RECOMMENDED ACTION:
Hold this public hearing to hear the staff report, receive public comment, and approve Resolution
No.rjmm-~al confirming the diagram and assessment as contained in the Engineer’s Report
and providing for the levy of the annual assessments of the Street Lighting and Landscaping District
No. I; and approve Resolution No. dooo -2 d 2 authorizing a transfer of funds from the
General Fund budget to certain special funds budgets.
I ITEM EXPLANATION:
After the City Council meeting of June 13, 2000, Council approved three resolutions which initiated
proceedings and ordered the presentation of an Engineer’s Report for a Special Maintenance District, approved the Engineer’s Report, and set tonight’s public hearing (July 11, 2000).
Tonight, Public Works staff will present a comprehensive report on the maintenance and operations
procedures and Fiscal Year 2000-01 adopted budgeted packages for the three zones: Street
Lighting, Street Tree Maintenance, and Street Median Maintenance, as detailed in the previously approved Engineer’s Report. Included in tonight’s report will be a description of the City’s
contribution of a “General Benefit” to each of the three zones which will be presented by the engineering consultant for the District. The “General Benefit” first became an inclusion of the
District’s processing in Fiscal Year 1997-1998 in compliance with Proposition 218.
The Resolution setting tonight’s public hearing was published in the North County Times in the time
frame codified in the Government Code (ten days prior to this public hearing). In addition, staff
published an additional information type announcement in the newspaper to invite public input prior
to tonight’s meeting.
At the close of the public hearing tonight, Council is requested to adopt Resolution No. acoo-am providing for the levy of the annual assessments for Fiscal Year 2000-2001,
and approve Resolution No. mn .a 2 a authorizing a transfer of funds from the General Fund budget to certain special funds budgets.
I
FISCAL IMPACT:
The Fiscal Year 2000-2001 Street Lighting and Landscaping District No. 1 total budget for the three
zones is projected to be $1,873,702.
Other Special Fund budgets will contribute $10,500 to the Street Lighting Zone for the personnel,
and operations services. In addition, the City’s General Fund will contribute $70,000 to the Street
Tree Zone for staff time and equipment spent on maintaining City Parks and Hosp Grove which, by policy, are not considered part of the public right-of-way program.
The City’s General Fund will also contribute $64,323.01 to the Street Lighting Budget, $44,697.87 to
the Street Tree Budget and $46378.06 to the Street Median Budget as “General Benefit’ assessments, as further described in the Engineer’s Report.
1 r”4
Page 2 of Agenda Bill No. 1~)s 15
As shown in the following table, a single-family residential parcel which benefits from the street
lighting, street tree maintenance and median maintenance programs would have an anticipated assessment of $70.48 for Fiscal Year 2000-2001, the same as for Fiscal Years 1996-97, 1997-98,
1998-99 and 1999-2000.
ASSESSMENT SUMMARY FOR THE AVERAGE
SINGLE-FAMILY PARCEL
Street Light Maintenance $26.00 l $26.00 -O-
Street Tree Maintenance $36.10 $36.10 -O-
Median Maintenance $8.34 $8.34 -o-
TOTAL $70.44 $70.44 -O-
‘Assessment rate represents a single-family residence within a coda with largest number of single-family residential parcels.
EXHIBITS:
1. Order of Procedure.
2. Approved Engineer’s Report.
3. Resolution No. d 0 00 -d d / special maintenance district. providing for the levy of the annual assessment in a
4. Resolution No. &KIo -dd&
to three special funds.
approving the transfer of funds from the General Fund
ORDER OF PROCEDURE
CITY OF CARLSBAD
MAYOR:
CITY CLERK:
MAYOR:
STAFF: Provide description of boundaries of district.
MAYOR:
STAFF:
STREET LIGHTING AND LANDSCAPING DISTRICT NO. 1
DATE OF PUBLIC HEARING: JULY 11,ZOOO
“This is the time and place fixed for the public hearing relating to the levy of certain assessments to cover the cost of maintenance for certain street improvements existing within the boundaries of Street Lighting and Landscaping District No. 7. ”
(Address the City Clerk) “Has proper notice been given in the manner and form as required by law, and is a Certificate of Compliance on
file and open for public inspection? w
Verifies and gives date of legal notice.
“And now staff will present a report based on the approved Engineer’s Report. ”
Explain extent of maintenance work.
Present and summarize report pursuant to the provisions of the Landscaping and Lighting Act of 1972.
Explain method and formula of assessment spread.
Report on protests received and announce that copies have been delivered to each member of the legislative body.
