Adopt Resolution No. da 1. ?,3 , approving the Zone 19 Community Park Master Plan and
direct staff to proceed with environmental and permit processing.
I
ITEM EXPLANATION :
Zone 19 Community Park is 24 acre park located in the Southwest Quadrant of the City and in
the northern portion of the Aviara community (refer to Exhibit 2). Development of the park is
outlined in the Parks and Recreation Element of the General Plan and is needed to meet the
standards established under the Growth Management Plan (3 acres park per 1000 population).
A project design team was formed that consisted of City staff from various departments as well
as the City’s park planners, P&D Consultants. After data gathering, site analysis, and preliminary
discussions of the initial program for the park, several conceptual layouts were produced for
consideration.
On November 20, 2000, staff presented an update on the progress of the master plan to the
Parks and Recreation Commission. Staff explained two alternative park layouts and described
the proposed public outreach program.
An “open house/ public workshop” was held on December 7,200O at the Dove Library. The
workshop was noticed using mailings and newspaper advertisements. Staff and the consultants
were in attendance to explain the exhibits and to encourage input from the attendees. Comment
forms were provided. Approximately 45 residents attended the open house and staff received
valuable input from the citizens.
Following the public meeting, the design team met and analyzed the public input. Along with the
expertise of staff, they developed the final program for the park and recommended the “preferred
alternative”. The proposed Zone 19 Park Master Plan is attached as Exhibit 3. Amenities include:
One *Large soccer field w/ 2 smaller
over-lay fields
One *Ball field
Two *Basketball courts (half court
design)
One Large tot lot
Walkways and trails
*will include sports lights.
One Community center (approx. 17,000
square feet)
One Large picnic area
Two Restrooms
One Maintenance bldg.
Parking (approx. 175 spaces)
The community center is intended to be different than the City’s other community centers. It will
be slightly smaller and will not include a gymnasium. The vision for the center is to
accommodate meetings, banquets, weddings, dance classes, and other like uses. Additionally,
’ there will be a “senior component” that will include a dedicated “senior family” room for “drop in”
services that cater to seniors (e.g. library, meeting rooms, computer station, occasional health
services, etc). The architecture is proposed to present a generally higher quality of aesthetics
than the more purely functional designs of Calavera Hills and Stagecoach community
center/gymnasiums.
AB# 16: lo&
Page 2
The recommended plan was presented to the Parks and Recreation Commission on January
22, 2001. After reading a letter addressed to the Commission advocating the development of a
new pool complex as soon as possible, and hearing public comment from a citizen requesting
the same, the Commission directed staff to investigate the possibility of incorporating a pool into
the Master Plan. The incorporation of an Olympic size pool complex into the plan would result in
the displacement of the soccer fields and either the community center g baseball field.
Currently, the Capital Improvement Program outlines the future pool to be located in Alga Norte
Park. For a variety of reasons, staff continues to believe that this is the best location for the pool
and recommends the Zone 19 Community Park Master Plan be approved as presented.
Finally, due to the “senior component” of the community center, staff presented the plan to the
Senior Commission on February 1, 2001. The item was informational only, and the Commission
generally approved of the plan.
Should Council approve the Master Plan, staff will proceed with submittal of the plan for
environmental review and processing of a Conditional Use Permit by the Planning Commission.
Should Council wish to investigate including a pool at Zone 19 Park, staff will conduct additional
design studies, and return to the Parks and Recreation Commission and/or City Council for
further direction,
ENVIRONMENTAL REVIEW
No environmental review has taken place to date on the Zone 19 Community Park. The site
itself was identified in the Pacific Rim (a.k.a., Aviara) Master Plan Environmental Impact Report
(1987) as a future park site. Staff is requesting that Council approve the Zone 19 Community
Park Master Plan and direct staff to submit the project for environmental review and processing
of a Conditional Use Permit.
FISCAL IMPACT:
In the Fiscal Year 2000-2001 Capital Improvement Program (CIP), Council has appropriated the
following funds:
In the proposed FY 2001-2002 CIP, staff has presented a recommendation to increase the park
construction budget (based on the preliminary cost estimates developed through the Master
Plan process), as well as merging Phase I and II (to complete the entire park at one time).
These funding issues are anticipated to be addressed by Council during the upcoming CIP
review.
EXHIBITS:
1. Resolution No.J&/=?3approving the Zone 19 Community Park Master Plan
2. Location Map
3. Zone 19 Community Park Master Plan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2o01-73
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING THE ZONE 19 COMMUNITY
PARK MASTER PLAN AND DIRECTING STAFF TO PROCEED WITH
ENVIRONMENTAL REVIEW AND REQUIRED PERMITS
WHEREAS, The City Council of the City of Carlsbad, California, desires to
develop Zone 19 Community Park; and
WHEREAS, the City of Carlsbad’s Parks and Recreation Element of the
General Plan outlines the development of the Zone 19 Community Park; and
WHEREAS, the Zone 19 Community Park is required to meet the standards of
the City of Carlsbad’s Growth Management Plan; and
WHEREAS, the City Council has previously approved a consultant agreement
with P&D Consultants to provide master planning services for Zone 19 Community
Park; and
WHEREAS, the Zone 19 Community Park Master Plan requires environmental
review and certain permits.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, the following:
1. That the above recitations are true and correct.
2. That the City Council hereby approves the Zone 19 Community Park Master
Plan.
