Existing concrete block shear walls are inadequately reinforced and e have inadequate diaphragm drag connections. 0 Existing non-structural masonry screen elements represent a falling 0 hazard in a seismic event and require additional bracing and
repair/replacernent of rusted framing elements.
Thin cantilevered-slab edges around the perimeter of the building
require repair or removal.
Existing exit stair railings require repair or replacement due to corrosion.
Structural improvements to bring the existing upper floor and roof
structure into compliance with current codes necessitate doubling the
amount of existing shear walls.
0 e e e
0
c, * * e e
e 0 e
0
0 e a
The library has long operated with reduced shelving in the upper floor areas due to
limitations in dead load recommended previously for these areas. Full renovation
of the building to current code standards for library use on two floor levels will be
most economically accorriplished through the demolition and reconstruction of
virtually all superstructure, including roof, mezzanines and masonry shear walls.
New second floor loads and areas can be designed to avoid conflict with existing
footings which may be undersized for the increased loads. Re-use of shear wall
footings is possible, but is not recommended as it may constrain the library layout
significantly. A full renovation may save between 33% and 50% of the cost of
foundations and slab on grade for a new structure.
0 * a e ..
0 0 e
HVAC, Plumbing and Fire Protection Systems
The mechanical systems report provided by Sevier Siskowic Engineers is attached
in the Appendices. The report can be summarized as follows: 0 0
I)
0 0
0
a
CardwelVMcGraw Architects
12
0
0 e a
0 0 e 0
With the exception of the cooling tower, all of the primary components of the
building Heating, Ventilating and Air Conditioning system are,over 30 years old and
have exceeded their useful life by industry standards. The existing cooling tower
has a useful life of approximately 10 years, which is less than the planning horizon
of the current project. The system was not designed to current standards of
energy efficiency and is no longer performing at peak efficiency. The operation of
the building incurs substantial costs in energy usage and ongoing maintenance.
Building plumbing is in satisfactory condition. Existing domestic water, sewer and
gaz service supply lines are located immediately to the east of the building and will
require protection/relocation during construction. Resizing of these service lines
may be required by expansion of the program areas.
There is no fire suppression (automatic sprinkler) system in the building. The
building contains a heat detector fire alarm system. There is no fan shut-down
capability in case of fire. The system requires a new fire alarm control panel to
meet current codes. An automatic sprinkler system may not be required by code
but is recommended for the purposes of life safety and protection of library
materials. A dry pipe system may be considered for areas containing irreplaceable
or extremely rare materials. The existing building does not afford locations or
adequate ceiling clearances for a concealed sprinkler piping system.
e e 0 8
0 e
e
0
0
a e a e e
0 * 0
e
e
d e e e e
0 0 the existing building service.
Power, Lighting and Communications Systems
The electrical systems report provided by Van Buuren Kimper & Associates
Engineers is included in the Appendices to this report. The findings of the report
can be summarized as folllows:
The electrical service feeder is not adequate to support any future building
expansion or modification. The existing transformer appears to be undersized for
The main electrical room does not meet current SDG&E design standards and
requires work to relocate utilities including water piping, fire alarm panel, and
telephoneldata panels. The main switchboard does not have the capacity to
support expansion. Existing panel boards are not suitable for future building
expansion or renovation.
The energy expended to maintain current lighting levels exceeds the current Title
24 lighting energy allowance of 1.5 watts per square foot by more than 300%
(existing lighting is 5 watts per square foot). The lighting system does not take
advantage of conservation methods such as daylighting, occupancy sensors, multi-
level switching and time control.
a *
0 e 0 e e
0 0 0
e
0
0 e *
a
CardwelMMcGraw Architects
13
- 0
e 0
0 0 0 0 * e
9
e 0
Exterior lighting should be removed and replaced with new energy efficient
luminaires capable of providing an average illumination level of 0.5 foot candles.
Existing telephone and data systems need a separate entrance room and a
building-wide system of cable management to support current library technology
and to allow for future modification. Currently, expansion of library information
networks is limited by the lack of communications infrastructure such as cable tray
and underfloor cable access.
A new fire alarm system is recommended for the existing building to conform with
national codes, the ADA, and City of Carlsbad Fire Marshal criteria.
e
c * e Summary of Renovation Potential
0
0 0 0
0 e
e
e
The extent of renovation required to allow for the implementation of the library
program in this building is comprehensive. Full renovation with this objective in
mind requires demolishing the bulk of the existing structure and making limited use
of existing slabs and foundations.
Incremental steps of renovation may allow for interim use of the facility but do not
achieve the City’s program objectives in a cost-effective or service-oriented
manner. Incremental renovation will incur substantial penalties of I) duplication of
construction effort in subsequent phases, 2) repeated interruption of library
services for construction activity and related costs of temporary facilities, 3) higher
construction costs associated with phased work, and 4) the creation of an end
product that does not allow the most effective provision of library services.
The potential steps of incremental renovation are interrelated but can be grouped
into three general categories as follows:
a
0
0
0 * 8 a 0
Minimum Requirements for lnterim Use: A minimum scope of work for
continued short term use of the building should include lateral
reinforcement of the existing structure as necessary to meet current life
safety standards, and safety improvements to exit railings, glazing and 0 e screen walls. 0 a Building Systems Upgrades: To reduce escalating operating and 0
0 * maintenance costs and to improve building function and comfort for
continued use, replacement of the HVAC and electrical systems and
installation of an automatic sprinkler system are needed.
0
0
0
a 0 e e
e
Cardwe///McGraw Architects
14
8
e
e a
e e e 8 0 e
Provision for Program Objectives: The scope of building systems
expenditures begs the question of aligning these improvements with the
long-term planning for library services - Le. all major building systems
may be renewed but no significant provision for future growth will have
been made. Meeting the library’s long term program needs and
creating the potential for future addition requires major structural
reconfiguration to eliminate the constraints of shear walls and existing
floor to floor heights.
a e 0 e a e Alternatives A and B described in this report assume a comprehensive renovation
approach accomplishing all of the above to meet the long term program goals of * the City of Carlsbad.
a e e 0
a
Alternative D described in this report encompasses only the minor improvements
necessary to facilitate continued interim operation of the facility and assumes that
these improvements will be demolished or replaced in future implementation of
Alternatives A, B, or C. e
0 0
e 0 * 0 * 0 e e * a
0
0
a * 0 e 0 a a e 0 a 0
e
m
e
e
CardwelVMcGraw Architects
75
e *
0 0
r) 0
IV. SITE ANALYSIS
0 e 0 e
Extent of City Owned Property
The Library and the City Hall are located on a single legal parcel. The library
parking area occupies the two parcels immediately to the east. The city owns the
parcel immediately adjacent to the north of the parking lot. These parcels provide
adequate site area for library construction and parking, if the alignment of the
corner of Laguna Drive arid Elmwood Street can be adjusted to obtain greater site
width. The city owns several parcels on the opposite side of Laguna Drive. These
are used for the Carlsbad Arts Office and for a neighborhood gardens program.
e
e 0
a Lot Consolidation and Subdivision
0 0
0
e
a a 0 0 e
0
Redevelopment of the City property for the Library may require consolidation of the
four contiguous city parcels into one legal parcel. In addition, it may be desirable
to subdivide the single parcel which contains both the Library and City Hall, so that
the Library becomes the sole use on a single parcel at the conclusion of the
project.
Topography
The Library sits at the top of a steep terrace 15’ above the City Hall site with a
finish floor elevation of approximately 123’. The Library parking area slopes uphill
22’ to the east property line which has an elevation of 145’. The rate of elevation
gain increases as one moves east, from a slope of 1:40 adjacent to the Library
increasing to 1 : 15 at the eastern property line. Carlsbad Village Drive continues to
ramp up to the east, making site access difficult from the east end of the site.
e 8 * *
e Adjacent Land Uses
a
a 0 0
0
0
The City Hall complex lies’ immediately to the west. The library adjoins public rights
of way to both the north and south. The library parking area is bounded by
residential properties to the north and the east. The City Hall is adjacent to the
Interstate 5 on-ramp, and the site is linked to Carlsbad Village to the west of the
freeway by Carlsbad Village Drive. The Library site marks a transition point from
these commercial and institutional areas to the primarily residential areas to the
e
e e east.
e
0
Planning, Zoning and Entitlement Requirements
The existing Library and parking lot are located on lots zoned R-P-Q (Residential -
0
0
0 0
e
e
a
CardweIVMcGraw Architects
16
i e 0 0 a e e e Professional - Qualifying). The “Qualifying” overlay indicates that Planning
Commission approval of development is required on these lots. Library use is
permitted outright in this zone. Through lots (i.e. street frontage on opposite sides
of the lot) are treated as having two front yards of required 20’ width. Development
standards for the R-P-Q zone are:
0 e e
e
e Bldg. Height: 35’
0 8
0
Front Setback: 20’
Side Setback:
Rear Setback:
10% of lot width, min. 5’, max. 10’
Twice the side setback, Max. 20’
e Bldg. Lot Coverage: 60%
0 0 e
(b
The City-cwned lot immediately north of the parking lot is zoned R-I -1 0000. The
24’ height limit in this zone would preclude two-story above grade development for
the library on this lot, due to the need for 15’ floor to floor height. The library and
related parking is a conditional use and would require application for a Conditional
Use Permit and associated reviews. Alternatively, application for change of the
General Plan zoning to reflect the consolidated parcel boundaries may be made.
Development standards fur the R-1-10000 zone are:
Front Setback: 20’
Side Setback:
Rear Setback:
Bldg. Height:
e
0 a
0 e 10% of lot width, min. 5’, max. IO’
Twice the side setback, Max. 20’
30’’ (24’ if roof is sloped less than 3:12)
e e e Bldg. Lot Coverage: 40%
0 e a
a a 0 *
0
0
e
The City-owned lots on the north side of Laguna Drive are zoned R-1 . These lots
are not proposed for library use.
Summary of Project Reviews: Entitlement for library site development will require
Parcel Map changes for lot consolidation (Administrative Decision), street right-of-
way vacation (City Council approval), and General Plan Amendment for zoning
change at the consolidated parcel (City Council approval at quarterly meeting). The
General Plan Amendment will also require a Local Coastal Program Amendment to
Land Use. Coastal Commission action is required once it is acted on by the City.
A negative Environmental Declaration is anticipated.
e e
0 Site Access
0 e 0 9
e e e 0
0
Library parking is accessible from Carlsbad Village Drive. The Library service
entrance is accessible from Carlsbad Village Drive with a separate curb cut to the
dock area. Future development of the site should maintain public access from
Carlsbad Village Drive to minimize impacts on Laguna Drive and Elmwood Street,
CardweWMcGra w Architects
17
0
e
e e
0 0 e
e
0
0
0
0
I,
0
e these are both local streets. The existing service access location should be
abandoned due to backing and turning difficulty at Carlsbad Village Drive. Service
access may be best accommodated from Laguna Drive adjacent to the City Hall
parking lots, or alternatively from the public parking area.
Parking
The City of Carlsbad parking requirement for libraries is one space per 200 square
feet of building area. The library currently has 97 parking spaces located in the lot
immediately to the east. E3y the current standard the exicting library (24,600 SF)
needs 26 additional spaces to meet the required 123 spaces.
Realignment of the Laguna Drive/Elmwood Street Intersection
The realignment of the Laguna Drive/Elmwood Street intersection is desirable to
remove the ‘bottleneck’ in the center of the library site. This narrowing occurs
immediately to the east of the existing structure in the area which is most favorable
for addition or new construction due to its relatively flat topography and the
minimization of impacts to residential neighbors. The realigned intersection would
cut into the corner lot currently occupied by the Carlsbad Arts Office. After review
of street realignment alternatives, it is clear that the termination of Laguna Drive
and Elmwood Street in cul-de-sacs meeting City Engineering Services criteria is
the most feasible approach to facilitating site development.
Street Improvements at Laguna Drive
Laguna Drive is currently a 40’ wide unimproved (lacking curbs, gutter, sidewalks)
right of way. Redevelopment of the City property will require street improvements
including an expanded 56’ right of way and installation of curbs, gutters and
e
e a
0
0 0 0 0
e 0
e
a
0
0
e * a sidewalks to City standards.
Vacation of Right of Way spur at Carlsbad Village Drive
At the west Library parking lot entrance the Carlsbad Village Drive right-of-way
contains a spur which aligns with Elmwood Street to the north. This appears to be
‘left over‘ from a previous vacation of Elmwood Street. This spur encumbers the
site in a similar fashion to the Laguna Drive/Elmwood Street intersection and it is
desirable to vacate this small area as well. This spur occurs in the most favorable
site location for addition or new construction and will have an effect on the
calculation of yard setbacks, which will constrain the building footprint substantially.
0
0 0
0 0
a
0 0 e a 0 a 0 0 0 e 0 0 0
CardwelVMcGraw Archffecfs
18
0
0 0
0 0 a e Relocation of Utilities e
0 Relocation of water, gas and sewer mains, which bisect the site, is required under
several different development scenarios. These mains align with Elmwood Street
and connect to mains located in Carlsbad Village Drive. Relocation will be required
a) for the realignment of the Laguna Drive/Elmwood St. intersection, b) for addition
to the existing building footprint (Alternative B) and c) for new construction in the
most favorable site location (Alternative C). Relocation of the gas main should be
coordinated with SDG&E. Existing overhead power lines at Laguna Drive and
Elmwood Street should be relocated underground in this area as well.
Relocation of Carlsbad Arts Office Structure
Relocation of the Carlsbad Arts Office will be necessary to accomplish the Laguna
Drive/Elmwood Street realignment. The structure is a converted single story slab-
on-grade dwelling. The structure cot!ld be relocated to one of the adjacent city-
owned parcels and its use maintained. There is a significant benefit to the
adjacency of the Arts Office and the Library, particularly if jointly bet ieficial
developments such as a sculpture court can be accomplished in the site plan.
Relocation of the existing structure is included in the cost analysis as a baseline.
Further project planning should include a more detailed feasibility study of
alternatives for the Arts Office. These might include creating space within the
library building or providing a new structure on-site more amenable to Arts Office
programs than the relocated house structure.
e
e
0
0 0
e e
0
e
a 0 e 0 *
0
0 e e 0 e 8 0 * 0 *
e
a
0 a
0
0 e e e e 0
0 0 e
e e
a
e
CardweWMcGraw Architecfs
19
e
a 0 0 0 e 0 V. ALTERNATIVE PLANlNlNG CONCEPTS e
Alternative A: Renovaticm for Future Expansion: 30,680 SF
Alternative A provides a baseline for comparison to the alternatives which meet the
City’s long term requirements. The intent of Alternative A is to facilitate the future
implementation of the full program by comprehensively reconstructing the existing
structure and building systems in the short term, to allow for future addition. The e proposed improvements provide for a long term service life for the renewed facility. 0 This alternative includes construction of a full second floor with a floor to floor 0 height of 13, and construction of a new roof structure with a floor to roof height of 0 15’. The resulting split of functions onto the two floors does not optimize the 0 program, but provides the maximum usable space in the interim.
0 First Floor Renovation: 16,280 GSF
New Second Floor: 14,400 GSF
Total GSF: 30,680 GSF
e e
e e e
0
0 0 a
0
0 0
Alternative A also includes replacement of all major building systems and site
development to accommodate parking for 154 cars. Alternative A can be
accomplished without the proposed realignment of Laguna Drive/Elmwood Street.
Alternative A requires temporary relocation of the library during the construction e period.
@ Advantages/Disadvantages: e + Reduces first cost * - Temporary relocation required now and in future
Future cost of duplication of work in future phase 0 - Defers long term program needs 0 - Least flexibility for library operations
e
-
a e a c
0 e 0
0 a Renovated first floor area: 16,280 GSF 0 Additional area at first floor: 15,720 GSF 0 Additional area at second floor: 13,155 GSF 0 Total GSF per Building Program: 45, f 55 GSF
Alternative B: Renovaticm and Addition to Meef Program: 45,155 SF
A/ternative E3 meets the requirements of the Building Program for the long term
service needs of the Carisbad City Libraries through a combination of renovation
and new construction. This Alternative includes the demolition of the existing roof
and second floor structures and new construction as follows:
e
0
0 0 0
CardwelVMcGraw Arch/fects
20
- 0
0 e e 0 a *
0
0 0 period.
Alternative B includes site development to create parking for 226 cars, and will
require the realignment of Laguna Drive/Elmwood Street to accomplish this.
Alternative B requires temporary relocation of the library during the construction
Advantages/Disadvantages: e
e + Meets long term program requirements
- Higher first costs than Alt. A - Temporary relocation required during construction
- Costs more than Alt. C and has additional design constraints
e
0 e 0 a
0 0
0 0 e
Alternative C: New Construction to Meet Program: 45,755 SF
Alternative C meets the requiremenfs of the Building Program for the long term service needs of the Carlsbad City Libraries through new construction. This alternative allows the existing facility to remain open during the construction period. e e
0 e
e *
0
New construction at first floor:
New construction at second floor: Total GSF per Building Program:
32,000 GSF
13,155 GSF
45,155 GSF
Alternative C includes site development to create parking for 226 cars, and will
require the realignment of Laguna Drive/Elmwood Street to accomplish this.
Alternative C can be phased to allow for development of parking and access to the
e
0 existing library during construction.