END OF STAFF REPORT-OPEN FOR PUBLIC DISCUSSION
*This public hearing is now open for public discussion. Will any
person who is opposed to the assessment district step forward and
present his/her opposition to the following:
Boundaries of the district.
Extent of works of maintenance or method of assessment spread. ”
Next,
Will any person wishing to speak in favor the district come forward. ”
Give final report on protests received.
Presentation of proposed changes, if any.
CITY COUNCIL: Discussion
MAYOR: “This public hearing is now closed. ”
3
I * . ’
,
CITY OF CARLSBAD
STREET LIGHTING AND LANDSCAPING DISTRICT ~0.1
ANNUAL ENGINEER’S REPORT
FISCAL YEAR 2000~2001
JUNE2000
ENGINEER’S REPORT
AGENCY: CITY OF CARLSBAD
PROJECT: STREET LIGHTING AND LANDSCAPING DISTRICT NO. 1
ENGINEER’S REPORT PURSUANT TO “LANDSCAPING AND LIGHTING ACT OF 1972”
WHEREAS, this City Council has previously formed STREET LIGHTING AND LANDSCAPING
DISTRICT NO. 1 (hereinafter referred to as the District) and has levied assessments within the
District for prior fiscal years, all pursuant to the Landscaping and Lighting Act of 1972, being
Division 15, Part 2 of the Streets and Highways Code of the State of California, commencing
with Section 22500 (hereinafter referred to as the Act); and
WHEREAS, this City Council has previously adopted a Resolution ordering the preparation and
filing of an Engineer’s “Report”, all in accordance with the provisions of the.Act.
WHEREAS, at this time there has been filed as a part of the “Report”, certain plans and
specifications for the maintenance of the improvements, an estimate of the costs of
maintenance, a diagram of the District, and an assessment roll containing a spread of the
estimated costs of maintenance within the District, all as required by the Act and as previously
ordered by this City Council.
-
NOW, THEREFORE, pursuant to the direction from this City Council, this Report is hereby
submitted to this City Council pursuant to the provisions of the Act. This Report is applicable for
the fiscal year commencing July 1,200O to June 30, 2001 (hereinafter referred to as the Fiscal
Year). This report is prepared in 2 parts (Street Lighting and Landscaping), each of which,
consists of the following 3 sub-parts:
Part I. PLANS AND SPECIFICATIONS for the maintenance and/or servicing of the
improvements during the Fiscal Year. The plans and specifications show and
describe the general nature, location and extent of the existing and proposed Improvements to be maintained and/or serviced during the Fiscal Year. The
plans and specifications also Indicate the class and type of improvements to be
maintained and/or serviced for each zone within the District.
Part II. A DIAGRAM of the District. The Diagram shows the exterior boundaries of the
District, the boundaries of, any zones within the District, and the lines ‘and
dimensions of each lot or parcel within the District. Each parcel is identified by
a distinctive number or letter. The lines and dimensions of each lot conform to
those shown on the County Assessor’s maps.
Part Ill. AN ESTIMATE OF COSTS AND AN ASSESSMENT SCHEDULE showing the net
amount to be assessed upon assessable lands within the District, describing each assessable lot or parcel within the District by reference to the Parcel
numbers contained on the County Assessment Roll, and ass.essing the net amount upon all assessable lots or parcels by apportioning the net amount
among the several assessable lots or parcels in proportion to the benefits to be
received by each lot or parcel.
Annual assessment Increases will be caused by.reasons of increases in the costs
of labor, materials and utility cost increases as applied to energy rates and water
fees.
Assessments can be annually modified and Increased to reflect an annual
modlflcation in the cost of labor and materials based upon the Consumer Price
Index, San Diego, as published by the Department of Labor as computed for the
first Index in March of each year with additional modifications for related energy
and water rate increases.
Executed this. 2 cd day of ,2000, at
iz ,,c Cwt~bwi .
Odd.
DAVID A. HAUSER, PI-.
Deputy City Engineer
RCE 33081
DESCRIPTION OF IMPROVEMENTS
TO BE MAINTAINED
The improvements to be maintained and serviced are generally described as street lighting,
street trees and landscaped and hardscaped street medians all located within the public
right-of-way and as caused by new development and City improvement projects, all as set forth
and described in this Engineer’s Report.
New development has added 97 street lights to be included in Fiscal Year 2000-2001
maintenance inventory. A complete street light inventory, completed by street lighting staff and
included field verification, produced a GIS map showing all City street light locations and a
corresponding Excel database. The project was completed in April of 2000.