3. That the City Council does hereby direct staff to proceed with processing
environmental review and permits for the Zone 19 Community Park Master Plan.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
Council of the City of Carlsbad, California, held on the day of
1
1
1
1
1
1
11
1’
1E
15
2c
21
22
to wit:
CLAUDE A. LEWIS, Mayor
. .
.*
ZONE 19 PARK
EXHIBIT 2 *
prepared for:
The City of Carlsbad
prepared by:
P&D Consultants, Inc. 401 West ‘A’ Street Suite 2500 San Diego, CA 92101
Scott Bernet Architects 525 Hawthorn Street Suite 4 San Diego, CA 92101
City of Carlsbad Zone 19
Community Park
Master Pl,an Report
February 2001
City of Carlsbad Zone 19
Community Park
Master Plan Report
February 9,200l
Prepared for:
City of Carlsbad
Prepared by:
P&D Consultants
401 West ‘A’ Street
Suite 2500
San Diego, CA 92101
6 19-232-4466
C
7
r
C
C
r
P
”
r I
7
P
P
r
r
.z :,. .--. City of Carlsbad Z&e I9
Master Plan Report Community Park
Zone 19 Community Park Master Plan
P
P
Acknowledgements
City Council
Claude A. Lewis, Mayor Ann J. Kulchin, Mayor Pro Tern
Ramona Finnila
Matt Hall
Julianne Nygaard
City of Carlsbad Parks 8 Recreation Commission
Gary Cox, Chairman
Dennis Cunningham
Tim Davidson
Leo Pacheco William Scott Pieratt
Julio Ramirez
Seth Schulberg
f
City of Carlsbad Staff
C
P
r
r r
c
Ken Price, Recreation Director, Recreation Department
Mark Steyaert, Park Development Coordinator, Recreation Department
John Cahill, Municipal Projects Manager, Community Development Department
Gail Watts, Recreation Supervisor II, Recreation Department
Robin Bettin, Recreation Supervisor II, Recreation Department
Sue Spickard, Senior Services Manager, Recreation Department
Dave Milliken, Recreation Supervisor II, Recreation Department
Doug Duncanson, Public Works Manager, General Services Department
Jerry Rodriguez, Parks Supervisor, General Services Department
Marshall Plantz, Senior Civil Engineer, Public Works Department
Jason Martin, Associate Planner, Planning Department
Scott Carroll, Management Analyst, General Services Department
Connie Beardsley, Arts Manager
P&D Consultants, Inc. . . . 111 City of Carlsbad
\~DSDNT3\pRaJuTIsuD refmumc lnhlM.?r PlmU19 master plm cowrQt=d~
Zone 19 Community Park Master Plan
C
?-
P
c
P
r-
P
Consultants
P&D Consultants, Inc.
Chuck Moore, Principal-in-Charge
Gary Wood, Project Manager
Betty Dehoney, Environmental Director
Steven Kettler, Civil Engineer
L. Clark Ritter, Landscape Architect
Salvatore Zimmitti, Biologist
Josephine Gabriel, Environmental Analyst
Scott Bernet Architects
Scott Bernet, Architect
Gallegos & Associates
Dennis R. Gallegos, Archeologist
C III P&D Consultants, Inc. iv City of Carlsbad
P:UDMtNUone 19!hkter PIan!Z19 master plan covcr&toc.doc
r-
P
C
r-
P
r !
f
Zone 19 Community Park Master Plan
Table of Contents
Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . ..I............................................................ *.. 111
Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ES-1
1 Introduction .................................................................................................... 1
2 Existing Conditions ........................................................................................ 6
3 Initial Concept Design Studies . . ..t......................*.........*...*...,....,,................... 9
4 Preferred Master Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
5 Architecture Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
6 Engineering Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
7 Landscape Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
8 Construction Phasing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Appendices . . . . . . . . . . . . . . . . ..I.................................................................................. A-l
A.1 BioIogical Resources Summary ......................................................... A-2
A.2 Preliminary Design Concept A .......................................................... A-6
A.3 Preliminary Design Concept B .......................................................... A-8
A.4 Public Input Summary ....................................................................... A-10
P&D Consultants, Inc. V City of Carlsbad
PAADMlhWone 19VGter PIadZ master plan cmr&tosdoc
r-
r
I
r
C
P
Zone 19 Community Park Master Plan
&&gj
A
B
C
D
E
F
G
H
I
J
K
L
M
N
A.1
A.2
A.3
list of Exhibits
City of Carlsbad Regional Location ..............................................................
Vicinity Map ..................................................................................................
Aerial Photograph ..........................................................................................
Opportunities and Constraints ........................................................................
Relationship Diagram ....................................................................................
Preferred Master Plan ....................................................................................
Park Program and Parking Requirements ......................................................
Site Sections ...................................................................................................
Community Building Program .......................................................................
Community Building Concept Floor Plan .....................................................
Community Building Concept Elevations .....................................................
Grading and Utilities Concept Plan ...............................................................
Landscape Concept Plan ................................................................................
Plant Materials List ........................................................................................
Habitat Map and Park Development Area .....................................................
Preliminary Design Concept A ......................................................................