0 Advantages/Disadvantages: e + Meets long term building program requirements e + No temporary relocation required e + Most flexibility in site and building design 0 + Similar cost to Alt. B, but increased flexibility e - Higher first. costs than Alt. A
0
0 e 0 0 a
Alternative D: Interim In7provements: 24,352 SF
Alternative D addresses the following in order of priority as far as the existing 7998-
1999 and 7 999-2000 Capital Improvements Allocations allow: I) highest priority life safety improvements, 2) reallocation of staff and public meeting spaces, and 3) 0 minor finishes improvements. ”
0 Interim Improvements to Existing: 24,352 GSF 0 Total GSF: 24,352 GSF
e
a 0
0
0 e 0
CardweWMcGraw Architects
21
- e
0 e e 0 0
0
a e 0 0 e rn rn
0 e 0 0 e
0
0 0
0 0 e * 0
0
0 0 a 0 0
0
0 e
0 e e rn 0 0 0
0 e
0
0 * Alternative D does not include site improvements.
Alternative D does not facilitate future improvements to the building.
Advantages/Disadvantages:
+ Allows continued use of existing building in the short term
+ Funds are currently in CIP budget - Library service interruption required now and in future - Future cost of duplication of work in future p9a5e
- Defers long term program needs
e
e
e
e
CardweWMcGraw Architects
22
0
0 0
0 e 0
0
0 0
0
0 0
* VI. COST ANALYSIS
Cost Analysis of Alternatives A, B, and C was prepared by Construction Analysts,
Inc. based on project drawings and descriptions. Costs for new work reflect the
specifications employed at the Carlsbad City Library currently under construction.
The scope of renovation work in Alternatives A and B reflect the analysis of the
existing structure prepared by the architects and engineers and assumes
substantial demolition of the existing structure with partial re-use of slab and
foundations as described iin this report.
Costs for off-site work are itemized including the termination of Laguna Drive and
Elmwood Street in cul-de-sacs, the relocation of the Carlsbad Arts Office, and the
relocation of utilities mains on the library site to avoid the building area.
Construction costs are escalated to a July, 1999 bid date. Additional ‘soft’ project
costs are budgeted based on the City’s experience at the Carlsbad City Library.
Current estimates for library furnishings and equipment.
The Project Budget for Alternative D (interim Improvements) was not estimated
based on scope of work but reflects the sum of the Capital Improvement Projects
budgets already allocated for 1998-99: $349,750 and 1999-2000: $1,241,000.
e
0 0 0
0
0 e
a
0 0
0
0 0 0 a a 0 * 0
0 0 0 0 0
0
0
0
0 e 0 0 a 0
0 0
0
a
e
Cardwell/McGraw Architects
23
0 0
0 0
0
0 e 0 0 0 ALT.A ALT. B ALT.C ALT. D 0 Gross Square Feet 30,680 45,155 45,155 24,352
Building Construction and Sitework $3,838,500 $6,203,394 $6,192,557 $1,141,135
(Construction Cost/SF) $125.11 $137.38 $137.14 $46.86
Off-site Work $487,612 $487,612 $487,612 $0
Subtotal Construction Cost $4,326,112 $6,691,006 $6,680,169 $1,141,135
Project Budgets for Alternatives A, B, C, D
0 0 0
0 0
0 Other Project Costs: 0 ArchlEngITesting Fees (15% of Const. Cost) $648,917 $1,003,651 $1,002,025 $171,170 0 Owner's Proj. Management (5%) of Const. Cost) $216,306 $334,550 $334,008 $57,057 0 Owner's Contingency (15% of Const. Cost) $648,917 $1,003,651 $1,002,025 $1 71 ,I 70 0 Library Furnishings and Equipment ($48/SF) $1,472,640 $2,167,440 $2,167,440 $0 0 1 YO for Public Art $43,261 $66,910 $66,802 $0
Coordination of Art Project $43,261 $66,910 $66,802 $0
Post Occupancy Outfitting (2% of Const. Cost) $86,522 $1 33,820 $1 33,603 $0 0
Utilities Design, Connection (2% of Const. Cost) $86,522 $1 33,820 $1 33,603 $0
0
Library Temporary Relocation (Allowance) $250,000 $250,000 $0 $0 0 0
0
0
0 0
0
0
0
0
0
0
0
0
0 0
0 0
0 0 0 0
0 a
0 0 0 0 0
Mitigation of Hazardous Materials (Allowance) $50,000 $50,000 $50,000 $50,000
Subtotal Other Project Costs: $3,546,346 $521 0,752 $4,956,309 $449,397
a Total Project Budget: $7,872,458 $1 1,901,758 $1 1,636,478 $1,590,532
CardweWMcGraw Architects
24
e 0
0 e
0 0
0
0 VII. RECOMMENDATIONS
0
0 Library Site Development: e
0 Consolidate adjacent parcels into a single parcel for Library use.
0 Subdivide the existing parcel between the Library and City Hall.
0 Amend the General Plan for R-P-Q zoning on the entire Library site.
Vacate the right-of-way spur at Carlsbad Village Drive and vacate
the right-of-way at corner of Laguna Drive and Elmwood Street.
0
0 0
0
0 0
0
0 0 Construct off-site improvements including cul-de-sacs at Laguna 0 0 0
0
0
0 e
0
0
0 e
0
0
0 0
0
0
0
0 0 0 0
0
0 0 0
0
0
0 0
0 0
lmplernenting the Library Master ffan:
Drive and Eilmwood Street. Relocate existing utilities mains and the
Carlsbad Arts Office to prepare for library site development.
Construct a new library structure to meet the full program
(Alternative C) adjacent to the existing library, allowing uninterrupted
operations in the existing building until the time of move-in.
Phase the inew construction to create parking and access to the
library during construction, and to demolish the existing building and
complete site improvements after move-in.
0
e
CardwelMMcGraw Architects
25
-
0 e
0
a
0 0 VIII. PROJECT DRAWINGS
0 e 0 e e
0 Proposed Off-Site Work 0 e Site Development Alternatives: 0
0 0 0 Alternative C: New Construction 0 Alternative D: Interim Improvements
e
Site Analysis:
Existing Buildings, Boundaries, Parking and Land Use
Existing Utilities and Topography
Alternative A: f3enovation for Future Expansion Alternative 5: Renovation and Addition
0 0
0
0
0 e e e e e e
0 e e 0
0
0
0
0
0
0 e
0 0 e a
0
0
0
0 0 0 0
e
Cardwell/McGraw Architects
26
0 0 0
0 e
0 0
0 0 0 0 0
0
0 0
0
0
0 0
0
0 0 0 e
0 0 0 0
0
0
0 * 0 0
0
0
0
0 0
0
0
0 e a
0
0 0 0
a
a P -c %4
Pz= (
0 lrmooa
e
E a Ea ‘3 $0 am
.s uz .!I 31
1 1
*c
2 i? P 4
Q) - 85 g 21 -e P E: k dP
Q) 25 Q db
mz e
e
0
0
0 e e 0 e 0 82 0
0 :I: Q
e
0
0
0
0 0 e e
0
0 0
0 e e 0
0
0 0 0 a
0
0
0
0
2
0
f! 0
P e
0 0 -
0
0 *
0 0 0
0
0
0 0
0 0
'S Q -
0 'i
DP .E 0 0 .i: 4
J
Q
0 85 1 ji
D $2
Q gg u db
b %g
0
0 0 0 e e e 0
0
0 e e e I
0 e e e e
0 0 a e
0 e
0
0
0 e e
0
0 e 0
0 e
0 0 0
0
0 0
0
0
0 0 0
0 e e a
0
Q) w ? 5 B
Ek 6 EP
c
(I)
e
2 i! P -I
Q) - 8 .g g $g
8 gz
- .-
Wrn p 52 D .P
c3 Bb
a
e
e e
e 0
0
0
0 0 0
0 0
0 0 0 0
0 0 0 0
0 0 0
0
e 0
0 e e 0 0 0
0
0
0 0 0 0
0 0
0 0
0
0 0 0
0
0
0 0 0 0
4 .E
- $2
$3 zg 4
8
-5 a$
e
?? E P 3 a - s .$ g .q
: X!
-P p E2
0 8c2
0
0 e e 8 0 0 0
0 0 0
0
0
0
0 e
0
0 0 a
0 0
0 e a 0 0
0 0 a
0 0 0
i?
0 0 0 E P 0 e a -
m e
a, >p - w= cu: Es a% zg (
a
-I
Q
0 8 .g 0 -B g q
8 gi p E2
CI BE
e
0
0 0 0 a 0 0
0
0 0
0 0 0 0
0 0 0 0
a
0 EE
0 0 0
0 0
0 0 0
0 a 0
0 0
0 0
0 0 0
e 0 0 e e 0 0 0
0 0
0
0
0 0 0 0
0 0
0
0
0 0 - g 0 aE cI=
0 s; 4
e
2 E P -I
(I) - 8 ,E g $8 -.e D 8% 5 $B
Q gz a EZ
a
e
0 0 e e e e
e e
e e e
I) e e e e e e e e e 0 e e
0 e e 0
@
e
8: g q!
8 gf
e 9 e e
e e e e e a a e e 8 822 a e e e a e e e a
n
$c
gg si
-s E
LE
ZfE Q
e
2 E P J
a, -
-8 p E:
e
0
0
0 0
0 a 0 IX. APPENDICES
0 0
0
I. Building Program David Smith, Consulting Librarian 0
2. Structural Systems Report Blaylock Engineering Group 0
3. Mechanical Systems Report Sevier Siskowic Engineers 0
4. Electrical Systems Report Van Buuren Kimper & Associates 0
e 5. Cost Analysis Construction Analysts, lnc. e 6. Planning Analysis City of Carlsbad Planning Deparfment 0
0
0
0 e a
0
0
0
0
0
0
0 0 0
0
0
0 0 0 a
0
0 0 0
0
0
0 0 0 0 e
Appendices :
a
a
0 Cardwell/McGtaw Architects 0 27
0 0.
w
0 0
0 e e e
0 0
0
0
0 0 e
0
0
0 a
0 0
0
0
0 LIBRARY BUILDING PROGRAM
David Smith, Consulting Librarian e
0 0
0
0
0 0 0 e 0
0 0
0
0
0
0
0 0 0 0
0
0
0 0 0 0 a
a
a
a
a
0
0
0
0 0
0
0 0 e e
0 0 0 e e e a 0 0
0 0 a
0 0
0 e
0
0
0 a 0
0
0 e
e a
0 0 e a* a e
0 0
0
0
0
0 e e
CARLS6AD CITY LIBRARIES
COLE LIBRARY BUILDING PROGRAM
0 June 1998
e
e Prepared by:
David R. Smith, Consulting Librarian
and the e Carlsbad City Library Staff
e
0 CARLSBAO LIBRARIES - COLE LIBRARY
0 0 INTRODUCTION - BACKGROUND
0 0
0
0
The basic purpose of a library building program is to translate the library resource needs of the
cornmunity served into the capacities and required building spaces for these resources and related activities which the new expanded library building will need to provide. A major
component is the collection of library materials -- print, non-print and electronic. To facilitate
accless to these materials requires a variety of types of shelving and seating and equipment
stations, as well as the necessary staff to assist in their use of the materials and to facilitate thc
circulation of materials for use outside of the library.
The Cole Library will offer two unique services. In addition to the basic resources and services
comparable to those offered in the new Carlsbad City Library, the Genealogy and Local History
seclion, which is a popular regional resource that is already established in the Cole Library, will
be enlarged and enhanced in order to meet the growing interest in these resources. The Adult
leaming Program, which IS now located in rental space a short distance from the Cole Library,
will elso be housed in the new expanded library and the training, tutoring and teaching areas
substantially improved. In developing the library building program, the resource capacities of al
of these, as well as basic library services, have been identified and translated into specific
space allocations for the new expanded library.
The assessed library needs for riorth Carlsbad and related capacities have resulted in a gross
library building area of approximately 45,000 square feet. This represents an increase of
approximately 20,000 square feet over the space available in the existing Cole Library building.
The following summary tables provide detail and documentation of the projected library
materials collection and the shelving required. The table on seating provides the breakdown on
type and location of seating. The table on equipment identifies all of the computers and other
equipment to be used by the public and staff in the library. There is also a table outlining the
staff work areas and service points. All of this information is consolidated in Table A which
summarizes all of the capacities and documents the square foot areas required.
The planning related to the Cole Library actually began in the late 1970’s and, in 1985, a
detailed study of public library needs resulted in “A Strategic Plan for the Carlsbad City Library
Facility.” This master plan identilied the need to provide for an ultimate built out population of
135,000 and that the bi-nodal nalure of the development and population distribution in the city
would require two major facilities -- one south and one north. The plan adopted also
established a library building standard of .8 square feet per city resident as a guideline to the
provision of library space. Planning discussions led to establishing the size of the Carlsbad City
Library in south Carlsbad at 64,000 square feet. At the same time that this was accomplished,
there were several summary library building programs prepared for the Cole Library which
ranged from the present 24,500 square foot to a 50,000 square foot facility. Based on the
needs and demographics of the developing population, approximately 60% south and 40%
north, and the built out standard, a minimum square footage for the Cole Library was
established at 44,000 square feet.
In the spring of 1998, the 1990 Cole library building expansion program for 50,000 square feet
was reviewed in-depth by members of the library staff and the consulting librarian. In
conju,nction with the architects preparing a study of the Cole Library building, an updated library
building program was prepared which details the needed library building of approximately
45,000 square feet. A basic premise of the planning for the new expanded Cole Library building
is thait the resources available and the basic library services will be comparable to those which
are available at the south Carlsbad City Library.
0 0 0
0
0
0
0 0
0
0
0
0
0
0 0 0
0
0
0 0 0
0
0
0 0
0 0
0
0 0 0
0
0 0’ e 0 e
0
0 0
0
0
0
0
0
e
1
- 0
0 e
0
CARLSBAD LIBRARIES - COLE LIBRARY
0 Public Library Trends
0 0
Over recent years, a number of trends have been noted in both local and national sudies which
must be taken into account in planning for new public library facilties.
1. The impact of technology on public library space has resulted in substantial increases in
square footage needed over space planning formulas in general use just a decade ago.
a.
0
0
0 0 0
0 0
There has been an unprecedented increase in materials being published and
new formats being created. Computers and other technologies have made it far
easier to create and to publish information and creative works. The printed page
remain the primary rneans of access for most library materials.
While electronic databases may result in a reduction in the amount of print
reference materials, back issues of magazines and newspapers, government
documents and other specialized materials, public libraries are finding it
necessary to provide increasing numbers of computer stations in order to
maintain adequate access to these materials. Whereas, a number of individuals
can simultaneously access a print set of an encyclopedia, only one person per
computer station can access the same database reference tool.
The library staffs increasing role as facilitators in the use of technology requires
the necessary public service and related workstations to accomplish.
0
0 e 0
0
b.
0
0 0 0 0
0
0 0 0
0
C.
Technology has served to increase, not reduce, the space needed within public libraries.
There is a high correlation between computer ownership, purchase of books and other
materials and heavy library use. These activities serve to complement and enhance one
another. Mega bookstores and libraries are growing and flourishing side by side.
Public libraries are "destination points" for many people seeking a place to spend their
time productively in a safe and hospitable environment. In many communities, the
library has become a major social, informational and recreational center for all age
groups. Mature citizens, particularly men, are living longer and have more leisure time.
Family use of public libraries facilities is increasing.
School library resources are in a serious decline -- collections, trained staff and
adequate space. Students, particularly K - 12th grade, are relying more heavily on the
public library for both print and non-print materials to support their studies.
Recent public surveys conducted on both a local and national basis find that the library
user's highest priorities are for improved, larger collections of print materials, access to
computers, other new technologies and improved, larger library buildings.
These trends have been taken into account in the updating of the library building program
requirements for the Cole Library. The provision of adequate library building space and a
functional, flexible layout and design will permit the new expanded Cole Library to respond
satisfactorily to the needs of the northern residents of the City of Carlsbad, both now and well
2.
0
0 0 0 0
0
3.
0 0 0
4.
5. 0
0 0 0, 0
0
0 0 0 into thts future.
0 0 0
0 2 0 0 0
'I 0 e m 0 0 0
CARLSBAD LIBRARIES - COLE LIBRARY
SUMMARY OF SPACES AND CAPACITIES
The projected capacities for all of the physical elements which are included in the expanded new library
result in specific allocations of floor area. These tables document both the projected capacities and the 0
0 square footage required. a e 0
0 0
0 0 e
0 0
0
0
e 0 0
0
e
Table! A - Summary of Space Allocations. Shelvina. Equipment and Staff Workstations
This consolidates the information fram the following tables in a detailed table which illustrates the
capacities for the library collections, seating, equipment and staff work areas and the space allocations
required.
Table 8-1 - Library Materials Collection - CurrentlProiected
These figures show the Cole Library circulating collection, growing to an estimated 175,550 items. In
addition, there are substantial magazine, reference and special collections such as Genealogy and Local
History -- 36,000 items.
Table 8-2 - Shelvinn Detail for Maior Collections
This table indicates the numbers of shelves and shelving units required for major collections. The amouni
of shelving shown is that needed to contain the portion of the collection which is not checked out.
Table C - Public Seating
This table illustrates area-by-area the quantities and type of individual and group seating. In the library,
there are 196 individual seats, at tabiles, equipment stations and lounge seats and 152 seats in meeting or
program rooms. In addition, there are 62 user seats in Genealogy and Local History and 71 seats for
students and tutors in the Adult Learning Program Area.
Table D - Staff Workstations/Offices
This represents stations and offices where library staff will be working, but not numbers of staff since a
ltclmber of stations such as check-out computers, copiers and work tables are used by many staff
members. There are 40 staff workstations in the expanded new library, 7 workstations in the Adult
Learning Program and 8 workstations in Genealogy and Local History. A police substation, with a
workstation and restroom, has also been proposed.