The City’s existing street tree inventory has been re-established at 15,000 street trees. Since
1984, new developments have not included trees in public right-of-way areas adjacent to
sidewalks. Prior to 1984, street trees were required as part of all public improvement.
The additional street median area to be maintained in Fiscal Year 2000-2001 is 4.62 acres due
to the inclusion of median improvements to portions of La Costa Avenue, Poinsettia Lane,
Cannon Road, and Palomar Airport Road. This brings the current street median acreage to a
total of 52.6 acres, which includes both hardscaped and landscaped medians. This acreage
figure is one of many fields of information contained in the new street median inventory, which
includes: plant types, lengths and meter locations of, irrigation systems. Street median
maintenance staff completed the inventory in April of 2000.
The Street Lighting Zone, the Street Tree Trimming Zone and the Street Median Maintenance
Zone assessments will not increase in Fiscal Year 2000-01, and will remain at the same base
formula rates as assessed in Fiscal Years 1996-97, 1997-98, 1998-99 and 1999-00. All new
assessor’s parcels, that by petition of the property owner(s) have been added to the three
zones, will be calculated at the same base formulas as used in the last four fiscal years.
STREET LIGHTING
Pursuant to direction from the City Council, submitted herewith is the “Report”, consisting of the
following documents pursuant to the provisions of Division 15, Part 2, of the Streets and
highways Code of the State of California, and specifically Section 22500 et.seq., the
Landscaping and Lighting Act of 1972.
PART I. PLANS AND SPECIFICATION
The plans and specifications for the maintenance and/or servicing of the street lighting
improvements during the Fiscal Year are on file in the office of the Assessment District
Administrator, 1635 Faraday Avenue, Carlsbad, California; are available for public inspection;
and are incorporated herein by this reference as though set forth in full. Said plans and
specifications show and describe the general nature, location and extent of the existing and
proposed improvements to be maintained and/or serviced during the Fiscal Year. The plans
and specifications also indicate the class and type of improvements to be maintained and/or
serviced for each zone and code within the District.
PART II. DIAGRAM
A diagram of the Street Lighting District. Said diagram shall show the exterior boundaries of the
Street Lighting District, the boundaries of any zones and codes within the Street Lighting District, the lines and dimensions of each lot or parcel within said Street Lighting District and
each parcel shall be identified by a distinctive number or letter. The lines and dimensions of each lot shall conform to those shown on the County Assessor’s map for the fiscal year to
which the Report applies. A simplified diagram is attached as Attachment “A”, followed by individual diagrams showing samples for each of the eight codes within Zone 1. A detailed
diagram is maintained in the office of the Assessment District Administrator, 1635 Faraday
Avenue, Carlsbad, California, and is available for public inspection.
P - . . ’
Lighting and Landscaping District No. 1
FY 2000 - 2001
= Street Light Maintenance Benefit Zones
[I Street Light Non-Benefiting Parcels
w
W
%+
L
8
NO SCALE
Al
CITY LIGHTS AT
INTERSECTIONS ONLY
NO SCALE
BI
CITY .LlGHTS AT
INTERSECTIONS AND
MIDBLOCK II .
4 NO SCALE
LA MACARENA AVE.
I3 JACARANDA AVE.
71’ 65 \
r?c’ ULIVENHAIN RD. Ik
c
Cl
CITY LIGHTS
SPACING AT CURRENT
CITY STANDARDS
4 NO SCALE
DI
CITY LIGHTS ON
MAJOR STREETS, PRIVATE
LIGHTING WITHIN DEVELOPMENT
\ \
NO SCALE
ALICANTE RD.
.
E2
CITY LIGHTS
CONDOS AND APARTMENTS .
-
.
NO SCALE
,F2
CITY LIGHTS COMMERCIAL AND
INDUSTRIAL ‘.
‘is’
-
NO SCALE .
GZ
CITY LIGHTS
REDEVELOPMENT AREA
NO SCALE
HI
CITY LIGHTS AT
TIME SHARE COMPLEX
METHOD AND FORMULA FOR ASSESSMENT SPREAD
FOR STREET LIGHTING
Within the citywide Street Lighting Assessment boundaries are the following two zones:
Zone 1 - City owned and maintained street lights Zone 2 - Undeveloped property - non-benefiting, not assessed
Zone 1 consists of the following sub-codes and their benefit spread formulas:
CODE Al l
CODE Bl*
CODE Cl*
CODE Dl*
Street lights at intersections only (residential)
Street lights at intersections and mid-block (residential)
Street, light spacing at current City engineering standards (residential)
City owned street lights on surrounding streets, private lighting within
development (single-family residential, only adjacent City lights will be calculated
for code assessment cost)
CODE E2”* Street light spacing at current City standard, condos and apartment buildings,
ten units and above
CODE F2** Street light spacing at current City standard, commercial and industrial parcels
CODE G2*” Special lighting’and spacing standard, downtown redevelopment area
CODE Hl”** Street light spacing at current City standard, time shares only
l
*t
Assessment is based on equal shares of cost of maintenance and operation of total
lights within each code.
