Loading...
HomeMy WebLinkAbout1999-06-15; City Council; 15261; Operating & Capital Improvement Program 1999-2000CITY OF CARLSBAD, CARLSBAD MUNICIPAL WATER DISTRICT AND HOUSING AND REDEVELOPMENT COMMISSION - AGENDA BILL &- AB# 15,26) TITLE: ADOPTION OF THE 1999-00 OPERATING AND DEPT HD. !.Lc/’ MTG. 6/l 5/99 CAPITAL IMPROVEMENT PROGRAM CITY ATTY.@? l DEPT. FIN I BUDGETS 1 CITY MG- 1 RECOMMENDED ACTION: 1. Hold public hearing on the City of Carlsbad’s, Carlsbad Municipal Water District, and Housing and Redevelopment Commission’s 1999-00 Operating Budget and 1999-00 to Buildout Capital Improvement Program. 2. Adopt Resolutions No. 9 9 -218: ld a .) and 9 10 __ ~ adopting the final Operating Budgets for 1999-00 and appropriating funds for the 1999-00 Capital Improvement Program. 3. Adopt Resolutions No. q?ar? and I OS 3 , adopting the Gann spending limit for the City of Carlsbad and the Carlsbad Municipal Water District for 1999-00. 4. Adopt Resolution No.gQ-a&.. adopting changes to the 1999-00 Fee Schedule for City services. ITEM EXPLANATION: The proposed 1999-00 Budget totals $166.3 million, of which $103.7 million is the Operating Budget and $62.6 million is the Capital Improvement Budget. Operating revenues total $108.2 million and Capital revenues total $50.6 million, for a total of $158.8 million. Operatina Budaet The proposed Operating Budget for 1999-00 of $103.7 million shows an increase of $300,000 from the current 1998-99 Budget. Operating revenues are estimated at $108.2 million, which is a $100,000 decrease over the current year projections. There were two changes made to the proposed Operating Budget since the Council Workshop on June 1 st. The first change was to transfer $180,000 of salary costs from the Recycled Water Budget to the Water Operations Budget. This change was based on a recently completed study of hours spent on the two water systems. The second change was an increase of $40,000 in the Sanitation Operations Budget for Encina services based on the Encina Board adoption of their 1999-00 budget. General Fund General fund revenues for 1999-00 total $64.4 million, which is an increase of 4%, or $2.5 million, from the current 1998-99 projected receipts. The $2.8 million of revenues in excess of expenditures are expected to be combined with $4.2 million from the General fund balance and transferred to the Capital Improvement Program to fund designated capital projects. The healthy economy coupled with continued low inflation has kept consumer confidence high, allowing for increased retail sales and tourism. This has boosted both our sales tax and transient occupancy tax (TOT) receipts. An increase of 8% is projected for sales tax for a total of $17.8 million in 1999-00. Transient Occupancy Tax receipts for 1999-00 are projected at $75 million, which is 9%, or $600,000, greater than 1998-99. The largest projected increase in revenues is for property taxes. These are expected to grow by 11% to $15.8 million. These increases have enabled us to recommend some enhancements to our services in 1999-00 to ensure the maintenance of high-quality of life for Carlsbad’s residents as our population grows. - -. PAGE TWO OF AGENDA BILL NO. rfi, acQl The increases in the recommended budget are generally the result of new facilities being built, the need to keep up with technological change, and the changes required due to the growth of the City. There are also several enhancements proposed to ensure that the City remains at the forefront in addressing health and safety needs. These program increases resulted in 33.5 new full-time positions. The proposed budget includes a $600,000 transfer to the Golf Course fund. In addition, $742,000 of capital outlay requests have been included in the proposed General fund budget. A contingency account totaling approximately $4 million has been included in the General fund budget proposal. The contingency account is available to the City Council to address unanticipated emergencies or unforeseen program needs. The recommended budget also includes $2,000,000 for an infrastructure maintenance program and $243,000 for community promotion services currently being provided by the Carlsbad Convention and Visitor’s Bureau. An increase of $100,000 in funding for the Employee Computer Purchase Program has been recommended. Since this is a loan program, the funds do not need to be appropriated and are not included in the budget. Capital Improvement Prooram The 1999-00 to Buildout Capital Improvement Program (CIP) outlines approximately 164 future projects at a total cost of $436.1 million. Appropriations scheduled for 1999-00 total $62.6 million, and will be added to approximately $79.8 million for ongoing capital projects which remain unspent at the end of fiscal year 1998-99, for a total appropriation of $142.4 million. Revenues for the CIP are projected at $51 million. Projects programmed for the upcoming year include remodel of the Cole Library, construction of the Public Works Center, completion of the Faraday Administrative Facility, acquisition of park land in the northwest and northeast quadrants of the City, Phase II of Leo Carrillo Park, and construction of a Coastal Rail Trail. Sewer and drainage projects include construction of the Vista/Carlsbad Interceptor, the South Agua Hedionda Interceptor, and the South Carlsbad Village Storm Drain. Construction of several major street projects are included in the CIP and will improve the flow of regional and local traffic throughout the City; projects which will undergo construction in 1999- 00 include Faraday Avenue to Cannon Road, Poinsettia Lane to El Camino Real and Ranch0 Santa Fe Road. Funding is also provided for preliminary activities relating to the construction of several major east-west roads, such as College Boulevard and Cannon Road east of El Camino Real and Poinsettia Lane east of El Camino Real. In addition, funding for the reconstruction of many individual roads, particularly in the older sections of the City, will help maintain the quality of our streets. Appropriations are also included for the replacement of the Carlsbad Boulevard Bridge and the widening of Poinsettia Lane Bridge. There were four changes made to the proposed CIP since the Council Workshop on May 18th. Changes to the 1999-00 appropriation include an increase of $245,511 in the Encina sewer projects based on the Encina Board adoption of their 1999-00 budget, and funding for Sewer and Water Connection Fee studies totaling $30,000, has been added. In addition, $150,000, which was previously included in the 1999-00 appropriation for telecommunications equipment, has been deleted because the project was brought before the Council in the current fiscal year, and funds were appropriated June 2, 1999. Current year expenditure and carry forward amounts have been updated through March 31, 1999. The net result of these changes the total anticipated 1999-00 appropriations (including continuing appropriations) from $141.7 million as shown in the preliminary budget document to $142.4 million. In accordance with the Government Code, all projects which receive appropriation of funds for fiscal year 1999-00 received a finding of General Plan Consistency by the Planning Commission at their meeting on May 5, 1999. d PAGE THREE OF AGENDA BILL NO 1.5, a6 1 Gann Limit In addition to adopting the Operating Budget, the Council is asked to adopt the Gann spending limit as required by Article XIIIB of the California Constitution. The Gann Limit creates a restriction on the amount of revenue which can be appropriated in any fiscal year. The revenues which are subject to this limitation are those considered “proceeds of taxes.” The basis for calculating the Limit began in fiscal year 1978-79, and is increased based on population growth and inflation. The City’s spending limit for 1999-00 is $198.1 million, with appropriations of “proceeds of taxes” of $44.9 million. The Carlsbad Municipal Water District spending limit for 1999-00 is $2.3 million, with no appropriations of “proceeds of taxes.” Fees for Citv Services One of the City Council’s goals is to annually evaluate fees and charges for services in conjunction with the budget. Staff has reviewed all fee schedules and is recommending changes as shown in Exhibit 1. Detailed information on the proposed 1999-00 Budget and recommended changes to the City Fee Schedule are included in the attached exhibits. Fiscal Year 1998-99 Adiustment An additional appropriation of $110,000 to the Section 8 Program Budget for fiscal year 1998-99 is requested as a result of increases in the assistance payments paid to rental owners to support the escalating rents in the area. These amounts will be paid through grant revenues from the U. S. Department of Housing & Urban Development (HUD). FISCAL IMPACT: The fiscal impact of the proposed budgets is detailed in the attached schedules. EXHIBITS: 1. Changes to City Fee schedule. 2. Resolution No.?‘+a@ adopting the City’s final Operating Budget and Capital Improvement Program for 1999-00 (the Technical Appendix is available for review in the Finance and Engineering Departments). 3. Resolution No. 10% adopting the final Operating Budget and Capital Improvement Program for 1999-00 for the Carlsbad Municipal Water District 4. Resolution No.31 0 adopting the final Operating Budget and Capital Improvement Program for 1999-00 for Housing and Redevelopment. 5. Resolution 6. Resolution District. 7. Resolution (i No% -3-l adopting the spending limit for 1999-00 for the City of Carlsbad. adopting the spending limit for 1999-00 for the Carlsbad Municipal Water adopting changes to the City fee schedule. The Preliminary Operating Budget and Capital Improvement Program 1999-00 is on file with the City Clerk. 3 CITY OF CARLSBAD - EXHIBIT 1 PROPOSED REVISIONS TO THE MASTER FEE SCHEDULES JUNE 1999 Current Proposed Change GENERAL CITY FEES Master list of Active Business Licenses $25 Monthly Business License List $5 Return Check Fee $15 Police - DUI Collision I Arrest Per Hour Actual Cost Police - Special Events Hourly Cost $30 Police - Second Call Per Police Officer Per Hour Actual Cost Police - Second Call Per Police Sergeant Per Hour Actual Cost Non Resident Fee - Instructional Classes and Daytrippers $4 Aquatics Staff Costs (Life Guard I Supervision - Per Hr.) $11 Facility after hours staffing fee (Per Hr.) $9 $50 $5 $25 $64 $32 $64 $84 $5 $15 $13 $25 $0 $10 N/A $2 N/A N/A $1 $4 $4 Facility Fees CLINICS (see attached list of classifications) Field plus Bases Lights Field Preparation Snack Bar A B C D E F N/C $3 $5 $5 $7 $7 N/C $7 $13 $13 $15 $20 N/C $15 $15 $15 $15 $15 N/C N/C $5 $8 $10 $12 Key Security Deposit $250 $500 $250 Cancellation Fee (Per Hr.) $0 $3 $3 FOR INFORMATIONAL PURPOSES ONLY These fees are increased annually based upon an index as stated in the resolutions or ordinances establishing the fees. Current Revised Change Affordable housing credit $32,000 $36,000 $4,000 License Tax on New Construction-mobile homes $1,400 $1,439 $39 Page 1 + -. CITY OF CARLSBAD - PROPOSED REVISIONS TO THE MASTER FEE SCHEDULES JUNE 1999 Traffic Impact Traffic Impact Fee - Residnt’l Cost Per Trip (Out of CFD) Traffic impact Fee - Commrc’lllndust Cost Per Trip (Out of CFD) Traffic Impact Fee - Residnt’l Cost Per Trip (Inside CFD) Current Revised Change $87 $89 $2 35 36 1 55 58 3 1 Traffic Impact Fee - Commrc’l/lndust Cost Per Trip (Inside CFD) 22 23 1 IPlanned Local Drainage Area Fees I Fee per gross acre Current Revised Low High Low High Area / Basin Name A Buena Vista Lagoon B Agua Hedionda Lagoon C Encinas Creek D Batiauitos Laaoon Runoff $1,618 3,478 2,601 35 Runoff $2,648 5,692 4,256 58 Runoff Runoff $1,691 $2,768 3,635 5,949 2,718 4,448 37 61 [Sewer Connection Fees I General Capacity Fee All Areas Plus Sewer Benefit Fees shown below Current $I ,854 Revised Channe $1,897 $43 ISewer Benefit Area Fees Area A Area B Area C Area D Area E Area F Area G Area H Area I Area J Area K Area L Area M [Bridge & Thoroughfare District #2 Fees Current Revised Change $340 $349 $9 598 615 17 495 509 14 956 983 27 977 1,005 28 1,070 1,100 30 93 95 2 626 643 17 347 357 10 1,195 1,229 34 2,411 2,480 69 945 971 26 46 48 2 Current Revised Change Zone 5 Zone 20 Zone 21 $260 $273 $13 540 566 26 280 293 13 Page 2 5 c--. .SSJFICATION OF APPLICANTS W-?WES Each application will be reviewed by the Recreation Supervisor and classified into a group depending on the type of organization and the intended use. The Parks and Recreation Division’s activities have first priority for the use of the facilities. The classifications are listed in order or priority with classification “A” first, classification “B” second, etc. :The City attempts to accommodate all groups; however, there is a limited number of facilities. Unfortunately, the demand exceeds the supply. For that reason, a priority system for use had to be established. a A. - Parks and Recreation activities; Co-sponsored activities; other City departments Examples: Friends of the Library, Carlsbad Book Fair B. Carlsbad resident not-for-profit, civic, social organizations (non-paid management); any organization sponsoring a public forum or candidates night; public education Examples: Carlsbad Rotary, La Costa Youth Organization, Carlsbad Softball Association, Carlsbad Youth Baseball, Boy Scouts, Carlsbad Homeowner’s Associations, Carlsbad Unified School District C. Carlsbad resident not-for-profit civic, social organizations (paid management); private educational institutions lhamples: Boy’s and Girl’s Club, Property Management Associations, Carlsbad Girl’s Club D. Non-resident not-for-profit, educational, civic and social organizations; resident private parties; resident religious; resident political candidate use for fund raisers; and locally organized groups whose normal place of meeting is located in the City of Carlsbad. hkamples: North County A.A., Y.M.C.A., resident religious and political groups, Mira Costa E. Resident commercial, business, profit making organization, non-resident private party activities lbamples: Carlsbad Inn, non-resident parties, weddings or receptions F. Non-resident commercial, business, political, profit making and religious organizations Examples: Trade shows, company training, meetings, seminars IN ORDER TO QUALIFY AS CLASSIFICATION “B” NON-PROFIT USER, THE ORGANIZATION MUST MEET ALL OF THE FOLLOWING CRITERIA: 1. The organization must be registered as a not-for-profit corporation with the State of California, or, if not registered with the State, must be a Carlsbad Chapter and have a constitution or by-laws which clearly state that the objectives of the organization are of a non-profit, non-commercial nature. 2. The organization must be comprised of volunteers, and 70% of which its membership and participants must be Carlsbad residents. Verification of residency may be required. Official rosters, approved by the league office, must be submitted with applications. 3. The organization must submit the following: a. If incorporated, submit State incorporation papers and by-laws; if not incorporated, submit constitution and by-laws. b. Financial verification of organization’s exemption from income tax. (Department of the Treasury form 990 may be used.) An up-dated copy will be required by October 1 st of each year. c. A signed statement verifying item “2” above. 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 h RESOLUTION NO. 99-218 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE FINAL OPERATING BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR THE FISCAL YEAR 1999-00 FOR THE CITY OF CARLSBAD AND ESTABLISHING CONTROLS ON CHANGES IN APPROPRIATIONS FOR THE VARIOUS WHEREAS, the City Council of the City of Carlsbad, California has reviewed the proposed final Operating Budget and Capital Improvement Program for fiscal year 1999-00 and has held such public hearings as are necessary prior to adoption of the final budgets. WHEREAS, the Planning Commission made a finding of General Plan Consistency for all projects receiving an allocation of funds for fiscal year 1999-00 on May 5, 1999 pursuant to Planning Commission Resolution No. 4555, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 7. That certain documents now on file in the office of the City Clerk of the City of Carlsbad entitled, “City of Carlsbad, 1999-00 Operating Budget and 1999-00 to Buildout Capital Improvement Program - Preliminary” as amended in accordance with Exhibits A through D attached hereto and incorporated by reference herein, is hereby adopted as the Operating and Capital Improvement Budgets for the City of Carlsbad for the fiscal year 1999-00. 2. That the amounts reflected as estimated revenues for fiscal year 1999-00 as shown in Exhibits A and B are hereby adopted as the budgeted revenues for 1999-00. 3. That the estimated revenues for fiscal year 1998-99 are hereby revised as shown in Exhibits A and B. 4. That the amounts designated as the 1999-00 Budget request in Exhibits A and B are hereby appropriated to the department or fund for which they 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 are designated, and such appropriation shall not be increased except as provided herein. 5. That total appropriations for each fund may only be increased or decreased by the City Council by passage of a resolution amending the budget except as provided herein. 6. That the following controls are hereby placed on the use and transfers of budget funds: A. No expenditure of funds shall be authorized unless sufficient funds have been appropriated by the City Council or City Manager as described below. i. The City Manager may authorize all transfers of funds from account to account within any department. ii. The City Manager may authorize transfers of funds between departments within the same fund in an amount up to $100,000 per transfer. iii. The City Manager may delegate the authority to make budget transfers. iv. The City Manager may authorize budget adjustments involving offsetting revenues and expenditures; the City Manager may authorize increases in an appropriation for a specific purpose where the appropriation is offset by unbudgeted revenue which is designated for said specific purpose. V. The City Council must authorize all transfers of funds from the budgeted Contingency Account. B. The City Manager may authorize emergency out of state travel for public safety or emergency services purposes. C. The City Council must authorize any increase in the number of authorized permanent personnel positions above the level identified in Exhibit C. D. The City Manager may authorize the hiring of temporary or part time staff as necessary, within the limits imposed by the controls listed above. 1 2 3 4 5 6 7 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 7. That the legai level of budgetary control is the fund level. Budgets may not legally be exceeded at the fund level without appropriate authorization by the City Council. 8. That all appropriations for Capital Improvements Projects remaining unexpended at June 30, 1999, are hereby appropriated for.such capital projects for the 1999-00 fiscal year. 9. That all appropriations for grants remaining unexpended at June 30, 1999, are hereby appropriated for the 1999-00 fiscal year. 10. That 1998-99 appropriations in the approximate amount of , $3,573,027 are hereby continued into 1999-00 for the purposes shown in Exhibit D. All appropriations for outstanding encumbrances as of June 30, 1999, are hereby continued into 1999-00 for such contracts or obligations. 11. That the reimbursement for business mileage will be set at the rate established from time to time by the IRS (as of June 1999, the business mileage reimbursement is $0.31 per mile.) 12. That the amount of funds available for the loans under the Employee Computer Purchase Program be increased by $200,000 to a total amount available of $350,000. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council on the 15th day of June , 1999, by the following vote, to wit: AYES: Council Members Lewis, Nygaard, Finnila and)4.+1 NOES: None ABSENT: Council Member Ku1 Al-l-EST:. HA U%QJ$ENKJX$NZ, City Clerk (SEAL) KAREN R. KUNDTZ, Assystant City Clerk EXHIBIT A 1999-00 PROPOSED OPERATING BUDGET OVERVIEW Carlsbad is a full-service City providing the following services to its citizen’s and customers: l Police department l Development services l Fire department including paramedic services l Street construction and maintenance l Water delivery system l Library and arts programs 0 Sewer system l Recreation programming for all ages l Solid waste services l Park lands l Housing programs School programs and facilities are provided by four different school districts located within the City boundaries. Although the City Council has no direct control over these school districts, the Council recognizes the importance of quality school facilities and programs to Carlsbad’s residents; Council has worked closely with the schools in the past to provide assistance, when possible. The Council‘s commitment to quality schools is also evidenced this year in their goals as noted below. The budget process for the City of Carlsbad begins in January each year, with a review and City of Carlsbad update of the City Council’s five- year vision statements. These 1999 Strategic Goals statements are shown on the first l page of this budget document. Ensure the effective and efficient delivery of top- Through the vision statements, quality sen/ices to our Community. Council continually defines and clarifies their vision of Carlsbad. l Create diverse, broad-based economic strategies to The Strategic Goals for the City ensure the financial health of the Community and the are developed next. The goals City. further define the methods to be used to achieve the vision and l integrate a comprehensive, efficient transportation call out areas in which Council system with “quality-of-life” centered land use would like to place special decisions. emphasis during the year. Once these are developed, staff l Enhance educational opportunities and school develops operational goals facilities for ail segments of the Community. based on Council’s direction. These operational goals are the basis for the development of the operating budget. Carlsbad’s operating budget allocates the revenues generated through taxes, fees and other charges to the various programs and services provided by the City to the community. The operating budget is a tool which guides the achievement of Council’s vision and goals for the City. It allocates the resources and sets the priorities for all of the programs offered by the City. Thus, it is an integral part of making Carlsbad a wonderful community in which to live, work and play. The recommended operating budget for fiscal year 1999-00 totals $103.7 million with revenues for the year estimated at $108.2 million. General fund revenues are estimated at $64.4 million and budgeted expenditures are $61.6 million. The $2.8 million of revenues in excess of expenditures are expected to be combined with $4.2 million from the General fund balance and transferred to the Capital Improvement Program (CIP) to fund needed capital projects. The CIP can be found in the last section of this document. Economic Profile The past two years have been exciting for Carlsbad. We have seen the return of economic prosperity to our community after the long and painful recession of the early 1990’s. Our industrial corridor has blossomed bringing in new jobs. New jobs create the need for housing, which has been reflected in the strong housing market over the past several years. It is expected that Carlsbad will issue more than 2,000 residential building permits this year compared to 1,400 in 1997-98. The price of housing is also on the rise, boosting the property taxes received by the City. The healthy economy coupled with continued low inflation has kept consumer confidence high allowing for increased retail sales and tourism. At the same time, we saw the -opening of a 200,000 square foot specialty outlet center and Legoland, a family theme park, in the central part of Carlsbad. These contributed to increased tourism and the highest level of transient occupancy taxes ever received by the City. All of these together contribute to a robust local economy which should be able to provide the funds to support the increased demands for City services. It is expected that the economy will continue at this level throughout fiscal year 1999-00. The City’s revenue projections reflect an expectation of increasing housing prices, continued strong development, but at a lower growth level than in the past two years, and continued consumer confidence. We have also projected increases in sales tax and transient occupancy taxes based on the increase in tourism expected from Legoland and several new hotels currently under development. In anticipation of the growth of our City population, both transient and permanent, staff is recommending some enhancements to our services in 1999-00 to ensure the maintenance of a high-quality of life for Carlsbad’s residents. REVENUE The following table shows the total operating revenues the City.anticipates receiving for 1998- 99, as well as those estimated for 1999-00. . REVENUE SUMMARY BY FUND TYPE (In Milliok) PROJECTED ESTIMATED PERCENT FUND 1998-99 1999-00 DIFFERENCE CHANGE GENERAL FUND $61.9 $64.4 $2.5 4% SPECIAL REVENUE 10.1 9.8 -0.3 -3% ENTERPRISE 25.7 22.9 -2.8 -11% INTERNAL SERVICE 8.8 9.4 0.6 7% REDEVELOPMENT 1.8 1.7 -0.1 -6% TOTAL $108.3 $108.2 -$O.l O%l Revenue estimates for the operating budget indicate that the City will receive a total of $108.2 million, a $100,000 decrease over the current year projections. The majority of the decrease is in the Enterprise funds which are offset by increases in the General fund. These and other funds will be discussed in more detail below. General Fund General fund revenues provide a representative picture of the local economy. These revenues are of particular interest as these resources fund basic City services such as Police, Fire, Library, Street and Park Maintenance and Recreation programs. The table below shows a summarized outlook for the major General fund revenues. SIGNIFICANT REVENUES TO THE GENERAL FUND (In Millions) PROJECTED ESTIMATED PERCENT FUND 1998-99 1999-00 DIFFERENCE CHANGE ‘ROPERTY TAX $14.2 $15.8 $1.6 11% SALES TAX 16.5 17.8 1.3 8% i+RANSlENT OCCUPANCY TAX 6.9 7.5 0.6 9% IEVELOPMENT RELATED REVENUES 7.7 6.7 -1 .o -13% 4LL OTHER REVENUES 16.6 16.6 0.0 0% rOTAL GENERAL FUND REVENUE $61.9 $64.4 $2.5 4% Sales tax is the single largest revenue source to the General fund representing 28% of the fund. Sales taxes are estimated at $17.8 million for 1999-00, an increase of 8%, or $1.3 million, over the projected 1998-99 receipts. The increase can be attributed to the full-year operation of Legoland, the projected opening of a number of new restaurants and the Phase II expansion of Carlsbad Company Stores, an upscale outlet mall. The expansion will add an additional 20 stores to the over 50 stores already in the mall and is expected to be completed by the end of 1999. The remaining increase is based on Statewide estimates of 5% average growth in sales 18 taxes due to the healthy economy and high 18 consumer confidence. This estimate also includes I4 approximately $500,000 that is restricted to spending on public safety services Proposition 172. Proposition 172 requires that the 112 cent increase in California sales taxes be 4 _ deposited to State and local public safety trust 2 - funds and allocated to local agencies to fund public 0 -’ I safety services. 