Preliminary Design Concept B ......................................................................
m
3
4
5
8
11
13
14
15
18
19
20
23
26
27
A-5
A-7
A-9
P&D Consultants, Inc. vi City of Carlsbad
PAADMlNZac 19Wutcr PhoK.19 master plan cover&tocdoc
c
P
-
P
Zone 19 Community Park Master Plan
Executive Summary
Developing an overall vision was the first step in launching the Master Plan process. It was
determined that the overall character and quality of this park should be commensurate with
the City’s existing community parks, but that the design program may vary. With each park
developed in Carlsbad, better ways to provide amenities and analysis of which amenities best
serve the public are incorporated into new designs.
The vision for this park was one that included a balance of active and passive uses. The
community center would not house a gymnasium (Poinsettia Community Park will ultimately
have a gym), but would provide more opportunities for meeting rooms, a large multifunction
space, and banquet accommodations. The aesthetics of the building would be upgraded from
the existing, more institutional designs of the City’s existing coxnmunity centers/gym.nasiums
to a warmer, more inviting architecture.
After an initial vision and program were established, the second step of the planning process
included a detailed analysis of the opportunities and constraints and feasibility of
accommodating the desired facilities on the site. The findings of this step led to the
following conclusions which were key factors in determining the park plan.
1.
2.
3.
The park development should avoid impact to the sensitive habitat areas along the north
and west edges of the park site.
The topography of the site would not easily allow the creation of a continuous level area
throughout the park. A site development approach which would include several terraces
would allow more efficient use of the site and produce a more aesthetic park design.
The lighted sports fields should be located in the west and central portions of the park.
This conclusion was due to the topography and configuration of the park site and where
there was the best opportunity to create pads of sufficient size to accommodate sports
fields, and the goal to not locate the lighted fields immediately adjacent to the residential
units east and south of the park.
These conclusions provided a framework for several initial concept park designs. Ultimately
two concepts were considered, Preliminary Concepts A and B (refer to Appendices A.2 and
A.3).
The Preliminary Design Concepts A and B prepared in the third step are differentiated by one
major item, the location of the Community Building and the parking associated with the
building. Each alternative was seen as having advantages and disadvantages, but the team
evaluation and community workshop comments led to the conclusion that a variation of
Plan B best achieved the objectives of the park. In the preferred master plan (frontispiece),
the Community Building is on the west, allowing this important facility to take advantage of
r Bi P&D Consultants, Inc. ES- 1 City of Carlsbad
P:L4D&IlNUone 19Wirtcr PlmUl9 muter phdoc
C
C
t-
C
r
Zone 19 Community Park Master Plan
northerly and westerly views to the surrounding hills and ocean. The picnic and play areas
on the east allowed parking to be provided closer to those facilities.
The third step also included the ongoing evaluation of draft space program for the
Community Building and the functional relationships within the building.
The fourth step involved conducting a public workshop/open house. This workshop was held
on December 7,2000, at the Dove Library. Public input was recorded and integrated, where
appropriate, into the design (refer to Appendix A.4).
The fifth step included a continued refinement of the park plan in response to comments from
staff and the public and the completion of a final Community Building space program and
identification of key operational characteristics. With the determination that the preferred
location of the Community Building was on a site with significant view potential, the concept
architectural design was begun to take maximum advantage of that potential. The last step
focused on the building design alternatives and confirmation that building design issues
inherent to the site could be successfully addressed. Similar to the park planning process,
there were key factors in determining the building plan.
1. The total site area available for the building is specifically defined by the site topography
and adjacent habitat. Also important are setbacks from the habitat for fire safety.
Buildings closer than 60 feet to the habitat areas may have limitations on the use of
windows and other design features. The building program needed to be accommodated
within the available area and allow for the desired windows, terraces, and other
architectural features that would contribute to the quality of the building and experience
of those who use it.
2. The building space program includes a variety of uses which could be going on at the
same time. The four major use areas needed to be configured to be consistent with their
unique use characteristics, and allow appropriate access to administrative and support
areas. The building plan also needed to permit operational flexibility for the City staff,
such as opening a portion of the building for after-hours use while securing other areas,
and scheduling diverse activities simultaneously without conflict.
The Community Building Concept Floor Plan (Exhibit J) places the four major use areas in
the four quadrants of the building, based on their specific needs and use characteristics. The
multifunction room is located in the northwest quadrant, the location of the best view, with
access to a large outdoor terrace, restroom facilities, and a kitchen. The meeting room is
located in the northeast quadrant, with access to a separate, smaller terrace and the kitchen.
The senior drop-in center with senior family room is in the southwest quadrant, close to both
handicapped and regular parking. It also has a separate terrace and a small restroom facility.
The activity room, a space for active uses such as dance, martial art, and exercise classes, is
in the southeast quadrant. The activity room has access to a second set of restrooms. All
four major use areas are supported by the administrative area located near the entrance.
P&D Consulfanfs, Inc. ES-2 City of Carlsbad
P:UDMJNUone 19iMuter PIanVZ19 muter ph.doc
C
C
r
f
r
Zone 19 Community Park Master Plan
The Community Park will contain public art integrated with the final park design, The
selection of the artist(s) and the location of the art component within the park is a separate public review that will extend beyond the completion of this master ph.