Assessment is based on share of cost of maintenance and operation of total lights as
formulated by front footage percentage of each parcel in relation to total footage within
each code.
**t Flat rate per unit
METHOD AND FdRMULA FOR ASSESSMENT SPREAD
FOR STREET LIGHTING (CONTINUED)
Assessment Criteria: The improvements and annexation into the District are required for the
approval of, and as a consequence of, new development, and thus benefit the respective
developments. The lighting is of benefit to abutting parcels as it provides increased property
protection, personal safety, visibility, traffic safety, and enhances those areas fronting upon the
illuminated street.
The method of assessment for codes within Zone 1 is based on units. In the case of codes Al,
Bl, Cl, and Dl, a residential dwelling is equal to one benefit unit. In Code E2 condominium
dwelling units or apartment buildings with ten units and above are assigned units based on the
front footage of these developments. In Code F2 commercial and industrial parcels are assigned
units based on the front footage of these developments. Code G2 includes the downtown
redevelopment area and units in this code is also based on front footage. Code HI only includes
time share units, which are all assigned the same cost per unit.
. . ’ .-
PART Ill. ESTIMATE OF COSTS AND ASSESSMENT SCHEDULE
July I, 2000 through June 30,200l
STREET LIGHTING
Cost of Maintenance Service
1. Personnel (1) $197,251 .oo ,
2. Maintenance & Operations (1) $549,773.00
3. Capital Improvements $0,
Subtotal $747,024.00
Less General Benefit at 8.81%
Less Tax Roll Surplus
$64,323.01
$44,140.48
I BALANCE TO ASSESSMENT 1 $636,560.51
Notes:
(1) See Table “B”. The cost estimate for Personnel and Maintenance & Operations has been
reduced by $10,500 for service to other Special Maintenance Zones and Districts.
The “Balance to Assessment” shown above is spread upon the several parcels of land within
the District liable therefore and benefited thereby, in proportion to the estimated benefits that
each parcel receives, respectively, from said maintained works of improvement and
appurtenances as established in the formation of the District.
All of the parcels within the District are located within the City of Carlsbad and are approved
developments or are in the final stages of obtaining approval for a proposed development. As a
condition of approval, the developer is required by the City to provide certain standard street
lighting for the entire area within the development; and the energy costs for the initial l&month
period. The units in a development are not assessed the initial fiscal year to account for the
developer funded energy costs.
The District provides funding for the furnishing of services and materials for the ordinary and
usual operation, maintenance and servicing of the installed street lights. These services and
materials include the furnishing of electric current. Personnel costs include City staff assigned
to Street Lighting services, City administration (annual audit of City’s street lighting assessment,
updating expenditures and reassessments) engineering and legal expenses. Maintenance and Operations includes supervision, coordination between citizens and City staff for the
maintenance of City street lights, providing expertise to City inspectors during inspection of
lighting systems, coordinating underground service alert mark-outs for various City
departments, performing mark-outs for street light systems, maintaining as-built record of City
street light system for future maintenance, performing routine night surveillance, checking
proposed improvement plans for wnfonnance with City standards regarding street lights,
coordinating with Planning, Engineering and Engineer’s of Work to ensure that departmental
needs are met. The tax roll reserve is an advance for a portion of the estimated costs of service
and maintenance prior to the receipt of tax collections from the County of San Diego.
I’ . .
The lighting and the orderly circulation of traffic directly benefits the developments within the
District. Any share of the benefits received that does not provide a special benefit to the
assessed properties is a general benefit provided by the improvements. The cost of the general
benefit is not to be assessed to the properties in the District.
The cost of the general benefit is to be contributed by the City. This cost for lights is equal to the
average annual unit cost difference between the low wattage 9,500 lumen lights and the high
wattage 22,000 lumen lights. A 9,500 lumen light is the standard required on a local street.
Other streets, such as arterial% require.a standard greater than 9,500 lumens in order to service
a capacity greater than the local traffic.