1994 1995 1998 1997 1998 1999 2000 This year it is expected that property faxes will grow to $15.8 million, a $1.6 million, or 11% increase, over 1998-99’s estimate. Property taxes continue to be the second largest source of revenue to the City bringing in approximately 25% of the total General fund revenues. By law, the assessed values upon which property taxes are based are only allowed to increase by 2% per year. However, the majority of the growth is expected to come from the new development and the increase in housing prices. Statewide there has been an 8.8% increase in home prices over the past year and a recent article showed a 16% increase in new home prices in North San Diego County over the past year. The next most significant General fund revenue is the Transient Occupancy Tax (TOT or hotel tax) which is estimated at $7.5 million for 1999-00, an increase of 9% over 1998-99 estimates. Most of the increase can be attributable to the opening of two new hotels. The Grand Pacific Palisades Hotel, located near Legoland, opened in March 1999. It has 90 hotel rooms and 181 I% timeshares. Another hotel due to open later in 1999 is the 121 room Marriott Residence Inn, which is located in the Carlsbad Research Center. The addition of these two new facilities will bring the total rooms available in Carlsbad to over 2,700. With the healthy economy and the recent opening of Legoland, which plans to have over 2,000,OOO visitors during its first full year of operation, it is expected that receipts from the TOT will continue to grow. Development within Carlsbad Permits Issued saw a sudden upward turn in 2000 1994-95 and has continued to accelerate since then. One of 1500 the commonly used indicators 1000 of building activity is the number of residential permits issued. 500 As of April 1999, Carlsbad has 0 issued i,842 building permits, which already surpasses last - i g 3 g g $ g g Q 8’ s: Q 2 Y c- r r r c- .? N N 8 N N year’s total of 1,339. It is expected that this will decrease to about 1 ,I 00 per year for the next five years. The 1998-99 development-related revenues, which include Planning, Engineering and Building department fees as well as building permits and other permits and licenses, are expected to total $7.7 million this year. The projections for 1999-00 show a 13% decrease in these revenues for a total combined revenue projection of $6.7 million. The majority of the decline is in the Engineering fees which are expected to taper off after the high amount of activity experienced during the last three years. All other revenues include franchise taxes, transfer taxes, vehicle license fees, ambulance fees, recreation fees, and other charges and fees. These revenues total $16.6 million, which is equal to the projections for 1998-99. We are projecting increases in the franchise fees, business licenses taxes and vehicle license fees of between 7% and 10% based on the population and job growth in the City. These increases are offset by a $500,000 drop in other revenue. Other revenue in 1998-99 contained several unusual receipts which are not expected in the next year. Overall, the outlook for the General fund revenues in the upcoming year is very good. All indicators point to a strong local economy persisting through 1999-00, especially in the building and tourism industries. However, the Vehicle License Fee (VLF) threat that we talked about last year is still lurking on the horizon. Vehicle license fees are paid when you register your vehicle and were put in place in lieu of personal property tax on automobiles. The amount allocated to cities was to offset the amount of personal property taxes lost. Although the State reduced the VLF last year by 25%, the revenue lost was replaced with the State’s General fund money. However, the bill has been reintroduced this year calling for the complete elimination of the fee. Although Sacramento lobbyists say the current proposals have little chance of passage, Assemblyman McClintock is pursuing a ballot initiative that would amend the State-Constitution to exempt the first $10,000 of a vehicle’s value from taxation and to phase the fees out completely over three years. In order to qualify for the March 2000 ballot, campaign workers must collect 670,000 signatures by August 23. Currently, the City of Carlsbad receives about $3.4 million in VLF annually. If this ballot initiative were successful, there is no guarantee that the State would replace the lost revenue. Clearly, this could have a very negative impact on our budget. Other Funds Revenues from Special Revenue funds are expected to total $9.8 million, a decrease of $2.5 million from 1998-99. The types of functions supported within Special Revenue funds include programs funded by specific revenue streams such as Section 8 Housing Assistance, Housing Trust fund, Community Development Block Grants (CDBG), and maintenance assessment districts. Most of the decrease is due to $1.8 million in revenue received from the Villages of La Costa in 1998-99 as a part of their affordable housing fee which was used to set up the Carlsbad Homebuyer Assistance Program. The other significant changes were in the Citizen’s Option for Public Safety (COPS) Grant and the Law Enforcement Block Grant, both which provide supplemental funding for local law enforcement. These grant programs require an annual appropriation to fund the programs which usually occurs in the middle of the fiscal year. For that reason, the revenues for the next year of the program have not been shown. The COPS grant has been used to fund two bicycle patrol officers. There are sufficient revenues available from the current grants to continue the program into 1999-00. The Law Enforcement Block Grant is used to purchase safety equipment and other one-time expenditures. Enterprise fund revenues for 1999-00 are projected at $22.9 million, down 10.8%, or approximately $2.8 million, less than 1998-99 projections. Enterprise funds are similar to a business in that rates are charged to support the operations which supply the service. Carlsbad Enterprises include the water and sanitation services, solid waste management, and the Carlsbad Golf Course. . F!!l The water, recycled water and sanitation operating funds all show decreased revenues this year. The decline is mainly due to decreased rates and less interest income to the funds. During 1998-99, computer models were developed to better forecast future operational expenses and establish subsequent 0 revenue requirements. Based on staffs review of the fund balances and the improved forecasting of rates using these models, a recommendation was made to reduce water and sewer rates and to transfer portions of the fund balances to the Capital Improvement Program. The average water rate was reduced by 6% and the average sewer rate was reduced by 13%. These rate changes will go into effect in July 1999. The fund balance transfers totaled $8 million in the water fund and $5.9 million in the sewer fund. These monies will be used to finance various water and sewer capital projects over the next several years. Interest Income is also projected to decrease due to the decreased revenues and decreased cash balances. Operating revenues to the ‘Golf Course Enterprise fund of $600,000 represent the proposed transfer of funds from the General fund. These amounts are needed to provide sufficient funds to the golf course to pay taxes, assessments, and expenses as needed for the future municipal golf course. This is a $1 million decrease from the prior year which included additional amounts that were used to pay off the balance of Palomar Airport Road. assessments. All necessary land has been purchased and development planning is underway. More information about the proposed golf course can be found in the Capital Improvement Program in the last section of this document. Internal Service funds show an estimated revenue of $9.4 million for 1999-00, an increase of $600,000, or 7%, over 1998-99 projections. Internal Service funds provide services within the City itself and include programs such as the self-insurance funds for Workers’ Compensation, Liability Insurance and Health Insurance, as well as Information Systems and Vehicle Maintenance and Replacement. Departments pay for services provided by these funds. The goal of the Internal Service funds is to match their budgeted expenses with charges to the departments after allowing for a certain level of reserves within the fund. The Internal Service fund demonstrating the largest revenue increase is the Information Systems fund, up $838,000, or 52%. Charges by Information Systems were increased this year based on projected increases in their proposed budget from new positions and programs. More information on these can be found in the next part of this letter on Expenditures. Vehicle Maintenance revenues have also increased due to increases in the rates and/or services provided to the departments. Redevelopment revenues are expected to total $1.7 million, a slight decline from 1998-99 levels. This decrease is primarily due to the elimination of the Seascape mortgage revenue bond administrative obligations and the associated $35,000 annual fee. Property tax revenues are not expected to change significantly as the increment on assessed values increased only 1.5% last year. EXPENDITURES Proposed City operating expenditures for 1999-00 total $103.7 million which represents an increase of $300,000, or .3%, from the current 1998-99 budget. Although the total amount has not changed significantly, there are a number of changes within the programs found in each of the funds. These will be discussed later in this document. Budaetarv Policies Budget policies this year began with the assumption that departments would be allowed to maintain their “base budget.” This is an amount allocated to each program sufficient to fund current services at current levels. The base budget is an approximation of the adopted budget for each department for fiscal year ? 998-99, adjusted for approved salary increases and revised assessments or charges from Internal Service funds. In addition, departments were allowed to submit requests for additional resources. These requests were considered if the department could show how the outcome of the new program, or increase in service level, would help to achieve Council’s vision of Carlsbad, and fit within Council’s strategic goals for 1999. The proposed budget also incorporates certain organizational and structural changes resulting from the strategic planning initiatives undertaken the past several years. During 1997-98, the City completed an organizational redesign process which analyzed the City’s current structure and made recommendations for a new design which will contribute to the overall effectiveness of the organization. During 1998-99, the City continued to implement these recommendations. The budget reflects these changes with the most significant ones occurring in the Public Works area. Bud& Recommendations Through the application of these guidelines and policies, the proposed 1999-00 operating budget of $103.7 million was developed. The budget includes funds to enhance the services already being provided to the community as well as the addition of several new programs. The majority of the new programs and increases in services were anticipated and are the result of new facilities being built, the need to keep up with technological changes and the changes required due to the growth of the City as prescribed by the General Plan, and growth management. There are also several enhancements proposed to ensure that the City remains at the forefront in addressing the health and safety needs of its citizens. In total, 33.5 new full and 3/4 time employees are proposed in the 1999-00 Operating budget; an increase of 6%. About one-third of these positions are the direct result of the opening of the new library in southern Carlsbad. Increased hourly staff totals approximately 24 full-time equivalents (FTE) with most of these going to operating the new library and maintaining service at the Cole library. These additions will bring the total City workforce to 586.5 full and 3/4 time employees and 135.5 hourly FTE. These changes and others are addressed in more detail below. New Citv Facilities The largest and the most long-awaited of the City facilities which will be opening in 1999-00 is the new Carlsbad library on Dove Street. This 64,000 square foot facility will provide a full range of library services. The operation will be state-of-the-art with over 150 computer work stations; most of which will be available to the public. Other features include a 220 seat auditorium, a 2,000 square foot art gallery for traveling art exhibits and productions and a children’s garden for outside reading and programmed children’s library activities. Operating this facility, in addition to the current Cole library, will require 11 new full-time positions and over 20 hourly full-time equivalents (FTE) with a total additional cost of $1.5 million. In addition to the library, the City will also be consolidating several of its offices into one new building located on Faraday Avenue. This building will improve customer service by providing a single location in which to serve the development community. It will bring together staff from the Public Works, Community Development and Administrative Services areas and provide sufficient space to accommodate current and future needs. Relocation is planned for the fall of 1999. The operating budget proposes 1.75 full-time and one hourly FTE to support staff at the new building. Poinsettia Park, Phase IA was competed this year which added two baseball fields and a restroom to the existing park facilities. Staff is requesting one hourly FTE to provide the additional recreational opportunities at the expanded park. Health and Safety The health and safety of our citizens has always been a top Council priority. This is reflected in the 1999-00 budget allocations. Over 35% of the recommended General fund budget has been allocated toward police and fire programs. There are ten new positions proposed in the budget this year to continue Council’s focus on health and safety. Some of the positions deal with the growing population. These positions include two new .patrol officers, clerical support for the traffic div.ision, a new DARE officer, a communications operator and a fire prevention officer. In addition, a CAL-ID evidence technician is proposed to provide faster processing of major crime scenes resulting in an increase in the incidence and speed of suspect identification. Also, the fire department would like to hire a battalion chief in place of a captain specialist which is currently allocated. The battalion chief will be responsible for coordinating all training of the fire department staff and oversee the establishment of a reserve firefighter program. Another new program recommended for the police department is the addition of laptop computers for all patrol officers. Putting this type of technology in the hands of our officers will mean that they will spend more time on the streets, keeping Carlsbad safe, and less time behind their desks. The cost of this program is $150,000, and will be paid using forfeited funds received as a result of the department’s narcotics enforcement efforts. In addition to the traditional safety staff, the budget includes two positions to deal with the health and safety of our water. One will work on developing a Storm Water Quality Management program for the City which will reduce the amount of pollutants going into our local lagoons. This program is mandated by the federal government. The other will insure the quality of our potable water system by testing to ensure that there is no cross-over between the recycled water system and the potable water system. Technoioay The final program being added in this category is the “Guard Start” program. This program takes relatively few staff resources (.4 FTE) and will offer the American Red Cross “Guard Stat-t” program to the City’s youth between the ages of 11 and 14. The program teaches children about water safety and will provide an opportunity for these children to advance into a professional lifeguard position in the future. Technology is a tool used to enhance and improve the way we currently deliver our services. It is an area which is rapidly changing and it is often difficult to determine whether the promises being made can actually be delivered and whether the benefits derived are worth the cost. Often with new technologies, it is difficult to envision how a particular tool will benefit you until you have the tool at hand. It has been the City’s philosophy during these rapidly changing times to keep up with the current technology and use it to its fullest extent to the benefit of our citizens. The City does not want to be on the extreme edge of technological change. Instead, we have positioned ourselves at the forefront, using tried and tested applications in innovative ways. Over the past several years, the City has invested heavily in new hardware and software, but has not kept up on the staff resources needed to fully implement the applications. Included in the 1999-00 budget are requests for five new positions which will allow us to use the technology we currently own, and future applications, to their fullest extent. Three of the positions will support our current applications, one will assist departments in installing new systems and updates as they occur and the final position is for a new program.- the City of Carlsbad’s web site. During 1998-99, Council approved a contract with an internet site development company to create a web site for the City. The site will be developed in phases: going from a static one- way informational tool to a fully interactive site through which citizens and customers can conduct business with the City on a 24-hour basis. The requested position will be the one charged with maintaining the technical aspects of the web site. Citv Growth The City’s population is growing at about 5% per year. It is anticipated that this growth will continue for several more years into the future. In addition to resident population, our employment population has also grown significantly with the addition of almost seven million square feet of industrial and commercial property over the past three years. This growth puts great demand on many City services. There are several positions being recommended in the 1999-00 operating budget in order to continue our level of service in response to the growth. We are requesting the addition of two maintenance workers and three utility workers in Public Works. These individuals will help deal with the increased maintenance caused by the rapidly expanding infrastructure and insure that all water valves and fire hydrants are in proper working condition. Some maintenance staff will also be rotated as needed to provide additional support to our construction inspectors. In this way, we are able to reduce our reliance on expensive consulting services at times of peak workload and provide seamless succession when employee turnover occurs. We would also like to expand the opportunities for internships within the City in the next fiscal year by increasing the building intern from a half-time position to full-time and adding two interns in the City Manager’s Office. The building intern is expected to primarily recruit from the City’s current employees, It will give the building department additional staff when the demand for their services is high and provide a pool of trained individuals to fill vacancies as they occur. The internships would typically be for a six-month time period. The two interns in the City Manager’s Office are being requested to replace the vacant Assistant to the City Manager position. These interns would typically be hired for one to two year assignments with the expectation that during this period the intern will work with a variety of departments, customers and projects. The internship program will fulfil1 the need for special projects staff throughout the City as well as providing a pool of qualified applicants for City positions. Other changes recommended in the operating budget include an office specialist in the Human Resources department and a 1.3 hourly FTE to keep up with the demand in several recreation programs including enrichment classes, Kidz Camps and the Stay ‘N’ Play program. Proaosed Buduet bv Fund Twe From the discussion above, it can be seen that although the total dollars in the proposed budget are not changing significantly from the previous year, there are major changes in the programs being proposed. Some of the fiscal impact of staff additions will be offset by decreases in the retirement (PERS) rates paid by the City. The rates went down between 20% to 30% this year, resulting in total savings across all funds of approximately $1.2 million. The discussion below of proposed expenditures by fund and program will provide more information about the changes occurring in the proposed budget. BUDGET EXPENDITURE SUMMARY (In Millions) BUDGET BUDGET PERCENT FUND 1998-99 1999-00 DIFFERENCE CHANGE GENERAL FUND $60.9 $61.6 $0.7 1% SPECIAL REVENUE 7.3 6.6 -0.7 -10% ENTERPRISE 23.6 23.5 -0.1 0% INTERNAL SERVICE 9.9 10.4 0.5 5% REDEVELOPMENT 1.7 1.6 -0.1 0% ITOTAL $103.4 $103.7 $0.3 O%l General Fund The General fund contains most of the discretionary revenues that finance the basic core of City services. However, this should not diminish the importance of the other operating funds, as they also contribute to the array of services available within Carlsbad. Total proposed budget for the General fund is $61.6 million which is 1% greater than the current budget of $60.9 million. The Council contingency account, which is available for unanticipated emergencies or unforeseen program needs, is budgeted at $4 million, or 6%, of the 1999-00 budget requests. This is approximately equal to the amount budgeted last year of which $2.2 million is remains as of April 30, 1999. GENERAL FUND BY MAJOR SERVICE AREA (In Millions) BUDGET BUDGET PERCENT MSA 1998-99 1999-00 DIFFERENCE CHANGE POLICY/LEADERSHIP ~ADMlNlSTRATlVE SERVICES PUBLIC SAFETY COMMUNITY DEVELOPMENT COMMUNITY SERVICES PUBLIC WORKS NON-DEPARTMENTAL CONTINGENCY $2.5 $2.5 $0.0 0.0% 4.7 3.8 -0.9 -19.1% 22.2 21.7 -0.5 -2.3% 5.1 5.1 0.0 0.0% 7.3 8.9 1.6 21.9% 12.6 11.5 -1.1 -8.7% 4.3 4.1 -0.2 -4.7% 2.2 4.0 1.8 81.8% 1 TOTAL $60.9 $61.6 $0.7 1.1%1 There are several reasons for the minor change in the General fund proposed budget compared to the 1998-99 budget despite the increases in staffing and programs that were previously