HomeMy WebLinkAbout1999-06-22; City Council; 15271; 1999 Pavement Overlay Project* e -
Cl 1-Y OF CARLSBAD -AGENDA BILL
4B# 15: !k? 1 TITLE- L
AWARD OF CONTRACT FOR THE
IIITG. 6122199 1999 PAVEMENT OVERLAY PROJECT
PROJECT NO. 3667-2 IEPT. ENG
DEPT. HD.
CITY ATTY.
CITY MGR.
RECOMMENDED ACTION:
Adopt Resolution No. 9 9 * aa accepting bids and awarding the contract for Project No. 3667-2
for the construction of the 1999 Pavement Overlay Project to Silvia Construction, Inc.
ITEM EXPLANATION:
For a number of years, the City of Carlsbad has made a strong commitment to a preventative
maintenance program for city streets. The goal of the program is to extend the life of city
pavements. Placing an asphalt overlay will prevent the complete reconstruction of these streets in
the near future.
Streets in need of rehabilitation were systematically surveyed, using a combination of visual
inspection, input from the street maintenance division, and recommendations from MicroPaver
Pavement Management Software. In the past, a quadrant based rotation system was used. Street identification was based on a quadrant by quadrant assessment, with the quadrant order rotated in
a clockwise direction. The identification process described above now uses a City wide area for
assessment. The streets in need of the most attention are attended to first, independent of the
streets’ location within the City. This eliminates the possibility of a three year wait for a roadway
rehabilitation. Once streets are identified a combination of slurry seals and pavement overlays are
used to revitalize, protect and prolong the life of existing pavements.
On June IO, 1999, the following four(4) sealed bids for the project were received:
CONTRACTOFt TOTAL Silvia Construction, Inc. $ 1,247,302.71
Hazard Construction, Co. $ I,31 8,382.25
Sim J. Harris, Co. $ 1,359,213.00
1 ABC Construction 1 $ 1.470.785.00 1
The Engineer’s Estimate for the project is $1,530,000.00. The low bid price for the project is
$1,247,302.71.
The low bidder, Silvia Construction, Inc., has completed all necessary subcontractor forms correctly
and affirms it will be performing more than 50% of the work with its own forces.
ENVIRONMENTAL COMPLIANCE:
This project is categorically exempt from the environmental review process under Section
Class l(C) of the Public Resources Code (California Environmental Quality Act). 15301
Page 2 of Agenda Bill No. I 3.23 1
FISCAL IMPACT:
Funds in the amount of $2,457,584.00 are available in the pavement management account to cover
the construction costs for this project as well as other pavement management projects per the
adopted 1999-2000 CIP.
Funds in the amount of $25,764.79 are available in CMWD Miscellaneous Outside Services
account to cover the CMWD utility relocation costs.
Funds in the amount of $206,927.52 will be reimbursed to the City by the State as part of the City’s portion of funds from the State and Local Transportation Partnership Program.
Following is the breakdown of costs to complete this project:
Construction !$ 1,247,302.71
Inspection and Administration (10%) $ 124,730.27
Construction Contingencies (15%) $ 187,095.41
Total $ 1,559,128.39
The Carlsbad Municipal Water District water and sewer facility relocations will be paid for through the
provisions set forth in the joint City of CarlsbadKarlsbad Municipal Water District agenda bill
AB#l5,044, approved on February 9, 1999. This agenda bill approved the agreement between the CMWD and the City for the reimbursement of funds for the relocation and/or reconstruction of CMWD
owned facilities. The water and sewer facility relocations total $25,764.79 and are included in the total construction price.
EXHIBITS:
1.
2.
Location Maps (Exhibit 1, sheets 1 through 5).
Resolution No. 99 - aa9 accepting bids and awarding the contract for Project No. 3667-2
for the construction of the 1999 Pavement Overlay Project to Silvia Construction, Inc.
CITY OF OCEANSIDE
STREETS TO BE OVERLAYED
NOT JO SCALE
SHEET 1 OF 5
PROJECT NAME PROJECT EXHIBIT
1998/99 OVERLA Y PROJECT NO. 1 NUMBER 3667-2 I
- STREETS TO BE OVERLAYED
NOT TO SCALE
SHEET 2 OF 5
PROJECT NAME PROJECT EXHIBIT
1998/99 OVERLA Y PROJECT NO. 1 NUMBER 3667-2 I
I
- STREETS TO BE 0 VERL A YED
NO ALE
SHEET 3 OF 5 \
PROJECT NAME PROJECT EXHIBIT
1998/99 0 VERLA Y PROJECT NO. 1 NUMBER 3667-2 I
4hT-J RY CCCITJ FVANC CARI WA,, FNCINFFRINC WPT
- STREETS TO BE OVERLAYED
SHEET 4 OF 5
PROJECT NAME
1998/99 OVERLAY PROJECT NO.1
AWN By: SCOTT EVANS, CARLSBAD ENGlNEERlNG DEPT.
PROJECT EXHIBIT
NUMBER 3667-2 7
b
LOCAUON MAP NOT TO SCALE
NOT TO SCALE
- STREETS TO BE 0 VERL A YED
F
5
SHEET 5 OF 5 \
. I
PROJECT NAME PROJECT EXHIBIT
1998/99 0 VERLA Y PROJECT NO. 1 NUMBER 3667-2 7
k
I .
7
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. gg-22g
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A
CONTRACT FOR THE CONSTRUCTION OF THE 1999
PAVEMENT OVERLAY PROJECT, PROJECT NO. 3667-2
WHEREAS, plans have been reviewed by the City Council of the City of Carlsbad for the
construction of the 1999 Pavement Overlay Project, Project No. 3667-2; and
WHEREAS, four(4) sealed bids were received on June 10, 1999 by the City of Carlsbad
for the construction of said project; and
WHEREAS, the low bid received to construct said project submitted by Silvia Construction,
Inc., is responsive; and
WHEREAS, Subsection 3.28.172(c)(l) of the Carlsbad Municipal Code authorizes the City
Manager to approve change orders in the amount equal to the contingency set at the time of bid
award; and
WHEREAS, City Council has previously appropriated $2,457,584.00 in the 1999-2000
Capital Improvement Program for design, construction, administration, and inspection of said
Project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the low bid of $1,247,302.71 submitted by Silvia Construction, Inc., for the
construction of the 1999 Pavement Overlay Project is accepted and the Mayor is hereby
authorized to execute a contract therefor.
3. That the City Manager is hereby authorized to approve construction change orders
up to $187,095.41.
4. That a construction contingency in the amount of $187,095.41 is hereby approved.
Ill
Ill
ill
Ill
Ill
/II
1
2
3
4
5
6
7
8
9
IO
11
12
13
14
16
17
18
19
20
21
22
23
24
25
26
27
28
5. That the award of this contract is contingent upon the bidder submitting the lowest
responsive bid executing the required contract and submitting the required bonds and insurance
policies, as described in the contract, within twenty (20) days of adoption of this resolution. The
City Manager may grant reasonable extensions of time.
~ PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council
1 held on the 22 day of June , 1999 by the following vote, to wit:
AYES: Council Members Lewis, Nygaard, Finnila, Hall & Kulchin
NOES: None
ATTEST
(SEAL)