Table “A”, on the following page, shows the calculation of the cost estimate for General Benefit for Street Lights.
a\
TABLE ‘A”
COST ESTIMATE FOR GENERAL BENEFIT
Street Light Summary Per SDGCLE
Lamp Size Number of Monthly
{Watts) Liahts Rate
Low wattaae liahts for collector streets:
Monthly
Amount
70 1,442 $2.32
100 2,788 $3.24
150 96 $4.44
Subtotal-l 4,326
Hiqh wattaae liahts for arterial streets:
$3345.44
$9,033.12
$426.24
200 1,071 $5.66 $6,061.86
250 569 $7.20 $4,096.80
400 7 $10.95 $76.55
Subtotal-2 1,647
Total ‘5,973
’ Annual Difference between Subtotal-l and Subtotal-2
Annual
Amount
Avg. Annual
Cost per Licrht
$40,145.28
$108.39744
$5.114.88
$153.657.60 $35.52
$72,742.32 $49,161.60
$919.80
$122.823.72 $74.57
General Benefit = Annual Difference times 1,647 high wattage lights
Total Budget for Street Lights
Percent of General Benefit Contribution
$39.05
$64,321 .Ol
$747,024.00
8.61%
. .
The following table, identified as Table “B”, shows the calculation for the reduction in cost for
service to other Special Maintenance Zones and Districts in the City. The cost for service to
other departments is subtracted from the total budget cost to arrive at the “Balance to
Assessment” to parcels in the District.
TABLE “B”
COST ESTIMATE REDUCTIONS FOR FY 20004
The total “Balance to Assessment” is then divided into the eight codes within Zone 1 as
previously identified. The dollar per assessment unit value for Fiscal Year 2000-2001 in each
code is calculated as follows:
ASSESSMENT SPREAD .
For the specific assessment on each parcel, reference is made to the Assessment Roll on file at
the office of the Assessment District Administrator, 1635 Faraday Aventib, Carlsbad, California,
which is incorporated herein by this reference as though set forth in full.
LANDSCAPING
PART I. PLANS AND SPECIFICATIONS
The plans and specifications for the maintenance and/or servicing of the Street Tree and Street
Median Improvements during the Fiscal Year are on file in the office of the Assessment District
Administrator, 1635 Faraday Avenue, Carlsbad, California; are available for public inspection;
and are incorporated herein by this reference as though set forth in full. Said plans and
specifications show and describe the general nature, location, and extent of the existing and
proposed improvements to be maintained and/or senriced during the Fiscal Year. The plans and
specifications also indicate the class and type of improvements to be maintained and/or serviced
for each zone within the District.
PART II. DIAGRAM
A diagram of the Landscaping District. Said diagram shall show the exterior boundaries of the . District, the boundaries of the Street Tree and Street Median zones within the District, the lines
and dimensions of each lot or parcel within said Landscaping District and each parcel shall be
identified by a distinctive number or letter. The lines and dimensions of each lot shall conform to
those shown on the County Assessor’s map for the Fiscal Year to which the Report applies.
Simplified diagrams are attached as Attachments “B” and “C”. A detailed diagram is maintained
in the office of the Assessment District Administrator, 1635 Faraday Avenue, Carlsbad,
California.
r .
Lighting and Landscaping District No. 1
FY 2000 - 2001
m Street Tree Benefit Zone w
W
+k 8
3 2ooO City of Cdmbd GIS /car&2/plodu&mlr39.@7~mm11.unl o!xwGo ATTACHMENT “6”
1
I
I I I I
I
I --
Lighting and Landscaping District No. 1
FY 2000 - 2001
m Median Landscaping Benefit Zone
m Existing Median Locations w
I,‘\*” Future Median lmations W
m Median Maintained by Others 4+ a
~2oaOCitvofCvbbdGIS ~lugir2~~~~~~9.~7~~imll.~l o!imm ArrACHMENT “C”
1
-.
ASSESSMENT SPREAD
FOR STREET TREE AND MEDIAN MAINTENANCE ZONES
Street Tree Maintenance Zone
Street trees are in the street right-of-way, generally located between the curb and sidewalk
and/or property line in the areas of the City as shown in Attachment “B”. Each property within
the Street Tree Maintenance Zone receives approximately the same degree of benefit to their property. Therefore, staff established a benefit formula in which -each zoned parcel is given an
equivalent dwelling unit (EDU) based on the average size of a single-family residential lot in the
City of Carlsbad (7,500 square feet or .17 acres). Thus, each single-family parcel is given an
EDU of 1 .O, while most other parcels* are given assessments based on acreage to establish an
EDU value based on the following formula:
Acreage of parcel / 0.17 acres = EDUs
Street Median Maintenance Zone
This service generally benefits all parcels and residents in the City. Thus, all parcels in the City
share in the cost of median maintenance using the same EDU formula as in effect for the Street Tree Maintenance Zone,
These formulas were approved by City Council at the June 6, 1989 regular meeting.