Table E - Comouter, Communicationls and Office EauiDment
This table documents the type and quantity of the equipment to be installed in the building, the principal
user, public or staff, and the general location. There are approximately 61 computer stations in the
expanded new library -- 41 for public use and 20 for staff assistance and support service activities.
In addition, there are 18 student and staff computer stations in the Adult Learning Area and 35 microfilm
and computer stations in Genealogy and Local History.
0
0
a
e
0
I)
a *
0 0
8 e
0 0
e
0
0, a
0
0 a
e 0 a 0 3 a e
0
a
- 0 0
0
0
0 0 0 a
0 0
CARLSBAD LIBRARIES - COLE LIBRARY
BASIC ALLOCATIONS OF SPACE USED
Detailed below are basic allocations used in determining the size of the program spaces. They are
derived lrom current library building planning guides and the experience of the consulting librarian.
0 Seatinq Sauare Feet
Table or Carrel 30 per individual (1 5/20 for small children)
Lounge Chair 35 - 40 per individual (minimum)
Public Access Catalog or CD-ROM Station - seated 30 - 40 wiprinter 0 Catalog Station - standing 20 w/printer 0 Index Table - 6 seats 150
Microfilm User Station - reader and reader/printer 35 - 50 equipmentlone user
Meeting Room - auditorium style seating 10 - 15 per individual - check local occupancy
code, plus presentation area
0
0
0 0 0
0 0 0 0
0 Conference/Study Room Table Seating 25 - 30 per individual
Shelving Units and Aisles Between She&
Double-faced section (3') - DF 18 36" aisles w/24 base 0 Single-faced section (3') - SF 9 36" aisles w/lZ base
Double-faced section (3') - DF 21 42" aisles w/24" base
Single-faced section (3') - SF 11 42 aisles w/l2 base
0 Double-faced section (3') - DF 23 48 aisles w/24 base e Single-faced section (3') - SF 12 48 aisles w/l2" base
Paperback Racks/Towers 35 - 80 NOTE: 4' shelves
increase 0 Book trucks, 18' w x 42" 8 area by 33%
0
0 Non-print Display/Shelving Units 35 - 80
Cabinets - File/Microtilm/Storaae 0 0 0 Standard letter 10
Standard legal 12 0 Lateral file, 30" - 42" w 15-21 0 Microfilm cabinets 15 0 Upright doubledoor storage c,abinet 15
- Staff 0 0 Public Desk - per staff service station 80 - 100 0 Office - enclosed wlcomputer station 150 a Workstation - open office w/computer station 85
0 Self-ch,arging Station - public 50 per unit 03 Copy Machine 50 - 60 per unit w/small sorting area
Fax Machine 10-20
Display Case 25 - 50 free-standing
Atlas/Dictionary stand 35
Other 0
0 0
0 Map Case - flat file 35 0 Materials Security System - sensordgates 50 - 150 per double lane 0 Public Queuing - check-outl reference lines, etc. 8-10 per standing person
0
0
0 0 4
0 0 0
- 0 0 CARLSEAD LIBRARIES - COLE LIBRARY e
e
0 e
0
0
0 0
0 0 0 0
0 e
0 TABLE A 0
0
0 0 0 0
0 0
0
0
0
0 programmed areas. 0
0
0
@ 0
0 0
0 0
0
0
0
0 0
0
0
0 0
0 0 0 e
0
Summary of Spaces and Capacities
Page A4 through A-I3 detail the specific units of shelving,
seating and workstations, their capacities and the square feet
allocated.
Page a-14 provides a square feet summary of the major
e
-
0
a SUMMARY OF SPACE, Table A 0 SEATING AND SHELVING REQUIREMENTS Rev. 6/2/98
CARLSBAD CITY LIBRARIES - COLE LIBRARY *
0 0
0
0
0 0 a
0 0 0 a
0 0
Assianed Buildina Area: The following assigned square feet allocations based on the desired capacities of
collections/shelving, seating, equipment, work and storage areas comprise 75% of the gross building area.
Unassiained Buildina Area: The total unassigned area (25%) includes the building structure, partitioning,
stairs, elevators, mechanical, telecommunications and other systems, restrooms and general lobby and
other circulation space between major building areas of an all new, more efficient layed out building of two
I evels .
Based on library staff and consulting librarian projections of the library materials collection, equipment,
seating, workstations and other space needs (rounded to the nearest five square feet).
0
0 PUBLIC: SERVICE AREAS
Area Totals PUBLIC: ENTRANCElLOBBY Scluare Feet
0 EntranceNestibuie unassigned 0 (unassigned area from a building total of 25% - see end of table)
Public Restrooms unassigned
Custodian's Closet unassigned
0 Lobby unassigned
e Art Display unassigned
0 a
0
a 0
0 0 FRIENDS BOOK SALES AREA
0 Friends Book Sales Area 4 DF sections @ 22 100 0 (self-service shelves)
(lJVorkroom/Storage (located near delivery and receiving area - 300 sq.ft.) - a
0
0
0 0 0
0 a
0, 0 0
0 0
0 * 0
0 0 All
0
0
0
100
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY e 0
e
0
0
0 e
0 ADULT LEARNING PROGRAM Sauare Feet Area Total
0 Entry/Reception/Offices
Entry unassigned
0 Waiting Area - 4 seats
Lounge chairs 2 @ 35 70
Two-place Table (junior) 1 @SO 50 0 Coffee Cart/Counter 1 @I5 15 0 Display - bulletin board, literature 0 racks (wall-mounted) 1 @I5 15 150
Reception/Secretary Desk Area 0
0
0 0
0 Fax 10
Lateral Files 3@15 45 0 0 0
a 0 0 0 0 Desk 1 @75 75
Computer Workstation 1 @75 75
Four-place Table 1 @ 100 100 0 m
0
0
0
0
0
a Reception DesWSecretary
1 Workstation w/PC 85
1 Workstation w/o PC 65 0 CopierEtand 50
Shredder 10
(back file cabinets in storage room)
Storage Cabinet 1 @I5 15 0 .Message Center/Elulletin Board 10 265
Program Coordinator's Office Area
Office
Lateral Files 2@ 15 30 280
0 File/Storage Room
0 Supply Shelving 6 SF sections @ 11 65 140
0 Multipurposeflraining Room
File Cabinets - legal 6@12 75
Table Seating 20 @ 25 500
Coffee CaNCounter 15
0 PC Station - seated 1 @30 30
Display Tables 2 @ 35 70
VCR/Monitor/Cart 20 0 Storage Closet 50 695 0
0 Training Room - small
0 Compact Refrigerator 10
0
(supplies, tables (2), chairs (5)) 0
0
0
0
0 0
0
0
Table Seating 6 @ 25 150
A/2
a
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY 0
0
0
e
0
0 ADULT LEARNING PROGRAM (cont.) Square Feet Area Total:
e Classroom
Tutoring Stations - 12 w/>! seats ea.
0 Enclosed station - glassed w/door 6 stations @ 50 300 0 Open station - partitioned to ceiling 6 stations @ 40 240
Circulating Collection - 2,000 items - 25% in circulation 0 e
0
0
0 Shelving 6 SF sections @ 10 60
Display Table/Bulletin Board 40
0 Public Access Computer1 e Check-out Station - sit down I station @ 35 35
Support Staff Open Office 0 0
0
e
e e
0 e
0
e
0
0 0
0
0 0 e 0 a
0 0 0
0
0
0
0 0 0 e
0 0
0
Staff Workstation WComputer 85 e Workstation w/o Computer 65 150 825
0 Computer Lab
Computer Stations
Two-place Stations 8 stations @ 50 400
instructional Materials
0 Shelving 2 SF sections @ 10 20 420
0 Server Room
0 Storage Shelves 3 SF sections@ 10 30 130 550 __
ServerKechnical Support Station 1 station @ 100 100
TOTAL ADULT LEARNING PROGRAM 3,05
N3
v
CARLSBAD CITY LIBRARIES - COLE LIBRARY e a
Entry Area unassigned
0 a
0
0 NSDCGS Cabinet 20 40 8 0 Information Desk Area
0 0
0
0
e GENEALOGY AND LOCAL HISTORY Square Feet Area Toti
Bulletin Board/Literature Display 20
Podium (researcher sign in) 25
e Public Queuing 4@10 40
Information Desk
0 Staff Workstation w/PC 85 e Shelving 2 SF sections @ 12 25 e Fiche Reader Station 1 @35 35 145 210
Public Copiers (1 now/2nd in future) 2 @ 50 100 0 0 a Supply Cabinet w/counter work surface 20 120 c
0 Public Workstations
e Four-place Tables (wired for equip.) 8@ 120 960 e 32 seats
Stand-up Work Stations (2)
(census indexes) 1 @40 40 *
0
c
0
e Microfilm Area (lower light area)
Microfiche Reader Stations 8 @ 35 280
Microfilm Reader Stations 8 @ 35 280
Microfiche Reader/Printer Stations 2 @ 45 90 e
0 Microfilm ReaderiPrinter Stations 2 @ 45 90 740
e PC Stations
0
8 e Computer Stations 5 @ 35 175
0 Public Access Computer Stations
Stand-up Stations 2 @ 20 40
Sit-downNVheelcliair Station 1 @30 30 70
e 0 c 8 a -
1,9 0 e
0 Total Public Workstation 0 Seats 58
6
0 Total Public Workstations 64
Standup Stations incl. Copier - 0 0
a 0
0
0 a
0 N4
v
CARLSBAD CITY LIERARIES - COLE LIBRARY 0
a GENEALOGY AND LOCAL HISTORY (cont.) Square Feet Area Total:
e Genealogy Collections - Print
0 Census Indexes
e
Regular - 35,000 volumes 104 DF sections @ 21 2,185 e
0 (by Microfilm Reader:;) 2 DF sections @ 22 45
File Cabinet 1 @I5 15
35
Atlases - stand 1 @ 35 35
Maps - flat file incl. local history
0 0
e
1 @ 35 0 General Circulating Collection 6 SF sections @ 11 65 2,380
a Collection - Microform (see also storage area)
Microfiche Cabinets 5@ 15 75 e e Microfilm Cabinets 32@ 15 480 e Microfilm Storage Unit 1 @I5 15 570 a 0
0 * 0
e
(I) 0
e
Local History Room
0 Shelving 5 SF sections @ 11 55
Cabinets - file - legal 5@12 60 lateral 2@15 30
Display cases - dimensions? 1 @30 30
1 vertical
0 Display Wall - clear area 60
One four-place table 4 seats @ 30 120
0 Staff Workstation - desk/chair/side chair 65 420
0 Non-public Areas
Manager's Office e a Desk w/PC, workstationkhair, 150
2 side chairs, 2 SF sections of shelving
Workroom 0
0 e Workstations w/Computer 1 @75 75 0 0 0
0 0 e
0 TOTAL GENEALOGY e AND LOCAL HISTORY 62
0
0 NOTE: DF Double-faced 3' shelving section 0 SF Single-faced 3' shelving section
Microfilm Reader 1 @35 35 File Cabinets 3@ 15 45
Book Trucks 4628
Work Table w/2 chairs 1 @ 100 100
Supply Cabinet 1 @I5 15
35
20
Staff Project Storage Unit 6 shelves 15
Message Center/Bulletin Board 1 @I5 15 355
0 Shelving 2 SF sections @ 10
-
e
e
N5 0 0
0
v
CARLSBAD CITY LIBRARIES - COLE LIBRARY a 0
e
I)
0 Presentation Area 100
a
0
0 0
0
0 0 a
e MEETII\IG/CONFERENCE ROOM AREA Square Feet Area Total5
Multipurpose Room
e 100 seats @ 12 sq.ft. 1,200
e Coffee Counter/Sink (cabinetslmicrowave under counter refrigerator) 50 1,350
Conference Room (1) 1 2'seats @ 25 300
0 Storage (chairs, tables, podium) 125
ChildrenWProgram Storage (separate) 75
0 1,851 - TOTAL PUBLIC SERVICE AREAS
OUTSIDE LIBRARY AREAS 1 1,23 a
PUBLIC LIBRARY SERVICES
0 ENTRY TO PUBLIC LIBRARY SERVICES unassigned
0 (General People Circulation unassigned
unassigned Security System - library materials a
0
0 e
e e a 0 0 Queuing 15 users @ 8 120 0
0
0 Self-check-out Stations - 2 (1 future) 100 795 0
0
0 C I RC 1J LATlO N SERVICES
Circulation Desk Area
e Public Service Stations - 5 w/PCs 6 @ 85 51 0
Check-in (2)
Check-out (3)
Open Station (1)
Reserve Shelving 6 SF sections @ 11 65
e Circulation Workroom
0 2 Computer checlcin stations 2@60= 120 0 Book trucks 20@8=160
Inside Book Return/Discharge/Reshelving Work Area - 375
Supply cabinets
Shelving - deliver)/ boxes
2 @ 15 = 30
6 SF sections @ 11 = 65 *
0
e 0 e 1,7: 0 a
e e
e Open Office Workstations (1 mending) 4 stations @ 85 340 715
0 Circulation Staff Office 125
100 Book Return Room - outside into library/24 hour (drive-by/waIk up)
0 A/6
a
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY e @ 0
0 a 0 0
CHILIDREN’S SERVICES Square Feet Area Tota
Children’s Collection Shelving - 42,750 print and non-print items,
plus 35 magazine titles and 400 reference items
Picture Books/Easy Readers - 8,500
1,800
16 DF sections @ 21 336 e Fiction - 9,000 21 DF sections @ 21 441 e Non-fiction - 19,500 30 DF sections @ 21 680
Paperbacks - 500 1 displayer @ 30 30
33
Parenting - 200 1 SF@ 12 10
Magazine Display - 35 titles
Reference - 400 1 DF section @ 21 21
e
e
0
0
0 0 e
e e e e
e
3 SF sections @ 11 e
0 Spanish Language - 1,500 titles 3.5 DF sections @ 21 74
e
e CD-ROM - 50 * 1 SF section @ 11 11
Video Cassettes - 1,500
Audio Cassettes - 1,700
k 8 SF sections @ 11
k 6 SF sections @ 11
88
66
11 Compact Discs - 300
Children Public Seating - 44 seats
k 1 SF section @ 11
1,000
Love Seats - 2 seats each 2 CiJ 50 (4) 100 0 Four-place Tables - younger children 5 CiJ 80 (20) 400 Four-place Tables - older children 5 @ 100 (201 500
Seats (44)
Public Access Computer Stations - 6 of 31
S to ryti m e/Activity Are a
Children’s Service Desk - 2 w/PCs
6 @ 30
40 seats @ 8, plus activity area
2 stations @ 85
180
550
170
e Children’s Services Staff Workroom 520
a
e
Workstations w/PCs 4 stations @ 85 340
Counter w/sink 60
e 0 0 8
a
Storage/Shelving 10 SF sections CiJ 12 120 * Children’s Services Librarian’s Office w/PC 150
Child ren’s Restroom (s) unassigned e
0 4,3i e
0
0
e
0 e 0
0
0 e e e
Sr Universal type shelving to be used.
a e
a
e
An
CARLSBAD CITY LIBRARIES - COLE LIBRARY 0 0
e
0
e YOUNG ADULT AREA Square Feet Area Total
0 (incl. 400 Spanish Language)
e Group Study Room - table seating - 6 persons 1 @ 150 150
70
0 Lounge 4 seats @ 35 140
Collection Shelving - 2,000 itenis 4 DF sections @ 21 85
Computer Stations - 2 seats - 2. PCs of 31 2 @ 35 e 0
e e Tables - 2 two-place 2 @ 60 120
0 0
e 0
0
0 e 30(
56;
0 COPY CENTER
Public Access Copiers 3 @ 50 150
0 Work Counter - stapler, punch, etc. 30
120 Tax Forms - display shelvesktorage
e REFERENCE SERVICES m
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY
MAGA.ZINES/NEWSPAPERS Square Feet Area Total
0 e
0 0
0 Display Shelving, plus Storage - 260 titles (includes 10 newspapers)
and shelving for current year of most titles back issues and 12 titles up to 10 years
Magazine Display 11 DF sections @ 21 230
Magazine Storage 4 DF sections @ 21 85
e
0 Newspaper Display 1 unit @ 20 20
0
e
0
0 a e 0
Newspaper Storage 1 DF section @. 21 20 355
17 DF sections @ 21
0 Loungemable Seating - 16 seats
8 Lounge Chairs 8 seats @ 35 280
2 Four-place Table 8 seats @ 30 240 520
16 seats
87 e 0 POPULAR BROWSING/PAPERBACI<S
New Books/Display - 1,000 items - 50% in circ. 2 DF sections @ 21 42
0 Paperbacks - 1,000 items - 25% in cir;, 2 DF sections @ 21 42
0 e
0 e e 0 0 22!