discussed. A comparison by Major Service Area (MSA) is discussed below. & The Policy/Leadership Group includes all elected officials and the City Manager’s Office. Although there was no change in the total appropriations requested, there was a change in the make-up of this group. The Administrative Services Director was created under a reorganization which took place last ‘year. This position had been budgeted in the City Manager’s Office. For 1999-00, it has been moved along with the clerical support and supplies budget to the Administrative Services MSA. This decrease was joined by a decrease in the City Clerks budget for reallocations of staff and offset an increase of $82,000 in the City Attorney’s budget for a new paralegal position to assist with the workload of the attorneys. > Administrative Services decreased mainly due to a one-time appropriation made in 1998- 99 for the records management system. Council approved the funding of a City-wide records management program which will provide quick access to documents and maps stored in electronic form for use by staff and citizens. The total appropriated in 1998-99 was $1.3 million. Ongoing costs are approximately $200,000 per year for the staff support to run the system. Increases in this MSA were mainly seen as a result of the transfer of the Administrative Services Director from the Policy/Leadership Group. > Public Safety shows a minor decrease which resulted from an unusually high budget for the fire department in 1998-99. In 1998-99, Council approved the pay off of certain lease agreements for the Regional Communications System in the amount of $1.6 million. The 1999-00 budget does not have a comparable item. This decrease was offset by increases in staffing and programs for the police and fire departments as described earlier. > In the Community Development area, decreases in all areas from the PERS retirement rate decrease were offset by an increase in Building due to the intern program discussed earlier and in the Geographic Information System (GIS) for software implementation. The software implementation will allow direct access to all mapping data from the various geographic information systems used by the City. ic p The largest change in Community Services is due to the opening of the new library on Dove Street, and enhancements to recreation programs as previously explained. > Public Works shows a decrease of $1.1 million in their proposed budget compared to the previous year. Approximately $600,000 of the decrease is due to budgeted special studies paid by developers which are not recurring in 1999-00. Other decreases are due to the reorganization of personnel in the Public Works divisions and the lower PERS rates. & Non-departmental expenses include payments for debt service, administrative and audit fees and other expenses not associated with any one department. These are detailed at the end of the Administrative Services area in the program detail section of the budget document. Significant changes include no funding for the community activity grants in 1999-00. During 1998-99, Council set aside an additional $685,000 in a special fund which brought the fund to a total of $1 million. The interest from this fund will be distributed to community groups on an annual basis. Council has designated a sub-committee to design this program during the upcoming fiscal year. Another significant addition to the non-departmental group for 1999-00 is a $2 million transfer to an Infrastructure Maintenance fund. This fund is proposed as “seed” money to begin a new program. The program will set aside funds on an on-going basis for the repair and replacement of the base infrastructure of the City: everything from streets and sidewalks to public buildings. Our City is relatively new so we have not yet experienced the significant costs of maintaining our infrastructure as it ages. We are just beginning to see major repairs needed on some of our older roads. These costs will increase as the City grows older. The Infrastructure Maintenance fund will give the Council the financial ability to deal with these significant maintenance expenses as they occur. The value of such a system is just now being recognized at the State level as seen in a recent report from the Legislative Analysts Office. Her report suggested that as much as 6% of the State’s annual General fund revenue be set aside to fund replacement of fixed assets. Carlsbad has an opportunity to be a leader in best management practices by establishing a system that will recognize the cost of depreciation in the annual budget each year. For this reason, staff is recommending a commitment of $2 million this year to begin the program. A full report and recommendations for future years will be brought to Council during fiscal year 1999-00. > Capital outlay expenses totaling approximately $741,000 have been included in the General fund budget. Chances In Other Funds Special Revenue funds, at $6.6 million, show a decrease in anticipated spending of approximately $700,000, or 9.7%. No appropriations for the police grants (COPS and the block grant) are shown in the 1999-00 budget as these funds will be appropriated when the grants are received. The 1998-99 budget for these funds is $437,000. There is also a $413,000 decrease in the Community Development Block Grant program compared to the previous year. This represents the appropriations that were carried from the previous year. The funding for this program has remained relatively steady at approximately $700,000 to $800,000 per year. Enterprise funds total $23.5 million, which is a decrease of less than one percent. Operating costs for both potable water and recycled water have increased by a total of $550,000, based on staff additions discussed earlier. These increases were offset by a $572,000 decrease in the Golf Course fund budget. The 1998-99 budget had been increased to pay off the balance of the assessments due under the Palomar Airport Road Assessment District. Current appropriations will pay for the other annual assessments on the property and minor maintenance of the land. Internal Service funds show a budget increase of $476,000, made up of various increases in decreases in these funds. The Risk Management fund decreased due to a change in liability coverage provider which resulted in a $160,000 reduction in rates. The Vehicle Maintenance budget also declined due to the sale of fuel to Waste Management in 1998-99 while their fuel island was under repair. This will not occur in 1999-00. Increases are proposed for both the Vehicle Replacement and Information Systems budgets. Information Systems increases include additional staff support for the new library and various software applications, increased costs for the help desk, Year 2000 compliance and strategic planning. The amount budgeted in Vehicle Replacement represents the cost of vehicles and equipment due for replacement in 1999-00. A list of these requests can be found in the appendix to this document. The Redevelopment Agency budgets have decreased for 1999-00 by a total of $117,000 due to less special studies and consultant services, decreases in PERS rates, and a slightly lower debt service payment. SUMMARY As can be seen from the previous information, the City of Carlsbad is in a period of solid economic growth which is anticipated to continue for at least the next year or two. As the City expands, it is evident that the planning and foresight by the City Council and residents has provided a sound economic base from which to grow. Along with the population increases have also come increases in the resources which will allow the City to maintain the quality of life in Carlsbad. Strong growth can be seen in all of the City’s base revenues: property taxes, sales taxes and transient occupancy taxes. The increased job opportunities from the development of the industrial and commercial areas is creating a higher demand for housing which will increase the property taxes. The opening of the Four Seasons resort in 1997, the Carlsbad Company Stores in late 1997, Legoland in 1999, as well as some smaller hotels and motels, will provide higher TOT revenues and sales taxes. In addition, the development revenues are providing the funding to pay for the services provided to the building industry. All of these events add to the diversity and strength of Carlsbad’s economic base which will provide the funding for additional services needed to maintain the quality of life in Carlsbad. The requests in this year’s budget reflect the anticipated achievement of Council’s vision and goals for the City. It allocates the available funding in a manner which proactively plans for the future. This plan will insure top quality services are provided to all who live, work and play in Carlsbad. CITY OF CARLSBAD - OPERATING FUNDS PROJECTED FUND BALANCES FOR FY 1998-99 UNRESERVED PROJECTED BALANCE ESTIMATED ESTIMATED FUND BALANCE FUND JULY 1. 1998 REVENUES EXPENDITURES TRANSFERS JUNE 30. 1999 IGENERAL FUND I SPECIAL REVENUE I INFRASTRUCTURE MAINTENANCE POLICE ASSET FORFEITURE COPS GRANT LAW ENFORCEMENT BLOCK GRANT HOUSING SECTION 8 HOUSING TRUST FUND AUDIO-VISUAL INSURANCE LIBRARY ENDOWMENT FUND LIBRARY GIFTS/BEQUESTS TREE MAINTENANCE MEDIAN MAINTENANCE STREET LIGHTING BUENA VISTA CRK CHNL MNT STATE GRANTS (CLSA) STATE GRANTS (PLF) ARTS SPECIAL EVENTS SENIOR NUTRITION SENIOR DONATIONS CDBG ENTlTLEMENT/REHAB ARTS GENERAL DONATIONS I ENTERPRISE I WATER OPERATIONS RECYCLED WATER OPERATIONS SEWER OPERATIONS SOLID WASTE MANAGEMENT GOLF COURSE I INTERNAL SERVICE WORKER’S COMP SELF INSURANCE RISK MANAGEMENT HEALTH INSURANCE VEHICLE MAINTENANCE VEHICLE REPLACEMENT INFORMATION SYSTEMS IREDEVELOPMENT I OPERATIONS DEBT SERVICE LOW AND MOD INCOME HSNG 31,497.698 0 382,386 141,389 124,241 88,155 722,974 2,191 0 28,615 606,830 123,417 996,955 602,068 32,637 98,792 42,451 0 117,551 10,190 33,002 12.822,200 691,600 7,819,lOO 1,786.600 2,814,500 11339,448 2,877.689 (180,871) 81,662 4.207,981 701,794 162.582 869,231 851,068 61,859.OOO 0 141,500 175,000 92,508 2.674,164 3,347.100 65,400 251,800 4,100 608,600 427,000 776,800 132,500 168,700 90,800 27,800 195,495 54,000 775,520 49,200 16,128,500 1.441.300 5.789,500 663,000 1,680,000 639,600 841,000 2.708,OOO 1,651,OOO 1,392.ooo 1.614,400 132.780 1,265,OOO 382,500 55.388,006 0 80,000 180,911 119,024 2,719,261 211,660 69,500 0 20,000 545,100 405,800 542,171 7,590 181,000 34,537 23,413 194,037 51,000 775,520 20,000 13,694,937 lm483.087 4,821.504 132,100 865,000 838.435 883,543 2,498,033 1.580,682 1,201,100 1.769,600 435,938 1.120,000 97,450 37.968.692 0 443,686 135,478 97,725 43.058 3.856.414 (1,909) 251,800 12,715 670,330 144,617 1.231,584 726,978 20,337 155,055 46,838 1,458 120,551 10,190 62.202 (8,OOO.OOO) 73255,763 649,813 (5.920,000) Z&67,096 2.317.500 3,629,500 1.140,013 2,835,146 29,096 151,980 4,398,%81 546,594 360,000 219,424 (360,000) 654,231 1.136,118 TOTAL OPERATING FUNDS $72.496.126 $108,244,967 $92.989,939 ($13,920,000) l $73.831.154 ‘, -. Cl.” <.I CITY OF CARLSBAD OPERATING FUNDS PROJECTED FUND BALANCES FOR FY 1999-00 PROJECTED PROJECTED BALANCE ESTIMATED ESTIMATED FUND BALANCE FUND JULY 1. 1999 REVENUES EXPENDITURES TRANSFERS JUNE 30.2000 IGENERAL FUND I 37368,692 64,384.OOO 61.641,289 (7.000,000) 33,711,403 ISPECIAL REVENUE INFRASTRUCTURE MAINTENANCE POLICE ASSET FORFEITURE COPS FUND LAW ENFORCEMENT BLOCK GRANT HOUSING SECTION 8 HOUSING TRUST FUND AUDIO-VISUAL INSURANCE LIBRARY ENDOWMENT FUND LIBRARY GIFTS/BEQUESTS TREE MAINTENANCE MEDIAN MAINTENANCE STREET LIGHTING BUENA VISTA CRK CHNL MNT STATE GRANTS (CLSA) STATE GRANTS (PLF) ARTS SPECIAL EVENTS SENIOR NUTRITION SENIOR DONATIONS CDBG ENTITLEMENTIREHAB ARTS GENERAL DONATIONS ENTERPRISE I WATER OPERATIONS 7,255.763 15.430,000 16t474.406 6,211,277 RECYCLED WATER OPERATIONS 649,813 1,400,000 1,498.380 551,433 SEWER OPERATIONS 2.867,096 4,810.000 4,974.471 2,702.625 SOLID WASTE MANAGEMENT 21317.500 677,000 189,743 2.804.757 GOLF COURSE 3,629,500 600,000 370,000 3.859,500 INTERNAL SERVICE 1 WORKER’S COMP SELF INSUR RISK MANAGEMENT HEALTH INSURANCE VEHICLE MAINTENANCE VEHICLE REPLACEMENT INFORMATION SYSTEMS IREDEVELOPMENT I OPERATIONS 219,424 95,000 422,093 380,000 272,331 DEBT SERVICE 654,231 1,270,OOO 1,082,OOO (380,000) 462.231 LOW AND MOD INCOME HOUSING 1.136.118 353,750 119,895 1,369.973 0 2.000,000 0 2,ooo.ooo 443,886 40,000 190,000 293,886 135,478 5,000 0 140,478 97,725 0 0 97,725 43.050 3,063.395 2.992,035 114,418 3,858,414 1.525.000 230,265 5.153.149 (1,909) 60,400 56,895 1,596 251,800 10,000 10,000 251,800 12,715 3,000 7,000 8,715 670,330 611,000 551,879 729,451 144,617 429,000 446,044 127.573 1.231,504 778,000 716,685 1.292.899 726,978 32,000 8.724 750,254 20,337 153,500 150,500 23,337 155,055 90,200 199,185 46,070 46,838 24,800 25,610 46,028 1,458 195,500 192,426 4,532 120,551 52,000 119,200 53,351 10,190 704,567 709,567 5,190 62,202 21,800 0 84,002 1,140,013 666,000 908,744 897,269 2.835.146 887,400 1.200.179 29522,367 29,096 2,457,OOO 2.537,409 (51,313) 151,980 1,608,OOO 1.456.221 303,759 4,398,881 1.292,ooo l,727.544 3.963.337 546,594 2.452.030 2.525.089 473.535 ITOTAL OPERATING FUNDS $73.831.154 $108,181.342 $103.733.558 ($7,000.000) ’ $37.567.535 1 * Amount represents transfer to Capital Improvement Program CITY OF CARLSBAD OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 1998-99 I 996-97 1997-96 ESTIMATED 1998-99 DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET %INCR (DEC) 98-99 BUD TO 99-00 BUD 1999-00 BUDGET GENERAL FUND I POLICY AND LEADERSHIP GROUP CITY COUNCIL CITY MANAGER CITY CLERK CITY A-ITORNEY Cl-l-Y TREASURER TOTAL POLICY/LEADERSHIP GROUP 198,867 187,979 903,568 829,595 336,417 295,918 568.277 604,001 112,087 100.884 2,119.216 2.010,377 213,740 213,740 238, i 30 11 4% 944,200 1,020.027 989,282 -3.0% 413,300 402,872 409,520 -15.2% 618,026 631,592 713,780 13.0% 106.298 138,832 134,740 -2.9% 2.295.564 2.487.063 2.485.452 -0.1% ADMINISTRATIVE SERVICES ADMINISTRATION 0 0 FINANCE 1,084,277 1,066,915 PURCHASING 391,747 414,685 HUMAN RESOURCES 991,134 1.169,301 RECORDS MANAGEMENT 0 0 TOTAL GENERAL GOVERNMENT 2,467,158 2.650.901 0 0 1,325,OOO 1 J43.214 466,188 524,360 1,519,688 1,529.139 296,588 1,315.180 505,796 1,494.005 146.500 0.0% -2.1% -3.5% -2.3% -08.7% -2O.i% 1,319,500 4.630,376 1.319,500 4,716.213 3,760.069 13,002,664 0s717.634 PUBLIC SAFETY POLICE FIRE TOTAL PUBLIC SAFEN 9.802,181 10,430.622 7,234,412 7,597.002 17.036.593 18.027.624 11.493.780 9.890.850 12.093.782 10,117.431 7.5% -13.8% 21.384.630 22.211.213 21.720.298 -2.2% COMMUNITY DEVELOPMENT COMMUNITY DEVEL ADMIN 570,161 510,016 GEOGRAPHIC INFORMATION 161,627 142.730 ECONOMIC DEVELOPMENT 101,747 99,820 PLANNING 2,002.143 2,215.355 555,215 186,361 129,951 2.245,909 555,215 263,137 142,997 2.4763490 1.635.473 -6.8% 17.6% -7.2% -3.2% 5.4% TOTAL COMMUNITY DEVELOPMENT 3,912.590 4.235,510 4.701.058 5,073,320 517,590 309,455 132,680 2,397.750 I ,723,387 5.080,862 0.1% 3,504.750 4,900,390 39.6% 378,331 543,250 43.6% 7,320 8,270 13.0% 498.711 554,340 11.2% 2,507.968 2.529.270 0.8% 355,515 386.306 8.7% BUILDING 1.076.912 1,267.581 1.583,622 COMMUNITY SERVICES LIBRARY 2,534,746 2.769,286 3,428.825 CULTURAL ARTS PROGRAM 281,223 277,983 363,730 SISTER CITY PROGRAM 6,619 6,181 7,320 PARK PLANNING/RECREATION MGT 680,773 545.717 393,400 RECREATION 1.998,668 2.076,612 2.331,445 SENIOR PROGRAMS 257,109 268,196 342,263 TOTAL COMMUNITY SERVICES 5,759,138 5,943,975 6.866,983 7.252.615 8.921.826 23.0% DEPARTMENT PUBLIC WORKS -. CITY OF CARLSBAD OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 1998-99 199697 1997-98 ESTIMATED 1998-99 ACTUALS ACTUALS EXPENDITURES BUDGET PUBLIC WORKS ADMIN 0 ENGINEERING 3,682.939 PARK MAINTENANCE 1.659,280 STREET MAINTENANCE 1,429,136 FACILITIES MAINTENANCE 1.178,285 Major Facility Maintenance (Transfer) 212,600 TRAFFIC SIGNAL MAINT 299,487 TOTAL PUBLIC WORKS 8,661.727 9,754,096 11.390.585 12,625,303 NON-DEPARTMENTAL COMMUNITY PROMOTION (CCVB) BEACH PARKING COMMUNITY CONTRIBUTIONS HIRING CENTER HOSP GROVE PAYMENT AUDIT PROPERlY TAX ADMIN FEE DUES & SUBSCRIPTIONS MISC I TRANSFERS OUT ASSESSMENT SERVICES INFRASTRUCTURE MAINT TRANS GOLF COURSE TRANSFER HARMONY GROVE FIRE COST TOTAL NON-DEPARTMENTAL SUBTOTAL GENERAL FUND 43,607,735 45,133,760 55.388,006 58.689,538 CONTINGENCIES 0 0 0 2,201.660 TOTAL GENERAL FUND 43.807.735 45,133,760 55,386,006 60,891.196 207,593 256,487 362,180 489.180 243,000 35,600 38,100 36.000 36,000 36,000 0 225.000 770,000 770,000 0 75,046 75,774 79,630 80.070 80,000 797,500 828,521 800,000 800,000 800,000 33,550 22,823 80,000 94.800 50,000 170,222 177,909 198,000 190,000 210,000 38,916 13,572 30,000 46,500 50,000 1,685,574 331,952 56,000 78,000 0 16,779 22,893 25,000 59,261 56,000 0 0 0 0 2.000,000 470,000 490,000 1,680,OOO 1.680,OOO 600,000 318,533 20,246 0 0 0 86,279 673,639 4,174,293 4.117.657 1,854.761 2.325.000 1.660,395 2.227.000 1.303,571 1.473.500 200.000 200,000 474,797 373,569 702,654 4,798,929 2.436.638 2.378.863 1.706.213 200,000 402,006 3,851,313 2,503,277 4.116,810 4,323,811 4.125.000 4.6% 1999-00 BUDGET 544,084 4.142,076 2.351.831 2.287.791 1,636,155 200,000 385,845 11 v547.782 5?,641,289 61641,289 %INCR (DEC) 98-99 BUD TO 99-00 BUD -22.6% -13.7% -3.5% -3.8% -4.1% 0.0% 4.0% -8.5% -50.3% 0.0% -100.0% -0.1% 0.0% -47.3% 10.5% 7.5% -100.0% -5.5% -64.3% -1.8% 81.7% 1.2% CITY OF CARLSBAD OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 1998-99 1996-97 1997-98 ESTIMATED 1998-99 DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET (SPECIAL REVENUE FUNDS I POLICE ASSET FORFEITURE 458. i 54 519,301 COPS FUND 38,865 157,455 LAW ENFORCEMENT BLOCK GRANT 21,282 46,534 HOUSING SECTION a 2.836,313 2.696,750 HOUSING TRUST 31,532 143,602 AUDIO VISUAL INSURANCE 102.582 114,172 LIBRARY ENDOWMENT FUND 0 0 LIBRARY GIFTS/BEQUESTS 41,511 36,471 TREE MAINTENANCE 526,886 508,756 MEDIAN MAINTENANCE 394,118 356,718 STREET LIGHTING 646,820 674,175 BUENA VISTA CRK CHNL MNT 203,783 7,048 STATE GRANTS (CLSA) 267,057 189,631 STATE GRANTS (PLF) 38.541 37,583 ARTS SPECIAL EVENTS 18,345 18,828 SENIOR NUTRITION 175.854 209.436 SENIOR DONATIONS 29,673 47,486 CDBG ENTITLEMENTIREHAB 573,556 752.567 ARTS GENIGALLERY DONATIONS 782 870 80,000 153,017 190,000 24.2% i80,9i i 317.897 0 -100.0% 119,024 119,024 0 -100.0% 2.719,261 2.897.316 2.992.035 3.3% 211,660 257,362 230,265 -10.5% 69,500 70,297 56,895 -19.1% 0 0 10,000 0.0% 20,000 50,491 7.000 -86.1% 545.100 585.206 551.879 -5.7% 405.800 432,928 446,044 3.0% 542,171 723,953 716,685 -1 .O% 7,590 7,590 8,724 14.9% iai,ooo 181,978 150,500 -17.3% 34,537 47,900 199.185 315.8% 23,413 25,699 25,610 -1.1% 194.037 195.495 192.426 -1.6% 51,000 104.000 119,200 14.6% 775,520 1.122.415 709,567 -36.8% 20.000 25.772 0 -100.0% TOTAL SPECIAL REVENUE FUNDS 6,407,654 6,517,405 IENTERPRISE FUNDS WATER OPERATIONS 13.100,861 RECYCLED WATER OPERATIONS 1.055743 SANITATION OPERATIONS 3.699.664 SOLID WASTE MANAGEMENT 133,869 GOLF COURSE 252,505 13,729.352 13,694,937 1,174.301 i ,4!3,087 3,609,819 4,821.504 i i 0,482 132,100 215,636 865,000 TOTAL ENTERPRISE FUNDS 18,442.642 18,839.590 20,996.628 23.570547 23.507.080 -0.3% (INTERNAL SERVICE FUNDS 1 WORKERS COMP SELF INSURANCE 783.954 571,457 838,435 905,626 908.744 0.3% RISK MANAGEMENT 874,475 668,422 863,543 1.335.751 1.200,179 -10.1% HEALTH INSURANCE 2,169.937 2,285,740 2.498.033 2.546,402 2,537,409 -0.4% VEHICLE MAINTENANCE 1.364.655 1.359,628 1.580,682 1,582,346 1,456.221 -8.0% VEHICLE REPLACEMENT 2,105.350 18758,563 1,201,100 1,462.509 1.727.544 16.1% INFORMATION SYSTEMS 1.280.350 i ,431.287 1,769,600 2,O46,308 2.525,089 23.4% 6.180.524 7.318.540 15,894.306 16.474,486 3.7% 1,527,605 1.498.380 -1.9% 5,015,429 4.974,471 -0.8% 190,697 189,743 -0.6% 942,310 370,000 -60.7% TOTAL INTERNAL SERVICE FUNDS 8,578,721 8.075.097 8.771,393 9.878.944 1999-00 BUDGET 6.606.015 10.355.186 %INCR (DEC) 96-99 BUD TO 99-00 BUD -9.7% 4 8% CITY OF CARLSBAD OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 DEPARTMENT 1996-97 i 997-98 ACTUALS ACTUALS 1998-99 ESTIMATED EXPENDITURES 1998-99 BUDGET 1 REDEVELOPMENT I OPERATIONS 539.517 381,846 435.938 483,946 DEBT SERVICE 1,631.500 1.679.491 1.120.000 1.120.000 LOWAND MOD INCOME HSNG 75,548 65,185 97,450 137,542 TOTAL REDEVELOPMENT 2,246,565 2.126,522 1.653,388 1,741,488 1999-00 BUDGET 422,093 -12.8% 1.062,OOO -3.4% 119,895 -12.8% n, ,.,mm ,F.re\ %ipYbrs (IJCL, 98-99 BUD TO 99-00 BUD 1 1,623,988 -6.7% ITOTAL OPERATING FUNDS 79.483.317 60.692.374 92.989.939 103.400.717 io3.733,558 0.3% - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 199940 ACTUAL PROJECTED REVENUE REVENUE REVENUE SOURCE 1997-98 1998-99 GENERAL FUND I ESTIMATED AS% DIFFERENCE REVENUE OF FY 98-99 199699 TO 1999-00 PROJECTED 1999-00 TAXES PROPERTY TAX $12,410.095 SALES TAX 14.817.057 TRANSIENT TAX 6J46.092 FRANCHISE TAX 1,713.526 TRANSFERTAX 835,530 TOTAL TAXES 35,822.300 w4,18i.o00 16.500.000 6,900.OOO 1,873.000 815.808.000 11.5% 1,627.OOO 17.756,OOO 7.6% 1,256.OOO 7.463.000 0.2% 563,000 2.034.000 8.6% 161,000 648.000 -10.0% (72,000) 43.709,000 8.8% 3.535.000 720,000 40.174.000 LICENSES AND PERMITS BUILDING PERMITS 2,094.523 2,200,000 1.980,000 -10.0% (220,000) BUSINESS LICENSES 1.603,744 1.700.000 1.829.000 7.6% 129,000 OTHER LICENSES 8 PERMITS i,i84.990 1.230.000 1.107.000 -10.0% (123,000) TOTAL LICENSES & PERMITS 4.883,257 5,130.000 4,916.OOO -4.2% (214,000) STATE SUBVENTIONS VEHICLE LICENSE FEES 2.970.189 OTHER 234,323 TOTAL STATE SUBVENTIONS 3,204.512 3,124.OOO 476.000 3,458.ooo 10.7% 334,000 509.000 6.9% 33.000 3,600,OOO 3.967.000 10.2% 367.000 CHARGES FOR SERVICES PLANNING FEES 1.148,396 BUILDING DEPT. FEES 1.393,860 ENGINEERING FEES 2.327,574 AMBULANCE FEES 747,425 RECREATION FEES 985.942 PROPERTY RENTALS 221,087 OTHER CHARGES OR FEES 595.863 TOTAL CHARGES FOR SERVICES 7.420.147 900,000 886.000 -1.6% 1,650.OOO 1.485,000 -10.0% 1.756.000 1,250.OOO -28.8% 800.000 859.000 7.4% 1.046,OOO 1 .o67,ooo 2.0% 350,000 357,000 2.0% (14,000) (165,000) (506.000) 59,000 21.000 7,000 603,000 7.105.000 615,000 6.519.000 2.0% -8.3% 12,000 (586,000) FINES AND FORFEITURES 331.318 800.000 816.000 2.0% 16,000 INTEREST 1.589,461 1,900,000 1.607,OOO 4.9% (93,000) INTERDEPARTMENTAL CHARGES 1,919,341 1.850.000 1.650.000 0.0% 0 OTHER REVENUE SOURCES 824,466 1,5.00.000 1.000.000 -33.3% (500.000) 64.384000 TOTAL GENERAL FUND 55.994,802 61.859,OOO 4.1% 2.525.000 - - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 AS % DIFFERENCE OF FY 98-99 1998-99 TO PROJECTED 1999-00 ESTIMATED REVENUE 1999-00 ACTUAL PROJECTED REVENUE REVENUE REVENUE SOURCE 1997-98 1998-99 ISPECIAL REVENUE FUNDS INFRASTRUCTURE MAINT FUND TRANSFER FROM GENERAL FUND 0 0 0.0% 2,000,000 0 2.000.000 0 POLICE ASSET FORFEITURE ASSET FORFEITURES INTEREST OTHER TOTAL 78,527 124,000 37,389 17,000 0 500 -75.8% e‘ww 41.2% (7.000) -100.0% (500) -71.7% (101,500) 115,916 141,500 COPS GRANT STATE FUNDING (AB3229) INTEREST TOTAL 161,229 10.886 -100.0% (166,000) 44.4% (4.000) -97.1% (170,000) 172.117 175.000 LA’I’I ENFORCEMENT BLOCK GRANT FEDERAL GRANT INTEREST TOTAL 85.027 3,964 88.708 3.800 -100.0% (88.708) -100.0% (3.800) -100.0% (92.508) 88.991 92,508 HOUSING - SECTION 8 INTEREST FEDERAL GRANT OTHER TOTAL 16,605 12,000 2.567.339 2.612.164 63.486 50,000 10,000 2.678.395 175.000 -16.7% WJOO) 10.2% 266,231 250.0% 125,000 14.6% 369.231 2.847.430 2.674.164 3.063.395 HOUSING TRUST FUND INTEREST INCLUSIONARY HOUSING FEES OTHER TOTAL 315,667 375,000 1.240.949 1.110,000 605.414 1.862.100 375,000 1,150.000 0 0.0% O- 3.6% 40,000 -100.0% (1.662.100) -54.4% (1,822.lOO) 2.162.030 3,347.lOQ 1.525.000 AUDIO-VISUAL INSURANCE INTEREST INSURANCE FEES TOTAL 2,121 73.494 400 65.000 400 60.000 0.0% 0 -7.70/ (5,000) -7.7% (5,000) 75.615 65.400 60,400 10,000 0 10,000 LIBRARY ENDOWMENT FUND INTEREST DONATIONS TOTAL 0 0 1,800 250,000 455.6% 8,200 -100.0% f250.000) 0 251.600 -96.00/o (241.800) - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED REVENUE REVENUE REVENUE SOURCE 1997-98 199899 LIBRARY GIFTS/BEQUESTS AS % DIFFERENCE OF FY 98-99 1998-99 TO PROJECTED 1999-00 ESTIMATED REVENUE 1999-00 GIFTS/BEQUESTS INTEREST TOTAL 34,900 2.424 -33.3% (1,000) -9.1% 1100) 37,324 4.100 -26.8% (1.100) TREE MAINTENANCE INTEREST MISC. REIMBURSEMENTS TREE MAINTENANCE FEES INTERDEPARTMENTAL TOTAL 31,975 0 498.883 35,000 2.000 501,600 70,000 608.600 37,000 2.000 502.000 70,000 611.000 5.7% 2,000 0.0% 0 0.1% 400 0.00% 0 0.4% 2,400 66,200 597.058 MEDIAN MAINTENANCE INTEREST MEDIAN MAINTENANCE FEES OTHER TOTAL 4,616 5,000 362,554 417,000 1.500 5.000 6,000 418,000 5.000 20.0% 1,000 0.2% 1,300 0.0% 0 388.670 427.000 0.5% 2.000 STREET LIGHTING INTEREST INTERDEPARTMENTAL STREET LIGHTING FEES OTHER 55,070 52,000 53,500 53,500 634,395 668.800 16.999 2.500 53,000 53,500 669,000 2.500 1.9% 1,000 0.0% 0 0.0% 200 0.0% 0 759.964 776.800 778.000 0.2% 1,200 BUENA VISTA CREEK CHNL MAINT INTEREST BUENA VISTA FEES TOTAL 31,510 100.371 32.500 100.000 32.000 -1.5% (500) -100.0% f 100.000) 131.881 132.500 32.000 -75.9% (100,500) STATE GRANTS (CLSA) INTEREST 3,117 2,700 2,500 -7.4% (2W GRANTS 128.649 166,000 151,000 -9.0% (15,000) TOTAL 132,566 168.700 153.500 -9.0% (15.200) STATE GRANTS (PLF) 0.0% 0 INTEREST 5,329 4.200 4.200 GRANTS 40.838 