*See foliowing page for Benefit Units/Land Use code conversion guide.
A7 .?-:
CITY OF CARLSBAD
LANDSCAPE MAINTENANCE BENEFIT UNITS/LAND USE CODES
I Timeshare I 1.0 I 52 I Avocados
I 13 I Res. 2-4 units/2 houses 1.0 57 1 Misc. irr
.l/DU 16
.l/DU 17
.llDU 16
.l/DU 19
Form. 20
Res. 61 units and up
Condominium
Co-op
Misc. residential
Vacant commercial
l-3 story misc. store bldgs.
4 story & up office/store
Reninnnl shonninn ctr~
1.0
1 .o
1 .o
1.0
1.0
61 Non-irrigated l-l 0 AC
62 Non-irrigated 1 l-40 AC
63 Non-irrigated 41-I 60 AC
84 Non-irrigated 161-360 AC
65 Non-irrigated 361 & up AC
Form. 21
Form. 22
Fnrlll
0.0 70 Vacant institutional
0.0 71 Church
Form. 1 26
24
Form. 29
25
26
27
Form.
Form.
Form.
Form.
Community shopping ctr.
Med., dental, animal hospital
Con. Hospital, rest home
Neighborhood shopping ctr.
Hotel, motel
Service station
0.0 72 Church parking/related
0.0 73 Cemetery
0.0 74 Mausoleum
0.0 75 Mortuary
Form. 77
Form. 79
Hospital
SpecJmisc. institutional
Form. 30
Form. 31
Form. 32
Form. 33
office condominiums Parking lot, garage, used cars
Trailer park
Theater
Fon. 80
Form. 61
Form. 82
Vacant recreational
Meeting hall, gym
Golf course
Formula: /fames < .20, then BU = 1 .O, else BU = 5.9 x AC (i.e. ACY0.17)
PART iii. ESTIMATE OF COSTS AND ASSESSMENT SCHEDULE
July 1.2000 through June 30,200l
STREET TREES
Cost of Maintenance
1. Personnel (1) $297,114.00
2. Maintenance & Operations (1) $222,025.00
Subtotal $519,139.00 -
Less General Benefit at 8.61% (2) $44.697.87 .
Less Tax Roll Surplus $15452.53
BALANCE TO ASSESSMENT $458,988.60
Notes:
(1) See Table “C”. The cost estimates for Personnel and Maintenance & Operations have been
reduced by $70,000 for service to other City departments.
(2) See Table “A” of the street lighting portion of this report for calculation of % of General
Benefit.
The Street Tree division provides maintenance to all trees in the public right-of-way (15,000)
parks, open space areas, and trees’at all City facilities. The maintenance consists of pruning,
planting, removal and root pruning. The division annually responds to over 500 street tree
order/requests, removes over 50 trees and plants over 100 trees.
Table “c” below, shows the calculation for the reduction in cost for service to other departments
in the City. The cost for service to other departments is subtracted from the total budget cost to ’ arrive at the “Balance to Assessment” to parcels in the District.
TABLE “C”
COST ESTIMATE REDUCTIONS FOR FY 1999100
The cost of the General Benefit for Street Trees is determined by utilizing the same percent as
calculated for Street Lighting as shown in Table “A”.
The total “Balance to Assessment” is then divided by the number of benefit units to arrive at a
cost per benefit unit. The dollar per assessment unit value for Fiscal Year 2000-01 in the Street
Tree benefit zone is calculated as follows:
Balance to Assessment = $458.988.60 = $36.10 per unit
Total Benefit Units 12,714.37
This unit assessment is applied to 13,793 parcels in the Street Tree Zone. For the specific
assessment on each parcel, reference is made to the Assessment Roll on file in the office of the Assessment District Administrator, 1635 Faraday Avenue, Carlsbad, California, which is
incorporated herein by this reference as though set forth in full.
3 0
h
July 1,200O through June 30, 2001
STREET MEDIANS
Cost of Maintenance Service
’ 1. Personnel
2. Maintenance & Operations
Subtotal.
$214,178.00
$312,861 .OO
$527,039.00
Less General Benefit at 8.61% (1) $45378.06
Less Tax Roll Surplus $64,077.58
I BALANCE TO ASSESSMENT 1 3417,58X38 1
Notes:
(1) See Table “A”, as shown in the street lighting portion of this report for calculation of % of
General Benefit.