0
0
0 0 a
0 0
0 e 0
(Major PB collection counted and
shelving w/hard cover collection)
Lounge Chairs 4 @ 35 140
PUBLIC SHELVING - ADULT
e Print - 11 5,000 items - 20% to 30% in circ. 294 DF sections @ 21
77 DF sections @ 21
217 DF sections @ 21
6,175
Fiction - 37,000
Non-fiction - 78,000
inc. LARGE Print (2,000)
a Non-print - 14,200 items - 35% in circ. - all on universal shelving
CD-ROMs - 200 1.5 SF section @ 11 17 Video Cassettes - 5,000 23 SF sections @ 11 253 0 Audio Cassettes - 3,600 6 SF sections @ 11 66 0 Compact Discs - 5,400 15 SF sections @ 11 165 500
Public Access Computers - main cluster/dispersed
10 of 31 stations - main c:luster
8 of 31 stations - dispersed
4 @ 30 seated 120 0 6 @ 20 standing 120 240 e
Fiction 1 @ 30 seated 30 0 I @20standing 20 (I, Non-fiction 2 @ 30 seated 60 * 4@20standing 80 190 430
0
7.10: 0 c
0 0
0'
At9 a
a
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY e e
0
e
e PUBLIC SEATING - ADULT - 56 seats total Square Feet Area Total:
(General Seating - 48 seats e
Lounge Chairs 8 @40 ( 8) 320 e Four-place Tables 8 tables @ 120 (32) 960 e One-place Tables/Carrels 8 @ 30 (8) 240 - Seats ’ (48) 1,520 0 0
e 4 rooms w/2 seats each @ 50 Seats ( 8) 200 e
*
0
0
0
0 0
0 e
0
0
0 0 0 0
0 e 0 e 0 e e 0 0
0
e
0 0 0 0 e 0
e ‘Two-place Study Rooms - 8 seats -
1,72[
0
0 Computer Stations 8 stations @ 40 32(
0 LIBRARY - PUBLIC: AREA 19,65C
COMPUTER LAB - 8 seats
e
e
e
e
AI1 0
CARLSBAD CITY LIBRARIES - COLE LIBRARY
a
e
a
0 NON -PUBLIC SERVICE AREA
e ADMINISTRATIVE STAFF OFFICE Square Feet Area TotE
Reception Area - 2 seats 50 a a
a
a
a Administrative Support Area (files/copier/fax) 200
a
a
a 1 - 2 workstations - 1 w/PC
Library Manager’s Office w/PC: 150
Library Projects Office - 1 - 2 stations a
1 workstation w/PC 1 @80
1 tablekhair 1 a120 200 0 a
0 a Conference Room - 6 seats 150
75 a
a a a
a
a STAFF FACILITIES
Closet/Lockers/Staff Mail Boxes/Bulletin Board//Restroom(s) -
located on corridor unassigned
Vending Machine Area 3 machines @ 20 60 m
9 a Kitchen Area - 1 - 3 occupants .l20
Counter, sink, cabinets w/dishwasher, * microwave. refrigerator * Meal/Break Area - 12 seats 2 four-place tables @ 100 200
50
e
a e
5c
e e a a a
0
0
a e 9 * 9
a e a
1 two-seat sofa @ 50
2 lounge chairs @ 35 70 320
Patio - Enclosed Outside Area unassigned
a
a
a
a
e All 1
CARLSEAD CITY LBRARIES - COLE LIBRARY 0
0
Square Feet Area Tot 0 DELlVERYlMAlUCOPY MACHINE/FRIENDS WORK AREA
0 Staff Entrance unassigned 0
0 Copy Machine Area 100 0 (1 copy machine w/work counter)
Mail/Delivery/Loading/Staging Area 200 0
0
0 Workstation - 1 0 Shelving for delivery boxes - 6 SF sections 50
Friends Gift Sorting/Storage Eoom 0 0
e Book Trucks 6@ 8 0
0
0 0
0
0
0
0 1 workstation 1 counter @ 80 80
50
120
50 300
unassigned Dock Pad (at grade) - exteriorlcovered
Refuse/Recycling Bins - exterior unassigned
S heiving
Box Storage
12 SF sections @ 10
9
9 6
0 NON-PUBLIC STACK AND STORAGE ROOM
Closed Stack Area - general collection shelving - 8,900 items 500
0 Shelving 25 DF sections @ 18 450 0 Workstation - counter 1 @SO 50
General Storage - furniture/ecluipment/bulk items 200 0 0
0 7 0
e 0
0
0
0 0 2. e 0
0
0
0
0
0
0
0 e AI1 2 0
0 0
0 MAINTENANCE
Work Area 100
0 Supplies 130
unassigned Custodial Closet(s) (see public restroom/meeting area
and other distant public areas)
e
e
CARLSBAD CIW LIBRARIES - COLE LIBRARY
a
0
0 *
0 -
0 0
0 - 0
0
0
0 0 0
0 -
0 0 TOTAL GROSS LIBRARY BUILDING AREA 44,95f
0
0
0
0
0 0
0
0
e
0
0
0 0 0
e
0 0
0 0 @
0
0 0
0 0
0
0
0
Square Feet Area Total:
0 MECHANlCAUELECTRlCAUCOMMlJNlCATlONS ROOMS u n asstg ned
TOTAL ASSIGNED LIBRARY SERVICE AREA 30,88!
0 TOTAL ASSIGNED NON-LIBRARY SERVICE AREA 2,831
TOTAL ASSIGNED BUILDING AREA 33,715
Plus 215% unassigned area for mechanical/architectural
requirements - mechanical equipment, structure and
people circulation. includes lobby, restrooms, corridors,
mechanical, electrical and communication rooms. 1 1,24(
0 POLICE SUBSTATION
0 Workstation w/Computer 85
Side Chairs 2@ 10 20
0 !Storage Cabinet 15
Restroom - unisex 40
0 Unassigned Area 40
20c
0 TOTAL GROSS BUILDING AREA 45,155
-- e
All 3
-
0
0 MAJOR PROGRAMMED AREAS
a PUBLIC LIBRARY SERVICE AREAS Square Feet
CARLSBAD CITY LIBRARIES - COLE LIBRARY 0
0 0
0 0
9 a
0 Circulation Services 1,735
0
0
Public Entrance/Lobby/Restrooms unassigned
0 Friends Book Sales Area 100
Adult Learning Program 3,055
0 Genealogy and Local History 6,230
Meeting and Conference Rooms 1,850 11,235
Children's Services 4,370
0 Young Adult Area 565
Copy Center - public 300
a Reference Services 2,435
0 Mag azines/Newspa pers 875
Popular Browsing/Paperbacks 225
0 Public !Shelving - adult 7,105
Public !Seating - adult 1,720
e
m 0
0 @ e Computer Lab 320 19,650
30,885 a
0
0 0
0 NON-PUBLIC LIBRARY AREAS
Administrative Staff Offices 750
e Staff Facilities 500
Delivery/Mail/Copy MachinelFriends Work Area 650
0 Non-public Stack and Storage Room 700
Maintenance 230
e 0
0 0
a
0
0 0
0 0 a 0 a
0
0 0
0 Mechartical/Electrical/Communications~ Rooms unassigned 2.830
33,715
0. TOTAL UNASSIGNED LIBRARY BUILDING AREA - 25% 1 1,240
TOTAL ASSIGNED LIBRARY BUILDING AREA
(structure, mechanical and general architectural requirements,
including restrooms, lobby and general people circulation)
e TOTAL LIBRARY BUILDING AREA 44,955
Police Substation - assigned square feet is 160 and unassigned is 40 200
TOTAL BUILDING AREA 451 55
e All 4
- e
0 a
0 0
0
1)
0 e 0 0 0
0 0 0
0 a
0 0 e 0 0
0
0 0
0
0
0 0
0 0 0 0 e
0s 0
0
0
0 0 0 0
0
0
0 a
0 CARLSBAD LIBRARIES - COLE LIBRARY
0 TABLE B-I
Library Materials Collection - Projections
e
e
e
- e 0 e CARLSBAD CITY LIBRARIES - COLE LIBRARY
LIBRARY MATERIALS COLLECTION - PROJECTIONS Table B-
513019 0 0
0
0 e
0 0 * e e
The attached table shows the 2002 projected maximum collection size of approximately 177,400 items,
the Genealogy (35,000) and Local History (1,000) Collections of 36,000 print items, plus microforms.
These projections were made by the Carlsbad City Library Collection Development Librarian. This may be
subject to further discussion and refinement.
In developing this initial information, certain provisions or assumptions were made.
1.
e
The maximum projected circulating collection size for the library is approximately 175,550 items.
exclusive of microfilm, CD-ROMs, magazines, newspapers and reference materials.
The circulating collection will be approximately 10% non-print and 90% print.
The distribution of the circulating collection will be approximately 42,750, 24%, children's materials
and 132,800, 76%, adult materials, based on projected allocations.
The library will house a reference collection -- 3,900 items - Adult, 3,500, and Children's, 400.
Anticipated levels of circulation, Le. proportion of collection checked out at any given time which
has a direct affect on the amount of shelving required:
e 2.
3.
a 4.
5. e * 0 * 0 e
0 0 Young Adult 20% e
0
Proportion in
Circulation/Checked Out*
Adult Fiction 30%
Adult Non-fiction 20% a Paperbacks 20%
Children's Picture/Easy Readers 50% e Children's Fiction 30%
Children's Non-fiction 30%
20% 0 Children's Paperbacks
e Non-print 45% NOTE: Shelving calculate 0 at 35% in circulatior
CD's
Video Cassettes
Audio Cassettes e 0 0 0 e
Any higher levels of circulation will result in further growth in the collection size without requiring
any additional shelves. Proportion checked out for adult paperbacks and young adult has been
estimated at 20% by the consulting librarian.
The projected distribution of the Carlsbad City Library Materials Collection: 6. 0 0
0
0 Total Collection*
City Library 213,500
Cole Library 179,450
Genealogy/Local History 36,000
0 430,950
a
Adult Learning Center 2,000
a * plus microforms, magazines and newspapers 0
0
0 0 0 f
B-1/1
w e 0
e 0 CARLSBAD CITY LIBRARIES - COLE LIBRARY
e Projected Collection a Collection Cateaory in Volumeslltems
Adult E!ooks 0
a
New Books/Browsing 1,000 e 0 * interfiled with the hard cover collections) 1,000 a 0 0 0
8 Fiction * 37,000
e Non-fiction * 78,000
Paperbacks (Major portion of collection is cataloged and
1 17,000 Subtotal
Younq Adult Books
a Hard Cover 1,000 a
Paperbacks 200 e
0
@
Spanish Language 400
Subtotal 1,600 e e * Children's Books e 8 a Fiction 9,000
9
0
Picture Books/Easy Readers 8,500
JY 3,600
JF 3,800
J YA 1,600
9 Non-fiction 19,500
1,500 0 Spanish Language
e Paperbacks 500 0
0
e
e 0
0
e Parenting 200
0 Subtotal 39,200
0 Total - Circulating Print Collection 157,800
* Includes LARGE PRINT -- 2,000 volumes total Fiction/Non-fiction
and Spanish Language materials
B-I I2 e 0 0
0 e
a e CAKLSBAD CITY LIBRARIES - COLE LIBRARY
a Projected Collection e Collection Cateaory in Volumeslltems
Non-print Materials a 0
e
0 e
e
Compact Discs a
e Adult 5,400
Children's 300
0 Audio Cassettes
Adult
0 Music/Non-fiction 0 Spoken/Fiction 3,600
a Children's
Spo kenlfiction 1,700
a
MusidNon-fiction a
0 0 0
a
a
0
a
0 0
0 0
Video Cassettes - VHS
0 Adult 5,000
1,500 e Children's
Q CD-ROM - Circulating
0 Adult 200
Children's 50
17,750
157,800
e Total - Non-print Collection
Print Collection - Circulating * Total - Circulating Collection a (Print and Non-print) 175,550
0
a
0 0 0 9 0 0 a e e
0
B-113
- *
0
0
e CARLSBAD CITY LIBRARIES - COLE LIBRARY
e Projected Collection 0 Collection Cateqorv in Volumeslitems
Reference Materials
e e
a 8 Children's 400
Located in the
Children's Area e e Adult, incl. Indexes 3,500
e "Ready" or telephone
0
a 0
(400 incl. with above
reference materials located
at reference desk
3 vertical file drawers Pamphlets -type and number 0 of file cabinets
30 - one CBSC
2 vertical file drawer!
Atlases
Maps - type and number of
e a
0 file cabinets
Speciial Collections e a
0 Genealogy
0 Print 35,000
Microfilm 35 cabinets
Microfiche 6 cabinets
Microfilm Storage Unit 1 cabinet
0
0 e
a 0
0
0
e
0
0 0 e 0 0 e
0
0
0
Local History
e Print
0 Maps l case
e Pamphlets 7 file cabinets
e
1,000
Adult Learning Center
0 Print 2,000
B-1/4 e
- e 0
a
CARLSBAD CITY LIBRARIES - COLE LIBRARY e
a Projected Collection e Collection Cateqory in Volurneslltems
.Magazines e e e Adult Titles 250
Years Held 1-5 12 titles - keep hard copy for 10 years
0 a 0
e
0
e a
0 0 e 0 0
0
0 e e
0 e 0 0 e *
0
e *
0 0 e
Young Adult Titles 10 e e Years Held - current Year only
Children’s Titles 35
e Years Held ._ curirent year onlv
Newspagers
e Number of Subscriptions 10
The “keeping policy” is 1 month except for the two local newspapers - 1 year.
a
e e .
e
a
B-115 a 0 a
7 * 0 CARLSBAD LIBRARIES - COLE LIBRARY e e
e e
0 0 e e
e 0 0 * e e TABLE 8-2 0 0 e
0 e e
0 0 e
0 a 0 e *
0
0 0 e 0 0 0' e 0 e e 0 e *
SHELVING [IETAIL FOR MAJOR COLLECTIONS
e e
e
0 0
- e a 0
a 0
e CARLSBAD CITY LIBRARIES - COLE LIBRARY
SHELVING DETAIL FOR MAJOR COLLECTIONS Table B.
5/30/E 0 0 NOTE? SF - single face units
DF - double face units 0
0 0 *
a 0
0
a
0
e 0 Paperbacks 1,000 20%
0
% in On- No. of No. of No. of
Total Circu- Shelf Items Per 3' Shelves SF or DF -- Collection - Size lation Capacity Shelf Needed Sections Detail
e
a ADULT
Fiction 37,000* 30% 25,900 24 1,079 77 DF 84"H, 9"
14 shelve
per sectio
0 Non-fiction 78,000* 20% 64,400 24 2,600 217 DF 84"H, 9
12 shelve a per sectio
New E3ooks/ 1,000 30% 700 20 35 7 SF 66"H, 9".
Brow sing 10 shelve
per sectioi
800 24 33 5 SF 84"H, 8"[
14 divider shelve
per sectioi
e Reference 3,100 0% 3,100 18 172 15 DF WH, 1o"I
12 shelve e (incl. Indexes) e per sectioi
Ready 400 0% 400 18 22 8 SF 45'H. 10"l
Reference 3 shelve. a (at Ref. Desk) per sectior
e
e
a 0
e
0 e e 0
0 0 0 0
SPECIAL COLLECTIONS
Genealogy 35,000 0% 35,000 28 1,458 104 DF 90"H, 10°C
Print Collection 12 shelve: 0 per sectior
Local History 1,000 0% 1,000 24 42 4 DF 90"H, 10°C
Print Collection 10 shelve2
per sectior
a Adult Learning 1,000 35%. 650 24 27 6 SF 90"H, 9°C a est. 5 shelves 0 per sectior
* Imludes LARGE PRINT - 2,000 volumes 0
e
0 8-211 0 e a
e
e
-
0
0 e
0
0 0 0
e e 0 0
0 CARLSBAD CITY LIBRARIES - COLE LIBRARY
Oh in On- No. of No. of No. of
Total Circu- Shelf Items Per 3' Shelves SF or DF -- Collection - Size - lation Capacity - Shelf Needed Sections Detail
e CHILDREN
Picture Books/ 8,500 50% 4,250 45 95 16 DF 45"H, 10"l
Easy IReaders 6 shelve
per sectio
0 Spanish 1,500 30% 1,050 30 35 3XDF 66H, 9'1 e 10 shelve 0 per sectio
Fiction 9,000 30% 6,300 30 21 0 21 DF 66H, 91
10 shelve! 0 J F - 3,800 per sectioi
0 e J Y - 3,600
0 J YA - 1,600
Non-fiction 19,500 30% 13,650 45 303 30 DF 66"H, 9'2
10 shelve e per sectioi
Paperbacks 500 20% 400 500 1 displayer display units
per unit 6' x E
a Parenting 200 20% 160 24 7 1 SF 84"H. 9"L 0 7 shelve: 0 per sectior
Reference 400 0 % 400 40 10 1 DF 66"H, 10°C
10 shelve: 0 per sectior
0 0
a a a
0 0
0 0 e
a 0
0 e 0 0
0 0 a e 0 c 8-212 0 0 a
YOUNG ADULT
Hardcover/ 1,600 20% 1,280 24 53 4 DF 84" H, 9' L 0 Paperbacks 14 shelves 0 (incl. Spanish Language - 400) per section
a
0 e e e CARLSBAD CITY LIBRARIES - COLE LIBRARY
Oh in On- No. of No. of No. of e e Total Circu- Shelf Items Per 3' Shelves SF or DF -- Collection Size !gt& Capacity Shelf Needed . Sections Detai e *
a e a'
0 NON-PRINT
Compact Discs
Adult 5,400 35% 3,510 60 59 10 SF universal shelvin
84"H, 12 Q 6 shelves per sectic a
Compact Discs
Children's 300 35 195 60 3 1 SF universal shelvir
66"H, 12"
5 shelves per sectic
e Audio Cassette
e. e e a
0 a 0
a e 0
0 0
Adult
Music/
Nlon-fiction 3,600 35% 2,340 36 65 11 SF universal shelvir
Spoken/ 84"H, 12": a Fiction 6 shelves per sectio
Audio Cassettes
Children's 1,700 35% 1,105 36 31 6 SF universal shelvin
66"H, 12"
5 shelves per sectio
e Video Cassettes e Adult 5,000 35% 3,250 24 135 23 SF 84"H, 12"D:
6 shelves per sectio
Children's 1,500 35% 975 24 41 8 SF universal shelvin!
e 5 shelves per sectioi
0 e Video Cassettes
e * 66"H, 12"[
CD-ROM 0
Adult 200 30% 130 17 8 1.5 SF universal shelvinf a 84"H, 12"[ e 6 shelves per sectioi
e
e 0 CD-ROM
Children's 50 35% 33 17 2 .5 SF universal shelvin! e 66"H, IT[ e 5 shelves per sectioi e e a
0
0
0 e a e
* All non-print materials will be displayed on universal shelving. a
0 8-213
0 0 0
0 0 0 0
0 0
0
0 CARLSBAD CITY LIBRARIES - COLE LIBRARY
% in On- No. of No. of No. of
Total Circu- Shelf Items Per 3' Shelves SF or DF -- Collection - Size lation Capacity - Shelf Needed Sections Details
0 PERIC)DICALS
Magazine Display
Adult 250 0% 25 3 84 21 SF 66"H, 10°C e 4 shelves higk
a Children's 35 0% 35 3 12 3 SF 66"H, 10°C e 4 shelves high
Young Adult 10 0 10 3 3 1 SF 66"H, 10°C 0 4 shelves high
0
0 0
0
0
0 Magazine Back Issue
84"H, 1O"D
6 shelves per section
-- 10 DF est. Adult 250 -- 250 --
a 1 - 5 years beyond current
Children's -- current year only -- -- -- -- in display shelves
Yclung Adult -- current year only -- -- -- -- in display shelves
0 Newspaper 0 D i!jp lay 10 -_ 10 1 display Marline display 0 unit tower
Back Issues -- 1 DF 84"H, 10"D
6 shelves per section
e'
0 0
0
a
8 - 1 mo.