000
r
r
P&D Consultants, Inc. ES-3 City of Carlsbad
P:UDMIN!ZO~I~ ISMuter PlanUl9 master plra.doc
Zone 19 Community Park Master Plan
P
P
C
C
P
P
f
I
r
P
i
Section 1
Introduction
The Zone 19 Community Park Master Plan is summarized in this report. The report
documents the design process, the alternatives considered, and the preferred master plan for
the park. The master plan was prepared and reviewed by a team comprised of City staff from
the departments of Community Development, Recreation, Planning, Engineering, Public
Works, General Services (Parks), and a consultant team comprised of a park planner,
landscape architect, environmental analyst, and architect. The process included progress
presentations to the Parks and Recreation Commission, and progress meetings involving all
City departments who would have some responsibility for the construction and ongoing
operation and maintenance of the park. The public had an opportunity to review the park
planning process at an early date during the first Parks and Recreation Commission Meeting
when two preliminary design concepts were under consideration. The public workshop was
held at the Dove Library, and opinion forms were provided to allow specific comments to be
submitted.
The Parks and Recreation Element of the Carlsbad General Plan, and the City’s Growth
Management Program, divide the City into four quadrants and 25 “zones” called Local
Facilities Management Zones. The Zone 19 Community Park is located in the Southwest
Quadrant, and is intended to be utilized for community-level park facilities serving the entire
City, but more specifically, citizens of the southwest quadrant of Carlsbad (Exhibit A). The
park site is located north of the intersection of Poinsettia Lane and Ambrosia Lane
(Exhibit B). The 24.25-acre site was acquired as part of the Aviara Master Plan process and
is on the northerly edge of that master-planned community. It is adjacent to residential
development on the east and south, an industrial park to the north, and open space to the
north and west (Exhibit C).
The proposed facilities within the park are to serve a variety of outdoor activities including
field sports, passive outdoor areas for individual and group play, and picnic areas. Also
included is a Community Building with specially designed spaces for active uses such as
dance, exercise, and martial arts, a space for meetings, a senior “family room”, and a large
multipurpose area. The recreation facilities for the park and the support facilities, such as
maintenance areas and parking, are consistent with the standards of the Recreation
Department. The park program was also developed to help meet the facility standards
adopted by the Parks and Recreation Commission. The park is intended to be an important
new addition to the Carlsbad park system and provide for the increasing community
recreation needs in this area of the City.
The public comments and the evaluation by the City/consultant team led to the preparation of
a third plan, a variation of one of the two alternative concept plans. This plan is identified as
the preferred master plan.
r P&D Consultants, Inc. 1 City of Carlsbad
P:UDMlNU.me 19iMastcr PImEl muter plmdoc
C
C
Zone 19 Community Park Master Plan
This report contains both the preliminary design concepts and the preferred master plan. It
also describes the key background information that affects the park plan and master plan
level grading, landscaping, and utility plans for the park. All the park facilities are expected
to be built in one phase, with the potential exception of the Community Building. The
Community Building may be included in a later phase. The timing for the implementation of
the park facilities and the Community Building will be addressed through the City’s Capital
Improvement Program.
r
P
P
P
r
r 1
P
i
r
P
r
r
r lm P&D Consultants, Inc. 2 City of Carlsbad
P
P
7
P
P
P
P
P
no scale
Southwest Quadrant
I 19 I Local Facilities Management Zones
City of Carlsbad Regional Location
Exhibit A page 3
no scale
y9 1
Community Park
Vicinity Map
Exhibit B Page 4
F
Community Park
F /
Aerial Photograph
f Exhibit C Page 5
P
Zone 19 Community Park Master Plan
P
P
C
-
r
C
c-
f
r
Section 2
Existing Conditions
The park is located in the northern part of the City of Carlsbad’s Local Facilities
Management Plan Zone 19 at the intersection of Poinsettia Lane and Ambrosia Lane. Its
relatively high elevation provides excellent distant views to the north and west. The overall
park site is 24.25 acres, with approximately 5 acres of that sensitive habitat areas. The
majority of the remaining area of the site is currently being used for agriculture.
The site is surrounded by an industrial park on the north, residential development on the east
and south, and open space on the west. There are 116 feet of elevation change from the
highest to the lowest point within the park boundary. The steepest slopes, some over 25%,
occur in the areas of sensitive habitat. Generally, the west part of the park drains to the south
and the east part drains to the north. There is a Carlsbad Municipal Water District easement with an 1 g-inch water line and 12-inch recycled water line on site that connects to adjacent
developments. It is expected that a portion of the easement and water lines will need to be
relocated as a part of the park development. The opportunities and constraints are illustrated
on Exhibit D. The biological resources are also illustrated on the exhibit and discussed
below.
Biological Resources
An overview biological resource survey was conducted on the property to characterize
habitats and document existing conditions. Because of the limitations of this survey, it was
not intended to provide census information regarding potentially occurring sensitive plants
and wildlife. The agricultural and disturbed habitats that dominate the central portion of the
site are unlikely to support sensitive or rare plants or animals; however, the native chaparral
habitats on the edge of the site may provide habitat for a variety of potentially occurring flora
and fauna.
Based upon this biological resources mapping, it was concluded that all preliminary design
concepts should avoid potentially significant impacts to the sensitive resources. The
Preferred Master Plan was evaluated, and there are no direct impacts to any sensitive
biological resources. However the following mitigation measures could be used to avoid
potential indirect impacts:
l Provide a physical barrier between the construction activities and the sensitive resources
to eliminate inadvertent impacts to off-site sensitive resources.
l Direct the storm water runoff from the park away from natural resources area.