86,600 86,000 TOTAL 46.167 90.800 90.200 -0.7% W’J) -0.7% V330) ARTS SPECIAL EVENTS INTEREST 2.681 1,800 1,800 0.0% 0 DONATIONS 20,223 26.000 23,000 -1 1.5% (3,000) TOTAL 22.904 27.800 24.800 -10.8% (3,000) - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED ESTIMATED REVENUE REVENUE REVENUE REVENUE SOURCE 1997-98 1998-99 1999-00 SENIOR NUTRITION GRANTS DONATIONS TOTAL SENIOR DONATIONS INTEREST DONATIONS TOTAL CDBG ENTITLEMENTIREHAB INTEREST OTHER GRANT REVENUE TOTAL ARTS GENERAUGALLERY DONATIONS 113.322 96,113 209,435 8,597 53,077 59,674 45 0 0 0.0% 0 0 52,900 0 -100.0% (52,900) 755.633 722.820 704.567 -2.5% (18.053) 101,137 94,358 195,495 4.000 50,000 54,000 755.678 775,520 764,567 -9.2% (70,953) INTEREST 1,768 1,700 DONATIONS 4.178 47.500 TOTAL 5,946 49,200 TOTAL SPECIAL REVENUE FUNDS 8.409.386 10.057.987 101,200 94,300 195,500 4,000 48,000 52,000 1.800 5.9% 100 20,000 -57.9% (27,500) 21,800 -55.7% (27,400) 9.799.162 -2.6% (2.017,025) AS % DIFFERENCE OF FY 98-99 1998-99 TO PROJECTED 1999-00 0.1% 63 -0.1% (58) 0.0% 5 0.0% 0 -4.0% (2.000) -3.7% eooo) CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED ESTIMATED AS % DIFFERENCE REVENUE REVENUE REVENUE OF FY 98-99 1998-99 TO REVENUE SOURCE 1997-98 1998-99 1999-00 PROJECTED 1999-00 IENTERPRISE FUNDS I WATER OPERATIONS WATER SALES READY TO SERVE CHARGES NEW ACCOUNT CHARGES BACK-FLOW PROGRAM FEES PENALTY FEES INTEREST ENGINEERING & PLAN CHECK FEES SERVICE CONNECTION FEES AGRICULTURAL CREDITS OTHER TOTAL RECYCLED WATER 10.410.505 11.289.500 10,943.000 -3.1% (346,500) 2.988.929 3.093,000 3.216.000 4.0% 123,000 108,063 100,000 100,000 0.0% 0 78,415 75,000 75,000 0.0% 0 178.404 176,000 176,000 0.0% 0 844,930 825,000 350,000 -57.8% (475,000) 167,671 160,000 160,000 0.0% 0 168.216 170,000 170.000 0.0% 0 192.663 200,000 200,000 0.0% 0 120,539 40,000 40,000 0.0% 0 15.258,335 16.128,500 15.430.000 -4.3% (698.500) WATER SALES READY-TO-SERVE CHARGE RECYCLED WATER CREDITS INTEREST OTHER TOTAL 839,031 860,500 807,000 -6.2% (53,500) 56.519 80,800 93,000 15.1% 12,200 378.627 440,000 440,000 0.0% 0 58.406 60.000 80,000 0.0% 0 5,670 0 0 0.0% 0 1.338,253 1.441.300 1.400.000 -2.9% (41,300) SANITATION OPERATIONS SERVICE CHARGES LATERAL CONNECTIONS PRE-TREATMENT CHARGES INTEREST OTHER TOTAL 5,299,220 5,200,OOO 4.600.000 20,000 40,000 40,000 74,140 67,500 70,000 438,597 440,000 100,000 7,685 42,000 0 -11.5% (800,000) 0.0% 0 3.7% 2,500 -77.3% (340,000) -100.0% (42.000) 5,837,642 5,789.500 4.810.000 -16.9% (979,500) SOLID WASTE MANAGEMENT INTEREST RECYCLING FEES (AB939) NON-JURISDICTIONAL FEES OTHER TOTAL GOLF COURSE 84,113 87,000 90,000 3.5% 3.000 175,199 196,000 199,000 1.5% 3,000 403.169 380.000 388,000 2.1% 8,000 66 0 0 0.0% 0 662.547 663.000 677.000 2.1% 14,000 1.680.000 TRANSFER FROM GENERAL FUND OTHER TOTAL 490,000 -64.3% (1.080,OOO) 162,409 0 652,409 1.680,000 600.000 0 600,000 TOTAL ENTERPRISE FUNDS 23,749,188 25.702.300 22.917.000 0.0% 0 -643% (1.080,000) -10.8% (2,785.300) - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 AS % OF FY 98-99 PROJECTED DIFFERENCE 199899 TO 1999-00 ACTUAL PROJECTED REVENUE REVENUE REVENUE SOURCE 1997-98 1998-99 ESTIMATED REVENUE 1999-00 IINTERNAL SERVICE FUNDS I WORKERS COMP SELF-INSURANCE INTEREST 114.164 INTERDEPARTMENTAL 888,869 OTHER 50,278 TOTAL 833.311 LIABILITY SELF-INSURANCE 85.000 504,000 50.000 80,000 -5.9% (5.000) 536,000 6.4% 32,000 50,000 0.0% 0 666.000 4.2% 27,000 639.000 INTEREST 171,947 INTERDEPARTMENTAL 930.185 OTHER 0 TOTAL 1.102.132 150,000 150,000 0.0% a 891,000 737,400 6.7% 46,400 0 a 0.0% 0 841.000 887.400 5.5% 48,400 HEALTH INSURANCE INTEREST INTERDEPARTMENTAL REIMBURSEMENTS TOTAL 23.531 10.000 5,000 -50.0% (5,000) 1.617,392 2,094.000 2,054.000 -1.9% (40,000) 331,206 604.000 398,000 -34.1% (206,000) 1.972.129 2.708.000 2.457.000 -9.3% (251,000) VEHICLE MAINTENANCE INTERDEPARTMENTAL 1,443.987 INTEREST 2,742 OTHER 43,556 TOTAL 1.490.285 1.600,OOO 8.000 0 1.523.000 8,000 120,000 1.651.000 5.1% 77.000 0.0% 0 -100.0% (120,000) -2.6% (43,000) 1.608.000 VEHICLE REPLACEMENT INTERDEPARTMENTAL INTEREST OTHER TOTAL INFORMATION SYSTEMS 1,052.298 1,091,000 1.142,OOO 4.7% 51,000 248.378 185.000 150,000 -18.9% (35,000) 35.062 118,000 0 -100.0% (116,000) 1.335,738 1.392.000 1.292.000 -7.2% (100,000) INTEREST 51,214 INTERDEPARTMENTAL 1,298,200 OTHER 0 TOTAL 1.349.414 50,000 1.564.400 0 50,000 0.0% 0 2,402.030 53.5% 837.830 0 0.0% 0 2.452.030 51.9% 837.630 1.614.400 TOTAL INTERNAL SERVICE FUNDS 8.083.009 8.845.400 9.362,430 5.9% 517,030 - CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED REVENUE REVENUE REVENUE SOURCE 1997-98 1998-99 REDEVELOPMENT FUNDS OPERATIONS RENTAL INCOME ADMINISTRATIVE FEES INTEREST OTHER TOTAL DEBT SERVICE TAX INCREMENT 1.208.387 1.215.000 INTEREST 64.663 50,000 TOTAL 1.272.950 1.285.000 LOW AND MOD INCOME HSNG TAX INCREMENT 302,097 INTEREST 322,069 - OTHER 5,550 TOTAL 629.716 47,485 47.500 47.500 71,380 71,380 42,800 3,612 3,000 2,500 2.395 10.900 2.400 124.872 132.780 95.000 302,500 303,750 80.000 50,000 0 0 382.500 353.750 ESTIMATED REVENUE 1999-00 1,230.OOO 40.000 1.270.000 AS O/o DIFFERENCE OF FY 98-99 1998-99 TO PROJECTED 1999-00 0.0% 0 -40.3% (28,780) -16.7% (506) -78.0% Woo) -28.5% (37.780) 1.2% 15,000 -20.0% (10,000) 0.4% 5,000 0.4% 1,250 -37.5% (30,000) 0.0% 0 -7.5% (28,750) TOTAL REDEVELOPMENT FUNDS 2.027.538 1,780.280 1,718,750 -3.5% (61,530) TOTAL OPERATING $98,283,901 $108,244,967 $108,181,342 -0.1% .$ (1,821,826) EXHIBIT B 1999-2000 PROPOSED CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The City of Carlsbad Capital Improvement Program (UP) is a planning document which incorporates the current budget for capital projects with future planned revenues and expenditures. This year’s CIP reflects the continued commitment to constructing the necessary facilities, in response to the current and anticipated development activity occurring throughout the City. Projects are continuously evaluated and prioritized to ensure the City’s resources for facilities are allocated based on a well thought out plan. The proposed 1999-2000 Capital Improvement Program totals $62.6 million, with projected revenues totaling $50.6 million. Development remains strong, and this is expected to continue through 1999-2000. As development occurs within the City, there comes a corresponding increase in the demand for development- related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds the needs of Carlsbad’s citizens and businesses, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan requires that a standard level of facilities is available to meet the new demands, or development cannot proceed. The CIP is also a tool available to Council to address the issue of resource availability weighed against the demand for facilities. This report and the accompanying the actions taken to fulfil1 these needs. CIP documents and schedules reflect A discussion of the City’s Growth Management Plan can be found at the end of this report. GROWTH PROJECTIONS Several assumptions about the rate and type of growth were made in order to project the revenues which result from development. Growth assumptions were made and .continue to change in correlation with the economic climate. Residential and non-residential development information was compiled by the Planning, Building and Engineering Departments; the Finance Department overlaid the economic forecast. This past year, City staff evaluated all existing developments and compared these projects to the buildout capacities of the City using adopted general plans. Existing building activity and estimates of how remaining net developable land might develop were used to prepare future growth projections. The following table shows the number of residential units used in calculating estimated revenues for 1999-2000 and subsequent years to buildout. Approximately 15,104 units are expected to be built from this point forward. Non-residential construction estimates are shown in projected square feet. 1999-2000 CIP Growth AssumDtions I Residential Non-Residential 1 Year 1999-2000 1,250 765,000 2000-2001 1,139 472,000 2001-2002 1,304 450,000 2002-2003 1,150 656,000 2003-2004 687 644,000 Years 6-10 3,635 4,303,ooo Years I I-2030 5,939 5,607,OOO Total Future 15,104 12,897,OOO Residential development for 1998-99 was projected at 1,439 building permits. However, recent estimates anticipate over 1,700 units by the end of the current fiscal year. Construction of residential units is expected to decrease slightly, to about 1,100 units per year for the next five years. Permits Issued 3000 2500 2000 1500 1000 500 0 Residential Units Trend 1985 to 2004 Non-residential development is also expected to decrease following the completion of Legoland and most of the Carlsbad Ranch area. Major- non-residential projects planned in the next few years include several hotel, timeshare, and commercial developments. REVENUES Revenues for Capital Projects from now until buildout total $462.6 million and may be segregated into four major categories: 1) fees generated by development in Carlsbad, 2) special district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), 3) Water and Sewer replacement reserves, and 4) other sources including grants, bond issues, and contributions from other agencies. Approximately 43.6% of all capital revenues are received as a result of development, and are dependent upon assumptions made about the City’s annual growth in dwelling units and commercial/industrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-ln- 3’ i? Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Existing and proposed Community Facilities District and Bridge and Thoroughfare Benefit District revenues comprise 18.1% of the total. Water and Sewer replacement revenues generated by user fees equal approximately 16.8% of total revenues, and the remaining 21.5% are related to Federal & State grants, license tax on new construction, the County sales tax program (Transnet), San Diego Gas & Electric funding, and contributions from other agencies. Funding Sources 1999-2000 to Buildout Total Revenue = $462.6 million Other 21.5% Water/Sewer 43.6% Districts 18.1% Calculation of Future Fees The revenue projections of the proposed Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units was assumed to be 35% and 65% respectively and reflects the anticipated mix of residential development shown in current plans for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees was $89,500 per multi-family dwelling unit, and $175,000 per single-family dwelling unit. A building permit valuation of $38 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of use. A multi-family residential dwelling unit was assigned eight trips per day and a single-family unit was assigned ten trips per day. Each residential trip was valued at the current TIF of $87. The trips-per-day value for commercial and industrial buildings was averaged at 32 trips per 1,000 square feet of development, although the actual volume of trips generated by commercial/industrial building can vary widely depending on the ultimate land use. The value assigned to each commercial/industrial trip was $35, the current TIF. The implementation of CFD No. 1 in 1991 reduced the total amount of projected PFF and TIF revenues, as some projects previously funded from these sources are now funded through this CFD. CFD No, 2 is proposed to fund Ranch0 Santa Fe Road and Olivenhain Road, but has not yet been formally established. A prepayment program is in place to enable development to proceed within this proposed district. CFD #3 is a proposed district for the funding of Melrose Drive and Faraday Avenue extensions. There are two existing and one proposed Bridge and Thoroughfare Fee District included in this year’s CIP. BTD No. 2 (Poinsettia Lane - Aviara Parkway) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. A proposed BTD No. 4 is being considered as the financing mechanism for College Boulevard and Cannon Road extensions east of El Camino Real. PROPOSED CAPITAL PROJECTS Project construction is reliant upon the availability of capital and operating funds in addition to established Growth Management requirements for facilities. Wherever project scheduling changes were proposed, projects were evaluated and prioritized, using compliance with the Growth Management Plan as the most important factor. The acceleration of street projects which will improve traffic flow in the industrial corridor was one of the results of this evaluation process. The proposed scheduling of park projects also reflects changes made as a result of this analysis. Growth Management requirements and the availability of revenues has resulted in the highest level of planned capital spending in the last ten years, as shown on the following chart (appropriations include amounts brought forward in each year). $160.000,000 $100.000,000 $80,000,000 $60,000,000 $40,000,000 $20,000.000 $- 89190 90191 91192 92l93 93194 94195 95196 96l97 97198 98199 PROPOSED CAPITAL PROJECTS 1999-2000 TO BUILDOUT The CIP for 1999-2000 to buildout outlines approximately 164 future projects at a total cost of $438.6 million. CIP Expenditures by Category 1999-2000 to Buildout Total Expenditures q $438.6 million Parks 16.1% Other 5.8% Water L 9.2% I Sewer r 14.1% Streets 30.7% The largest expenditure category is for street, traffic signal and interchange projects at $134.4 million, or 30.7%, of the total. Included are the construction of several major roadways which will add east-west connections and improve the flow of regional traffic as well as local traffic throughout the City. Several of these roads will provide additional routes to the neighboring cities of Oceanside, Vista and San Marcos. Following is a list of major street projects .in the 1999-2000 to Buildout CIP: l Faraday Avenue to Cannon Road l Faraday Avenue and Melrose Drive Extensions east of El Camino Real l Poinsettia Lane to El Camino Real l Poinsettia Lane east of El Camino Real l Cannon Road to El Camino Real l Cannon Road and College Boulevard East of El Camino Real l Ranch0 Santa Fe Road to San Marcos and Encinitas The second largest level of expenditures at $83.2 million, or 19% of the total planned capital expenditures, is construction and maintenance of City facilities such as libraries, administrative facilities and police and fire facilities. The South Carlsbad Library is currently under construction, and is expected to open in September 1999. This 64,000 square foot facility is estimated to meet the City’s needs up to a population of 100,000 residents. Upon completion of the South Carlsbad Library, the Cole Library, located at the north end of the City, will undergo renovation. The Capital Improvement Program includes funds to reconstruct and expand this facility in future years. Additional facilities include the Faraday Administrative Offices which are expected to be completed by September 1999, as well as a Public Works Center scheduled for construction next year. A new City Hall is planned for construction in the future; the timing and location have not been determined. The third largest expenditure category is for park projects totaling $70.7 million, or 16.1%, of the total. Park projects include acquisition and development of acreage within all quadrants of Carlsbad. Future park projects include: Northwest Quadrant Northeast Quadrant Park Acquisition and Development Park Acquisition and Development Community Center Larwin Park Development Cannon Lake Park Development Hosp Grove-Buena Vista Lagoon ,Recreational Improvements Southwest Quadrant Southeast Quadrant Poinsettia Park Phase II Alga Norte Park Development Zone 19 Park Development Alga Norte Pool Zone 19 Park Community Center Leo Carrillo Park Development P In addition, a business park recreational facility in the industrial area is planned, as well as the Carlsbad Municipal Golf Course. Sewer projects total almost $61.9 million, and include the construction of the South Agua Hedionda interceptor, the Vista/Carlsbad trunk line interceptor, cleaning and refurbishment of existing sewer lines and access holes, the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina parallel ocean outfall and cogeneration projects. The largest of these projects is the Vista/Carlsbad interceptor; construction will occur along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way, and is expected to span over several years. Water projects total about $40.3 million (9.2%) and include reservoir construction and improvements and recycled and potable pipelines. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard, Poinsettia Lane, El Fuerte, and along El Camino Real. The 1999-2000 to buildout CIP also includes funding for sea water desalination and other water resource development programs. Specific timing and cost estimates for all capital projects are identified in the Current and Future (I 999-2000 to Buildout) Projects schedule following the narrative. PROPOSED CAPITAL PROJECTS -THE NEXT FIVE YEARS Some of the major projects planned for the next five years are discussed below. l Libratv Facilities - Construction of the South Carlsbad Library is over 80% complete, with the opening planned for September 1999. The Cole Library is scheduled to undergo remodeling upon the completion and opening of the new library in the south. 0 Faradav Administrative Offices - The City currently has several administrative facilities located in different areas throughout the City which are no longer able to accommodate current and anticipated space needs. The Faraday Building is currently under construction, and will be used by staff from Public Works, Community Development, and Administrative Services. This consolidation will improve customer service by providing a single location to serve the development community. Relocation to the new building is planned for the fall of 1999, once construction is complete. In addition to improved customer service, it is expected the consolidation will improve efficiency and interdepartmental communication. l Public Works Center - Design of a new Public Works Center is underway, and construction could begin in 1999-2000. This facility, located next to the Safety Center, will include a purchasing warehouse, general offices, and yard facilities for the Public Works Departments. 0 Carlsbad Municioal Golf Course - Environmental permits are currently being processed for the City’s 250 acre golf course located in the industrial corridor directly south of the future Veterans Memorial Park. Once approved, development of the golf course will proceed. l Streets - Several large street construction projects are planned for the next 5 years as shown on the following map. The extensions of Cannon Road and Poinsettia Lane to El Camino Real and Faraday Avenue to Cannon are-all located west of El Camino Real and are being constructed primarily as a result of residential developments in those areas, College Boulevard and Cannon Road extensions to the east and north, as well as Faraday Avenue and Melrose Drive extensions, are located east of El Camino Real and will alleviate traffic on Palomar Airport Road. The widening and realignment of Ranch0 Santa Fe will improve regional and local traffic flow generated in the southern part of the City. Proposed Major Road Projects 0 Coastal Rail Trail - The Coastal Rail Trail is a non-motorized multi-modal trail in the railroad right-of-way between Oceanside and downtown San Diego. Once built, the trail will be 44 miles long and will accommodate bicycles, joggers, rollerbladers and skateboarders. The current CIP includes funding for construction of the section between the Oceanside Transit and Encinitas Coaster stations. a Leo Carrillo Park - The master plan of Leo Carrillo Park is complete, and the development of phase two is scheduled to begin in 1999-2000 on this 10.5 acre site. Park development will consist of parking lots, restrooms, walkways and large group picnic facilities. The general theme for this park will be. passive in nature with the option for interpretive programming. 0 Northeast and Northwest Quadrant Parks - The City has accelerated plans for park facilities. In 1999-2000 there are plans to purchase land for future park sites in both the northeast and northwest quadrants, with development of those sites in the years to follow. These parks will include ball fields and other recreational amenities. 0 Aloa Norte Park - This park will include the development of 30 acres in the Southeast Quadrant with amenities such as ball fields, soccer fields, tennis courts, picnic areas, tot lots, restrooms and parking facilities. Design is planned for 2001-2002 with construction in the years to follow. Zone 19 Park - Construction is expected to begin in approximately three years on this 24 acre site located in the southwest quadrant north of Poinsettia Lane and west of El Camino Real. This park may include ball fields, soccer/football fields, basketball and tennis courts, tot lots, and picnic areas. Poinsettia Park Phase II - Within the next five years, development of the final phase of Poinsettia Park is scheduled. Amenities may include a community center/gymnasium, enclosed soccer field, tot lots, picnic areas, a tennis complex, and additional parking. South Carlsbad Villaae Storm Drain - Construction of the South Carlsbad Village Storm Drain from Oak Avenue to the Agua Hedionda Lagoon along the easterly portion of the northern San Diego railroad right-of-way will control flooding and standing water along its route. South Aqua Hedionda Interceptor - This interceptor sewer includes a sewage lift station and force main, and will provide sewer service to those areas generally tributary to the south side of the Agua Hedionda Lagoon. Construction will occur along Cannon Road from Lego Drive to El Camino Real and along Faraday Avenue from Cannon Road to the existing Faraday Avenue. The following phase will begin at Cannon Road and El Camino Real and proceed east to the Raceway Property. The design for this project has begun and will continue into next year; construction could begin in the following year (2000-2001). Vista/Carlsbad Interceptor - The Vista/Carlsbad Interceptor project involves installation of a new and upgraded sewer trunk line through the downtown portion of Carlsbad to the Encina Water Pollution Control Facility. The interceptor will run along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way. This project is required to handle buildout flows and replace deteriorated pipeline, and is funded in part by the City of Vista. SUMMARY The proposed 1999-2000 to Buildout CIP continues to reflect an aggressive plan for new facilities. It is being driven by the continued pace of development and the need to insure that facilities are available to service the developing areas as well as the current residents. Significant progress is being made to construct major traffic circulation projects in response to current and future development. Carlsbad’s philosophy has been to build quality capital facilities which meet, and at times exceed, Growth Management standards. Practices such as phasing projects over a period of years to match funding availability as well as maximizing the use of available resources, have been implemented in order to meet the needs of Growth Management. The 1999-2000 to Buildout Capital Improvement Program reflects the commitment of Carlsbad’s Council and staff to continue providing its residents with a better quality of life. GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established in an effort to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan adopted has established precise standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Wastewater Treatment - Circulation - Fire - Schools - Water Distribution - Library - Parks - Drainage - Open Space - Sewer Collection The Plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless each of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Program. The detailed level of planning required by Growth Management has allowed Carlsbad’s Capital Improvement Program to anticipate the.funding needed for capital improvements through buildout of the City. The timing of construction of facilities is governed by the rate of development and the 11 performance standards. New public facilities often require additional staffing and other resources, which affects the Operating Budget. Facilities such as community centers, parks, and fire stations have been constructed and opened to the public under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the 1999-2000 CIP, compliance with the Growth Management Plan is assured. CALIFORNIA ASSEMBLY BILL 1600 (AB 1600) In 1987, the California Legislature passed Assembly Bill 1600 (AB 1600) which set forth the process a city or county must follow to establish developer fees to finance public facilities. This legislation applies to fees established, increased, or imposed on or after January 1, 1989, the effective date of the law. AB 1600 contains four general requirements: 1. A “nexus” or connection must be established between a development project or class of project and the public improvement being financed with the fee. All AB 1600 fees adopted by the City have met the nexus test. For example, Traffic Impact, Bridge and Thoroughfare District and Drainage Sewer Benefit Area Fees were all established under AB 1600. 