2 local - 1 yr.
e 0
0 a 0
0
0 e
0
0
e 0
0 0 e
0
Explanatory Comments:
0
0
Numbers of items per shelf represent an average of 80% of full capacity.
Type of AV and paperback display requires further staff review.
No microform back files - All will be housed at the Carlsbad City Library.
Aocess to indexes and back issues will be provided at the computer workstations. e
a
0 8-214
0
e
0 0 a 0 e
0 0 0
0 0
0 0
0
0 0 0 0 0 0 0 e e a 0 0 a * a * 0 0 * 0 0 0 e 0
0, e 0 0
e
0
0
0 e
0
e CARLSBAD LIBRARIES - COLE LIBRARY
e
TABLE C
PUBLIC SEATING
e
CARLSBAD CITY LIBRARIES - COLE LIBRARY 0
0 PUBLIC SEATING Table ( 0 Rev. 61319
Adult Learninlq Program - Seats
Individual Seating
0
0 0 0
0 Reception - Waiting Area Lounge chairs 2 0 1 two-place table -junior - 0 0
0
0 0 a
0
0
0 0
0
0
0
a
0
2 4
Classroom 12 two-place tutoring stations 25 1 PAC/circulation station
0 Computer Lab 8 two-place stations - 16 45
Group Seatinq
MultipurposelTraining Room table seating 20
Training Room (small) 1 six-place table - 6 - 26 71
Geneailogv and Local History
Individual Seatinq 8 four-place tables 32
0 microfiche reader stations 8
microfiche readerlprinter stations 2
microfilm reader stations 8
microfilm readerlprinter stations 2 e
0 Local History Room I four-place table 4 e e Computer Stations 5
0
0 e 0
0
0
0
0
0‘ e
0 e Storytime/Activity Area (40 seats - see Group Seating) -
0 0 0 0
0
0
0
0
Public Access Computer Station - wheelchair accessible - 1 62
Libranr
0 Individual Seating
Children’s Services
Children’s Public Seating 44 e
0 Lounge 2 two-place love seats - 4
Tables 5 four-place small - 20
5 four-place tables - students - 20
0 Public Access Computer Stations (6) - 1 seat each 6
50 --
c-1
0 CARLSBAD CIN LIBRARIES - COLE LIBRARY
Young Adult Area Seats
0
0 0
0 Group Study Room 6
4 0 Lounge Seating
0 Public Access Computer Stations (2) 2
2 14 Tables - 2 two-place - 0
0
0 0
0
0
0
0
0 Table Seating -
0 a
0
0 Public Access Computer Stations 7 0 0
0
0
0
0 Reference Services
Table Seating 30
Index TablelCounter 6
5 41 Public Access Computer Stations - 5 stations -
0 MagazinesINewspapers
Lounge 8
8 16
Populair Browsing/Paperbacks 4
Lounge - 4
Public Seating - General Adult
Lounge 8
Tables 8 four-place tables 32 0 8 one-place carrels 8 40
0 Two-place Study Rooms - 4 rooms w/2 seats each 8 56
8 Computer Lab Stations -
0 Total Library Individual Seating 196
0 - 107
0
0
e
0
0
0 Library -. Multipurpose Room - auditorium style seating 100 0 0 Library - Conference Room 1 @ seating 12 12
0
0
0 0 Total Group Seating -
0
0
0
0
0 c-2 0
0
0
Total Individual Seating - GenealogylLocai History and Adult Learning
Total Individual Public Seating 303
Group Seatinq
0, Library - Children’s Storytime/Activity Area 40
26 Adult Learning Program - Multipurpose and Training Room -- 20 and 6 -
178
TOTAL- 48 1
-
0 0 0
0 0 0
0 e 0 0
0
0 0 e
0 e
0
0
0 0 0
0 e * 0 0
0 e
0 e 0
0
0 * 0 0 0 0
0
0 *
0
0
0
0 0 e 0
0
0
0 0
0
CARLSEAD LIBRARIES - COLE LIBRARY
TABLE D
STAFF WORKSTATIONS/~FFICES
-
CARLSBAD CITY LIBRARIES - COLE LIBRARY
STA IFF WO RKSTATIO NSlO F F I C ES
0 e
0 Table I e Rev. 513019 e
0 * Denotes Public Service Point
0 Workstations * Adult Learn ina P roara m 0
0 0 * Reception Desk/Secretary/Support Staff 2
0 Copier/Fax 1 3 e
e
e
e
m Computer Lab 1
0 Program Coordinator’s Office Area 1
Computer Workstation I
e Classroom 2
* Support Staff Open Office 2 0
e 0 Server Room - technician 1 e
1 0
0
0 0 *
0
0 * 0 Workstations 1
0 a 0 e 0 Genealogy and Local History Total - a e 0 0
0 m
e 0 0
a (plus 1 four-place table)
-
Adult Learning Program Total
a Genealoav and Local History
c * Information Desk Area 2
0 Local History Room ‘1
Information Desk 1
Microfiche Reader Station 1
0 * Workstation
Non-public Area - Workroom 4
Table 2
Microfilm Reader 1
1 Manager‘s Office -
8
15
e 0-1
CARLSEA0 CITY LIBRARIES - COLE Ll6RARY 0 0
0
0
0
0
0 e a a
0
0 a
a 0
0
0 e * Reference DesMUser Assistance Desk 4 e
a e Reference ServicesNVorkroom 4
0 e
e e
0 e e
e 0 Mail, Delivery, Loading and Staging Area -
0 Maintenance - custodial closet(s) - e e 0 Police Substation - Workstation w/computer - 8
0 0-2 0 e e
e - Libray Workstations
Circulation Services
I, * Circulation Desk Area 6
a Staff Service Stations - check-in/out, registration
Workroom 7
inside Book Return/Discharge/ 2 Reshelving Work Area Open Office Workstation 4
Circulation Staff Office 1 13
0 Children's Services * Children's Service Desk 2
Staff Work AreaIOffice 4
1 Children's Services Librarian's Office - 7
Reference Services
Public Service Stations 3
Fax Station 1
1 Reference Supervisor's Office - 9 a Administrative Staff Office
Administrative AssisUanVSupport Staff 2
(incl. fax and copier)
0 Library Manager's Office 1
2 Library Projects Office - 5
Delivery, MaWCopy Machine
0 Copy Machine Room 2
@* Non-public Stack and Storage Room 1
1 3
2
Library Total Individual Workstations 40
1
56 0 TOTAL BUILDING
0
CARLSBAD LIBRARIES - COLE LIBRARY 0 a e e 0 e a
0 e 0 e
e 0 e
0 0 e e
9 0
0
0 0 e a
0 e 0
0 0
0 e
0 0 e .a a
e
e TABLE E
COMPUTER, COMMUNICATIONS AND OFFICE EQUIPMENT
e
e
0
0
0 0
0
0
0 e e
0
e
COMPCJTER, COMMUNICATIONS AND Table I
OFFICE EQUIPMENT 513019
0 e 0
0 Public: Access CatalonlAutomated Circulation System Stations - Number of Stations e e L I B RA.RY Projected
Staff a e e 0 Check-in Station(s) 1
0 Check-out Station(s) 3 0
DischargelReshelving Area 2 0 e 0 Staff Work Area 1 e Circulation Staff Office 1
Reference Desk 3 0
Reference Supervisor’s Office andlor 1 e
0 e Staff Work Arealopan Office 1 e Children’s Service Desk 2
Children’s Services Work ArsalOffice 2 0
Library Manager’s Office 1 e e 0 Administrative AssistanVSupport Staff 1
0
0 Self Check-out Stations 2
0
Reference Area 5 e
Main Cluster 10 e
0 Adult Fiction Area - dispersed 2 e Adult Non-fiction Area - dispersed 6
Young Adult 2 0
Children’s Services Area 6 0 0 e Computer Lab 8
- Circulation Desk Area
Workroom
Total - Library Staff Computer Stations 2(
e Public
Public Access Computer Stations
a
e Total - Library Public Computer Stations 39 a - 0 TOTAL - COMPUTER STATIONS 61
See Page E13 for the equipment stations in the Adult Learning Program and Genealogy and
Local History.
NOTE: Personal computers will be used throughout instead of dumb terminals.
All stations will be multi-tasked -- access to catalog, databases -- for the public and the addition
of production and management software for staff.
All computer stations will be networked within the library.
a
e
0 0 e
0
e
0 e
e
El1
a e Number of Eaubment Sta'
Proiected e
Othier Equipment
-- Staff
a e 0 e
0 0 FAX 2 a e
0 Administrative Office 1 0
a 0 * Copy Machine Room - collating copier 1 *
0 e Copiers - Copy Center 3 0 a Microhlm/fiche ReaderdPrinters - Genealogy only (see E-3) - a 0
0 Overhead Projector - Multipurpose Room I e e Video Projector - ceiling mounted - Multipurpose Room 1
-
Public Address System (building wide) - control in Reference 1
Reference Desk 1
2 0 Copiers -Staff Workroom(s)/Offices
Administrative Office - desk top 1
e Total - Staff - Other Equipment
-- Public
VCR/lVlonitor - Viewing Station - Multipurpose Room 1
1
1
a
e 0 e
0
0
e 0
e 35 mm Slide Projector - Multipurpose Room
Public Address System - portable - Multipurpose Room
0 Total - Public - Other Equipment .
Total - Other Equipment e
- 0 TOTAL - LIBRARY COMPUTEKWEQUIPMENT STATIONS
TeieDihones Attach a list of locations and number of telephones. Identify features of the telephone
system/answering systemkoice mailkall routing equipment. e Projected number of voice lines to library ? One at each staff worksi e. Projected of data lines to library ? One at each staff worksl
To be completed. e e e e
0
a
0 a El2 e e 0
e
Current Proiected e a e
0 - Staff - Computt?rs/CD-ROM
Adult Learninci Proaram - Equipment
Reception Area/Support Staff 1 2 0 e e Program Coordinator 1 1
Classroom - Support Staff Workstation 1 1 e
Server Room - Technician Workstation 0 1 0
Copier 1 1
0 0
0 Total - Staff 4 6 0 e 0 Classroom PAC 1 1
0 Multipurpose Room 1 1
Computer Lab Stations 6 8
VCR - Reception ArealWlultipurpose Room 1 1 a e
0 Total - Public 9 11 e
0 e
Information Desk 0 1 0 a
0 Workroom 0 1
Manager's Office 0 1 e
Information Desk and Workroom 1 2 e 0 e Total - Staff 1 5
0 e PC Stations 3 5 muititask e Public Access Catalog 0 3 multitask
e 0
0 Microfilm ReadedPrinters 1 2
Microfiche Readers 6 8 a
Microfiche ReaderlPrinters 2 2 e e e Copiers - Public 1 2
Total - Public 20 30 a 0 0 *
0 a
0 e 0
Public - Computers/CD-ROM
ADULT LEARNING PROGRAM
TOTAL - EQUIPMENT STATIONS 13 17
0 - Genealoav and Local History - Equipment
- Staff - Computers
Public - Computers e
Microform Readers e
Microfilm Readers 6 8
GENEALOGY AND LOCAL HISTORY
TOTAL - EQUIPMENT STATIONS 21 35
E13
w e
0 e 0 0 e a e e
0 a 0
0 e e 0
0
0 0 0
0 e
0 STRUCTURAL SYSTEMS REPORT
0 Blaylock Engineering Group
0 0 0 0
@ * a
0 0 0
0 0 e
0 0
0 e 0 0 e e * 0 0 a 0
e
e
-
0 0 a
0 0 0 0
0 0 0 a * May 1'2, 1998
0 0 e 0
0
0 0 e
0 e 0 0 8
0 a 0
0 0 a 0
e Existing Facility Structural Deficiencies 0 a 0 @ Code ('94 UBC) requirements: 0 e a 0 e constructed). a
0
0 0
0 a
0
0
CardwelVMcGraw Architects
1221 Second Ave., Suite 300
Seattle, WA 98101
Attention: Mr. Brad Miller
Reference: Georgina Cole Library Scoping Study
Subject: Existing Facilities Analysis to identify CostsRequirements for Reuse of the Existing
Facility
Gentlemen:
In acciordance with the terms of our agreement, Blaylock Engineering Group has completed an
updated structural assessment of the subject facility. This work was performed by Messrs.
Matthew N. Martinez, S.E. and Gary W. Tubach, S.E. and included a visit to the site on May
1 1 , 19%. Our analysis of the existing facility structural deficiencies and written description of
the structural system requirements for the building renovation are as follows: e
Our cursory rcwiew of the existing structural drawings for the library building and a on site
inspection find s the following structural deficiencies with respect to the 1994 Uniform Building
Item No. 1 - Current Code Seismic Force Level Requirements: The current '94 UBC requires
masonry bearing/shear wall structures to be designed for seismic forces that are 38% higher than
the force levels required in the 1966 Uniform Building Code (in effect when the building was
Item No. 2 - Inadequate Lateral Force Resisting System at the Old Adult Reading Room Rool
(between grid lines A & B) and at the Clerestory Roof (between grid lines B & C): The
predominant vertical lateral force resisting system for these roofs appears to be cantilever steel
columns or an inverted pendulum-type structural system. Because of little redundancy and
smaller inherent ductility of this type of system the current Uniform Building Code requires this
a
a
0
e e
0
0
0 0 Page Two 0 May 14,1998
0
0 0 0 0
0 0 0 e
0 0
e 0 0 0
0
0
0 0 0
0 e
0 0 0
0
0 e 0
0
0
9 0 0 0
0 e 0 e 0 0
0
0 0
Letter to Mr. Elrad Miller
type olf structure to be designed for twice the lateral seismic load of the shear wall structure
existing at the rest of the structure. Our analysis indicates that current code lateral force levels
greatly exceed the capacity of this cantilever column system at these two roofs.
Item No. 3 -Diaphragm Discontinuity Irregularity and Inadequate Diaphragm Connections
(shear transfer mechanism) at the North Mezzanine Floor: The stair and elevator openings at the
north inezzaniiie floor between grid lines B & C result in a diaphragm discontinuity irregularity
(plan structural irregularity type 3 per ’94 UBC Table 16-M) and renders the diaphragm
inadequate to Iransfer the floor seismic loads to the shear wall at grid line 3. Elements of this
diaphragm woiild be required to be designed for forces 84% higher than design requirements that
were in effect when the building was constructed. It appears that the concrete block walls
enclosing the adjacent toilet rooms and heating equipment room and the west concrete block wall
of the adjacent record storage room are necessary to provide the lateral resistance for mezzanine
floor north-sou th seismic loads. Lack of seismic collector beams and drag connections however,
from tihe floor (diaphragm to these north-south shear walls, results in a load path through the short
east-west concrete block cripple walls between the mezzanine floor and the offset floor slabs at
the heating eqiipment and the mechanical rooms. Concrete block walls have a much smaller
capacity to resst seismic loads that are normal to the walls and loading the walls in this fashion
results in an undesirable cantilever column or inverted pendulum lateral load resisting system
similu to the mofs of item No. 2 above.
Item No. 4 - Adequacy of the Concrete Block Shear Walls and Diaphragm Drag Connections:
The horizontal reinforcing at the concrete block walls does not satisfy the minimum horizontal
reinforcing required by current codes for walls that resist seismic loads. The shear capacities of
the concrete block shear walls and the diaphragm drag connection capacities at the walls are
most likely significantly below current code lateral force levels at many locations. Lack of
special inspection for the concrete block walls (as was provided for the formed concrete floors
and columns) results in allowable stress levels of one half allowable levels for masonry walls
constnicted wii:h special inspection to guaranty that construction procedures are used that ensure
the structural iitegrity of the walls. Also the partially grouted concrete block shear walls (only
the cells of the hollow core units with reinforcing are grouted) have less shear capacity than solid
grouted concrete block shear walls.