The Street Median program provides weekly landscape maintenance and litter control to all City medians and to Redevelopment Landscape improvement areas. It includes maintenance on a
weekly basis of approximately 52.6 acres of landscaped medians and 8 acres of planter boxes,
downtown fountain, landscape pockets and parking lots. Maintenance includes trash pick-up,
weed control, pruning, planting, pesticide/fertilizer application, removals, replanting, irrigation repair/adjustment, and parking lot sweeping. A contractual median maintenance program
provides for contracting, administering and overseeing median maintenance for approximately
42.5 acres of City medians.
The cost of the General Benefit for Street Medians is determined by utilizing the same percent
as calculated for .Street Lighting as shown in Table “A”.
The total “Balance to Assessment” is then divided by the number of benefit units to arrive at a cost per benefit unit. The dollar per assessment unit value for Fiscal Year 2000-01 in the Street
Median benefit zone is calculated as follows:
Balance to Assessment s $417.583.36 = $8.34 per unit
Total Benefit Units 50,069.95
This unit assessment is applied to 44,028 parcels in the Street Median Zone. For the specific
assessment on each parcel, reference is made to the Assessment Roll on file at the office of
the Assessment District Administrator, 1635 Faraday Avenue, Carlsbad, California, which is
incorporated herein by this reference as though set forth in full.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, CONFIRMING THE DIAGRAM AND
ASSESSMENT AND PROVIDING FOR THE LEVY OF THE
ANNUAL ASSESSMENT IN A SPECIAL MAINTENANCE DISTRICT.
WHEREAS, the City Council of the City of Carlsbad, California, has initiated proceedings
for the levy of the annual assessment for a landscaping and lighting district created pursuant to
the terms of the “Landscaping and Lighting Act of 1972,” being Division 15, Part 2 of the
Streets and Highways Code of the State of California (the “Act”), in a special maintenance district
known and designated as Street Lighting and Landscaping District No. 1 (hereinafter referred to
as the “District”); and
WHEREAS, the Maintenance District is an existing assessment district in which
assessments are not proposed to be increased, and is exempt from the procedures and
requirements of all assessments under California Constitution Act XIIID 5 5 (a); and
WHEREAS, at this time, a public hearing has been held relating to the levy of the annual
assessments, and this City Council is now satisfied with the assessment and diagram and all
other matters as contained in the Engineer’s Report as now submitted for final consideration and
approval.
NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS:
RECITALS
SECTION 1. That the above recitals are all true and correct.
PROTESTS
SECTION 2. That all protests and objections of every kind and nature be, and the same
hereby are, overruled and denied.
CONFIRMATION
SECTION 3. That the final assessment and diagram for the proceedings, as contained in
the Engineer’s Report is hereby approved and confirmed.
Ill
Ill
1 SECTION 4. That the public interest and convenience requires, and this legislative body
2 does hereby order the maintenance work to be made and performed as said maintenance work is
3 set forth in the Engineer’s Report, and as previously declared and set forth in the Resolution of
4 Intention.
5 SECTION 5. That the assessments contained in said “Report” for the next fiscal year are
6 hereby confirmed and levied upon the respective lots or parcels of land in the District in the
7 amounts as set forth in said final “Report.” It is hereby further determined that all assessments
8 have been apportioned properly in accordance with the benefits that each parcel receives from
9 the proposed maintenance works of improvement.
10 ANNUAL ASSESSMENT INCREASE
11 SECTION 6. Future assessment increases will be caused by reason of increases in the
12 costs of labor, materials and utility cost increases applied to energy rates and water fees.
13 Assessments can be subsequently modified and increased, as authorized by Section 54954.6 of
14 the Streets and Highways Code of the State of California to reflect annual increases in the costs
1s of labor and materials based upon the Consumer Price Index, San Diego, as published by the
16 Department of Labor, computed for the first index in March of each year, and those above
17 referenced changes will not constitute new and/or increased assessments requiring additional
18 notification.
19 FILING AND RECORDING
20 SECTION 7. That the above-referenced diagram and assessment shall be filed in the
21 office of the City Clerk, with a certified copy to be filed in the office of the Administrative
22 Coordinator-Special Districts. Said diagram and assessment, and the certified copy thereof, shall
23 be open for public inspection.
24
25
SECTION 8. That the City Clerk is hereby ordered and directed to immediately file a
certified copy of the diagram and assessment with the County Auditor. Said filing to be made no
26 later than the third Monday in August.