IM P&D Consultants, Inc. 6 City of Carlsbad
P:UDMlNUoae 19iMarter PlnnUl9 master plm.doc
Zone 19 Community Park Master Plan
C l Provide a permanent physical barrier with signage (i.e., “No Trespassing”) around all
areas of the park that approach native habitats to reduce human intrusion into biologically
sensitive areas.
l Design all lighting such that it is oriented to the active use areas and the sensitive
resources are shielded.
Tabulation of Habitat Types
Habitat Type I Acres I Agriculture 13.7 Disturbed 3.8
Landscaped 2.2 1
P
P
r
Subtotal 19.7
Southern Maritime Chaparral 2.8
Southern Maritime Chaparral/Scrub Oak 0.3
Coastal Sage Scrub -- Disturbed 0.3 Non-native Grassland 0.4
Oak Woodland 0.2
Ruder al 0.5 I Subtotal 1 4.5 1
r I TOTAL 1 24.2 1
f-
P
r
r
r r
Cultural Resources
Prior to the City’s acquisition of the park site, a cultural resources program was conducted.
Literature review, record search, field survey, and testing identified two prehistoric sites
within the park property. Both sites have been tested to determine site significance. The first
site was identified as significant, and mitigation of impacts was achieved through the
completion of a data recovery program. The second site was tested and identified as not
significant. Given the presence of a significant cultural resource that may contain burials,
monitoring during grading is recommended.
000
PdGD Consultants, Inc. 7 City of Carlsbad
PAADMINEone 19iMmter Plan\Zl9 master plaadoc
r’ 1 * 1, @ ‘1 ! ’ -cn
P
1:
3
P
r-
P
Zone 19 Community Park Master Plan
Section 3
Initial Design Concept Studies
The two initial design concepts were based on a park development program that included :
P
P
P
P
P
l
l
l
l
l
l
l
l
l
l
A full-size lighted soccer field;
Two soccer practice fields that overlay the full-size field;
A lighted softball/baseball field;
A lighted basketball court;
A large tot lot;
Picnic areas;
A Community Building with a Senior Drop-in Center;
A park maintenance facility;
Restroom building(s); and
Parking to support the facilities.
The functional relationships between these facilities were analyzed, and these are
surnmarized on Exhibit E. With a combination of active and passive recreation uses to be
accommodated in the park, it was determined that the lighted, active use areas should be
located on the west and north away from the adjacent residential areas. Both concepts locate
the soccer fields west of Ambrosia Lane, and the softball field north of the Ambrosia Lane
cul-de-sac. It was also determined that the Community Building should be located with
some visual and functional separation from the sports fields. The 5,000~SF maintenance
facility will provide storage for materials and equipment for maintenance of the park. It will
also provide office space and restrooms for the maintenance personnel. Both concepts locate
the maintenance facility at the southwest comer of the park that allows for right-in/right-out
access to Poinsettia Lane. The restroom building will also provide a storage area to local
sports organizations. Both concepts also eliminate the existing cul-de-sac terminus of
Ambrosia Lane to allow for a more continuous landscaped entry drive into the park.
Preliminary Design Concept A locates the parking on the perimeter of the site to maximize
the useable park area and to act as an organizing element. The Community Building is
located at the east side of the park with adjacent parking shared with the softball field. A
single separate restroom building is located adjacent to the play fields and the tot lot, and the
main passive recreation and picnic area is located at the high point of the park with views to
the northwest.
Preliminary Design Concept B locates the Community Building at the high point of the park
to take advantage of the views. The entry drive connects directly to the Community Building
and a parking lot that is shared with the soccer fields. The tot lot and passive recreation and
picnic areas are located at the east side of the park, with additional parking shared by the
P&D Consultants, Inc. 9 City of Carlsbad
P:UDMINZoac INaster Plani muter ph.doc
C
C
P
Zone 19 Communitv Park Master Plan
softball field. Two restroom buildings are shown. One is for use at the soccer fields, and one
for use at the softball field, tot lot, and picnic areas.
Both Preliminary Concepts A and B are included in the Appendix.
000
P&D Consultants, Inc. 10 City of Carlsbad
P:!ADME+Wonc MMartu Phi219 muter plandoe
C
P
r
r
t-
r
r
P
t-
C
F
P
P
r
/ -1-1111111111-1-1111----------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Restroom
e Soccer Field > Softball field
c3 Picnic
4
Parking
Basketball E
-1 I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I
I
I
Parking
f
I some functional i andvisual : separation . . : .
P 1 Maintenance Facility
b J mI-------
I
I
I
I
I
I
I
I
I I
I City of Carlsbad Zone 19
Concept Plan Relationship Diagram
Exhi$$ E
C
Zone 19 Community Park Master Plan
C
I-- / ,,
P
P
P
C
C
Section 4
Preferred Master Plan
After thorough review, staff and consultant analysis, and public input, Preliminary Design
Concept B was selected as the preferred plan, with some recommended modifications and
refinements. (See the Preferred Master Plan, Exhibit F, and the Park Program and Parking Requirements, Exhibit G.)
The modifications to the plan included changing the grading of the site to more closely
balance the earthwork cut and fill. As a result, the softball field and picnic area are closer to
the same elevation, allowing better circulation between the two. This also creates a
landscaped slope backdrop at the park entry. Other changes included making the basketball
court a double half court, which allowed it to be more easily integrated into the plan. Also,
the restroom building serving the soccer fields was moved to the west side of the fields.