2. The fee must be segregated from the General fund. Carlsbad segregates all capital funds not only from the General fund, but also each classification of fee as well. 3. Fees collected by a city or county must be spent or committed to a project within a five year period. Funds are viewed to be committed if they are programmed to be spent on a specific project(s). If the money is not spent, findings must be made describing the continuing need for that money each fiscal year after the five years has expired. The City of Carlsbad commits the revenues from these fees through its Capital Improvement Program budget. This budget, which is adopted by the City Council, sets forth the City’s Capital expenditure program from the current year to projected build out of the City. The expenditure plan is updated annually as part of the City’s budget process. 4. Refunds must be made only if the City cannot make the required findings. At this time, no refunds are due because the City’s Capital Improvement Program commits all AB 1600 fees to projects to be constructed both in the current year and in the future. CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 1998-99 JULY 1, 1998 ESTIMATED ESTIMATED JUNE 30,1999 UNRESERVED ESTIMATED CAPITAL DEBT SERVICE PROJECTED PUBLIC ART 313,487 GOLF COURSE 2,807,608 PUBLIC FACILITIES FEE 217723,652 ZONE 5.13,16 PARK FEE 4,181,832 PILAREA 1 NW 2,586,877 PIL AREA 2 NE 884,629 PIL AREA 3 SW 677,195 PIL AREA 4 SE 1,835,280 TRAFFIC IMPACT FEE 3.696,442 TRANSNET/LOCAL 3.1859062 TRANSNETIHIGHWAY 1,200,890 TRANSNETIBIKE 26.283 TRANSNET/STP 1,274,359 TDA 373,253 STATE GRANTS 96,942 COUNTY GRANTS 1,859,969 ASSESSMENT DISTRICTS 1,165.262 CFD #l 32,691,711 l CFD#2 12.849.302 l CFD#3 0 BTD#2 POINS. LN-AVIARA PKWY 3,091,167 BTD#3 CANNON ROAD WEST 523,659 * BTD#4 COLLEGE/CANNON 0 FEDERAL GRANTS 4 SDG&E 0 PLANNED LOCAL DRAINAGE 5,273,625 SEWER BENEFIT AREAS 886,807 SEWER CONNECTION 19,141,077 SEWER REPLACEMENT 9,705,312 WATER - RECYCLED WATER 1,964,996 WATER CONNECTION 6,118,850 WATER REPLACEMENT 8,601,526 REDEVELOPMENT BONDS 2,132,557 GAS TAX 6,002,296 OTHER 29614.485 FUND BALANCE REVENUES EXPENDITURES & OTHER BALANCE GENERAL CAPITAL CONST. 3,818.164 2554,079 1,454.084 962,497 3,9X,662 247,850 2.407,045 27,048.935 315,497 2.704.899 947,315 883,007 2,191.464 3,081,043 9,247,099 196,013 26.975 1.307.914 307,628 38,521 273,181 6,435,642 24,452,110 18,769.659 0 2,757,938 1,207,225 0 166,228 0 5,778,647 3,204,370 21,718,199 16,397,213 28428,837 78385,587 16,901,418 2,167,015 69887,152 1,333,808 7,744 73,381 0 1,784,016 1,242,269 942,310 8,082.399 2,757,116 0 470,843 48337,178 0 118,022 0 0 62,686 0 O- 224,712 18,900 0 356.184 0 0 1,962,937 13828,336 750,000 8,065,776 2,003,739 0 995,386 2,000,263 0 692 0 0 33,555 0 0 73,264 138,889 0 209,115 267,536 0 141,078 1,727,866 0 17.155,045 Il.8849665 0 12,378.831 20448,689 169,743 7,407,202 1.486.845 0 0 0 0 355,261 648,490 40,000 2,671.478 1,972.040 15.872 0 0 0 245,000 78,776 0 0 0 0 721,068 216,046 0 2.943.525 625,962 0 4,960,609 1.2671061 1,116.426 7,450,269 758,368 0 888,803 264,962 160,000 4.957,607 2,513,526 1,177,344 9,959,060 1,616,817 42,351 68,290 33,832 0 1,550,194 665,338 0 843,776 2,124,453 0 TOTAL 163,304,560 99,698,505 64.455,427 5.376,543 193,171,095 l PROPOSED DISTRICTS. 46 GIN OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR N 1999-2000 JULY 1,1999 1998-99 PROJECTED ESTIMATED CONTINUING FUND BALANCE REVENUES APPROPR. GENERAL CAPITAL CONST. 3,955,662 7,250,OOO 3,577,568 PUBLIC ART 247,850 0 GOLF COURSE 2,407,045 0 PUBLIC FACILITIES FEE 27,048,935 3,829,609 ZONE 5,13.16 PARK FEE 315,497 228,011 PIL AREA 1 NW 2.704.899 804,633 PIL AREA 2 NE 947,315 133,560 PIL AREA 3 SW 883,007 292,163 PIL AREA 4 SE 2.191,464 55,650 TRAFFIC IMPACT FEE 3,081,043 1,141,923 TF!ANSNET/LOCAL 9,247,099 2.500,OOO TRANSNET/HIGHWAY 196,013 550,000 TRANSNET/BIKE 26,975 0 TRANSNET/STP 1,307,914 0 TDA 307,628 120,000 STATE GRANTS 38,521 1,980,OOO COUNTY GRANTS 273,181 532,699 ASSESSMENT DISTRICTS 6,435,642 0 CFD #l 24.452.110 7,116,403 CFD #2 18,769,659 0 CFD #3 0 0 BTD#2 POINS. LN-AVIARA PKWY 2,757,938 242,000 BTD#3 CANNON ROAD WEST 1,207,225 100,000 BTD#4 COLLEGE/CANNON 0 0 FEDERAL GRANTS 166,228 6,683,600 SDGBE 0 0 PLANNED LOCAL DRAINAGE 5.778,647 131,462 SEWER BENEFIT AREAS 3,204,370 1,400,000 SEWER CONNECTION 21.718,199 4,556,371 SEWER REPLACEMENT 16.397.213 2,000,000 WATER - RECYCLED WATER 2,428.837 950,000 WATER CONNECTION 79385.587 3,678,819 WATER REPLACEMENT 16,901.418 2,725,OOO REDEVELOPMENT BONDS 2,167,015 0 GAS TAX 6.8878152 1,550,000 OTHER 1,333.808 0 TOTAL 193.171,095 50,551,902 NEW APPROPR. 6,686.500 107,557 1,505,050 5,068,835 24,184 0 0 219,100 0 2,220,224 8,335,896 5,855 0 0 270,905 37,665 65,517 5.938.514 14,923,214 5,135,960 0 2,491,611 1,131,775 0 142,055 0 813,804 2,441,733 12,821,374 2,791,323 720,405 2,628,667 1,599,569 1,818,297 1,773,700 20,000 0 9.143.000 10,000 3.500,000 150,000 0 0 1,677,OOO 2,300,OOO 550,000 0 1,240,OOO 120,000 1,980.OOO 500,000 0 4,410,000 0 0 450,000 0 0 6,683,800 0 950,000 1,857,OOO 2,427,083 3.034,981 659,527 5.728,983 2,775.592 0 5,699,200 0 1,180,336 79,790,693 628552,466 1999-00 TOTAL CIP APPROPR. 10.264.068 127,557 1,505,050 14,211,835 34,184 3,500,000 150,000 219,100 0 3,897,224 10,635,896 555,855 0 1,240,OOO 390,905 2,017,665 565,517 5.938,514 19,333,214 5.135,960 0 2;941,611 1,131,775 0 69825.655 0 1,763,804 48298.733 153248,457 5,826,304 1,379,932 8.3579650 4,375,161 1.8188297 7,472,900 1 .180,336 142,343,159 JUNE 30.2000 PROJECTED BALANCE 941,594 120,293 901,995 16,666,709 509,324 9,532 930,875 956,069 29247.114 325,742 1,111.203 190,158 26,975 67,914 36,723 856 240,363 497,128 12,235,298 13,633,699 0 58,327 175.450 0 24,173 0 4,146.305 305,637 11,026,114 12.570,909 1,998,905 29706,755 15,251,257 348,718 964,252 153,472 101,379,839 CITY OF CARLSBAD CAPITAL FUNDS REVENUE ESTIMATES FOR 1999-2000 PUBLIC ART 20,454 18,033 18,471 7,744 GOLF COURSE 42,191 79,365 289,482 1,784,016 PUBLIC FACILITIES FEE 3,172,700 4,618,487 8,562,805 8,082,399 ZONE 5.13 & 16 PARK FEE 375,038 701,492 1.203,795 470.843 PIL AREA 1 NW 271,399 283,688 207,517 118,022 PIL AREA 2 NE 234,755 44,222 69,997 62,686 PIL AREA 3 SW 12,911 403,682 326,350 224,712 PIL AREA 4 SE 68,857 278,736 701,093 356,184 TRAFFIC IMPACT FEE 772,544 1,101,838 1,691,916 1.962,937 TRANSNET/LOCAL 24,122 1,155,361 4,103,007 8,065,776 TRANSNET/HIGHWAY 8,503 103 3,310,960 995,386 TRANSNET/BIKE 97 520,948 1.524 692 TRANSNET/STP 660.599 237,167 98,380 33,555 TDA 82,683 189,854 321,253 73,264 STATE GRANTS 213,661 2,596,708 45,414 209,115 COUNTY GRANTS 253,417 277,695 293,629 141,078 ASSESSMENT DISTRICTS 1.037.967 269,106 9.494.392 17,155,045 CFD #l 7,279,245 10.676,209 159184,782 12,378.831 CFD #2 3,017.345 6.085,033 2,247,234 7,407,202 CFD#3 0 0 0 0 BTD#P POINS. LN-AVIARA PKWY 1,265,756 2.289.588 213.180 355,261 BTD#3 CANNON ROAD WEST 408,294 26,238 291,424 2.6713478 BTD#4 COLLEGE/CANNON 0 0 0 0 FEDERAL GRANTS 165,994 421,036 79,745 245,000 SDG&E 0 0 0 0 PLANNED LOCAL DRAINAGE 488,794 863,504 1,061,677 721,068 SEWER BENEFIT AREAS (C,D.E,F) 0 253.024 452,181 2.943.525 SEWER CONNECTION 2,669,428 2,823,755 5,200,226 4,960,609 SEWER REPLACEMENT 1,233,895 2,014,974 1,750,325 7,450,269 WATER - RECYCLED WATER 230,676 593,808 1,073,366 888,803 WATER CONNECTION 2,442,896 2,266,441 3,738,617 4,957,607 WATER REPLACEMENT 1,107,737 2,185,341 2,506,152 9,959.060 REDEVELOPMENT BONDS 133,308 127,079 254,554 68,290 GAS TAX 1.415.803 1,471,758 1,610,623 1.550,194 1995-96 1996-97 1997-98 1998-99 1999-2000 ACTUAL ACTUAL ACTUAL ESTIMATED ESTIMATED FUND REVENUES REVENUES REVENUE REVENUE REVENUE GENERAL CAPITAL CONST. 2,888.993 3.000,585 1,581,221 2,554,079 7.250,OOO 0 0 3,829.809 228.011 804,633 133,560 292,183 55,650 1,141,923 2,500,OOO 550,000 0 0 120,000 1,980,OOO 532,699 0 7.116,403 0 0 242.000 100,000 0 6,683,600 0 131,462 1,400,000 4,556,371 2.000,000 950,000 3,678,819 2,725,OOO 0 1.550,000 0 OTHER 542,320 1,352,547 2,471,355 843,776 TOTAL CAPITAL FUNDS 329542.382 49,227,405 70.456,647 99,698,505 50,551,902 NOTE: REVENUES INCLUDE INTERFUND LOANS AND TRANSFERS. CITY OF CARLSBAD CAPITAL FUNDS BUDGET EXPENDITURE SCHEDULE 1998-1997 TO 1998-1999 1996-97 1997-98 1998-99 (1) FUND ACTUAL ACTUAL ESTIMATED GENERAL CAPITAL CONST. 39068,165 1,137,693 2,416,581 PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13 8 16 PARK FEE PILAREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNET/HlGHWAY TRANSNET/BlKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #l CFD #2 CFD#3 BTD#2 POINS. LN-AVIARA PKWY BTDW3 CANNON ROAD WEST BTD#4 COLLEGE/CANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX OTHER 26,780 252,506 1,285,908 0 0 0 301,226 0 275,234 786,134 499,666 498,066 0 251,114 2,516,379 261 279,582 3540,881 255,722 0 83,345 17,505 421,302 0 484 0 1,334,650 187,625 151,251 2,447,648 2,170.009 20,795 462,810 602,662 19,705 73,381 768,416 2.184.579 474,493 2.7579116 28,638 4,337.178 0 0 0 0 3,449 18,900 0 0 926,582 28578.336 1.751,812 2.003,739 1,732,856 2.000,263 0 0 0 0 13,684 138,889 74,694 267,536 35,816 1,727.866 9.994.978 11,884,665 5,235,076 208618.432 670,688 1.486.845 0 0 589,053 688,490 246,276 1.987,912 0 0 79,475 78,776 0 0 255,507 216,046 98,843 625,962 1,395,ooo 2,383.487 608,373 758,368 115,641 424,962 2,595,405 3.690,870 1,937,045 1,659.168 540,536 33,832 343,806 865,338 1,122,720 2.124.453 1998-99 1999-2000 1999-2000 CONTINUING NEW TOTAL CIP APPROPR. APPROPR. APPROPR. 3.577.568 8,888,500 10.264.068 107,557 1,505,050 5,068.835 24,184 0 0 219,100 0 2,220,224 8,335,896 5,855 0 0 270,905 37,665 65,517 5,938.514 14,923,214 5,135,960 0 2,491,611 1,131,775 0 142,055 0 813,804 2,441,733 12.8219374 2,791,323 720,405 29628,667 1,599,569 1,818,297 1,773,700 20,000 0 9,143,ooo 10,000 3,500,000 180,000 0 0 1,677,OOO 2,300,OOO 550,000 0 1,240,OOO 120,000 1,980,OOO 500,000 0 4,410,ooo 0 0 450,000 0 0 6,683,600 0 950,000 1,857,OOO 2,427,083 3,034,981 659,527 5,728,983 2,775,592 0 5,699,200 0 127,557 1,505,050 14,211,835 34,164 3,500.000 150,000 219,100 0 3v897.224 10,635,896 555,855 0 1,240,OOO 390,905 2,017,685 565,517 5,938,514 19,333,214 5,135,960 0 2.941,611 1,131,775 0 6,825.655 0 ln763.804 4.298,733 159248,457 57826,304 1,379,932 8,357,650 4,375,161 13818,297 7,472,900 1 ,180,336 1,180,336 79.790.693 62.552.466 142.343.159 (1) 1998-99 ESTIMATED AMOUNT INCLUDES ACTUAL EXPENDITURES 8 ENCUMBRANCES ti (D E 0’ F: N 0‘ c: c-5 r: $. 8 8 :a0 .-i N. d -0 2. 8. a- % -2 m $v3 8 7 4 1 z 4 4 h 65 I L 5 I 2 w I : 0 ( ; 2 g fZE - - i’ma : ;; ; Li , 1 1 , , , , I 1 1 I I , e : 5 P E c i? a: s 4 E E I < c ‘ ‘ : . / : i : ! - I ,E . c- ” I c < : ; C & - : % c t : c z = E I ii 2 : 3 ; : : : z ” 5, ;I : I 1 1 I 1, , I ‘I 1 , i 1 1 I I I I , I I I : < I . i I i . F 3 Y :: I k t e 2 E i 0 I 1 I ; i : : i I I , b , , , , , , : > > i 1 I , I I , I , , , I 1 , I I , I I I I n ; 1 3 i 1 i i b , , D , I I b , I I , 1 , t , I , I , c s : F . : ,i I B B 5 e 5 : i : a B 3 B : : !i 4 2 s i 3 : ; ! i i j i ! i ; I i i i f i : = :- 2 E . r r : - r ’ E I t 2 3 P B 5 8 I L 2 3 Y I E , , > I I , 1 , , I / 1’ : s 2 oco ,zg CCL 4w5 ! 2 8.8 j<iZ :psg ! w > -z jW<O ; Lj 0 z j d Liz4 :828 ;oo?i :zzw : 4 ‘2 , 0 0 g id8 B 3gg : z z -I : z z I : 4 4 < ) 0 0 0 !4JJ rmnmm a2 8 9 c . 2: r-l: t siw 3 E 2F ii5 Ov, 48 ‘(L d !!I!!! JJ ma l4.u. cc I , L : - I 2 r , c I R : r t 3 E L 2: D 2 9 ii 2 P & F: 9 1 : . E c ; :: L 4 c > f 5 2 > E w : : F ,i : : E z B Ii E e c I 9 : s f ; C c 5 i I 5 i ; : 1 5 : 5 i ! . c : I , : c : . : i i I I j 1 i 1 i , 2 PP9 i&a,i ,,cAGi aaan.ao OOOOOC Ebi5Lt: 88888E tttttt I-++I-l--c 22SSii 222222 oooooc : j ! 5 z I I ? I i i ; I ; : c E 1 P I : 5 P E 5 : : E 5 3 E t 3 ;j I z is I 2 J 2 : lx ;# . u) 8 !i Y a 9 ig t Y : g , ! :: j $ , m z j In ; a’ i 2 , , D j e 1 z ; : 1 F I a ! :: I 2 ’ c 4 1 Y . II j $ : 4 : - i k ! e / z I 2 ) z ; g I e .i z E e t tf i? : : e : 6 3 c c: g e : : : i 5 1 ; I % , : j 3 I e b 5 I ; I CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT IBAR I 1999 - 2000 I FUND PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNET/HlGHWAY TRANSNETlBlKE TRANSNETlSTP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I1 CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST BTD#4 COLLEGE/CANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREA (C-D-E-F) SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GASTAX GENERAL CAPITAL CONST. 378.094 7,250,OOO 6.686,500 941,594 140,293 0 20,000 901,995 0 0 21,980,lOO 3,829,609 9.143,ooo 291,313 228,011 10,000 2,704,899 804,633 3,500.000 947,315 133,560 150,000 663,907 292,163 0 2,191,464 55,650 0 860,819 1,141,923 1,677,OOO 911,203 2,500,OOO 2.300.000 190,158 550,000 550,000 26,975 0 0 1,307,914 0 1,240,OOO 36,723 120,000 120,000 856 1,980,OOO 1,980,000 207,664 532,699 500,000 497,128 0 0 9,528,896 7,116,403 4,410,000 13,633,699 0 0 0 0 0 266,327 242,000 450,000 75,450 100,000 0 0 0 0 24,173 6,683,600 6,683,600 0 0 0 4,964,843 131,462 950,000 762,637 1,400,000 1,857,OOO 8,896,825 4,556,371 2,427,083 13,605,890 2,000,000 3,034,981 1,708,432 950,000 659,527 4,756,920 3,678,819 5,728,983 15.301,849 2,725,OOO 2,775,592 348,718 0 0 5,113,452 1,550,000 5.699,200 OTHER 153,472 0 0 153,472 TOTAL 113,380,402 50,551,902 62,552,466 101,379,839 120,293 901,995 16,666,709 509,324 9,532 930,875 956,069 2,247,114 325,742 1,111,203 190,158 26.975 67,914 36,723 856 240,363 497,128 12.235,298 13.633,699 0 58,327 175,450 0 24,173 0 4,146,305 305,637 11,026,114 12,570,909 1,998,905 2,706,755 15,251,257 348,718 964,252 BEGINNING BAL 7/l 199 REVENUE EXPENDITURES ENDING (1) BEGINNING BALANCE ON 7/l/99 IS NET OF CONTINUING APPROPRIATIONS. 6s CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES ?999 TO BUILDOUT K 2 2000 - 2001 1 BEGINNING FUND BAL 7/i/2000 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 941,594 1,750,000 1,786,OOO 905,594 PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNET/HlGHWAY TRANSNET/BlKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #l CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST BTD#4 COLLEGE/CANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AR’EAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX OTHER 100,293 901,995 15,311,580 627,324 361,439 979,824 1,252,406 2,764 546,826 1,311,203 190,158 26,975 67,914 36,723 856 284,697 497,128 18,577,064 7,931,299 0 55,687 2,175,450 0 24,173 0 4,451,339 314,637 13,158,793 9,664,264 1,089,378 4,295,245 9,479,833 348,718 1,818,352 153,472 TOTAL 101,379,839 44,625,238 49,061,674 96,943,403 120,293 901,995 16,666,709 509,324 9,532 930.875 956,069 2,247,114 325,742 1,111,203 190,158 26,975 67,914 36,723 856 240,363 497,128 12,235,298 13,633,699 0 58,327 175,450 0 24,173 0 4,146,305 305,637 11,026,114 12,570,909 1,998,905 2,706,755 15,251,257 348,718 964,252 153,472 0 0 33333,871 118,000 351,907 198,949 296,336 555,650 893,084 1,900,000 0 755,000 0 0 104,000 44,334 0 6,451,766 0 500,000 197,360 2,000,000 0 5,024,OOO 700,000 565,034 3,400,000 6,051,232 1,300,000 150,000 3,149,716 2,025,OOO 0 1,600,OOO 1,210,000 20,000 0 4,689,OOO 0 0 150,000 0 2,800,OOO 672,000 1,700,000 0 755,000 0 0 104,000 0 0 110,000 5,702,400 500,000 200,000 0 0 5,024,OOO 700,000 260,000 3,391,ooo 3,918,552 4,206,645 1,059,527 1,561,226 7,796,424 0 745,900 1.210,000’ kl CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT -, PAR 3 2oo’ - 2oo2 I BEGINNING FUND BAL 7lll2001 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 905.594 1,700,000 1,664,625 940.969 PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNETILOCAL TRANSNETlHlGHWAY TRANSNET/BlKE TRANSNETlSTP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #l CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PKW BTD#3 CANNON ROAD WEST BTlX4 COLLEGE/CANNON FEDERAL GRANTS SDGLE PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GASTAX OTHER 1001293 0 901,995 0 15,311,580 3,754,316 627,324 60,000 361,439 497,630 979,824 825,383 1,252.406 304,684 2,764 55,650 546,826 963,134 1.311,203 2,000,000 190,158 905,000 26,975 0 67,914 0 36,723 0 856 0 284,697 18,982 497.128 0 18,577,064 6,987,748 7,931,299 757,781 0 6.180,000 Y 55,687 1.216,400 2,175,450 400,000 0 1,200,000 24,173 0 0 0 4,451,339 692,945 314,637 400,000 13.158.793 2,226,126 9.664,264 1,300,000 1,089,378 150,000 4,295,245 3,601,716 9,479,833 2.025,OOO 348,718 0 1,818,352 1,650,OOO 153,472 3,000,000 20,000 80,293 0 901,995 4,339,ooo 14,726,896 0 687,324 600,000 259.069 1,800,OOO 5,206 0 1,557,089 0 58,414 447,000 1,062,960 1,700,000 1,611,203 905,000 190,158 0 26,975 0 67,914 0 36,723 0 856 0 303,679 0 497,128 5,810,OOO 19s754.812 8,686,673 2,407 6,180,000 0 1,200,000 72,087 0 2,575,450 1,200,000 0 0 24,173 0 0 1,600.OOO 3,544,284 355,000 359,637 6,559,991 8s824.928 1,141,835 9,822,429 159,527 1,079,851 2,549,808 5.347.153 1,515,202 9,989,631 0 348,718 362,000 3,106,352 3,000,000 153,472 TOTAL 96,943,403 423872,495 51,795,661 88,020,237 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT PAR 4 2oo2 - 2oo3 I BEGINNING FUND BAL 7/l/2002 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 940.969 700,000 433,000 1,207.969 PUBLIC ART 80,293 GOLF COURSE 901,995 PUBLIC FACILITIES FEE 14,726,896 ZONE 5,13,16 PARK FEE 687,324 PIL AREA 1 NW 259,069 PIL AREA 2 NE 5,206 PIL AREA 3 SW 1,557,089 PIL AREA 4 SE 58,414 TRAFFIC IMPACT FEE 1,062,960 TRANSNETlLOCAL 1.611,203 TRANSNETlHlGHWAY 190,158 TRANSNET/BlKE 26,975 TRANSNET/STP 67,914 TDA 36,723 STATE GRANTS 856 COUNTY GRANTS 303,679 ASSESSMENT DISTRICTS 497,128 CFD #l 19,754,812 CFD #2 2,407 CFD #3 0 BTD#2 POINS. LN-AVIARA PKWY 72,087 BTD#3 CANNON ROAD WEST 2,575,450 BTD#4 COLLEGE/CANNON 0 FEDERAL GRANTS 24,173 SDGBE 0 PLANNED LOCAL DRAINAGE 39544,284 SEWER BENEFIT AREAS 359,637 SEWER CONNECTION 8,824,928 SEWER REPLACEMENT 9,822,429 WATER - RECYCLED WATER 1,079,851 WATER CONNECTION 5,347,153 WATER REPLACEMENT 9,989,631 REDEVELOPMENT BONDS 348,718 GAS TAX 3,106,352 0 0 3,490,008 106,341 496,080 225,383 303,293 23,651 1,019,007 1,700,000 0 0 0 0 0 0 0 6,348,161 KY 0 783,600 95,000 10,645,OOO 0 0 1,063,490 400,000 2,163,316 1,300,000 150,000 3,407,609 2,025,OOO 0 1.700,000 0 20,000 0 2,050,OOO 0 0 0 0 0 447,000 1,700,000 0 0 0 0 0 0 0 110.000 0 0 500,000 0 10,645,OOO 0 0 2,600,OOO 0 5,888,262 691,835 159,527 1,514,682 1,635,178 0 250,000 0 60,293 901,995 16,166,904 793,665 755,149 230,589 1,860,382 82,066 1,634,967 1,611,203 190.158 26,975 67,914 36,723 856 303,679 497,128 25,992,974 2,407 0 355,687 2,670,450 0 24,173 0 2,007,774 759,637 5.099,982 10,430,594 1,070,324 7,240,081 10.379,453 348,718 4,556,352 153,472 OTHER 153,472 TOTAL 88,020,237 38,144,939 289644,484 97,520,692 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT I\ltAR52003-2004 I BEGINNING FUND BAL 7/l/2003 REVENUE EXPENDITURES GENERAL CAPITAL CONST. 1,207,969 1,100,000 I,31 3,000 ENDING 994.969 PUBLIC ART 60.293 0 GOLF COURSE 901,995 0 PUBLIC FACILITIES FEE 16,166,904 2,259,351 ZONE 5,13,16 PARK FEE 793,665 108,000 PIL AREA 1 NW 755,149 159,676 PIL AREA 2 NE 230,589 225,383 PIL AREA 3 SW 1,860,382 304,684 PIL AREA 4 SE 82,066 23,651 TRAFFIC IMPACT FEE 1,634,967 774,753 TRANSNETILOCAL 1,611,203 1,700,000 TRANSNET/HIGHWAY 190,158 0 TRANSNETlBlKE 26,975 0 TRANSNETISTP 67,914 0 IDA 36,723 0 STATE GRANTS 856 0 COUNTY GRANTS 303,679 0 ASSESSMENT DISTRICTS 497,128 0 CFD #l 25,992,974 59428,836 CFD #2 2,407 0 CFD #3 0 0 BTD#2 POINS. LN-AVIARA PKWY 355,687 500,000 BTD#3 CANNON ROAD WEST 2,670,450 0 BTD#4 COLLEGE/CANNON 0 0 FEDERAL GRANTS 24,173 0 SDGBE 0 0 PLANNED LOCAL DRAINAGE 2,007,774 1,101,717 SEWER BENEFIT AREAS 759,637 400,000 SEWER CONNECTION 5,099,982 1,426,594 SEWER REPLACEMENT 10.430,594 1,300,000 WATER - RECYCLED WATER 1,070,324 200,000 WATER CONNECTION 7,240,081 2,379,524 WATER REPLACEMENT 10,379,453 2,025,OOO REDEVELOPMENT BONDS 348,718 0 GAS TAX 4,556,352 1,750,000 OTHER 153,472 0 20,000 40,293 0 901,995 11,678,OOO 6.7489255 0 901,665 0 914,825 0 455,971 0 2,165,066 0 105,717 447,000 1,962,721 1,700,000 1,611,203 0 190,158 0 26,975 0 67,914 0 36,723 0 856 0 303,679 0 497,128 110,000 31,311,810 0 2,407 0 0 0 855,687 0 2,670,450 0 0 0 24,173 0 0 0 3,109,492 0 1 ,159,637 6,191,472 335,104 861,835 10,868,759 159,527 1,110,797 2,530,428 7,089,177 1,796,272 10,608,181 0 348,718 0 6.306.352 0 153,472 TOTAL 97,520,692 23,167,169 26,807,534 93,880,327 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT PAR 6 - -lo 2oo4 - 2oog I BEGINNING FUND BAL 7/l/2004 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 994,969 4,310.000 2,165,OOO 3,139.969 PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PILAREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNETlHlGHWAY TRANSNETlBlKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #l CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST BTD#4 COLLEGE/CANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GASTAX 40,293 901,995 6,748,255 901,665 914,825 455,971 2,165,066 105,717 1.962,721 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 31,311,810 2,407 0 855,687 2,670,450 0 24,173 0 3,109,492 1,159,637 335,104 10,868,759 1,110,797 7,089.177 10,608,181 348,718 6,306,352 O r 0 16.573.633 615,337 697,613 1,520,636 1,275,776 395,115 4,686,500 8,000,OOO 0 0 0 0 0 0 0 13,322,590 0 0 2,500,OOO 1,500,000 0 0 900,000 3,715,653 2,000,000 8,274,598 6,500,OOO 1 ,ooo,ooo 12,279,854 10,125,OOO 0 8,500,OOO 0 0 0 23,275,OOO 0 0 600,000 2,550,OOO 500,000 3,985.OOO 8,000,OOO 0 0 0 0 0 0 0 38,933,500 0 0 3,226,800 2,000,000 0 0 900,000 110,000 0 5,405,716 2,973,309 797,635 8,031,OOO 2,874,OOO 0 555,000 0 40,293 901,995 46,888 1,517,002 1,612,438 1,376,608 890,842 832 2,664,221 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 5,700,899 2,407 0 128,887 2,170,450 0 24,173 0 6,715,145 3.159.637 3.203.986 14,395,450 1,313,162 11,338,031 17,859,181 348,718 14,251,352 OTHER 153,472 153,472 TOTAL 93,880,327 108,692,305 106,881,960 95,690,673 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT 9 to Buildout FUND GENERAL CAPITAL CONST. I BEGINNING BAL 7/l/2009 REVENUE EXPENDITURES 3,139,969 3,000,000 4.763.000 PUBLIC ART 40,293 GOLF COURSE 901,995 PUBLIC FACILITIES FEE 46,888 ZONE 5,13,16 PARK FEE 1.517.002 PIL AREA 1 NW 1,612,438 PIL AREA 2 NE 1.376.608 PIL AREA 3 SW 890,842 PIL AREA 4 SE 832 TRAFFIC IMPACT FEE 2,664,221 TRANSNETlLOCAL 1,611,203 TRANSNET/HIGHWAY 190,158 TRANSNETlBlKE 26,975 TRANSNET/STP 67,914 TDA 36,723 STATE GRANTS 856 COUNTY GRANTS 303,679 ASSESSMENT DISTRICTS 497,128 CFD #l 5,700,899 CFD #2 2,407 CFD #3 0 BTD#2 POINS. LN-AVIARA PKWY 128,887 BTD#3 CANNON ROAD WEST 2,170,450 BTD#4 COLLEGE/CANNON 0 FEDERAL GRANTS 24,173 SDG&E 0 PLANNED LOCAL DRAINAGE 6,715,145 SEWER BENEFIT AREAS 3,159,637 SEWER CONNECTION 3,203,986 SEWER REPLACEMENT 14,395,450 WATER - RECYCLED WATER 1,313,162 WATER CONNECTION 11,338,031 WATER REPLACEMENT 17,859,181 REDEVELOPMENT BONDS 348,718 GASTAX 14,251,352 0 1 ,ooo,ooo 16,921,289 373,977 1,370,421 2,724,068 527,284 669,191 7,717,007 800,000 0 0 0 0 0 0 0 6.412.839 (0) 0 1,200,000 1,500,000 0 0 0 7,646,625 9,700,000 10,541,724 20,900,000 2,200,000 16,359,445 22,275,OOO 0 20,700,OOO 0 1,765,200 16,391,OOO 1,840,OOO 2,980,OOO 3,425.OOO 1.410.000 565,000 10,364,OOO 800,000 0 0 0 0 0 0 0 12,104,500 0 0 514,000 3,664,OOO 0 0 0 14,265,OOO 6,600,000 6,675,079 6,575,266 2,369,007 0 0 0 13,325,OOO 0 0 . OTHER 153,472 153,472 TOTAL 95.690.673 154.538.869 110.395.052 139.834.490 ENDING 1,376,969 40,293 136,795 577,176 50,979 2,859 675,675 8,126 105,023 17,228 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 9,239 2,407 0 814,887 6,450 0 24,173 0 96,770 6,259,637 7,070,631 28,720,184 1,144,155 27,697,475 40,134,181 348,718 21,626,352 - CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT IGMV BEGINNING TOTAL TOTAL FUND BALANCE REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 378,094 1.9,810,000 18,811,125 1,376,969 PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNETILOCAL TFtANSNET/HIGHWAY TRANSNET/BIKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #l CFD #2 CFD #3 BTD#P POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST BTD#4 COLLEGE/CANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX OTHER 140,293 0 901,995 1 ,ooo,ooo 21,980,100 50,162,077 291,313 1,609,666 2,704,899 4,377,959 947,315 5,853,360 663,907 3,304,219 2,191,464 1,778,559 860,819 17,195,410 911,203 18,600,000 190,158 1,455,ooo 26,975 755,000 1,307,914 0 36,723 120,000 856 2,084,ooo 207,664 596,015 497,128 0 9,528,896 52,068,343 13,633,699 757,781 0 6,680,OOO 266,327 6,639,360 75,450 5,595,ooo 0 11,845,OOO 24,173 11,707,600 0 1,600,OOO 4,964,843 14,916,927 762,637 17,700,000 8,896,825 35,239,961 13,605,890 34,600,OOO 1,708,432 4,800,OOO 4,756,920 44,856,682 15,301,849 43,225,OOO 348,718 0 5,113,452 37,450,ooo 153,472 4,210,OOO 100,000 40,293 1,765,200 136,795 71.565,OOO 577,176 1.850,OOO 50,979 7,080,OOO 2,859 6,125,OOO 675,675 3,960,OOO 8,126 3,865,OOO 105,023 18,039,OOO 17,228 17.900,000 1,611,203 1,455,ooo 190,158 755,000 26,975 1,240,OOO 67,914 120,000 36,723 2,084,ooo 856 500,000 303,679 0 497,128 61,588,OOO 9,239 14,389,073 2,407 6,680,OOO 0 6,090,800 814,887 5,664,OOO 6,450 