27 I//
28 III
4
ENTRY UPON THE ASSESSMENT ROLL
2 SECTION 9. That after the filing of the diagram and assessment, the County Auditor shall
3 enter on the County Assessment Roll, opposite each lot or parcel of land, the amount assessed
4 thereupon.
5 COLLECTION AND PAYMENT
6 SECTION 10. The assessments shall be collected at the same time and in the same
7 manner as County taxes are collected, and all laws providing for the collection and enforcement
8 of County taxes shall apply to the collection and enforcement of the assessments.
9 FISCAL YEAR
10 SECTION 11. That the assessments as above authorized and levied for these
11 proceedings will provide revenue and relate to the fiscal year commencing July 1, 2000 and
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council
,200O by the following vote, to wit:
Council Members Lewis, and Kulchin
tant City Clerk
(SEAL)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2000-222
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA APPROVING THE TRANSFER OF
FUNDS FROM THE CITY’S GENERAL FUND TO THREE
SPECIAL FUNDS AS FURTHER DETAILED IN THE APPROVED
“ENGINEER’S REPORT’ FOR THE CITY OF CARLSBAD
STREET LIGHTING AND LANDSCAPING DISTRICT NO. 1 FOR
FISCAL YEAR 2000-2001.
WHEREAS, the City Council of the City of Carlsbad approved the “Engineer’s Report” for
the above titled lighting and landscaping district by Resolution No. 2000-190 for Fiscal Year
1999-2000; and
WHEREAS, the aforementioned resolution approved said report that transferred a sum of
money from the City’s General Fund to certain special district funds; and
WHEREAS, said transfer is approved in compliance with Articles XIIIC and XIIID of the
State Constitution as added by the passage of Proposition 218.
NOW, THEREFORE, BE IT RESOLVED that the following fund transfer is hereby
authorized to be made by the City Finance Director:
1. One hundred fifty four thousand, three hundred ninety eight dollars and ninety four
cents ($154.398.94) from the General Fund to be transferred to the Special District Funds for
Fiscal Year 2000-2001 as adopted by Resolution No. 2000-l 90.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council
held on the 11th day of July , 2000 by the following vote, to wit:
and Kulchin
CLAUDE A. L
II ATTEST:
(SEAL)
PROOF OF PUBLICATION
(2010 & 2011 C.C.P.)
CiZiC$yL ,‘t p//-66
* /p, m3 “57 j?/g
This space is for the County Clerk’s Filing Stamp
STATE OF CALIFORNIA County of San Diego
I am a citizen of the United States and a resident of the County aforesaid: I am over the age of eighteen years and not a party to or interested in R
ECEWD
JUN 2 9 -3
the above-entitled matter. I am the principal clerk
of the printer of WY OF CARLSEAD
QTY CLERK’S OFFICE North County Times
formerly ‘known as the Blade-Citizen and The Proof of Publication of
Times-Advocate and which newspapers have been adjudged newspapers of general labEolutim No. 2000-191
circulation bv the Suoerfor Court of the Countv of San Diego, -State of California, for the cities of
Escondido, Oceanside, Carlsbad. Solana Beach and San Diego County; that the notice of which
the annexed is a printed copy (set in type not smaller than nonpareil), has been published in
each regular and entire issue of said newspaper and not in any supplement thereof on the
following dates, to-wit:
Jura 27, 2000
I certify (or declare) under penalty of perjury that the foregoing is true and correct.
sac Marcoe Dated at , California
27th this day Jutx, 2000
NORTH COUNTY TIMES
Legal Advertising
I , *
i s
i
: : : s 5 ,e l
e
,2
;
:
4 i
i
I
i
t
I
I
i
I
/j
I
I I
L
I
‘I
!j
1
I
1
I , I
WRITE IT - DON’T S&Y IT!
Date August 8, 2000 xex
ToVirginia , 0 Reply Wanted
From Debra IJNo Reply Necessary
I am following up with you regarding the STREET LIGHTING AND LANSDCAPING annual
assessments< Per resolution the City Clerk's office is to have on file a copy
the diagram and assessment which should be detailed in the Engineer's report
dated June 2000.
While I do see several diagrams the assessment shcedule as discussed in the
Engineers report does not seem to be included.
It was my understanding that after our discussion regarding this item, you as the
Administrative Coordinator-Sptial Districts, were going to do the filing with the
County Auditor. Can you please supply me with the correct diagrram and assessment
which makes reference to the Parcil numbers "contained on the County Assessment
Roll, assessing the net amount upon all assessable lots. . . . II As refered to in the
Engineers report.
If you have any questions please feel free to call me. I can be reached at ex 5106.
Thanks in advance for your help. I hope to have this item resolved by the end of
August.