The preferred site plan places the park facilities at different elevations, creating a terraced
site design. The Community Building is at approximate elevation 322 feet. The center of the
soccer fields to the south is about 9 feet lower at elevation 3 13 feet. The center of the
softball field is elevation 306 feet, and the tot lot and picnic area are elevation 300 feet. The
total elevation change over the developed park acreage is about 30 feet. The terraced park
design and the relationship of the park to the surrounding area are illustrated in Exhibit H.
The most significant refinement to the plan is the development of the walkway system.
Pedestrian access into the park will be primarily from the end of Ambrosia Lane, and
secondarily from the southwest comer of the park site. At the Ambrosia Lane entry, a
staircase and pedestrian ramp is shown to provide direct access to the soccer fields and to the
Community Building. A walkway will parallel the entry drive and the drive to the east
parking lot, and a universally accessible walkway/trail connects the softball field, basketball
court, picnic and passive recreation areas, and the tot lot and can be used to walk around the
perimeter of the park. Also at the east side of the park, a walkway connects to a potential
gate which would provide access to the park from the adjacent neighborhood.
000 r
r
r
P&D Consultants, Inc. 12 City of Carlsbad
F?lADhiINUone 19\Munr PIan\Zl9 muter plur.doc
Zone 19 Community Park Master Plan
P
r r
Exhibit G
Park Program and Parking Requirements
Program Activity
Adult Soccer(‘)
Sofiball
Practice Soccer(‘) - 2
Basketball Court
Tot Lotc2) - 1 large
Community Building
Maintenance Facility’3’
Picnic Areas (l-acre size)
Restroom Buildings(4’
Total Parking Required
Total Parking Shown
(‘) It is assumed that the two youth/practice soccer fields will be in use at the same-
require more parking than the single adult field. The single adult field will overlay the two youth/
Comments
Adult users: 50 people
Youth groups: 70 people
1 space per 3 users
Adult users: 50 people
Youth groups: 70 people
1 space per 3 users
Adult users: 50 people
Youth groups: 70 people
1 space per 3 users
8 spaces 8
45 people per tot lot
1 space per 3 users
Multipurpose: 300 people
Meetings/activities: 80 people
Offices: 4 people
Senior drop-in center: 25 people
1 space per 3 users
2 spaces per facility
2 covered picnic areas
5 noncovered picnic areas
100 people
15
136
--
33
1 space per 3 users
Parking
Spaces
Required
23
23
23
--
261
273
(‘) practice fields. It is assumed that the tot lot will accommodate 3 times as many people as the standard tot lot. The
(3) standard tot lot has a projected use of 15 people.
(4)
Parking for the Maintenance Facility will be accommodated within the Maintenance Facility area.
It is assumed that the separate restroom buildings will generate no additional users on their own.
P&D Consultants, Inc. 14 City of Carlsbad
P:UDMlhWone 19Wastcr PIrdZ.19 muter plmdoc
f
i --fl k3 gf:B 26
Zone 19 Community Park Master Plan
r
C
C
r
P
r
I- i
I-
Section 5
Architecture Concept
Architectural Design
The architectural design of the buildings in the Zone 19 Community Park has been completed
at a level of detail consistent with a master plan for the park and its facilities. The three
primary steps have been the preparation and refinement of a space program for the buildings,
particularly the Community Building, identification and evaluation of the site for each
structure within the overall park master plan process, and the preparation of an initial floor
plan and concept elevations for each building.
Architectural Space Program
The architectural program for the Community Park is comprised of three building types:
Building Approximate
Size
The detailed design program for the Community Building is illustrated in Exhibit I. The initial program was prepared by the Parks and Recreation staff. The refinement of that
program and the determination of key functional relationships occurred throughout the first
half of the master plan process and involved the entire City/Consultant Team.
Building Site location
The overall master plan process for the park produced Preliminary Design Concepts A and B.
These are differentiated by one major item, the location of the Community Building and the
parking associated with the building. Plan A placed the Community Building on the east side
of the site, and parking is located south of the building (Appendix A.2). Plan B places the
Community Building on the west side of the site, the highest point, and parking is located
between the Community Building and the soccer fields (Appendix A.3).
The evaluation of the Preliminary Design Concepts A and B focused particularly on the
feasibility of successfully siting a Community Building on the westerly site. The gross area
P&D Consultants, Inc. 16 City of Carlsbad
P:UDMINUone 19Wuter PlnnU19 muter plna.doc
Zone 19 Community Park Master Plan
C
r
C
C
available of the westerly site is approximately 1.1 acres. For fire safety purposes, the
standard building setbacks from the native vegetation is 30 feet if there are no windows, and
60 feet if there are to be windows. The evaluation included plot plan and building footprint
studies to determine if a structure of a size sufficient to satisfy the building space program and with the desired window treatments could be sited in accordance with Plan B. The
studies concluded that the westerly site could accommodate the Community Building.
Each of the Preliminary Design Concepts A and B was seen as having advantages and
disadvantages, but the team evaluation and community workshop comments led to the
conclusion that a variation of Plan B best achieved the objectives of the park. In the
preferred master plan (Exhibit F), the Community Building site on the west allows this
important facility to take advantage of northerly and westerly views to the surrounding hills
and ocean.
Architectural Design
The building space program includes a variety of uses which could be going on at the same
time. The four major use areas are configured to be consistent with their unique use
characteristics, and allow appropriate access to administrative and support areas. The
building plan also is designed to permit operational flexibility for the City staff, such as
opening a portion of the building for after-hours use while securing other areas, and
scheduling diverse activities simultaneously without conflict.