11.845,OOO 0 11.707,600 24,173 1,600,OOO 0 19,785.OOO 96,770 12,203,OOO 6,259,637 37,066,155 7,070,631 19,485,706 28,720,184 5,364,277 1,144,155 21,916,127 27,697,475 18,392,668 40,134,181 0 348,718 20,937,100 21,626,352 4,210,OOO 153,472 TOTAL 113,380,402 462,592,919 436,138,831 139,834,490 CITY OF CARLSBAD PERSO, ZL ALLOCATIONS FOR 1998-99 AND 1. ~-00 EXHIBIT C MAJOR SERVICE AREA POLICY AND LEADERSHIP GROUP CITY COUNCIL CITY MANAGER CITY TREASURER CITY CLERK CITY ATTORNEY OVER 98199 99100 (UNDER) FINAL FINAL 1998-99 BUDGET BUDGET ALLOCATED I 1 1 0 9 6.75 (2.25) 0.75 0.75 0 4 4 0 5 6 1 ADMINISTRATIVE SERVICES I ADMINISTRATION 0 2 2 INFORMATION SYSTEMS 13 17 4 FINANCE 14 20 6 RISK MANAGEMENT 2 2 0 PURCHASING 5 5 0 HUMAN RESOURCES 8 WORKERS COMP 8 9 1 PUBLIC SAFETY POLICE FIRE I 128 134 6 79 79.75 0.75 COMMUNITY DEVELOPMENT I COMM DEVELOPMENT ADMINISTRATION 4.75 4.75 0 BUILDING INSPECTION 13 13 0 ECONOMIC DEVELOPMENT 1 1 0 GEOGRAPHIC INFORMATION 2 2 0 PLANNING 24 24 0 HOUSING AND REDEVELOPMENT 10 10 0 COMMUNITY SERVICES I LIBRARY CULTURAL ARTS PARK PLANNING AND RECREATION MANAGEMENT RECREATION SENIOR PROGRAM PUBLIC WORKS ADMINISTRATION ENGINEERING SERVICES GENERAL SERVICES MAINTENANCE & OPERATIONS I 32.25 40.75 8.5 3 4 1 3 3 0 15.5 16 0.5 3 3 0 7.25 4 (3) 37 51 14 47.25 51.75 5 81.25 71 (10) GRAND TOTAL LABOR FORCE 553 586.5 33.5 - CITY OF CARLSBAD -1 PERSO, .iL ALLOCATIONS FOR 1998-99 AND 1. j-00 SUMMARY OF REQUESTED LABOR FORCE BY CATEGORY 98199 Full Time Personnel 547 314 Time Personnel in Full Time Equivalents 6 Hourly Full Time Equivalent Personnel 111.41 TOTAL LABOR FORCE 664.41 99100 582 4.5 135.55 722.05 Difference 35 -1.5 24.14 57.64 INTERNS Management Interns Building Inspector Intern GIS 98199 99100 Difference 0 2 2 0.5 1 0.5 0.5 0.5 0 Planning -front counter 1.5 1.5 0 TOTAL LIMITED TERM EMPLOYEES 2.5 5 2.5 - CONTINUING APPROPRIAT, 5 EXHIBIT D 1998-99 TO 1999-00 City Clerk AMOUNT Office furniture & equipment for redesign & reconfiguration of Clerks Department 21,500 City Attornev Legal services for Habitat Management Plan Scanner 7,078 1,000 Purchasing NIGP Commodity Code System Human Resources Cabinets Pulsetaker Survey Mandated Title VII training Records Mananement Citywide records management / imaging project Citizen alert system 28,000 Office furniture for remodel project 38.035 Communitv Development Administration Systems Furniture Public Works Administration Systems Furniture Park Maintenance Holiday Park tot lot sidewalk I curbing Tennis court lighting upgrades (La Costa Canyon & Laguna Riviera) Poinsettia irrigation filter installation Sports lighting control system Playground equipment replacement Enqineering NPDES program Beach erosion program Traffic impact fee program Enoineerinn - Developer funded Developer deposits for condemnation projects Aquatics Solar heating system renovation Recreation Computer equipment Harding systems furniture 4,500 1,300 15,000 40,000 I,31 9,500 55,000 12.000 40,000 40,000 10,000 36,000 45.000 15,924 6,423 16,100 464,432 95,000 1,775 5.325 A CONTINUING APPROPRIATI 5 EXHIBIT D 1998-99 TO 1999-00 AMOUNT Library - Adult learning Literacy Scholarship Account 1,363 Librarv - Historical preservation Historic tree inventory and management program 2,500 Non - Departmental Batiquitos Lagoon Foundation 20,000 Subtotal General Fund $ 2,342,755 Police Asset Forfeiture Available year-end balance 68,000 COPS Grant Available year-end balance, Bicycle Patrol 169,000 Law Enforcement Block Grant Available year-end balance 3,371 Cultural Arts - Sister City Available year-end balance, delegation visits Art Gallerv Donations Available year-end balance, for art exhibits Recreation Donations Available year-end balance; for park improvements 3,900 Available year-end balance; for triathlon and luau festival 10,900 Available year-end balance; for youth sports uniforms and T-shirts 8,800 Library Literacy Grants Available year-end balance Misc. State Grants Available year-end balance Misc. Federal Grants Available year-end balance CDBG Available year-end balance Water Operations Utility Billing System Implementation staffing 12,500 Automatic meter reading (AMR) equipment 35,000 Flashing arrow signs (traffic control) 6.000 1.122 22.500 7,519 17,200 128,736 268,387 CONTINUING APPROPRIATI j EXHIBIT D 1998-99 TO 1999-00 CII vouchers Asphalt repairs Valve box adjustment after overlay AMOUNT 2,000 15,000 20,000 Recvcled Water Operations Trench Safety Equipment trailer 5,000 Sewer Maintenance Utility Billing System Implementation staffing Televising & evaluating sewer collection system Asphalt repairs Sewer benefit area study Manhole adjustment after street overlay Asphalt I concrete saw with trailer 12,500 75,000 10,000 10,000 15,000 5,000 Fleet Replacement Medium replacement trailer 3 small replacement trailers 13,000 30,000 Information Systems Faraday network integration assistance Outside help desk pilot Microsoft Office 2000 upgrade and UNIX tools MS Office and BiTech /IFAS technical training New GIS computer CMWD server HP K380 UNIX box upgrades Remote access equipment 23,000 30,000 77,837 22,000 22,000 12,000 25,000 43,000 Subtotal Other Funds $ l-230.272 Grand Total $ 3573,027 RESOLUTION NO. 1056 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, CALIFORNIA, ADOPTING THE WATER DISTRICT FINAL OPERATING BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, California, has held such public hearings as are necessary prior to the adoption of the 1999-00 Operating and Capital Improvement Budgets. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District as follows: 1. That the above recitations are true and correct. 2. That certain documents now on file in the office of the Secretary entitled “City of Carlsbad, 1999-00 Operating Budget and 1999-00 to Buildout Capital Improvement Program - Preliminary” as amended in accordance with Exhibit A attached hereto and incorporated by reference herein, is hereby adopted as the Operating and Capital Improvement Budgets for the Carlsbad Municipal Water District for the fiscal year 1999-00. 3. That the amounts reflected as estimated revenues for fiscal year 1999-00 are hereby adopted as the budgeted revenues for 1999-00. 4. That the amount designated as 1999-00 Budget in Exhibit A is hereby appropriated to the department or fund for which it is designated, and such appropriation shall not be increased except as provided herein. 5. That total appropriations may only be increased or decreased by the Board of Directors by passage of a resolution amending the budget. 6. That the following controls are hereby placed on the use and transfers of budget funds: A. No expenditure of funds shall be authorized unless sufficient funds have been appropriated by the Water Board or Executive Manager as described below. i The Executive Manager may authorize all transfers of funds from account to account within the same fund in an amount up to $100,000 per transfer. ii. The Executive Manager may delegate the authority to make budget transfers. . . . 111. The Executive Manager may authorize budget adjustments involving offsetting revenues and expenditures; the Executive Manager may authorize increases in an appropriation for a specific purpose where the appropriation is offset by unbudgeted revenue which is designated for said specific purpose. C. The Board of Directors must authorize any increase in the number of authorized permanent personnel positions above the level identified in the final Budget. The Executive Manager may authorize the hiring of temporary or part time staff as necessary, within the limits imposed by the controls listed above. 7. That all appropriations for outstanding encumbrances as of June 30, 1999 are hereby continued into 1999-00 for such contracts and obligations. 8. All appropriations for Capital Improvement Projects remaining unexpended at June 30, 1999, are hereby appropriated for such capital projects for the 1999-00 fiscal year. 9. That 1999-00 appropriations in the approximate amount of $95,500 are hereby continued into 1999-00 for the purpose shown in Exhibit B. All appropriations for outstanding encumbrances as of June 30, 1999, are hereby continued into 1999-00 for such contracts or obligations. PASSED, APPROVED AND ADOPTED at a regular meeting of the Board of Directors held on the 15 day of June , 1999 by the following vote, to wit: AYES: Board NOES: None Members Lewis, Nygaard, Finnila & Hall ABSENT: Board Member Kulchin ATTEST: (SEAL) KAREN R. KUNDTZ, Atistant Secretary EXHIBIT A PROGRAM: WATER OPERATIONS FUND: WATER ENTERPRISE PROGRAM GROUP: MAINTENANCE & OPERATIONS ACCT NO. 5016310/5026310 I I 1996-97 I 1997-98 I 1998-99 I 1999-00 I ACTUAL ACTUAL BUDGET BUDGET PERSONNEL 1,996.908 $ 2,327,089 $ 2,710,457 $ 1,854,565 MAINTENANCE & OPERATION CAPITAL OUTLAY PROGRAM GROUP DESCRIPTION: The Carlsbad Municipal Water District, a subsidiary district of the City of Carlsbad. provides potable water service to approximately 85 percent of the City (66,300 customers), and recycled water service to 116 sites Citywide. The District purchases 100% of its potable water as treated water from the Metropolitan Water District and the San Diego County Water Authority. Recycled water is purchased from the Vallecitos and Leucadia Water Districts who own and operate their own water reclamation facilities. PROGRAM ACTIVITIES: Operations 8 Maintenance: Provide safe and efficient circulation of water and recycled water utility systems and a high level of maintenance for infrastructure to include storage facilities, transmission distribution pipelines and reservoirs. Meter Services: Collect customer usage data for billing of all water customers and provide requested customer service for water utility customers and assistance with account maintenance. Account Maintenance: Provide information and customer service in support of meter services and the utility billing divisions. Cross Connection Control: Provide recycled water customer with information regarding use site requirements and to insure City/district compliance with State-mandated regulations. PERFORMANCE MEASURES: Operations 8 Maintenance: . Operate and maintain 340 miles of transmission and distribution pipelines. . Operate and maintain 13 reservoirs totaling 54 million gallons of storage capacity and Maerkle Reservoir with a capacity of 600 acre-feet (195 million gallons). . Maintain and test 2,300 tire hydrants and continue valve maintenance program. . Continue development of Phase II of the Recycled Water Program. . Review and, if needed, update Wastewater Rate Model to insure appropriate rates and fees. PROGRAM: WATER OPERATIONS FUND: WATER ENTERPRISE PROGRAM GROUP: MAINTENANCE & OPERATIONS PAGE TWO ACCT NO. 5016310/5026310 PERFORMANCE MEASURES (continued): Meter Services: . Collect usage data and maintain 20,100 potable and 116 recycled water meters. . Install utility services for new development. . Investigate water consumption issues in response to customer requests. . Implement Single-Jet Large Meter Replacement Pilot Program. . Continue development of the Automatic Meter Reading (AMR) Pilot Program. . Coordinate with Information Systems implementation of new utility billing software system. Account Maintenance: . Process accurate customer usage monthly and transmit to utility billing division for preparation of monthly utility billing. . Resolve meter reading discrepancies. . Process requests for relocation and/or exchanges of water meters. . Provide assistance to water customers regarding their utility accounts. . Coordinate with Information Systems implementation of new utility billing software system. Cross Connection Control: . Schedules and tests for cross connections between potable and recycled water systems on both new and existing sites. SIGNIFICANT CHANGES: This budget reflects the transfer of the utility billing and engineering divisions to the City’s Finance and Engineering Departments, respectively. These figures also include budgetary consolidation of the potable and recycled water operations. Two Utility Worker positions have been added to ensure that all water valves and fire hydrants are in proper working condition. A Cross Connection Control Technician has also been added to ensure that there is not cross-over between the recycled water system and the potable water system. h PROGRAM: FINANCE FUND: GENERAL I ENTERPRISE PROGRAM GROUP: FINANCE ACCT NO. 0011310 I I 1996-97 I 1997-98 I 1998-99 1999-00 I ACTUAL ACTUAL BUDGET BUDGET PERSONNEL $ 718,308 $ 744,689 $ 900,224 $ 1,154,517 MAINTENANCE & OPERATION CAPITAL OUTLAY MISSION STATEMENT: Our mission is to ensure that the City of Carlsbad makes sound financial decisions. We take pride in accomplishing this mission by utilizing our chief values: maintain individual and departmental credibility; work together as a team while respecting each others differences; and, consistently strive to go above and beyond expectations. PROGRAM ACTIVITIES: Lonq-Range Financial Planning:. . Prepare ten year operating forecasts incorporating various “what if “scenarios to facilitate decision-making for City Council and city departments. Budget Management: . Prepare and monitor annual capital and operating budgets to allocate resources in a cost effective manner in alignment with the Council’s goals. . Perform annual review of all City fees and present recommendations for changes to Council. . Prepare annual cost allocation plan to provide an accurate accounting of program costs. - . Monitor and report on revenues and expenditures monthly to insure budgetary integrity and facilitate effective decision-making. Accounts Receivable/Cashiering: . Accurately bill, collect, record and report all City revenues. . Collect all funds due to the City through timely follow-up of delinquent accounts and use of collection agencies. . Continue to refine business processes which will improve customer service and increase efficiency. Accounts PavablelPayroll: . Prepare checks for City employees and service and commodity suppliers . Maintain turnaround time of 30 days to process and pay invoices General Accountiw and Reporting: . Meet the financial reporting needs of our customers through better access and training on the financial information system. . Prepare and maintain finance records and documents in conformity with generally accepted accounting principles and applicable legal and contractual provisions. . Prepare Comprehensive Annual Financial Report in conformity with generally accepted accounting principles . Provide City management and Council with timely monthly financial reports. . Monitor City debt issues to insure timely payment and identify refinancing opportunities. Provide continuing disclosure as required. PROGRAM: FINANCE FUND: GENERAL / ENTERPRISE PROGRAM GROUP: FINANCE PAGE TWO ACCT NO. 0011310 Assessment DistrictlCFD Administration: l Assist in evaluation and formation of new districts. . Issue bonds for capital projects when required. Pay debt service and provide continuing disclosure information as required. l Monitor contracts for day-to-day administration of CFD and all assessment districts as required by formation documents and State law. Audits.. -* l Monitor sales tax audit contract to ensure effectiveness. . Perform in-house internal control reviews as needed. WORKLOAD AND PERFORMANCE INDICATORS: FY1997 FY1998 FY 1999 lest) 1. Average number of days to close books at month end: 2. Number of business licenses processed: 3. Number of payroll checks issued 4. Number of electronic payroll checks issued 5. Awards received for CAFR 6. Awards received for Annual Budget 7. Outstanding debt issues administered 20 15 5,079 5,600 20,555 16,359 0 4,278 CSMFO/GFOA CSMFO/GFOA Excellence: Operating and Capital $100 million $96 million 10 5,750 10,868 10,868 Not Available Meritorious: Operating $100 million KEY GOALS FOR 1999-00: “Ensure the effective and efficient delivery of top-quality services to our Communitv.” . Increase the availability and accessibility of useful financial information to our customers through easy-to-use reporting systems. . Redesign business processes in utility billing, business licenses and cashiering to improve customer service and increase efficiency. “Create diverse, broad-based economic strategies to ensure the financial health of the Community and the Citv.” . Improve ability to forecast and plan for the future by refining our comprehensive long-term financial planning models. . Promote responsible cost management through the development and use of job costing systems. . Develop and implement a plan to maximize the City’s revenue collection and recovery with a focus on enforcement of the business license tax ordinance. . Identify and secure funding sources for the construction of major east-west circulation elements within the City. “Enhance educational opportunities and school facilities for all segments of the Community.” . Develop training plan to ensure that the City’s workforce has the knowledge and skills needed to excel on their job. SIGNIFICANT CHANGES: Finance will assume responsibility for utility billing during this fiscal year. Utility billing was previously a responsibility of the Public Works department. Budget includes funding for the bi-annual fee update as well as a business systems analyst position which will provide a liaison between the Information Services department and the finance department in the creation of reports, troubleshooting of systems, and implementation and maintenance of all systems. I . . . . . . . . . . . . . . . . . H H 00 I , d 4 ;’ i B 2 3 F I F B % n 2 I d 4 5 3 s ; 2 ; 8 : = 3 ? ? : :! 5 2 : I : g ! 0 0 z 8 x a’ P I 5 0 2 I D 9 3 Y 5 6 m I i I f i : 2 i [ f ; j ? * , CONTINUING APPROPRIATIONS EXHIBIT B 1998-99 TO 1999-00 DEPARTMENT/PURPOSE Water Operations Utility Billing System Implementation staffing Automatic meter reading (AMR) equipment Flashing arrow signs (traffic control) CII vouchers Asphalt repairs Valve box adjustment after overlay Recycled Water Operations Trench Safety Equipment trailer AMOUNT 12,500 35,000 6,000 2,000 15,000 20,000 5,000 Total Continuina Amrowiations $ 95.500 RESOLUTION NO. 310 A RESOLUTION OF THE HOUSING AND REDEVELOPMENT COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE OPERATING BUDGET OF THE REDEVEL- OPMENT AGENCY AND HOUSING AUTHORITY FOR FISCAL YEAR 1999-00 WHEREAS, the Housing and Redevelopment Commission of the City of Carlsbad, California (the Commission), has reviewed the operating budget for the Redevelopment Agency for Fiscal Year 1999-00; and WHEREAS, the Commission has reviewed the operating budget for the Housing Authority Section 8 Programs, for Fiscal Year 1999-00; and WHEREAS, public hearings have been held as necessary prior to the adoption of the final operating budgets. NOW, THEREFORE, BE IT RESOLVED by the Housing and Redevelopment Commission of the City of Carlsbad, California as follows: 1. That the above recitations are true and correct. 2. That certain documents now on file in the office of the City Clerk of the I City of Carlsbad entitled “City of Carlsbad, 1999-00 Operating Budget and 1999-00 to I Buildout Capital Improvement Program - Preliminary” as amended in accordance with Exhibit A attached hereto and incorporated by reference herein, shall be and the same are hereby adopted as the Operating Budgets for the Carlsbad Redevelopment Agency and Housing Authority Section 8 Programs for the fiscal year 1999-00. 3. That the amounts reflected as estimated revenues for fiscal year 1999- 00 are hereby adopted as the budgeted revenues for 1999-00. 4. That the amount designated as 1999-00 Budget in Exhibit A is hereby appropriated to the department or fund for which it is designated, and such appropriation shall not be increased except as provided herein. 5. That the following controls are hereby placed on the use and transfers of budget funds: A. No expenditure of funds shall be authorized unless sufficient funds have been appropriated by the Commission or Executive Director as described below. i. The Executive Director may authorize all transfers of funds from acount to account within the same fund in an amount up to $100,000 per transfer. ii. The Executive Director may delegate the authority to make budget transfers. . . . III. The Executive Director may authorize budget adjustments involving offsetting revenues and expenditures; the Executive Director is authorized to increase an appropriation for a specific purpose where said appropriation is offset by unbudgeted revenue which is designated for said specific purpose. C. The Commission must authorize any increase in the number of authorized permanent personnel positions above the level identified in the final Budget. The Executive Director may authorize the hiring of temporary or part time staff as necessary, within the limits imposed by the controls listed above. 6. That all appropriations for outstanding encumbrances as of June 30, 1999, are hereby continued into 1999-00 for such contracts and obligations. 8. That all appropriations for Capital Improvement Projects remaining unexpended at June 30, 1999, are hereby appropriated for such capital projects for the 1999-00 fiscal year. 9. That an additional $110,000 be appropriated to the Section 8 budget for 1998-99 due to increases in rental assistance payments resulting from escalating rents in the area. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 20 PASSED, APPROVED AND ADOPTED at a regular meeting of the Housing and Redevelopment Commission of the City of Carlsbad on the 15 day of June 1999, by the following vote, to wit: AYES: Commissionexs Lewis, Nygaard, Finnila & Hall NOES: None ATTEST: ABSENT: Commissioner Kulchin (SEAL) EXHIBIT A PROGRAM: REDEVELOPMENT OPERATIONS FUND: REDEVELOPMENT AGENCY PROGRAM GROUP: HOUSING AND REDEVELOPMENT ACCT NO. 8013410 MAINTENANCE & OPERATION CAPITAL OUTLAY MISSION STATEMENT: Helping people achieve their dreams. PROGRAM ACTIVITIES: Implementation of the Carlsbad Village Redevelopment Master Plan: l Coordination of project development and permit processing. . Implementation of the Facade Improvement Program. . Administration of the Parking-In-Lieu Fee Program. . Property acquisition for future redevelopment projects and facilitation of new development. Community Relations and Public Relations Program: . Work with the Carlsbad Village Business Association and other business organizations to continue community awareness and public relations activities on behalf of the Redevelopment Agency. . Implement the Village Beautification Program through coordination of maintenance efforts in the Village. . Work with NCTD to resolve parking and land use-related issues associated with the Village Commuter Rail Station and surrounding properties. . Process fifteen (15) redevelopment permit applications for improvements to existing structures or new construction projects. . Process ten (IO) sign permit applications. . Process five (5) preliminary review applications. . Process four (4) FacadeISignage Improvement Grants. l Facilitate the development of at least one “special opportunity project” identified in the Village Redevelopment Master Plan. l Provide quarterly updates on the on-going maintenance efforts of the Village Beautification Program. PROGRAM: REDEVELOPMENT OPERATIONS FUND: REDEVELOPMENT AGENCY PROGRAM GROUP: HOUSING AND REDEVELOPMENT PAGE TWO ACCT NO. 8013410 KEY GOALS FOR 1999-00: “Create diverse, broad-based economic strateuies to ensure the financial health of the Community and the citv.” . Process redevelopment permits of all types for projects within the Village Area which represent high quality development or redevelopment of properties and buildings. . Implement a program to attract and retain desired businesses based on the results of the resident/customer survey conducted by SANDAG. “Integrate a comprehensive efficient transportation svstem with quality of lifecentered land use decisions.” . Implement the Village Area Parking Program which supports public/private partnerships in financing the maintenance and construction of public parking lots in centralized areas and encourage visitors to the Village to utilize the public parking areas and to walk to surrounding businesses and/or tourist activities. . Develop a program to identify impediments to full utilization of all existing public parking lots and coordinate required improvements to eliminate any impediments. . Complete and implement the Transportation Corridor Master Plan within the Village which supports transit- oriented development. SIGNIFICANT CHANGES: None. PROGRAM: REDEVELOPMENT DEBT SERVICE FUND: REDEVELOPMENT DEBT SERVICE PROGRAM GROUP: HOUSING AND REDEVELOPMENT ACCT NO. 8023412 MAINTENANCE & OPERATION CAPITAL OUTLAY MISSION STATEMENT: Helping people achieve their dreams. PROGRAM ACTIVITIES: . Bond Interest Payments: Process payments on principal and interest amounts due. . Property Tax Administration Charnes: Process payment to San Diego County for. administration and collection of property taxes on behalf of the Redevelopment Agency. PERFORMANCE MEASURES: . Completion of program activities in a timely fashion. KEY GOALS FOR 1999-00: “Ensure the effective and efficient delivery of top-quality services to our Community.” . Complete payments on bond interest principal amounts in a timely fashion as required under issuance criteria. . Complete payment to County of San Diego for administration and collection of property taxes in accordance with the billing invoice from the County. SIGNIFICANT CHANGES: None PROGRAM: LOW/MODERATE INCOME HOUSING FUND: REDEVELOPMENT AGENCY PROGRAM GROUP: HOUSING AND REDEVELOPMENT ACCT NO. 8033420 1996-97 1997-98 1998-99 1999-oc ACTUAL ACTUAL BUDGET BUDGET PERSONNEL $ 39,452 $ 37,312 $ 60,593 $ 43,700 MAINTENANCE & OPERATION 36,096 27,873 76,949 76,195 CAPITAL OUTLAY 0 0 0 0 GRAND TOTAL $ 75,548 $ 65,185 $ 137,542 $ 119,895 F&- Tl,YEf f?Wl3X$‘+S _ ‘,_ -lb,‘, ‘: .’ ;_ : ,, ,9.25 1 : 0~80 , ‘apo 1’ ;, ,, (3.65 HOURLYFTE PQSFT@NS I (@o 1 i - ,, _i 0.00 1 0.00 1, 0.00 MISSION STATEMENT: Helping people achieve their dreams. PROGRAM ACTIVITIES: Affordable Housing Project Processing Procedures: . Continue development of affordable housing project processing procedures. Affordable Housing Project Coordination: . Assist in the structure and implementation of affordable housing projects. Affordable Housinq Education Prowam: . Direct educational programs for citizens, businesses and government agencies interested in affordable housing. PERFORMANCE MEASURES: l Process at least three (3) requests for financial assistance through the Housing Policy Team. l Use existing low and moderate income housing funds to purchase property for an affordable housing project in, or near, the Village Redevelopment Area through acquisition of vacant land and new construction or acquisition of existing units and rehabilitation. l Participate in at least three (3) outreach programs, professional conferences, and/or citizen and business groups on affordable housing. KEY GOALS FOR 1999-00: “Ensure the effective and efficient delivery of top-quality services to our Communitv.” . Continue to assist private developers to provide affordable housing as required by the lnclusionary Housing Ordinance. “Create diverse, broad-based economic strategies to ensure the financial health of the Community and the city.” . Attract and retain target industries, businesses and jobs that result in improved economic health through the implementation of affordable housing programs which serve to enhance the jobs/housing balance within the community. SIGNIFICANT CHAl’iGES: None. PROGRAM: FUND: PROGRAM GROUP: RENTAL ASSISTANCE HUD SECTION 8 HOUSING HOUSING AND REDEVELOPMENT ACCT NO. 1903401/3403 MAINTENANCE & OPERATION CAPITAL OUTLAY ~HQURLY/FTE POStTIolW 0.00 ,. 1 0.06 f 0‘00 1 0.00 1 MISSION STATEMENT: Helping people achieve their dreams. PROGRAM ACTIVITIES: Section 8 Tenant-Based Rental Assistance . Provide federal funding to subsidize rents for 503 very-low and low income households. . Assist low-income households in the community to access rental housing that is decent, safe and sanitary. . Ensure program is being administered in compliance with federal regulations, federal guidelines and the Carlsbad Administrative Plan. . Achieve and maintain a lease rate that effectively utilizes funding allocation. Familv Self-Sufficiency . Designed to enable unemployed, under-employed or under-educated low income families to achieve economic independence from welfare. . Assist families in identifying barriers to becoming self-sufficient. . Provide guidance to the family to establish a five year goal and plan. . Coordinate needed support services and acts as an advocate on behalf of the client. Community Opportunities Program . Collaborative effort among several local housing agencies. . Provide education and guidance to rental assistance participants to reach personal goals and career objectives, emphasizing housing opportunities in neighborhoods of choice. . Participate in ongoing implementation of program changes and marketing of the program to participants and owners in Carlsbad. PERFORMANCE MEASURES: . Achieve and maintain a monthly lease rate utilizing 90-95% of allocated funds. . Update and revise Administrative Plan to adopt changes in federal regulations. . Expand rental assistance knowledge by conducting community workshops, providing quarterly owner newsletters and conducting an owner workshop. . Funding utilized FY 1997-1998: 88% . Average families assisted: 474 PROGRAM: RENTAL ASSISTANCE FUND: HUD SECTION 8 HOUSING PROGRAM GROUP: HOUSING AND REDEVELOPMENT PAGE TWO ACCT NO. 1903401/3403 KEY GOALS FOR 1999-00: “Ensure the effective and efficient delivery of top-quality services to our Community.” Encourage the innovative, cost effective delivery of City Services mechanisms such as: public/private partnerships/non-profit organizationslenterprise services/regionaIization/consolidation. . Revise and update the Tenant-Based Rental Assistance Administrative Plan to incorporate the upcoming program changes outlined in the Quality Housing and Work Responsibility Act. “Enhance educational opportunities and school facilities for all segments of the Community.” Develop, maintain, and enhance programs that result in an informed, knowledgeable and involved public through enhanced Community dialogue. . Increase owner and community knowledge of the Tenant-Based Rental Assistance Program by collaborating with non-profit and social service agencies; make presentations to business and community organizations, non- profit and social service agencies and local citizen groups; and expand informational/educational materials. SIGNIFICANT CHANGES: None. $ 3 I , 1 : i J ! i , , j 1 , 1 , 1 I I ; : 5 , , ; ; : i ; 1 a > 1 1 , ; i J ! 1 i > i , , I B , , , I I I 2 : ; 3 : ; I i i , i j RESOLUTION NO. 99-219 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA ESTABLISHING THE 1999-00 APPROPRIATION LIMIT AS REQUIRED BY ARTICLE XIIIB OF THE CALIFORNIA STATE CONSTITUTION AND STATE LAW WHEREAS, Article XIIIB of the California State Constitution requires that governments annually establish a limit on the appropriation of proceeds of taxes; and WHEREAS, State law requires that this limit be presented to the governing body of each entity each fiscal year; and WHEREAS, State law also requires that this limit be published in a newspaper of general circulation to allow public response to the limit as adopted. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the City Council of the City of Carlsbad, California, does hereby establish and adopt the 1999-00 appropriation limit of one hundred ninety- eight million, eighty-nine thousand, one hundred sixty-eight dollars ($198,089,168) as computed in Exhibit A attached hereto. 2. That the City Clerk is directed to publish this Resolution in a newspaper of general circulation. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council on the 15 wit: day of June , 1999, by the following vote, to AYES: Council Members L NOES: None ABSENT: Council Member K ATTEST: At&HA L&!A&CENKR@JZ, City Clerk KAREN R. KUNDTZ, Assistant City Clerk (SEAL) EXHIBIT A CITY OF CARLSBAD GANN APPROPRIATIONS LIMIT The Appropriations Limitation imposed by Proposition 4 and modified by Proposition 111 creates a restriction on the amount of revenue which can be appropriated in any fiscal year. The revenues which are subject to the Limitation are those considered “proceeds of taxes.” The basis for calculating the Limit began in fiscal year 1978-79 and is increased based on population growth and inflation. The major change made by Proposition 111 allows the City to annually choose among the following options for calculating its Gann Limit: > Population growth of Carlsbad, OR p Population growth within San Diego County, AND 9 Growth in California per capita income, OR 9 Growth in non-residential assessed valuation due to new construction in the City, The factors used to calculate the 1999-00 Limit were: 9 Population growth in Carlsbad, AND 9 Growth in non-residential new construction The formula is outlined below: 1998-99 Expenditure Limit $162,626,837 % Carlsbad Population Growth 1.0524 Growth in non-residential new construction x 1.1574 Net Increase Factor 1.2181 1999-00 Limit (1998-99 Limit X Factor) $198,089,168 Current Appropriation of Proceeds of Taxes (Subject to the Limit) $44,891,694 The spending limit for the City of Carlsbad for 1999-00 is $198.1 million with appropriations of “proceeds of taxes” of $44.9 million. The result of the calculation provides the City with an operating margin of $153.2 million. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. I 057 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, CALIFORNIA ESTABLISHING THE 1999-00 APPROPRIATION LIMIT AS REQUIRED BY ARTICLE XIIIB OF THE CALIFORNIA STATE CONSTITUTION AND STATE LAW WHEREAS, Article XIIIB of the California State Constitution requires that governments annually establish a limit on the appropriation of proceeds of taxes; and WHEREAS, State law requires that this limit be presented to the governing body of each entity each fiscal year; and WHEREAS, State law also requires that this limit be published in a newspaper of general circulation to allow public response to the limit as adopted. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District, California, as follows: 1. That the Board of Directors of the Carlsbad Municipal Water District, California, does hereby establish and adopt the 1999-00 appropriation limit of two million, three hundred twenty-four thousand, one hundred twenty-nine dollars ($2,324,129) as computed in Exhibit A attached hereto. Ill Ill Ill 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 ia 19 20 21 22 23 24 25 26 27 28 I -4 2. That the Secretary is directed to publish this Resolution in a newspaper of general circulation. PASSED, APPROVED AND ADOPTED at a regular meeting of the Board of Directors on the 15. day of June , 199_9 by; the following vote, to wit: AYES: Board Members Lewis, Nygaard, Finnila & Hall NOES: None ABSENT: Board Member Kulchin ATTEST: / ~&HA L-EN@ NZ, Secretary KAREN R. KUNDTZ, Assistant Becretary (SEAL) EXHIBIT A GANN APPROPRIATIONS LIMIT The Appropriations Limitation imposed by Proposition 4 and modified by Proposition 111 creates a restriction on the amount of revenue which can be appropriated in any fiscal year. The revenues which are subject to the Limitation are those considered “proceeds of taxes.” The basis for calculating the Limit began in fiscal year 1978-79 and is increased based on population growth and inflation. The major change made by Proposition 111 allows the Carlsbad Municipal Water District to annually choose among the following options for calculating its Gann Limit: 9 Population growth of Carlsbad, OR 9 Population growth within San Diego County, AND 9 Growth in California per capita income, OR 9 Growth in non-residential assessed valuation due to new construction in the City, The factors used to calculate the 1999-00 Limit were: 9 Population growth of Carlsbad, AND 9 Growth in new non-residential construction The formula is outlined below: i 998-99 Expenditure Limit $I ,908,058 % Carlsbad Population Growth Growth in new non-residential construction Net Increase Factor 1.0524 x 1.1574 I.2181 1999-00 Limit (1998-99 Limit X Factor) $2.324.129 Current Appropriation of Proceeds of Taxes $0.00 The spending limit for the Carlsbad Municipal Water District for 1999-00 is $2,324,129 with no appropriations of “proceeds of taxes”. All revenues subject to the Gann Appropriations Limit are appropriated within the capital replacement fund and are therefore exempt. 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 ia 19 20 21 22 23 24 25 26 27 28 I RESOLUTION NO. 99-220 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE MASTER FEE SCHEDULE AND ESTABLISHING THE FEES FOR GENERAL CITY SERVICES, DEVELOPMENT-RELATED SERVICES AND DEVELOPMENT IMPACT FEES. WHEREAS, the City Council of the City of Carlsbad has the authority to establish fees for City services; and WHEREAS, from time to time said fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for City services; and WHEREAS, the City Council has determined the cost of providing general and development-related services; and WHEREAS, the City Council finds it necessary to recover the costs for City services; and WHEREAS, the City Council has held the necessary public hearing and allowed for public comment on the establishment of said fees. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California: 1. That the changes to the business license, police, recreation and facility fees as listed on Exhibit A attached hereto are hereby adopted. 2. That all other general City fees and development-related fees shall remain, except as specifically amended, all other terms and conditions of Resolution No. 97-724 remain in full force and effect. 3. This resolution shall become effective on August 1, 1999 for General City fees and September 1, 1999 for the Development Related fees. 1 2 2 4 5 6 7 a 9 10 11 12 13 14 15 16 17 la 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council on the 15 day of June , 1999, by the following vote, to wit: AYES: Council Members Lewis, Nygaard, Finnila & Hall NOES: None ABSENT: Council Member Kulchin ATTEST: KAREN R. KUNDTZ, Assistant City Clerk (SEAL) EXHIBIT A CHANGES TO THE CITY FEE SCHEDULE GENERAL CITY FEES Proposed Change Current Master list of Active Business Licenses Monthly Business License List Return Check Fee Police - DUI Collision I Arrest Per Hour Police - Special Events Hourly Cost Police - Second Call Per Police Officer Per Hour $25 $5 $15 Actual Cost $30 Actual Cost Actual Cost Police - Second Call Per Police Sergeant Per Hour Non Resident Fee - Instructional Classes and Daytrippers Aquatics Staff Costs (Life Guard I Supervision - Per Hr.) Facility after hours staffing fee (Per Hr.) Facility Fees CLINICS (see attached list of classifications) A Field plus Bases N/C Lights N/C Field Preparation N/C Snack Bar N/C $4 $11 $9 $50 $5 $25 $64 $32 $64 $84 $5 $15 $13 $25 $0 $10 N/A $2 N/A N/A $1 $4 $4 B $3 $7 $15 N/C C D E F $5 $7 $7 $13 SE $15 $20 $15 $15 $15 $15 $5 $8 $10 $12 Key Security Deposit Cancellation Fee (Per Hr.) $250 $500 $250 $0 $3 $3 CLASSIFICATION OF APPLICANTS AND FEES Each application will be reviewed by the Recreation Supervisor and classified into a group depending on the type of organization and the intended use. The Parks and Recreation Division’s activities have first priority for the use of the facilities. The classifications are listed in order or priority with classification “A” first, classification “B” second, etc. The City attempts to accommodate all groups; however, there is a limited number of facilities. Unfortunately, the demand exceeds the supply. For that reason, a priority system for use had to be established. A. Parks and Recreation activities; Co-sponsored activities; other City departments Examples: Friends of the Library, Carlsbad Book Fair B. Carlsbad resident not-for-profit, civic, social organizations (non-paid management); any organization sponsoring a public forum or candidates night; public education Examples: Carlsbad Rotary, La Costa Youth Organization, Carlsbad Softball Association, Carlsbad Youth Baseball, Boy Scouts, Carlsbad Homeowner’s Associations, Carlsbad Unified School District C. Carlsbad resident not-for-profit, civic, social organizations (paid management); private educational institutions Examples: Boy’s and Girl’s Club, Property Management Associations, Carlsbad Girl’s Club D. Non-resident not-for-profit, educational, civic and social organizations; resident private parties; resident religious; resident political candidate use for fund raisers; and locally organized groups whose normal place of meeting is located in the City of Carlsbad. Examples: North County A.A., Y.M.C.A., resident religious and political groups, Mira Costa E. Resident commercial, business, profit making organization, non-resident private party activities Examples: Carlsbad Inn, non-resident parties, weddings or receptions F. Non-resident commercial, business, political, profit making and religious organizations Examples: Trade shows, company training, meetings, seminars IN ORDER TO QUALIFY AS CLASSIFICATION “B” NON-PROFIT USER, THE ORGANIZATION MUST MEET ALL OF THE FOLLOWING CRITERIA: 1. The organization must be registered as a not-for-profit corporation with the State of California, or, if not registered with the State, must be a Carlsbad Chapter and have a constitution or by-laws which clearly state that the objectives of the organization are of a non-profit, non-commercial nature. 2. The organization must be comprised of volunteers, and 70% of which its membership and participants must be Carlsbad residents. Verification of residency may be required. Official rosters, approved by the league office, must be submitted with applications. 3. The organization must submit the following: a. If incorporated, submit State incorporation papers and by-laws; if not incorporated, submit constitution and by-laws. b. Financial verification of organization’s exemption from income tax. (Department of the Treasury form 990 may be used.) An up-dated copy will be required by October 1st of each year. c. A signed statement verifying item “2” above. J - I SL4\ FREENDS OF CRRILLO RANCH, INC. 2622 El Aguila Cane, Carlsbad, CA 92009 0 760/438-1666 e-mall 0 rancho@email.com June 10, 1999 Hon. Buddy Lewis, Mayor City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, CA 92008 8UBJ: 1999-2000 TO BUILD-OUT Co1.P. BUDGET AGENDAITEM# 3 c: Mayor City Council City Manager City Attorney City Clerk ~~ Dear Buddy: disappointment with the Carrillo Ranch portion of the subject budget. If approved as proposed we believe it will result in a precipitous drop in community interest and support. Based on the current rate of progress it now seems apparent the Park will not open to the public for many more years. We believe this is due to under-staffing and the low priority long associated with this resource. If these delays continue, the Board believes that the on-going deterioration of the Ranch will prevent it from ever serving the public in a viable manner. otherwise. Delaying the first major restoration funding ($3,389,000) to 2000-2001 only reinforces our fears since an achievable completion date has not been specified. 2010-2020 trash heap virtually eliminates some of the Park's best and most anticipated features (see exhibit attached). This would be a dreadful policy decision. the city's very large capital surplus it is surely possible to do better - faster - even if it requires hiring outside project managers or facilitators to finish the tasks at hand. The Board of Directors wishes to express its extreme A credible timeline has never been offered that would convince us Further, the consignment of Phase I11 funding ($1,622,000) to the We urge you to instruct staff to restructure its proposal. With This letter is our official objection to the proposed C.I.P. budget as it now stands relevant to Carrillo Ranch. Please look to the future with vision. The survival of the rancho rests in your hands. Yours truly, Alan K.yle, for the BOARD OF IRECTORS C: Manager - Recreation t Park Planning City Clerk A 501 (c)(3) California Educational Corporation -. Leo Camllf-?anch Master Plan @ 1 E. Bdanlcal Garden Area E. Upper Lawn Area (Hydroseed) E. Lower Lawn Area (Hydroseed) E. Slope Areas around Ramps E. West Meadow Area (Hydroseed) E. Ph 3 Soli PrepJFlne Grad. E. Ph 3 CIearVMalnt (90 days) F. Publlc Aft Elements A. Cantlna Restoratton A. Carriage House Restoratlon A. Feed Storage Are Protectlon A. Stables Fire ProtectlorVRestoratlon A. New Restroom FacKhlcken Hou. A. Foundry Restoratlon A. Restored Water Tank A. Storage Shed A. Wood Barn Restoratlon/NewTheatre A. Equlpment Shed A. CtW Wide Communltv Trail SUBTOTAL 15,250 43,67 1 39,300 72,600 6 1,400 170,821 170,821 1 H.rdra#/Fumishings C Concrete Stairs/Raillng - C. Amphltheatre C Restore Orlglnal Old Brldge C Meadow/Bot Trail (Rd. Oyle) C Restore lnterlor Ranch Fendng C Restore Flsh Pond C Restore Cabana Conc Paving Areas C Restore Vis. Ctr. Tile Paving Areas C Restored Arbor lO'x90' C Restored Arbor 1O'xSO' C Restore Ex. Barbeque/Pavlng D. Wood Hltchlng Post D. Wood Benches D. Wood Plcnlc Tables D. DC Plcnlc Table pads D. Botanical Garden Signage D. Patlo Chaln & Tables (Cabana) D. Umbrellas (Cabana) SUBTOTAL 1 1 1 .1 1 1 1 '. 1 1 1 1,670 400 1 1 1 1,370 3,300 1 7,900 3,000 1 1 1 4 8 8 800 1 1 1 - Ls Ls Ls Is Ls Ls Ls Ls Ls Ls LF - - SF LS EA SF LF Ls SF SF Ls Ls Ls EA EA EA SF LS Ls Ls - 55,500.00 $7,500.00 $5,000.00 $40,000.00 596,000.00 51 5,000.00 $1 0,000.00 $2,500.00 $220,000.00 $25,000.00 524.00 $30.00 $5,000.00 535,000.00 $3.00 540.00 $8,000.00 $3.00 $6.00 $20,000.00 $5,o00.00 $2O,OoO.00 $1,200.00 $800.00 $1,500.00 $3.00 ' $5,o0o.00 $20,000.00 $8,000.00 50.85 $0.20 $0.25 $0.10 $5,500 $7,500 $5,000 $40,000 $96,000 51 5,000 $1 0,000 $2,500 $220,000 $25,000 $40,080 $466,580 $1 2,000 55,000 535,000 $34,110 $1 32,000 58,000 $23,700 $ 1 8,000 $20,000 $5,000 $20,000 $41800 56,400 $ 1 2,000 $2,400 s5,OOo 520,000 $8,000 $371,410 $30,500 $37,120 $33,405 $72,600 $ 1 2,280 $42,705 $1 7,082 Ls I 550,000.00 I $50,000 $295,693 $226,737 $136oA19 [GRAND TOTAL (Phases 1,Z 3 - does not indudc soft corb) SS,~ 1 strs DEVELOPING TOMORROW'S LEADERS Citv of Carlsbaa June 9, 1999 STRENGTHENING FAMILIES Alan Kindle FRIENDS OF CARRILLO RANCH 2622 El Aguila Lane Carlsbad, CA 92008 Recreation Department For the Wonnation of the: CARRILLO RANCH: RESPONSE TO CONCERNS BUILDING COMMUNITY PRIDE As I mentioned in my initial response (4/1/99) to your letter (3/3/99), staff was looking into your concerns and would respond as soon as more information was gathered. The item we were waiting for was a survey and staking of the property lines in the field. This was needed to respond fully to item #3 below. The survey has been completed and we can now respond to all the concerns mentioned in your letter. 1. DEEDIE'S HOUSE: What is the status of repairs? IMPROVING QLlALlTY OF LIFE Repair of Deedie's House is part of the third phase (Phase IC) of 3 phases of Phase I and is currently funded in this fiscal year CIP. Plans have been completed for the repair of Deedies House and other select buildings, and the project is anticipated to go out to bid in Fall '99 (following completion of Phase IA (perimeter walls, fences, and landscaping). 2. PALM LANE: Status of reseeding area damaged by installation of sewer line and trash pick-up? I disagree with your comment that we agreed to reseed the area in question. We did agree to investigate and consider seeding. Prior to the installation of the sewer line, this area was weeds. Due to the rains and resultant herbaceous growth, it is now well on it's way to looking the same as it did before the disturbance. This area is part of Phase II and no improvements are scheduled in this area at this time. We will however, be adding some additional shrubs along the road in the area in question. This will help focus views down the road rather to the side. Trash pick up will be handled by Park staff. 1200 Carlsbad Village Drive Carlsbad CA 92008- 1989 (760) 434-2824 FAX (760) 434-7185 - > Pg. 2; Kindle letter 3. SECURITY: Status of the "Security Master Plan" and "gap" in the fence? We intend to seek proposals for the Security Master Plan within the next couple months. The proposals will give us a better idea how long this Plan will take to prepare (I don't anticipate it taking more than 2 months). The gap in the fence you are referring to is where the chain link fence along the western park boundary, being installed as part of Phase IA, must break to allow the creek and riparian area to pass through. We were forced to create this gap for several reasons: a. In order to get environmental approvals for Phase IA, the Planning Department required that the fence not encroach into the wetlands / riparian area. Otherwise, we would have to get approval and permits from California Fish and Game and US Fish and Wildlife. This could possibly create new issues that could potentially stall the construction of the wall / fencing around the project. It was also Planning's opinion that, the resource agencies would not issue a permit for this encroachment into the wetlands. b. The creek flow would be interrupted by a fence unless the bottom of the fence was raised to allow flow underneath. Raising the fence would allow people to crawl under the fence if they wished, partially negating the purpose of the barrier. c. The perimeter walls and fences are essentially barriers that will discourage random entrance into the park. The perimeter planting (with spiny plants) will aid in this barrier. IT WILL NOT keep people out who want to jump the fence or wall. Therefore, it our recommendation to wait and see how effective the perimeter walls and fences are for security. We can always seek approvals at a latter date for permits to cross the creek with a fence. Finally, the Security Master Plan will address the best way to protect the Ranch. It should be noted that the recent survey and property staking allowed us to actually see in the field what our options are for the fence in question. We found that we will be able to dead end the fence into thick brush and tules to help prevent access. 