Item No. 5 - F’alling Hazards from Non-Structural Elements: The 4-foot wide by 20-foot high
screeas elements between grid lines D and E.2 on the east and west sides of the building are
composed of open decorative masonry units sandwiched by steel channel sections. This
construction appears to be within code parameters for unreinforced masonry. However,
horizointal bracing in the plane of the outrigger beams at the head of these panels to stabilize for
in plane seismic loads would reduce the potential for cracking at the masonry units and
e
e
0 0
0
0
0 0
0
0
0 0 0'
0
0
0 locations. 0
0 0 0 0
0 0 *
0
0 a Alternative A, - Structural Systems to Maximize Potential Utilization of Existing
8 0
0 e 0
0 0 0
0
0
0 0
0
0 e
0
0 0 0 0 0 e
0
0
0
e
e Page Three
May 14,1998
Letter to Mr. Brad Miller
dislodging of the masonry units from the steel frames in a major earthquake. During the site visit
corrosjon at the bottom of the steel channels from landscaping water sprinklers was noted. The
rust should be cleaned off these steel sections (preferably by sand blasting) and the steel sections
repainted with a protective coating to prevent further deterioration of the steel sections. Bracing
of bookshelves, also considered to be a falling hazard in an earthquake, was observed at some
Item No. 6 - Other Observations: An exterior exit stairs on the west side of the structure
appeared to be adequately tied to the structure, however some of the light guard rail posts were
observed to be completely rusted through. This stair guardrail should be repaired or replaced as
soon as possibie. Also a minute mount of spalling and cracking of the thin concrete 2nd floor
overhangs was observed. Similar thin ledges occur at the slab on grade outside the glass walls.
If these thin slab ledges at the slab on grade are not removed in the new construction the architect
should consider concrete repair at these locations.
Foundations and Concrete Block BearingBhear Walls and Cost Implications
Vertical Gravity Force Resisting Systems
Floor !System: Alternative A adds approximately 6570 square feet of second floor area to the
existing 7830 square foot second floors. In order to increase the potential for utilizing the
existing foundations and minimize the increase of the building mass and seismic loads, a light
floor system consisting of metal deck with a light-weight structural concrete (1 10 pcf) topping
supported composite steel beams is recommended. Because the increased second floor plan area
would increase the gravity foundation loads to all the footings except those at grid lines D.5 and
E, new first story column grid lines are proposed midway between grid lines A, By C and D
resulting in a 20' x 25' column grid at the first level. These steel columns with isolated spread
column footings need only extend to the second floor leaving the 40' x 25' column grid at the
second floor level and above.
Roof System: As with the floor a system, a roof system that minimizes the dead load added to
the existing foundations and building seismic mass is recommended. Steel deck with insulating
concrete fill (;!2 pcf) and rigid insulation board, similar to that used on the new Carlsbad City
Library, supported on steel beams is recommended. Roof slopes should be achieved by sloping
of the steel framing in lieu of varying the insulating concrete thickness to minimize the roof dead
load.
e
-
0
0
0 0
0 e
0 0
0
0
0 0
0
0
0
0
0
0
0
0 Lateral Force Resisting System 0
0
0
0 0
0 e 0 e
0 0
0
0 a
0
e Foundation System
0 a
0 e
0
0 0
0
0
0 0 0 0 0
Page Four
May 14,1998
Letter to Mr. Ekad Miller
Existing Concrete Block Bearing Walls
In order to salvage the existing concrete block walls with insufficient horizontal reinforcing, (see
Item No. 4 above), it will be necessary to add steel or concrete columns and floor and roof beams
immediately adjacent to the walls to create a complete vertical load resisting space frame. These
added columns and beams would be on the column grid pattern described above at locations
where the existing concrete block walls support the floor and roof framing. It should be noted
that the engineering and construction costs required might negate the savings gained from
salvaging these concrete block walls.
e
The proposed Full rigid second floor diaphragm precludes the use of a mixed vertical lateral load
resistiing system as was possible €or the split flexible roof diaphragms of the existing structure.
Concrete block shear walls are an economical cost effective lateral force resisting system in
buildings where flexibility for fkture remodeling is not required. Approximately 200 linear feet
of new concrete block shear walls would have to be added in both the north-south and east-west
directions (400 linear feet total) to reduce the force levels in the existing partially grouted,
uninspected cclncrete block walls to code acceptable levels. A predominant portion of the new
east-west shea- walls needs to be added at grid line A in place of the existing cantilever column
system to avoid a torsional irregularity (plan structural irregularity type 1 per '94 UBC Table 16-
M). It should be noted that the amount of new shear wall required to achieve the stiffness
necessary to limit loads on the existing partially grouted, uninspected concrete block walls is no
less than would be required for a new structure. In other words, the cost for these new concrete
block wall would be similar to that required if all the existing concrete block walls were
demolished. Consequently there is no cost savings in the lateral force system by salvaging the
existing concrc te block walls. e
The superstructure systems proposed maximize the potential for utilizing the existing
foundations. New spread column footings would have to be added at the new first story columns
proposed to keep from overloading the existing foundations from the new second floor areas.
New continuous wall footings would have to be added at new shear walls. The existing shear
wall footings could be used as footings for new shear walls at demolished walls by leaving the
footing dowel reinforcing in place and/or drilling and epoxy grouting new dowels in place.
Enlarging the ends of existing wall footings (dumbbell footings) may be required if used to resist
larger overturning loads from higher seismic force levels. It appears that using the existing
foundations may save between 33% to 50% the cost of foundations for a new structure. If the
- 0
0
0 e 0 0
0
0 *
0
0
0
0 0 0 *
0
0
0 e
0 e
0
Page Five
May 14,1998
Letter to Mr. Brad Miller
e
e
e
existirig slab on grade is not cornpletely removed some demolition will be required for new
founditions arid utilities. It may also be desirable to completely remove the slab paving at the
interior patio between grid lines C & C.2 and grid lines 2 & 3 and pour a new slab over a
waterproof membrane and sand base to ensure new interior floor finishes are not damaged by
water infiltration from the soil.
Summary - Alternate A
The structural systems proposed above are similar to those used in the new Carlsbad City Libra9
with the exception of use of lightweight structural concrete fill at the second floors in lieu ol
normal weigh1 concrete. Because costs associated with the complications of salvaging the
existing non-code-complying partially grouted concrete block walls are likely to exceed the costs
of demolition we recommend that they be demolished and new solid grouted reinforced concrete
block walls be built at locations that optimize space planning in the new facility. We believe that
the square footage structural costs for Alternate A construction will be similar to the new
Carlshad City Library square footage costs with a 33% to 50% savings in the foundation costs
and some poss tble savings in new slab on grade construction.
.
e
0
0 0 0 e
0 0 e a
e a e 0 0 0
0
0
0 0 0 0
0
Alternate B - Structural Systems
The structural :systems recommended for Alternate B are identical to those for Alternate A above
and those used on the new Carlsbad City Library except that normal weight concrete fill may be
used ai the second floor over the new building foot print outside of the renovated area. It is
presunned that the soil conditions at the new building foot print are similar to those at the existing
building so that shallow spread footings could be used. Structural square footage costs should be
assumed to be similar to those for the new Carlsbad City Library with a 33% to 50% savings on
the foundation costs at the renovated portion.
Alternate C - Structural Systems
The structural systems recommended for Alternate C superstructure are identical to those for
alternade A above and those used on the new Carlsbad City Library except that normal weight
concrete fill bz used at the second floor throughout. Shallow spread footings are the most
economical cost effective foundation system providing that soil conditions at the site are suitable
for their use. Less suitable foundation soils at the specific site may require more expensive
deeper foundat ions.
e
-
0
e
0 a 0
0 e e e * 0
0 a
0 0 0
0 e
0 0 e a
0
0
0 e 0
0 0
e 0 e 0 e *
0 e a
0
0 e 0 0
0
0 e a
0
Page Six
May 14,1998
Letter to Mr. Brad Miller
Should you have any questions in regards to the findings contained herein, please do not hesitate
to call Gary Tu bach or myself.
Very Truly Yours,
BLAYLOCK ENGINEERING GROUP
e
Matt N. Martinez, SE
C.C.: Norm Lulcer - Cardwell/McGraw, San Diego
Bob Giffii - Construction Analysts
E-mail Brad Miller @ brad@cardwellthomas.com
\\Blay lo ck\Vol I\Jobs\Struct\l998\98SOO l\Engr\letters\ScopeStudy doc
- 0 a
0
0 e 0
0 0
0 0
e
e e e e 0 0 a
0
0 0 0 a MECHANICAL SYSTEMS REPORT 0
0 0 0
0 0 0 a a 0
0
0 0 e *
0 0
0
0 0 * 0 a
0 8
0
Sevier Sisko wic Engineers
e
0
0 a
0 ANALYSIS OF EXISTING BUILDING 0 a e MECHANICAL SYSTEM
0 e a e 0 0
0 *
The Library is served by four multizone air handling units, with integral humidifiers, serving twelve
separate zones. A sixty-six ton water cooled chiller provides chilled water to the air handlers for
space cooling. A cooling tower, located on grade at the south end of the building, provides
condenser water for the chiller, and a boiler provides 180 degrees Fahrenheit water to the air
handlers for space heating. Each zone is controlled by its own thermostat and humidistat. The
control system is pneumatic. A four-pipe fan coil serves the addition at the northwest corner of the
building.
Most of the system was installed during construction of the original building in the mid 60’s. The
air handlers, chiller, boiler, pumps and controls were from observation in satisfactory condition and
operating adequately. The cooling tower, condenser water piping and pump were replaced in 1989
and are in good condition. Each component of the system was observed for vibration and seemed
to be operating within acceptable ranges. The equipment transmitted noise and vibration were
reasonably attenuated by the vibration isolators and enclosure shielding. As a result, noise in the
occupied spaces was barely discernible. Chiller operation was obvious in the rest rooms, but was
not at an objectionable level. Minor amounts of noise from the air handlers were more than
masked by air noise from the air diffusers. Each of the twelve zones was observed for comfort
level. All were Found to be maintaining the temperature settings set at the thermostats. It should
be noted that outdoor conditions were moderate on the days the system operation was observed.
Operation during extreme conditions such as a Santa Ana wind or at near freezing temperatures
a e 0 e e 0 0 e 0 a e
0 0 could not be determined.
e e
0
The design air (quantity for the administrative area is currently 4,700 cfm. This should be adequate,
and perhaps even excessive, for a reading area or book stack area.
The system has, thus far, been well maintained and can be expected, with proper maintenance,
to last indefinitely with only replacement of failed equipment. The bearings for air handler #3,
however, were observed to be in marginal conditions and should be scheduled for replacement.
Air quantities actually delivered to the conditioned spaces should be measured to determine air
handler perforrnance and general system balancing.
Additionally, the supply and return ducts should be cleaned as well as the heating and cooling coils
within the air handlers and fan coil unit. The thermostats should be calibrated on an annual basis
to increase comfort levels and system efficiency. On the long term, motors at the air handlers and
pumps should be replaced with high efficiency units. SDG&E has an incentive program in place
which will provide funds for the use of high efficiency motors, boilers and chillers. Representatives
of their “Energy Conservation Program” should be contacted when these items require
*
0 e
0 e 0 0 e 0 a e e replacement.
0
0 0 GEOWGINA COLE LIBRARY REPORT e SSE#3026 1 a May 14, 7998
0
0 0 e 0
e
e
0 e
0 0 0 e e 0 0
0
The preceding mostly represents a copy of the report given in 1990. Today, the concern is that
most all of the air conditioning equipment and distribution systems have exceeded their useful life
by recognized standards such as ASHRAE. Most of the installation has been serving the building
for over 30 years. Discussions with several of the long time employees have disclosed certain
unstable conditions in various areas of the library. Most significant is the variation of space
temperatures and air distribution withing the administrative areas. Indications are that some
space:; are too hot or cold while others are the opposite. The air distribution zoning and location of the room thermostat could be one of the causes. Another explanation is that the system may
not have been balanced for some time. This along with the age of the system, can cause
decreased sysiem capacity. It should also be noted that age will also take its toll on the value of
the duct insulalion. With age, the ability of insulation to keep out unwanted heat or cold can have
an adverse effect on the supply air temperature. Consequently, the air distributed to the space
may be higher than designed. This leads to a longer period to heat or cool a room. The ultimate
result is that the cost of energy to provide the correct space condition will go up. The system is no
longer performing at its peak efficiency. In terms of efficiency, the existing air conditioning system
0 * e 0 e is outdated. e e e 0
0
If the existing building were to remain, it is recommended that the entire system be replaced. Once
the existing building is made more energy efficient, retaining the existing cooling tower for the same
floor airea is a real possibility. Of course, this would depend on how extensive the remodeling
increases the room volume. If an addition to the building is provided, it is the recommendation of
this report to r13move the existing air conditioning system in its entirety and be replaced by a
completely nevi system to serve the entire building as one. Consideration can be given to the
existing cooling tower as a back up or a supplement to the new system.
a 0 0 e
e * 0
0
0 *
0 BUILDING RENOVATION
e Regardless of the alternatives listed below, it is the recommendation of this report that all new air
conditioning equipment should be used. In alternate A, the existing cooling tower may last another
IO years. The understanding here is that consideration should be given for the long term condition.
That is, useful life of the proposed installation should last from 20-30 years with proper
maintenance. Each alternative wiill incorporate two separate pumps for the chilled water and
heating hot water systems. The folRowing are the various alternatives to consider:
-- Alternate A Modifications to the existing structure to meet today's California Energy Act will
assure installation of an air-conditioning system which will match the present capacities (66 tons).
The recommendation is to change the cooling plant to an air cooled system which would eliminate
the need for two separate pieces of equipment - chiller and cooling tower. Maintenance, in turn,
would be simplified. In addition, the building air distribution system would include four separate
air handlers to serve the administration, core area, stack and reading area, and the second floor
geneology area A variable air volume system would be utilize along with variable frequency drives
for the air handlers. This would save on energy by automatically compensating for the low as well
as the peak periods of the library's occupancy. The heating system would be replaced by a 1.35
mbh input boiler and distribution piping.
0 0
0 e 0 e
0 0 a 0 0
0 SSE#3026 2
0
0 0 0 0
e GEORGINA COLE LIBRARY REPORT
0 May 14, 1998
e
0
e 0 e e 0 chiller!; can be utilized.
~- Alterniate B The system recommended here would be the same as in Alternate A. The only
differeince would be that the chiller would increase by 50 tons to a nominal 120 tons and the heating
system would increase 900,000 btuh. To offer some stand-by capacity, two separate 60 ton
Alternlate C An all new building would incorporate the same system as currently under
construction ai: the new Carlsbad Library location on Dove Lane. Due to the higher capacity
requirements, the most economicali approach, would be to revert back to the central plant concept
using g a cooliiig tower and one or two chillers.
e -- 0 *
e'
0 e PLUMBING
0 0 e
e
The Library is served by a standard building system for potable water supply, irrigation, sanitary
drain and venting. The 2" domestic potable water supply is currently supplying 107 g.p.m. through
154 fixture unit!; (fu). The 4" drain, waste and vent (DWV) system has an available capacity of 216
fu and is handling only 94 fu. Natural gas for the space heating boiler is supplied through a
metered 2-1/2" low pressure line with an available capacity of 1,600 cfm which is presently using
1,350 ccfm. Domestic hot water is supplied by three small electric storage type water heaters. All
parts of this system appear to be in satisfactory condition with no need, barring failure, to replace
any of the fixtures or equipment.
An updated report indicates that the restroom has been brought up to current ADA requirements.
There is no indication that the plumbing system is failing or has required frequent servicing. When
the domestic hot water heater needs replacement, consideration should be given to converting the
electric: heater YO a gas fired unit. This will require bringing in combustion air, but the economics
will pay for the conversion in a relatively short time as a result of the energy savings realized.
In the event that the building is extended to the east, the existing underground services including
gas and water, will be required to be rerouted and/or resized depending on the addition of any new
loads. Caution will be required where the existing sewer line runs close to and parallel with the
east side of the building. The new construction work will require extra care in digging new footings
in the area around or over the pipe. It is very conceivable that the whole service main outside the
building may require replacement. This is something that will not be known until the sewer line is
uncovered.
0
e 0
0
e
0 0 0 a e 0 0 0 e a e 0 0 e
e 0 FIRE F'ROTECTION
0 There IS no fire suppression system existing in the building. There are, however, heat detectors 0 triggering a fire alarm system, as well as pull boxes and alarm bells near exits, The fire alarm e system was built by "Notifier", a company still in existence. Additionally, there is no fan shut down
capability in case of fire. The fire alarm system under Division 16 would have to be replaced to
meet current fire safety regulations, especially with the planned expansion in mind. e 0 e GEORlGlNA COLE LIBRARY REPORT 0 SSE#3026 3 e May 141, 1998
0 a e 0 e
e e e e
0 0 e
Serious consideration should be given to providing a sprinkled building for the purpose of life
safety. This is especially true if the building extension is provided. In addition to the sprinklers, a
new fire alarm control panel would be required to meet current codes. An alternative dry type
systeni may be considered for those archive areas containing rare books. a 0
0
I) *' 0 *
e 0
0 0
0
0
e e 0
0 0
0
0
e 0
I) 0 0 e 0
0 e 0
e SS E#3 026 4
e 0 0 0 0
e
e a
e
0 GEORiGlNA COLE LIBRARY REPORT
e May 14, 1998
e e 0
OI
0 0 0 0
0
0 0 0 e
0 0 0 0 0 0 0 0
0 0 0 0
e ELECTRICAL SYSTEMS REPORT 0 0 c
0 a
0 0
0 * 0 0 0 0
0
0 0 8 0
0
0 a m 0
0 0
Van 13uuren Kimper & Associates
e
a
e
e
- 0 0 0 e GEORGINA COLE LIBRARY 0
0 ELECTRICAL SYSTEMS ANALYSIS 0
0
0 0 0
0
0
Q 0
0 0 0
0 e 0 0 0 0 e e a
0 * a 0 0
The existing main switchboard is a 1000 amp, 2081120 volts, 3 phase, 0
4 wire unit with an SDG&E meter. The switchboard is in fair condition. 0 0 The switchboard sections are properly grounded together with a #3/0
0 conductor, and the board is bolted to the concrete floor slab. a However, the main switchboard was manufactured by a company e (Bulldog Electric Company) which is no longer is business. This will e make repair parts (circuit breakers, switches, etc.) difficult, if not
0 impossible, to get. Also, based on metered readings, the main a switchboard Ademandz load is 71 1 amps. This reading indicates very
0 little additional capacity in the switchboard.