The Community Building Concept Floor Plan (Exhibit J) places the four major use areas in
the four quadrants of the building, based on their specific functions and support
requirements. The large multipurpose room is located in the northwest quadrant, the location
of the best view, with access to a large outdoor terrace, restroom facilities, and a kitchen.
The meeting room is located in the northeast quadrant, with access to a separate, smaller
terrace and the kitchen. The senior drop-in center with senior family room is in the
southwest quadrant, close to both handicapped and regular parking. It also has a separate
terrace and a small restroom facility. The activity room, a space for active uses such as
dance, martial art, and exercise classes, is in the southeast quadrant. The activity room has
access to a second set of restrooms and a small terrace on the front of the building. All four
major use areas are supported by the administrative area located near the entrance.
The Community Building Concept Elevations (Exhibit K) illustrate a Spanish/Mediterranean
design theme consistent with the prevailing architectural themes throughout Aviara. This is a
conceptual design intended to show the general form and character of the building. This final
design process will warrant a more focussed design effort and will articulate the architecture
to a greater degree.
000
P&D Consultants, Inc. 17 Cify of Carlsbad
PAADhlIMZone MMashr PIanU19 muter ph.doc
P
P
?
P
C
7
P
P
Zone 19 Community Park Master Plan
Exhibit I
Community Building Program
Program Use
Approximate Approximate
Dimensions Area
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Multi-function Room
Multi-function Room storage
Activity Room
Activity Room storage
Meeting Room
Meeting Room storage
Kitchen
Storage
Connecting hallway to
auditorium
“Service style” kitchen
Restrooms
One set near the Multi-
function and Meeting Rooms
One set near Offrces and
Activity Room
Reception Office
Provide for 2 workstations
Supervisor’s Office
Adjacent office
Copy/rile/work room
Attendant’s Offrce
Provide 2 workstations
Lobby
Custodial Closets (2)
Service Entrance
No target space requirement;
needs to provide access to
kitchen area and the Multi-
function room
Senior Drop-in Center
Senior Family Room
Family Room Storage
Two office areas
Restroom (may be unisex)
Unassigned Space/Circulation
50’ x 100’
16’ x 20’ minimum
40’ x 50’
10’ x 25’
23’ x 55’ 12’ x 35’
12’ x 12’ 225 SF
12’ x 12’
10’ x 10’
10’ x 12’
10’ x 20’
12’ x 25’
--
10’ x 12’
5,000 SF
320 SF
2,000 SF
250 SF
1,265 SF
420 SF
750 SF
750 SF
365 SF
200 SF
300 SF
450 SF
120 SF
1,000 SF
200 SF
250 SF
65 SF
3,070 SF
Total 17,000 SF
P&D Consultants, Inc. 18 City of Carlsbad
P:UDMINUone 19Wuter PlnnU19 muter ph.doc
r
f
P
7
r
r
r
r
P
-
P
r
r
r
e
r
r
P
P
Community Building
Concept Floor Plan
Exhibit J page 19
Zone 19 Community Park Master Plan
P
C
F
c
P
C
C
C
P
i
r
r
Section 4
Engineering Concept
Access
The only public vehicular access to the park will be from the end of Ambrosia Lane. The
existing cul-de-sac terminus of Ambrosia Lane will be removed and the street will transition
to a driveway connecting into the park. The access to the maintenance facility will be from a
right-in/right-out driveway connecting to Poinsettia Lane. This access point will be for
maintenance vehicles only.
Utilities
The proposed utility services are illustrated on Exhibit L. Sewer, water, electrical, gas, and
cable television connections to the Community Building, Restroom buildings, and the
Maintenance Building can be made from the existing utilities located within Ambrosia Lane
and Poinsettia Lane. In some cases new public facilities will be required to extend the
existing systems from Ambrosia Lane and Poinsettia Lane to the park site. There also exists
an existing 30-foot wide water easement to the Carlsbad Municipal Water District that
traverses the park site in an east to west direction. There exists an 18-inch steel domestic
water main and a 124nch recycled water main within the easement. These two facilities
either connect or are planned to connect to the adjacent developments. It is assumed that a
portion of the existing easement, domestic water main, and recycled water main will need to
be removed and/or relocated as part of the park project.
Storm Runoff and Storm Drain Facilities
Storm runoff from the park site in the existing pre-developed condition drains north into the
natural areas, south into Ambrosia Lane and Poinsettia Lane and west into undeveloped
areas. Storm runoff from the park site (i.e., parking lots, playing fields, open areas, and areas
adjacent to the buildings) in the developed condition will respect, as much as possible, the
pre-developed drainage patterns. The ultimate storm drain design of the park will have to
consider the constraints of draining into the natural resource areas and the capacity of the
existing storm drain facilities located in Ambrosia Lane, Poinsettia Lane, and the existing
downstream facilities. It is presumed that a portion of the developed park site may be
diverted south, away from the natural resource areas (Exhibit L).
P&D Consultants, Inc. 21 City of Carlsbad
P:UDMINiZonc 19Warler PladZ19 m.‘lcr phdoc
C
Zone 19 Community Park Master Plan
P
F
C
Grading
The proposed grading, in general, will be terraced between the use areas, fkom west to east,
with the high point at the proposed Community Building. The grading design anticipates a
balanced condition, with no need to import or export mass excavation material. The design
of the proposed grading will be done in accordance with recommendations included in a
geotechnical report for the project.