4 - Pg. 3; Kindle letter 4. NEWLY INSTALLED TRANSFORMER: How will it be concealed? As part of Phase II, the transformer will be enclosed in a small wooden shed to conceal it. In Phase Ill, it will be incorporated into the "Chicken House / Restroom" (refer to page 4-28 of the Master Plan). 5. PHASE I ADDITIONAL WORK: What are the projects and timing? Below is an outline of the different stages of Phase I: Phase IA: Perimeter wall, fencing and landscape. The contract for this phase has been awarded and is scheduled to begin June 21. Phase IB: Installation of an 8" water line into the park which will provide water for the fire sprinklers at select buildings (see Phase IC). Plans are being prepared by Carlsbad Municipal Water District. They are also planning to do the work with CMWD forces. Work will be done as the Water District's schedule permits (anticipating within 4 months). Phase IC: Minor renovation to select buildings (including fire sprinklers to some of the structures should there be enough funds remaining after completion of Phase IA and B). Refer to Item #1 above for timing. Repair of Deedie's House is a top priority in Phase IC. I hope this answers your questions. Please contact me should you need further information. Mark Steyaert Park Development Coordinator attachment (cc's only) c: City Manager Assistant City Manager Recreation Director April 1, 1999 Alan Kindle Friends of Carrillo Ranch, Inc. 2622 El Aguila Lane Carlsbad, CA. 92009 DEVELOPING TOMORROW'S LEADERS RESPONSE TO LETTER Dear Alan, We are in receipt of your letter dated March 3, 1999. Staff is currently looking into these issues and will respond as soon as we are able to study and make recommendations on each of your concerns. Thank you. BUILDING COMMUNITY PRIDE STRENGTHENING MARK STEYAERT PARK DEVELOPMENT COORDINATOR IMPROVING QUALITY OF LIFE c: Recreation & Park Planning Manager 1200 Carlsbad Village Drive Carlsbad CA 92008-1989 (760) 434-2824 FAX (760) 434-7185 - 2622 El Aguila Lane, Carlsbad, CA 92009 0 760/438-1666 e-mail 0 rancho@emall.com March 3, 1999 Mark Steyaert, Project Coordinator Parks & Recreation Department City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, CX 92008 Dear Mark: During a recent Friends of Cad0 Ranch Board of Directors meeting, the Board Members possible that many of these concerns have already been addressed, but if not. we would be most appreciative of updates on the following issues: cn ,.nnt0rl tL"+ A":- ...-...--.-" n-. c 11-- * TL tu.(~-Yr..uu blwL Lllwu WeILwcIIIw 1111 tk A~uu~ig ikr15 be bioiight io y-~iii ,ittcA"ii. IL 13 1. 2. 3. 4. 3. DEEDIE'S HOUSE: As you how, major restoration had been completed on this building, and it was in excellent condition. But it has recently sustained a great deal of structural damage, including large cracks with gaping holes. Some of the wood trim around the windows has fallen down, and there is a broken window- on the back side of the House. How and when will tlus new damage be attended to? PALM LANE: Thank you so much for having the dead palm replaced by the contractor. but the meadow that the contractor graded ha5 yet to be reseeded. as agreed to. U%at is the tuning for this reseeding? Also, the dead palm and other grading debris was sunpl:. tossed under nearby bushes. and the contractor should be responsible for properly remoking tlus debris from the Ranch. SECtmITY : Has the security blaster Plan for the Rarch been irtlated yet, 2nd if SQ. hmv hrc the security gap across the creek been addressed? Has the application for a permit to close this gap been applied for yet'? Board hkmbers feel this issue shouid be resolved as soon as possible. NE\\'LY INSTALLED TRUVSFORMER: QIut are the plans for concealing this transformer'? It defmitely does not "blend in" with the existing historical buildings on the Ranch. and its location is one that can linrdly be missed. PILASE ONE ..U)DITION.AL M'ORIC Illiat is the timing for the additional work under Phase One funding. as desciibed at tlic Octohzr- 20. 1998 (louncil meeting? Hac specific pro-iccts been identified, and iL'so. \cliat is thc timing for tliciii? h4arch 3. 1999 Page 2 h4ark. we want to personally thad you for aU you have already done for Cad0 Ranch, and by continuing to work tosether. we will be able to restore and create one of the frnest parks for the City of Carlsbad. and one that everyone can, and will be, proud of. Again. thank you for retiewing our concerns, and we will wait to hear from you. Sincerely, FRIENDS OF CARRILLO R-LYCH Board of Directors fldP&,P@& Me1 Cad0 Tony Carter Bonnie Dornhguez cc: hlayor Bud Lewis Council h kmbers A 501 (c)(3) California Educational Corporation All Receive-Agenda Item # 7 June 14,1999 For the Information of h TO: CITY MANAGER FROM: Finance Director Da& .I V City Manag- CITYWIDE TRAILS SYSTEM At the Operating Workshop on June lst, Gary Hill spoke about the Citywide Trails System and requested funding for the Volunteer Trails Program. As a follow-up to his request, the Planning Director provided a status report on the Citywide Trails System dated June 10, 1999, which specified some of the remaining planning issues to complete the Trails System. The financing issues that were still outstanding centered mainly around how to maintain the trail system once it was completed. Funding for the acquisition and development costs are one-time occurrences, but maintenance is an on- going issue. It was originally assumed that a Citywide benefit assessment district would be formed. However, with the passage of Proposition 218, the creation of a benefit assessment district would now need to be taken to a vote of the citizens. The methods and timing of creating such a district will be discussed when the final report is given to Council. The Parks and Recreation Planning Manager, Ken Price, contacted Gary Hill to get more details on his specific request for funding. The request from Mr. Hill was for between $15,000 - $20,000 to support the trails program in the following areas : 0 Replacement of hand tools and supplies 0 Volunteer appreciation awards Educational training materials for volunteers T-shirts 0 Miscellaneous supplies 0 Fuelhepair costs 0 Information and directional signs 0 Equipment and vehicle rental 0 Funds to service and maintain mechanical equipment Please let me know if you, or Council, would like any further information on the status of the trails system or Mr. Hill’s request. 622 LISA HILDABRAND LH:shk From: Ken Price To: Lisa Hildabrand Date: 6/11 /99 4:09PM Subject: Request for Funds - Volunteer Trails Program Hi Lisa, I spoke to Gary Hill and clarified the funding request he made to City Council for the Volunteer Trails Program. Gary is requesting that Council budget $1 5,000 - $20,000 to support the Trails program in the following areas : Replacement of hand tools and supplies Equipment and Vehicle rental Alr€ae#3i*=Am&&me*” Funds to service and maintain mechanical equipment Information and Directional Signs Volunteer Appreciation awards T-shirts Fuelhepair costs For the Information of the: CrIY COUNCIL Asst.cM-cAdcd Dab$- f 9 City Manage Miscellaneous Supplies Educational Training materials for Volunteers Gary indicated that he would be at the June 15th City Council meeting to answer additional questions. Ken cc: Frank Mannen, Keith Beverly, Ray Patchett NOTICE OF PUBLIC HEARING CITY OF CARLSBAD The City of Carlsbad will hold a public hearing on Tuesday, June 15, 1999 at 6:OO p.m. in the Council Chambers of City Hall, 1200 Carlsbad Village Drive, Carlsbad, California, to discuss the 1999-00 Operating Budget and the 1999-00 to Buildout Capital Improvement Program Budget. Also included will be discussion on the Carlsbad Municipal Water District Operating and Capital Improvement Program Budgets as well as discussion on behalf of the Housing and Redevelopment Board regarding the Redevelopment Budgets. The City Council will also discuss selected City development fees and general fees and the Appropriation Limitation for fiscal year 1999-00. Interested parties are invited to attend this meeting and present their views and comments to the City Council. Copies of the budget are available for public inspection at the City Clerk’s office, 1200 Carlsbad Village Drive, or the two libraries: 1250 Carlsbad Village Drive, Carlsbad, and La Costa Branch Library, 6949 El Camino Real, Suite 200, Carlsbad. Written and telephone inquiries may be directed to Lisa Hildabrand of the Finance Department, 1200 Carlsbad Village Drive, Carlsbad, 434-2867. PROOF OF PUBLICATION (2010 8 2011 C.C.P.) I NOTICE OF PUBLIC HEARING CITY OF CARLSBAD ' The City of Carlsbad will hold a public hearing on Tuesday, June 15,1999 at 6:OO p.m. in the Council Chambers of City Hall, 1200 Carlsbad Village Drive, Carlsbad, California, to discuss the 1999-00 Operating Budget and the 1999- 00 to Buildout Capital Improvement Program Budget. Also included will be discussion on the Carlsbad Municipal Water District Operating and Capital Improvement Program Budgets as well as discussion on behalf of the Housing and Redevelopment Board regarding the Redevelopment Budgets The City Council will also discuss selected City development fees and gener- al fees and the Appropriation Limitation for fiscal year 1999-00. STATE OF CALIFORNIA County of San Diego I am a citizen of the United States and a resident of the County aforesaid: I am over the age of eighteen years and not a party to or interested in the above- entitled matter. I am the principal clerk of the printer of North County Times formerly known as the Blade-Citizen and The Times-Advocate and which newspapers have been adjudged newspapers of genera! circula!ion by the Superior Court of the County of San Diego, State of California, under the dates of June 30, 1989 (Blade-Citizen) and June 21, 1974 (Times- Advocate) case number 171 349 (Blade-Citizen) and case number 1721 71 (The Times-Advocate) for the cities of Escondido. Oceanside, Carlsbad, Solana Beach and the North County Judicial District; that the notice of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: May 31, 1999 I certify (or declare) under penalty of perjury that the foregoing is true and correct. .sa! Marcos ~ ~~~ Dated at California, this 1st day June. 1999 of NORTH COUNTY TIMES Legal Advertising This space is for the County Clerk's Filing Stamp Proof of Publication of Interested parties are invited to attend this meeting and present their views and comments to the City Council. Copies of the budget are available for public inspection at the City Clerk's office, 1200 Carlsbad Village Drive, or the two libraries: 1250 Carlsbad Village Drive, Carlsbad, and La Costa Branch Library, 6949 El Camino Real, Suite 200, Carlsbad. Written and telephone inquiriis may be directed to Lisa Hildabrand of the Finance Department, 1200 Carlsbad Village Drive, Carlsbad, 434-2867. Legal 63464 May 31, 1999 LOS t3ummmwa PRESENTATION TO THE CITY OF CARLSBAD BUDGET HEARING, JUNE 15,199 George E. Gray Publicity Co-Chair, Los Californianos Good evening. My name is George Gray. I am here on behalf of Los Californianos, a nonprofit organization of the descendants of the Hispanic settlers of Alta California who arrived prior to the signing of the Treaty of Guadalupe Hidalgo, February 2,1848. This organization was created for the purpose of preserving the heritage of the early Hispanic Californians in Alta California by conducting research on genealogy and civil, religious, military, and cultural activities in Alta California in order to provide an accurate and authentic interpretation of the history of Spanish and Mexican Alta California. Los Californianos has reviewed the Master Plan for the Leo Carrillo Ranch and has given the City of Carlsbad strong support for the development of the Leo Camllo Ranch Community Park. A copy of our resolution of support is attached, along with a brochure on the organization. The Master Plan is, in our judgment, an excellent document that lays out a rational program for development. The Carrill0 family is well-recognized as an early California family. Members of the family were with the 1769 Portolh expedition. Also, the first permanent settlers of Alta California, who arrived in September of 1774 in San Diego, included Maria Antonia Victoria Carrillo, wife of JosC Francisco Ortega, who was the "pathfinder" with the PortolS expedition and is credited with the first sighting of San Francisco Bay. In February 1775, Maria gave birth to the first Spanish child born in San Diego, JosC Francisco Maria Ortega y Carrillo. Los Californianos is very disappointed that the proposed City budget, the subject of this hearing, gives short shrift to the development of the Leo Carrillo Ranch and postpones, virtually indefinitely, the opportunity for the public to visit this unique resource to learn more about their California heritage. The opened Rancho ca~, Among other things: 0 Present a showplace of the early California rancho period. 0 Serve as a resource for the area’s fourth grade students as they study California e Offer a suitable recognition of Leo Carrillo, his career on stage, screen, radio, and television, and his contributions to his community and the State of California. Provide a venue for display and visitor exposure to California’s indigenous Indian Culture. 0 Serve as a community park and provide an attractive and unique location for weddings, receptions, civic celebrations, and cultural gatherings and displays. Serve as an added attraction for tourists coming to the area to visit Legoland and other area drawing cards and provide a tourist attraction in its own right. history. Not only can this facility become an integral part of community life as a community park and historical resource, but, as a tourist attraction, it has the potential to repay the City’s investment many times over by increasing tourism. It is hoped that the City will reconsider its present budget proposal and recognize the importance of this asset by accelerating the development of the Ranch. With the possibility of a budget income augmentation from State sources, the realization that the income potential to the City by opening of the Ranch is significant, and the general financial health of the City of Carlsbad, the cost effectiveness of acceleration of the development of the Rancho at this time should be an attractive investment. The City may wish to provide for financing this development through establishing a budget with funds for a challenge to the private sector and others to match the City funds through donations. Thank you for your attention and consideration. LO5 CRCIFORRIRI Oelicrtrl tr the Prerrrratiar rf Uta Crlifrrrir'r irritagr - October 30, 1998 The Honorable Claude "Bud" Lewis Mayor of the City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, Ca 92008 Dear Mayor Lewis: Los Californianos, a national nonprofit organization dedicated to the preservation of the heritage of early Hispanic Californians in Alta California, is very supportive of the City of Carlsbad's plans for the development of the Leo Carrillo Ranch Community Park. A statement of that support is the attached Resolution passed by the Board of Directors at its quarterly meeting in San Rafael, California, on October 17, 1998. We would be pleased to cooperate with the City of Carlsbad, the Friends of the Carrillo Ranch, and E. Clampus Vitus, and other organizations to assure a timely opening of the Leo Carrillo Ranch as a show place of the early California rancho days. If you would like our organization to formally present this resolution to the City, please contact Benita H. Gray, a distant cousin of Leo Carrillo, at 619-538-3027. Sincerely, 4 Betty J. Watts, President Los Californianos cc: Alan K. Kindle, President Friends of Carrillo Ranch 2622 E. Aguila Lane Carlsbad, Ca 92009 Wayne Donaldson, Noble Grand Historian E.-Clampus Vitus, Squibob Chapter 530 Sixth Avenue San Diego, Ca 92101 .. - - Los cALIFoR”0s RESOLUl, .J In Support of the Development of the Leo Carrillo Ranch Community Park By the City of Carlsbad, California WHEREAS Los Californianos is a nonprofit organization dedicated to preserve the heritage of early Hispanic Californians in Alta California, to conduct research on genealogy and on civil, religious, military and cultural activities in Alta California, and to provide an accurate and authentic interpretation of Alta California’s history; and WHEREAS the regular members of the Los Californianos have proven themselves to be descendant of a Hispanic person or of Hispanic persons who arrived in Alta California prior to February 2,1848; and WHEREAS the ancestors of Leo Carrillo arrived in San Diego, Alta California in 1769, and WHEREAS many of the Los Californianos are related to the Carrillo family; and WHEREAS part of the Mexican land grant of Rancho Aqua Hedionda was known as hs Kiotes; and WHEREAS a “Rancho de 10s Quiotes” (accepted translation “Ranch of the Spanish Daggers”) was purchased by movie star, Leo Carrillo, who renamed it the “Flying LC Ranch” and rebuilt it as a recreation of an old California working rancho with its attendant lifestyle; and WHEREAS 10.5 acres of the Carrillo Ranch, including all the major historic structures, is now the property of the City of Carlsbad, which has a development plan for the property to become the Leo Carrillo Ranch Community Park; and WHEREAS the City of Carlsbad has developed a well-deserved reputation as a visionary city that also honors its past; and WHEREAS it is recognized that the proposed Leo Carrillo Ranch Community Park will be an asset to the City to complement the Flower Fields, Legoland, and the City’s beaches and other attributes; and WHEREAS the City of Carlsbad is working to restore the Carrillo Ranch and to furnish it with its original artifacts; and WHEREAS the developed Community Park will provide an excellent showcase for presenting the historic past of California to our future generations: Therefore be it RESOLVED, That Los Californianos supports the development of the Leo Carrillo Ranch Community Park by the City of Carlsbad and urges the City to proceed expeditiously with the implementation of the park’s development plan. 3 , c 4 __ _- - - City __ - of Carlsbad - March 29,1999 Barbara Kirstein 3 129 Hataca Rd. Carlsbad, CA 92009 Dear Mrs. Kirstein, Thank you for your intcrest in the maintenance of our streets within the city. IR response to your letter we are in the process of checking the integrity ofthe City’s storm drain for my possible leaks that might be creating the gutter flow. Past history and field vestigations indicate however that the water surfacing from ‘the curb drains and into the dter is a result of subsurface groundwater. A few years back our Maintenance department constructed a subdrain below the roadway surface on Carlina Street and Hataca Road. The roadway section on Carlina Street was being undermined due to a high groundwater level in the roadway area. The subdrain diverts the groundwater below the roadway into the City’s stdrm drain system. The subdrain appears to be functioning effectively as water can be seen draining kom the subdrain and into the catch basin at Verde Avenue and Brava Street. This subdrain does not capture the water that flows in the gutter that you mentiorjed in you letter, however. The gutter flow is actually groundwatet that comes from private properties north of Hataca Road. This can be seen from groundwater being intercepted by backyard drains and then directed out of curb-side drains and into the street gutter. To prevent this gutter flow, the groundwater generated from private property yard drains needs to be picked up before the curb-side drains and diverted to the City’s storm hain system. TQ date, the City has not budgeted any capital improvement project fbnds for the diversion of private property drainage into the City’s storm dtain system. This !ype of project is being proposed and submitted for approval in the City’s Capital Improvement Program for the next fiscal year. If you have any fiuther questions please feel fTee to contact myself at (760)438-1161 ext. 4387, or Walter Brown at (760)438-1161 ext. 4352. Associate Engineer City of Carlsbad C: Public Works Director, LlojI .lubbs Traffic Engineer, Bob Jchinson Principal Engineer, Wal+sx* Rrow- Streets Superuirelidenr. C.. LA Mitc ,LA 2075 Las Palmas Or. Carlsbad, CA 92009-1 576 (760) 438-1 161 FAX (760) 431 -5769 - --- City of Carlsbad January 25,1999 Barbara Kirstein 3129 Hataca Road Carlsbad, CA 92009 COMPLAINT REGARDING WATER IN GUTTER The City of Carlsbad Public Works Engineering Depaflment is in receipt of the letter you wrote to the County Health Sevices Departmdnt regarding the constant flow of water in the gutter in front of your residence, zero lot lines, and pest control. This letter will deal with the "water in the gutter problem" and the zero lot line/pest control problems were referred to the BuRding Department, Code Enforcement Division (438-1 161 , x42 15) for response. We have inspected the site and agree that the constant flow of water in the gutter is a nuisance. Therefor, the problem has been r'eferred to David Hauser, Assistant City Engineer, for inclusion into the capital improvements program as a future construction project. I will recommend that the project be included in the 1999/2000 budget so that the problem can be corrected as soon as possible. Should you have any questions as to the timing of the project please contact Mr. Hauser at 438-1161, x4362. Should you have any further questions of me regarding this matter please call me at 431-8529. RICHARD E. COOK Principal Construction Inspector c: Public Works Director Assistant City Engineer Street Maintenance Superintendent Principal Building Inspector i i I-___ 2075 Las Palmas Dr. Carlsba A 92009-1576 (760) 438-1 161 FAX (760) 431-5769 @ November 25, 1998 . Administration Health Services Dept. 1700 Pacific Hwy San Diego, CA 92101 Dear Sir/Ms: For whatever reason, homeowner associations have become dominant figures in California. Specific problems have arisen in Carlsbad; a developer was able to implement zero property lines and affect natural springs creating long-term problems. The Homeowners Association wants to nit-pick little issues khich are absurd, but Hhen community issues urise, the aseociation nor the city want to address problems that affect property values of individual owners. City related: Backyard water problems for a few families (problem #l) became running "River LaCosta" at the curbside which wae created with a french drain by the developer (problem #2) and still running 20 years later. Not only is the curbside unsightly, but a liability hazard from the slime that grows which becomes a greater nuieance. Also, a year ago the road itself collapsed due to water problem with no resolve for homeowners' issue. The zero property line was also created by the developer (problem #3) which leaves a homeowner with extremely limited righte to their own propertyf In particular, a neighbor with compost and wood fire stacked by my house has created a pest control problem (rats; mice, etc). The problems created by the developer and approved by the city have turned into legal nightmares for the homeowners. Please advise how these matters may be resolved without high legal fees since homeowners are at the mercy of the developer (long gone) and city approval of all problems left unresolved or at the homeowner's expense. These issues affect the daily lives of many others in this neighborhood. 3129 Hataca Road Carlsbad, CA 92009 cc: P.S. City of Carlsbad State Attorney General within developments (1/5 acre lots)? Plcbase send infoi! What are specific guidelines for compost and wood stacking March 11, 1999 Dear Neighbor, On Tuesday March 2, 1999, we had a meeting with Walter Brown, civil engineer for the city of Carlsbad. We discussed the ground water problem on Carlina Street in detail followed by an inspection of our property at 7404 Carlina. His principal concern was determining if the problem was truly ground water . the result of leakage from a city sewer or water main. At the end of our meeting he said that he was convinced that the problem was, indeed, ground water. He said that he would rc -ommend that the city inspect the mains In the area to inbdre that there was, in fact, no leakage and that he would recommend the construction of drains along Carlina Street to carry the run off from our properties. This proposal must be approved by the Engineering Department of the City Council. If this proposal is approved by the city, Lt would end the problem of water continually running down the street in front of our homes. We urge each of you to join is us in writihg to the members of the city council, the city manager, and the mayor. Mr. Brown believes this project has a good chance of being approved; it will have a much better chance if we all make ourselves heard. Letters may be addressed to: Bud Lewis, Mayor Ray Patchett, City Manager Matt Hall, City Council Member Ann Kulchin, City Council Member Julie Nugaard, City Council Member Ramona Finnj.le, City Council Member Sincerely, r, Bonnie Lowry ‘I f ‘l Carol McKee