8 The existing main electrical (metering) room does not meet current 0 SDG&E design standards. These standards require that no other e utilities share the same space. Presently, there are exposed cold
0
0 0
0 a
ELECTRICAL SYSTEM
1.01 ELECTRICAL SERVICE
A. Analysis:
I. The existing building service is taken from SDG&E (12KV) overhead
service pole #218108. The electrical service to the building is 1000
amps, 208/120 volts, 3 phase, 4 wire, and is provided via a 15OKVA
SDG&E padmounted transformer. The existing service feeder
consists of ,three (3) 4zC.-4#500MCM (each conduit) for a service
feeder capacity of 1140 amps.
B. Conclusion:
1. The electrical service feeder is adequate for the existing building
loads, but is not adequate to support any future building expansion or
modifications. Also, the existing SDG&E transformer KVA capacity
appears to tie undersized for the building service. a
1.02 MAIN SWITCHBOARD
A. Analysis:
1. e
a
2.
GEORGINA COLE LIBRARY
ELECTRICAL SYSTEMS ANALYSIS PAGE 1 a
- 0
0
0 0
0 a B. Conclusion: 0
0 0
0
0 0 0’
0 0
0
e 0 *
0
0
0
0 *
0 a 0
0
0
0
(5
0
0 0 0 0
0
0
0 e
0
0 0 0 0 0 0
0
water pipes, a telephone backboard, a data backboard and a fire
alarm control panel in this room.
1. The existing main switchboard is adequate to support the existing
building loads. However, based on the limited amount of additional
capacity in the board, the lack of available spare parts, and the age
of the equipment, the existing main switchboard is not suitable to
support any future building expansion.
The existing main electrical room will require work to relocate the
telephone and data backboards, fire alarm panel and cold water
piping in the space to another area of the building.
2.
1.03 PANELBOARDS e
A. Analysis:
1. The existing branch circuit breaker panels are in fair condition.
However, the panels were manufactured by the same company as the
main switchboard. Since this company is no longer in business,
repair parts will be difficult or impossible to get. All existing
panelboard:; are full in relation to the available breaker space on their
bus.
B. Conclusion:
a
1. The existing panelboards are adequate to support the existing building
loads. However, the existing panelboards are not suitable for future
building expansion or renovations.
a
a
1.04 INTERIOR LIGHTING
A. Analysis:
1. Surface mounted fluorescent lighting fixtures are used throughout the
entire building. Multi-level switching is utilized in large open areas,
although the smaller rooms and private offices are not equipped with
dual level switching as required by present California Energy Code
Title 24 requirements. ADay Lighk lighting controls have not been
utilized in areas adjacent to large windows. In some areas, light
meter readings exceeded 300 footcandles. Footcandle readings were
taken in all areas and the average maintained level falls between 90
and 150 footcandles. Due to the quantity of light fixtures used,
however, most areas are operating at approximately 5 watts per
GEORGINA COLE LIBRARY
ELECTRICAL SYSTEMS ANALYSIS PAGE 2
-
0 0 0
0 square foot. The building lighting system requires extensive work to
0 bring lighting design into compliance with current Title 24 0 requirements.
0 6. Conclusion: 0
0
0
0 0
0 e 0 9
0 0
a A. Analysis: 0
0
0 0 0
0
0 0 0
a a
0 0
0
0 8 0 e
0
0
0
0 *
0 0
a
0
0
0 0
0
1. The current Title 24 lighting (energy) allowance for this building is 1.5
watts per square foot. To reach this goal, the existing building lighting
system will require a complete redesign with an emphasis on fixture
type, application and location. Also, Title 24 energy conservation
methods such as daylig hting, occupancy sensors, multi-level
switching and timeclock control must be utilized to aid in reducing
energy consumption in the building.
1.05 EXTERIOR LIGHTING
1. The existing exterior lighting consists of both fluorescent and high
intensity discharge (HID) fixtures. Fluorescent fixtures are wall and
ceiling mouiited at entryways and exits. HID fixtures are installed at
the loading dock, entry ways and building perimeter for landscaping
and wall washing.
All areaway and parking lot lighting fixtures have HID (mercury vapor)
lamps. Additionally, the lighting at the extended parking lot has
newer, contemporary Ashoe-box= light fixtures installed adjacent to
the original light fixtures. Under the contemporary fixtures there is
1Ofc at ground level, but there is only 1.3fc at ground level for the
original fixtures. Clearly the two fixtures have different photometric
characteristics, making even distribution of light difficult. Parking lot
fixtures are 12 feet high and 100 feet apart. Insufficient lamp wattage,
mounting height and distance between fixtures make it impossible to
meet the Illuminating Engineers Society's required maintained
average illurmination level of 0.5 footcandles.
2.
B. Conclusion:
1. The existing exterior lighting should be removed and replaced with
new energy efficient luminaires. Building and landscape lighting
should be compact fluorescent and/or metal halide. Parking lot
fixtures should be metal halide luminaires mounted on 20'-0z poles.
All exterior lighting should be controlled via photocell and timeclock.
a
a
e
GEORGINA COLE LIBRARY
ELECTRICAL SYSTEMS ANALYSIS PAGE 3
- e e e
0 1.06 FIRE ALARM SYSTEM 0 e A. Analysis: a e 0 e e e 0
1. There is no fire suppression system in the existing building. There
are, however, heat detectors and smoke detectors which trigger a fire
alarm system, as well as pull boxes and alarm bells near exits. If a
fire sprinkler system were installed, there would be no room in the fire
alarm control panel to add zone wiring to trigger the alarm system at
water flow to the sprinkler heads. Additionally, there is no fan shut
down capability in case of fire. e e B. Conclusion: 0 e
0 e 0 e
0
0 0
I. A new fire alarm system should be provided for the existing building.
The new system shall comply with applicable National Codes, ADA
and the City of Carlsbad criteria.
e e
e
0 0
e *
0
0 8 0 e 0 e 0
0
e
0 0 e e
0
0
0 0
0
GEORGINA COLE LIBRARY
ELECTRICAL SYSTEMS ANALYSIS PAGE 4
- 0 e
0 GEORGINA COLE LIBRARY RENOVATION e BASIS OF DESIGN e MAY 1998 a a ELECTRICAL DESIGN
0 A. Codes 0 e 0' a
0 a 0
0 a a 0 a
0
0 e e e
0
0
0
e
Elevator (30HP) 40,000
e e e e Total 71 3,600
0 e * 0 0 a
0
0
0 e
e
e
1. The electrical system shall conform to latest applicable rules of the
National Electrical Code, NFPA 70; California Code of Regulation, Title 24
(Lighting); Life Safety code, NFPA 101 ; National Electrical Safety Code;
Uniform Building Code; and the City of Carlsbad Electrical Code.
B. Standards
1. All materials, equipment, fixtures, and other appurtenances shall comply
with the applicable Underwriter's Laboratories, Inc., standards, or
applicable standards of a similar independent testing organization.
Overcurrent protection shall be provided for building service entrance
conductor. All wiring shall be copper and in conduit.
C. Interior Distribution Systems e
1. This project is based on a distribution voltage of 480/277 volt, 3 phase, 4
wire. The projected electrical loads are as follows:
ITEM VNSFBLDG SF TOTAL VA
Lighting 3.0 47,400 142,200
Receptacles 2.0 47,400 94,800
HVAC (MECH) 8.0 47,400 379,200
Miscellaneous - 1 .o 47,400 47,400
e
Subtotal 12.0 663,600 e
Parking Lot Lighting 10,000
71 3.6KVN480V-3PH = 859 amps
Electrical Provisions (25%(min) Spare ampacity in main switchboard, etc.)
Will be provided for any facilities future expansion.
2.
a
e GEORGlINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 19'98 PAGE 1
-
0 e 0 e 0
1, e e c
0 0 0
0 c 0 e 0
0 0
a e 0
0
0
e e
0 * 0 0
0 * e 0
0
0 e F. Wiring Systems
0
0 e
0
0 0 0
3. The building electrical distribution system shall consist of a 1200 amp,
480/277 volts, 3 phase, 4 wire Main Distribution Switchboard in the
Electrical Room. Branch circuit panelboards shall be located in the
electric closets and storage areas of the building. Circuit-protection
devices in panelboards shall be dead front, recessed, circuit breakers.
An SDG&E electric (KWHR) meter shall be located in the service entrance
equipment in the Main Electrical Room. The Main Electrical Room shall
have direct outside access per utility company requirements.
4.
D. Uninterruptable Power Supply “UPS”
1. A 75KVA UPS will be provided for computer power in the building. The
UPS shall provide conditioned power and fifteen (15) minutes of battery
backup for the computers.
E. Receptacles
1. Specification Grade, NEMA 5-20R, nylon face receptacles shall be
provided for all 120 volt outlets. Ground fault interrupting receptacles will
be provided for all above counter receptacles in bathrooms, kitchens,
locker rooms and for all exterior receptacles. A separate 120 volt circuit
shall be provided for each coffee machine, microwave, refrigerator,
vending machine, copy machine, garbage disposal, and fax machine.
Safety receptacles shall be provided in the Children’s Library area, or
similar areas. Safety receptacles shall limit improper access to energized
receptacle contacts via an internal mechanism.
A maximum of four (4) general use receptacles shall be connected to a 20
amp circuit.
Office computer outlets shall be on separate (dedicated) circuits from the
rest of the building.
Receptacles and coverplates shall be white. Multiple devices shall be
ganged under a single coverplate.
2.
3. e
4.
5. e
e 1. Electrical Metallic Tubing shall be used above ceilings and in exposed
interior space not exposed to physical damage. Rigid Galvanized Steel
conduit shall be used in concrete or where exposed to physical damage.
PVC schedule 40 conduit shall be used in concrete walls or below slab on
grade. All general use wiring shall be type ATHWNg 600 volt, copper. All
GEORGINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1998 PAGE 2
e
-
0 e 0 8 e conduit. 0 0 General use wiring for branch circuits shall not be smaller than No. 12 0 AWG. Circuit breakers for general use branch circuits shall be 20 amp
rated. 0 0 e G. Voltage Drop
e. 0 9 * 6 0
This project shall provide a complete fire alarm control system including a *
main fire alarm control panel, manual pull stations, audio-visual devices, e
pressure switches, smoke detectors, and (24 hour) battery back-up
power. The fire alarm control panel will be located in the Main Electrical 0
Room. 0 e
Batteries shall be rechargeable sealed nickel-cadmium. The building's fire e
alarm system shall comply with the applicable portions of NFPA-101, 0
1994 Life Safety Code. e
A fire alarm systern remote annunciator panel shall be located at the e
Circulation Desk. 0
Fire alarm system conduits in building shall be run above ground, 0
concealed in walls or above ceilings. Fire alarm conduits to the PIV
(tamper switch) and exterior water shut off valves shall be underground. e
0
An exterior fire alarm bell shall be located near the building entrance. a
A telephone lease line and auto dialer shall be provided to report alarms 0
to the fire station. 0 0
0 I. Cable Television (CATV)
0
0 e e 0 e 9 a * 0 0 0
wiring (including fire alarm, telephone and CATV systems) shall be in
2.
I. Feeder wiring shall be limited to 2 percent voltage drop. Branch circuit
wiring shall be limited to 3 percent. Maximum voltage drop (feeder and
branch circuit) shall be limited to 5 percent.
H. Fire Alarm System
I.
e
2.
e
e
e
3.
4.
5.
1. This project shall provide the CATV backboard, in the Main Electrical
Room, along with conduit and junction boxes throughout the building for
the building's CATV system. A terminal cabinet shall be provided in
electrical rooms or storage areas at midpoints of the building.
Outlets shall be flush with wall and conduits concealed where possible. 2.
GEORCYNA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1998 PAGE 3
- 0
0 e 0
a J. TelephoneIData System
0
0
a 0 0
0
a e 0
0 0 e 8 e
e
0 e e 0 lamp wire guards.
a
0 e e 0 e
0
0 4. e
0 Lectern area. 0 0 a
0 0 e
e e
0
3. All work shall be done according to the CATV company's requirements. e
a
a
1. This project shall provide a telephone/data backboard in the Main
Telephone Room along with outlet boxes and conduit throughout the
building for the telephone/data system. Terminal cabinets (or
backboards) shall be provided in electrical rooms or storage areas at
midpoints of the building.
The telephone/data system components and wiring shall be an Owner
Furnished-Vendor Installed system. The Contractor shall provide a
complete conduit and box system per the manufacturer's requirements
and as indicated. The Contractor shall coordinate all work with the
manufacturer prior to rough-in.
Outlets shall be flush with wall and conduits run concealed. Each outlet
shall have a 314'' conduit to the telephone backboard.
All work shall be done according to telephone company (PacBell)
requirements.
a
a 2.
3.
K. Lighting
1.
a
In small offices and other administrative areas, lighting shall be recessed
Z'X~', or 2'x2', Aparabolk fluorescent fixtures. Lighting in utility and
storage areas shall be standard open industrial fluorescent fixtures with
e 2. Book stack lighting shall be linear fluorescent fixtures integral to the book
stacks. Illumination levels on the vertical surfaces of the book stacks shall
comply with IES criteria. A minimum of 30 (vertical) footcandles shall be
provided at 30-inches above the floor between the book stacks.
Compact fluorescent downlight fixtures shall be used in combination with
2'x4' and 2'x2' fluorescent fixture, where appropriate.
Community Room lighting shall consist of compact fluorescent downlight
fixtures on dimmers. Track lighting on dimmers shall be provided at the
3.
GEORGINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1998 PAGE 4
- a
0 e
0 0
0 Area Footcandles 0 a
0 0 0 0 e
e e e 0 e e 0 e e
0
0 e
0 0
0 0 e
IO. 0 0
0 L. Emergency Lighting
1. 0 0 e e a e e e e
0 0
0 e 0
0
5. The illumination levels for this project shall be as follows:
Administrative 50
Office 50
Storage 10
Mechan ica I 10
Restrooms 20
Community Room 50
Book Stacks 30 (vertical)
The footcandle levels for areas listed shall be met with wattage
consumption of less than 2 watts per square foot.
All exit sign lights on this project shall be LED type (with red letters) and
with an integral self-contained battery back-up system.
All light fixtures located in stairwells shall have an integral (self-contained)
battery back-up system in addition to being on the EPS system.
Fluorescent lamps for 2'x2' and 2'x4' fixtures shall be energy-saving (17
watt) T8 lamps and (32 watt) T8 lamps, respectively. Compact fluorescent
lamps shall be used in downlights and sconce fixtures. All fluorescent
ballasts on this project shall be the (solid state) electronic type. All light
fixtures shall be complete with lamps.
Light switches, dimmer switches, and coverplates shall be white. Multiple
devices shall be ganged under a single coverplate.
120V general use receptacles shall not be located in light fixtures.
6.
7.
a
8.
9. e
Corridor, stair, andl passageway lighting shall be provided in accordance
with NFPA-101 , 1 E194 Life Safety Code. Exit paths shall be illuminated at
any time the buildiing is occupied.
This project will provide a 7.5KVA emergency power supply (EPS) system
with batteries for 90-minutes of continuous operation. The EPS system
will be an Aon-lineg (inverter) system capable of sustaining an HID light
source during a power outage. The EPS shall be a programmable micro-
processor based unit with self-diagnostics, main and output circuit
breakers and status display panel.
2.
GEORGINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1998 PAGE 5 e
- e
0
0 e 0 e M. Lighting Controls (Building Interior) e e e e 0 a e.
0 N. Miscellaneous Systems 0 e e e e e 0 a 0
0
0 e
0 e e 0
0
0 0 0 a e e 8
0
3. A remote EPS alarm panel shall be located at the Circulation Desk.
1. This project shall provide a low-voltage switching system to control all
interior lighting in ihe building. The low-voltage switching system shall be
a micro-processor based, programmable system with an interface for
timeclock control, daylighting controls, motion sensors and Aoff-sweepg
(at predetermined times) per Title 24 requirements.
1. Security System: This project shall provide a security control panel, door
switches, intrusion detectors, access key pads, etc., for building security.
A telephone lease line and auto dialer (communicator) shall be provided
to report alarms.
Paging System: This project shall provide a public address system with
microphones at the Circulation Desk and speakers in public areas.
Clock System: This project shall provide a master clock system
throughout the facility. The master clocWprogrammer shall be located in
the Main Electrical Room.
2.
3.
0. Outside Distribution System
1. Electrical Service
a. An SDG&E padmounted transformer shall be required to provide
the 1200A-~?08/120V-3PH-4W electrical service to the building.
The 480/277V service feeder shall run underground from the
padmounted transformer to the service entrancejmetering
equipment located in the Main Electrical Room of the building. All
work shall be done per SDG&E standards.
e
2. Telephone and CATV Service
a. Telephone ;and cable television service shall be taken from an
existing overhead service pole adjacent to the facility. New
underground conduit shall be provided from the service pole to the
telephone blackboard in the Main Telephone Room. All work shall
be done pel. utility company requirements.
e e e 0 0 0 P. Exterior Lighting
0
0 e e e 0
GEORGINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1998 PAGE 6
0
0 e e e a *
0 0 e e a
e 0
0 0 0 0 a
a
a
1. Building Lighting: This project shall provide a minimum of three (3)
footcandles around the perimeter of the building and shall consist of High
Pressure Sodium luminaires or compact fluorescent. The building lighting
shall be controlled by an electronic time clock (in the Electrical Room) and
a common photocell located on the building roof.
Site Lighting: all sidewalks, covered areas, circulation areas, etc., shall be
illuminated to ensure pedestrian safety. Site lighting shall be either metal
halide or high pressure sodium type, and shall be a combination of
building lights, canopy lights, step lights and bollards. Site lighting shall
be timeclock and photocell controlled. Light levels shall comply with the
Illumination Engineering Society (IES) lighting handbook.
Parking Lot Lighting: Metal halide (250 watt) light fixtures on 20-foot poles
shall be provided to light the new parking lot. Illumination levels in the
parking lot shall not fall below 0.5 footcandles and shall comply with the
IES lighting handbook. Parking lot lighting shall be timeclock and
photocell controlled.
2.
e
3.
e
e
e
e e
e e 0
0 e
a
0
0 e 0 e 0
0 e *
0 e e
0
e
GEORGINA COLE LIBRARY RENOVATION
BASIS OF DESIGN
MAY 1990 PAGE 7
0
e
0 0 0 0 m e 0 0
0 a e 0
0 0 0 e
0 0 0 e
0 e a
0 e 0 8 * a *
0 0
0 0 a
0
e
e * 0 0 a
0
e
e
e
COST ANALYSIS
Ccmstruc fion Analysts, lnc.
e
e
a
a
0 e .I e e e e
e * e e
APPENDIX 5: COST ANALYSIS DOCUMENTATION a
The attached summary pages represent the work of Construction Analysts, lnc.,
cost consultants for the feasibility study. The following revisions were made to
these documents to derive the figures shown in the table included in the body of 0 e the report:
e e a e
e
0 The cost estimates for Alternative B and C attached reflect a preliminary
program area of 48,900 gross square feet and parking for 245 cars. The
totals were reduced to reflect the 45,155 square foot and 226 cars in the
final program. Costs were reduced on the basis of the square foot costs.
The cost estimates for Alternative B and C attached are inclusive of the Off-
Site Costs whereas Alternative A is not. Those costs have been pulled out
as a separate line litem in each alternative in the body of the report to create
a consistent basis for comparison.
The budget for Library Furnishings and Equipment was increased to $48/SF
at the recommendation of the consulting librarian to reflect recent current
experience and to include such as items as computer network cabling.
Several Project Costs percentages were adjusted to reflect the project
management experience of City of Carlsbad staff with the Carlsbad City
Library and other rlecent projects.
0
e e e e a
0 0 e
e a e
a
0
a e 0 e * e e e e a 0 a e
0 0 e
e e 0 0 e e
a
CardweWMcGraw Architects
6
DATE 0 PROJECT GEORGINA COLE LIBRARY
o ARCHIENG o LOCATION CARLSBAD, CA
ESTIMATE CONCEPTUAL ESTIMATE JOB NO TYPE CSI 16 DIVISION 0
PREP
CHECK R.
CARDWELL / McGRAW ARCHITECTS
0
0
0
0 ALTERNATIVE A a
0
0
0
GEORGINA COLE LIBRARY
RENOVATION / EXPANSION OF EXISTING BUILDING
0 BLDG SF
0 DIVISION
0 NO (SUMMARY OF ESTIMATE SQ FT
COST 0
@
0 0 0
0
7 28
3.63
7 32
12 29
3.50
2.89
6 74
13.50
1 40
0.73
0.61
0.00
1.45
16 73
16.94
2 SITEWORK
3 CONCRETE
4 MASONRY
5 METALS
6 WOOD & PLASTICS 0 7 THERMAL & MOISTURE PROTECTION 0 8 DOORS & WINDOWS 0 9 FINISHES 0 10 SPECIALTIES 0 11 EQUIPMENT
12 FURNISHINGS
13 SPECIAL CONSTRUCTION
15
16 ELEXTRICAL
0
0 @ l4 0 0
0
0
CONVEYING SYSTEMS
ME C HANl CAL
95.01
8.50% 8.08 0 GENERAL CONDITIONS
12.00% 11.40 0 CONTINGENCY
3.50% 3.33 0
0 117 81
1.20% 141
5.00% 5.89
ESCALATION (BASED ON JULY 99 CONST) 0
0
0
0
0
BONDS
COI\JTRACTOR'S FEE
e 125 11
103.77 0 1 SPEXIAL REQUIREMENTS
0 ETAL ESTIMATED PRICE 1 228.89 c 0
0
0 e e
0
0
0
05/26/98 CAI NO. 1995 GEORGINA COLE LIBRARY - ADAPTIVE - ALTERNATE A - EXIST BLDG.
-
lTEM EST UNIT
NO DETAIL OF ESTIMATE QTY UNIT COST 0 0
0
0
0 DIVISION 1 - SPECIAL REQUIREMENTS
1.1000 mCIAL REQUl REMENT 5
1.1001 LIBRARY FURNISHINGS & EQUIPMENT 30680 SF 40.00 0 1.1002 ARCHITECTURE /ENGINEERING / SPECIAL INSPECTION 1 LS 575772.79 0
1.1003 PLAN CHECK FEES 1 LS 6000.00
1 LS 0.00
1.1005 OWNERS PROJECT MANAGER - 5% OF CONST. COST 1 LS 191 924.26
1.1006 OWNERS CONTINGENCY - 15% OF CONST. COST 1 LS 575772.79 o 1.1007 PUBLIC ART, CONSTRUCTION CORDINATION - 2% 1 LS 76769.71 0 OF CONST. COST
1 LS 115154.56 0 OF CONST. COST
1 LS 1 151 54.56 1 .IO09 UTII-ITIES DESIGN, INSPECTION & CONNECTION
1.1010 LIBRARY TEMPORARY RELOCATION 1 LS 250000.00
1.1011 IDENTIFICATION I MITIGATION OF HAZARDOUS MATERIALS 1 LS 50000.00
0
TEESTING 15% OF CONSTRUCTION COST
0 0 1.1004 PERMITS BY CITY OF CARLSBAD - WAIVED
e 1.1008 POST OCCUPANCY EVALUATION AND OUTFITTING - 3%
FEEES - 3% OF CONST. COST 0
a
0
0 0
0 * * 0
0 0
0
0
0 0 0
0
0
0
0 e 0
0 0 e
0
0 0 0
NOTE:: ITEMS 1, 2 & 5 THRU 11 ARE PER CITY OF CARLSBAD.
e
e
e
-
ITEM EST UNIT a
0
0
a
0
NO DETAIL OF ESTIMATE QN UNIT COST
*
0
0 1.1001 LIBRARY FURNISHINGS & EQUIPMENT 30680 SF 40.00 0 1.1002 ARCHITECTURE / ENGINEERING / SPECIAL INSPECTION 1 LS 1080788.63
1.1003 PLAN CHECK FEES 1 LS 11000.00
1.1004 PERMITS BY CITY OF CARLSBAD - WAIVED 1 LS 0.00 * 1.1005 OWNERS PROJECT MANAGER - !j% OF CONST. COST 1 LS 360262.88 e 1.1006 OWNERS CONTINGENCY - 15% OF CONST. COST 1 LS 1080788.63
1.1007 PUElLlC ART, CONSTRUCTION CC)RDINATION - 2% 1 LS 1441 05.1 5 e OF: CONST. COST 0 1.1008 POST OCCUPANCY EVALUATION AND OUTFlITlNG - 3% 1 LS 2161 57.73 e OF' CONST. COST .. 1 .IO09 UTILITIES DESIGN, INSPECTION 8; CONNECTION 1 LS 216157 73 * 1.1010 LlBFlARY TEMPORARY RELOCATION 1 LS 250000.00
1.101 1 IDENTIFICATION / MITIGATION OF I-iAZARDOUS MATERIALS 1 LS 50000.00
DIVISION 1 - SPECIAL REQUIREMENTS
1.1000 mCIAL RFQU IR FMFNTS
TESTING 15% OF CONSTRUCTION COST 0 0
e FE.ES - 3% OF CONST. COST
NOTE. ITEMS 1 2 & 5 THRU 11 ARE PER CIN OF CARLSBAD. 0 0
0 a * 8 e
e 0 * e e
0
0 e
a c e e
e a * * e 0 0 @
SF COST 94 82
a
e
a
e
*
PROJECT GEORGINA COLE LIBRARY DATE
ESTIMATE CCINCEPTUAL ESTIMATE
TYPE CSI 16 DIVISION * LOCATION CARLSBAD, CA
JOB NO
ARCHIENG CARDWELL I McGRAW ARCHITECTS PREP
CHECK R e 0 e
ALTERNATIVE C 0 e 0
GEORGINA COLE LIBRARY
NEW CONSTRUCTION
0 BLDG SF
DIVISION SQ FT COST e NO SUMMARY OF ESTIMATE
a
0
1) e * 0 a 0
21 26 2 SITEWORK
5.71 3 CONCRETE
6.90 4 MASONRY
5 METALS 12.32 3 50 6 WOOD & PLASTICS
3 52 7 THERMAL & MOISTURE PROTECTION
6 12 8 DOORS & WINDOWS
14 40
1.22
0.47
0.58
0.00
0.91
15.86
e 9 FINISHES e 10 SPECIALTIES 0 11 EQUIPMENT 0 12 FURNISHINGS * 13 SPIECIAL CONSTRUCTION
14 CONVEYING SYSTEMS
15 MECHANICAL
ELEXTRICAL
I 8.95 e e e l6 .1
a
e *
8 e
a .. o * a e 0 *
a 111.71
8 50% 9.50
12.00% 13.41 COiNTlNGENCY
3.50% 3 91 0
e 138.52
120% 1 66 e BONDS
5 00% 6 93
0 147 11
89.50
GENERAL CONDITIONS
ESCALATION (BASED ON JULY 99 CONST.)
CONTRACTOR'S FEE
1 SPEICIAL REQUIREMENTS
E- TO TAL ESTIMATED PRICE I 236.61 c
05/26/98 CAI NO. 1995 GEORGINA COLE LIBRARY - ADAPTIVE - ALTERNATE C - EXIST BLDG.
-
ITEM EST UNIT
NO DETAIL OF ESTIMATE QTY UNIT COST 0
0
e a
e DIVISION 1 - SPECIAL REQUIREMENTS
1 .IO00 SEJ=,CIAL REQUIRFMFNTS * 1.1001 LlElRARY FURNISHINGS & EQUIPMENT 30680 SF 40.00
1 LS 1079069.51 * 1.1002 ARCHITECTURE / ENGINEERING I SPECIAL INSPECTION a
1.1003 PLAN CHECK FEES 1 LS 6000.00
T’ESTING 15% OF CONSTRUCTION COST
1.1004 PERMITS BY CITY OF CARLSBAC) - WAIVED 1 LS 0.00
1.1005 OWNERS PROJECT MANAGER - 5% OF CONST. COST 1 LS 359689.84
a
e 0
1.1006 OWNERS CONTINGENCY - 15% OF CONST. COST 1 LS 1079069.51
1.1007 PUBLIC ART, CONSTRUCTION CORDINATION - 2% 1 LS 143875.94 e OF CONST. COST * 1.1008 POST OCCUPANCY EVALUATION AND OUTFITTING - 3% 1 LS 215813.90
OF CONST. COST
1 .IO09 UTILITIES DESIGN, INSPECTION & CONNECTION 1 LS 21 5813.90
* c
1,
m
0
a e e 0
0 a e a a e a
8 0 0 e
e
0 e e e 0
FEES - 3% OF CONST. COST
1.1010 LIBRARY TEMPORARY RELOCATION I LS 0.00
1 .IO1 1 IDEINTIFICATION / MITIGATION OF HAZARDOUS MATERIALS 1 LS 50000.00
II) NOTE: ITEMS 1, 2 & 5 THRU 11 ARE PER CITY OF CARLSBAD e SF COST 89 50
e
e
a
e
6
DATE PROJECT GE.ORGINA COLE LIBRARY
ESTIMATE CONCEPTUAL ESTIMATE JOB NO TYPE CSI 16 DIVISION
ARCHlENG PREP CARDWELL I McGRAW ARCHITECTS
CHECK R. LOCATION CA.RLSBAD, CA a a e GEORGINA COLE LIBRARY
1) ALTERNATE B (CULDESAC) a a PROPOSED STREET REALIGNMENT e e 0 0 e
c *
a
e
0 CONTINGENCY 12.00%
e * 0 e 0 0 e
0 *
e 0 * e 0
0
DIVISION
NO SUMMARY OF ESTIMATE
e DIVISION 2 - SITEWORK
e 2.1000 DEMOLITION
0 2.2000 SITE PREPARATION & EARTHWORK
a 2.3000 SITEWORK SPECIALTIES
e 2.4000 PAVING & SURFACING
2.5000 SITE / OFFSITE UTILITIES
a 2.7000 LANDSCAPE & IRRIGATION
e GENERAL CONDITIONS 8 50%
0 ESCALATION (BASED ON JULY 99 CONST.) 2.50%
BONDS 120%
CONTRACTOR'S FEE 5.00%
1 C 0 ITO.TAL ESTIMATED PRICE
05/26/98 CAI NC). 1995 GEORGINA COLE LIBRARY - ALTERNATE B - ST. REALIGNMENT
w e *
0 e
e a a a
e 0 0
0 e 0 * * e e e a 0 * 0 PLANNING ANALYSIS
m e d a e e 0
0 0 3
0 * c
., *
0
0
8
e
e
City of Carlsbad Planning Depatfrnent
e
a
e
Date
Juiy 1, 1998
Buildaut (SANDAG '98 est.)
(I) e
Grawtb Management Standard (sq. ft)
60,000
92,960
e * 0 0
0 0 0
(.
6)
e 0 c e e
e f. Library floor area = 74,986 persons/l ,000 x 800 square feet e * e- 3. For cumnf re sldential b trlld-out caoacih, estjmata use SANbAG’s mast
recent estimate of housing stock at buiid-out and convert to population. a Assume no vacancies and no non-housing poputation. 0 * a. Capacity estimate (existing pollcles) = 50,130 d.u. (SANDAG, May *
c
= 116,214 persons I, a
0 = 92,960 square feet
1) e 0 e e e*
e c * * Buiid-out Pop = capacity d.u. x household size factor !e Build-out Pop = 54,600 d.u. x 2.3178 persons /d.u. oi = 126,552 persons e 0 = 101,241 (say 101,250)
9 c
0. e 6
,
CIJRRENT AND FUTURE LiBRARY DEMAND
Page 2 - a
c. Household slze factor Is: 2.3178 persons per househaid, the factor
adopted by Council April 22,1997.
d. Housing units cornpiciting construction 1/1/98 to 6/30/98 = 560 d.u. (from
PERMITS 7/1/98). Assume all new housing units are occupied.
= 73,688 persons + p.3178 penondd-u. x 560
d.u.1. = 74,986 persans
e Therefore, July 96 Pap
= 59,989 square feet (say 60,000)
1998). Assume no urrits are vacant.
Buitd-out Pop = capacity d.u. x household site factor
Buiiddut Pop = 50,140 d.u. x 2.3178 persons/d.u.
e
b. Ubrary floor area = 116,214 persondl ,000 x 800 square feet
e
4. Despite the current estimate ofthe build-out capacity of the City, the Dwelhq
Unit Limitation of the GrnwJh Manaaement Plan allows up to 54,600 dwelling
units at buiid-out. Although our current estimate of future residential build-out
is for fewer units than the maximum limit, R may be appropriate to pian library facilitiec and sewices for Uhis maximum potential. In this instance an
alternative demand for libwry space is calcufated as follows:
a) Capacity estimate (Growth Management Plan limit) = 54,600 d.u.
b) Library floor area = 126,552 persondq ,000 x 800 square feet
e *
U e e
0 * a a e 0 c e e *
e a- e
a * *
9 -3- e
0 Dennis A. Turner @
r) 0 *
(I) 0 e e e * a e 8 a * e e
* e e * @
,
CURRENT AND FUTURE LUBFWRY DEMAND
Palge 3 -
a
Interim Estimates
Neither SANDAG nor the City has officially adopted estimates of individual-year
building activi?y or popuiatiori growth MOE recent than the SANDAG Series 7. Forecasts (based upon 1985 assurnpuons). The Series 8 Forecast (1990
assumptions) for local jurisdictions wem not adopted by SANDAG or any local agency, although 'interim" numbers were published. The current 2020 Forecast
effort (formeriy known as Seiies 9) is not yet completed.
The Pl,anning department has provided the Finance Department with a one-year
forcccast of growth for the 19498-1 999 fisca1 year. If interim forecasts of population beyond one year are needed, the Planning Department could
produce such forecasts only with difficulty.
If you have any questions of have any comments please contad me.