000
r
r
r
r
r
P&D Consultants, Inc. 22 City of Carlsbad
P:UDMlN&onc 19lMaster PlanKA master plnn.doc
C
Zone 19 Community Park Master Plan
Section 7
landscape Concept
The intent of the Landscape Design is to provide an attractive unifying element to the park,
defining the separate use areas, and buffer adjacent residences. The landscape concept is
illustrated on Exhibits M and N.
The groundcover on the existing manufactured slopes along Poinsettia Lane and Ambrosia
Lane will be supplemented with informal tree and shrub massing to soften their
manufactured character. Similarly, the existing manufactured slopes at the east and southeast
corner of the park, adjacent to the existing residential areas, will have supplemental tree and
shrub massings to screen views of the parking area.
The parking areas will be planted with canopy trees to provide shade and mitigate heat gains
from the paved areas, and provide a unifying and identifying element.
New manufactured slopes on the perimeter of the park will be planted with native and low-
water-use plants that will blend with the existing on- and off-site natural areas. Barrier
shrubs will be planted on the manufactured slopes of a size and spacing to discourage
intrusion of park patrons into the sensitive habitats of Oak Woodland, Southern Maritime
Chaparral, Scrub Oak Chaparral, and Coastal Sage Scrub-Disturbed.
The Community Building will be landscaped primarily with lawns and groundcovers so the
views to the north and west will not be interrupted. This will also help to mitigate any fire
hazards from the adjacent native vegetation. Some trees will be used on the south side of the
building and in the terrace area to provide shade and visual softening of the facade.
The majority of the park will be planted in lawn for the soccer fields and the softball field,
the passive recreation areas, and the picnic areas. Trees will be planted to define the use
areas and to provide shade to the picnic areas.
Based on the definitions in the City of Carlsbad Landscape Manual, there are four planting
Zones within the park boundary.
Zone One - comprises the most water- and maintenance-intensive areas and includes the
turf ball fields; picnic areas; and high-use areas around the Community Building.
Zone Two - comprises the areas of refined maintenance and design and includes the
entry area slopes and planting within the parking areas.
Zone Three - includes naturalizing and transitional areas such as the revegetated
manufactured slopes.
Zone Four - includes the existing native undisturbed landscape.
M P&D Consultants, Inc. 24 City of Carlsbad
P:UDMlNUonc 19Wuter PlmnUl9 muter plm.doc
r
r r
r
r
r
r
r
r
F
Zone 19 Communiiv Park Master Plan
Water Use
Water conservation is an important objective of the landscape design. The park will be
designed to use recycled water wherever possible. The irrigation will include the use of low-
precipitation rate sprinklers. The entire system will be controlled electronically through a
central controller, with soil moisture sensors and rain sensors also incorporated. Other
conservation measures will include the selection of low-water-use plant materials, thorough
soil preparation, and appropriate mulching of non-turf areas.
P&D Consultants, Inc. 25 City of Carlsbad
P:UDbUNiZone 19tMasar PIaa\Z19 mrster plm.doc
Zone 19 Community Park Master Plan
Exhibit N
Plant Materials List
Common Name
Canopy Trees
Jacaranda
American Sweetgum
Coast Live Oak
Holly Oak
Tipu Tree
Accent Trees
Cape Chestnut
Neti Zealand Christmas Tree
African Sumac
Screen and Barrier Shrubs and Trees
Bougainvillea
Toyon
Pink Melaleuca
Canary Island Pine
Mondell Pine
Aleppo Pine
Fushia Flowering Gooseberry
NCN
Sweet Hakea
Ornamental Shrubs and Groundcovers
Lily-of-the-Nile
Fortnight Lily
Rosea Iceplant
Lantana
Honeysuckle
India Hawthorn
Australian Bluebells
Oleander
Silverberry
Plurnbego
Cape Honeysuckle
Botanical Name
Jacaranda mimosifolia
Liquidambar styraciflua
Quercus agrifolia
Quercus ilex
Tipuanu tipu
Calodendrum capense
Metrosideros excelsus
Rhus lancea
Bougainvillea hybrid
Heteromeles arbutfolia
Melaleuca nesophila
Pinus canariensis
Pinus eldarica
Pinus halepensis
Ribes speciosum
Rosa bracteata
Hakea suaveolens
Agapanthus afiicanus
Dietes vegata
Drosanthemum floribunda
Lantana montevidensis
Lonicera japonica ‘Halls ’
Rhapiolepis indica
Sollya heterophylla
Nerium oleander “Casablanca
Eleagnus pungens “‘Fruitlandii”
Plumbego auriculata
Tecomeria capensis
P&D Consultants, Inc. 27 City of Carlsbad
P:UDhUNUm.e 19ihlmter PhAZ19 muter plmdw.
C
P
P
F I
Zone 19 Community Park Master Plan
Exhibit N
Plant Materials List (Continued)
Common Name Botanical Name
Native Trees, Shrubs, and Groundcovers
Coastal Sagebrush
Wart-stemmed Ceanothus
California Encelia
California Buckwheat
Golden Yarrow California Poppy
Toyon
Deerweed
Pigmy-leaf Lupine
Laurel Sumac
Scarlet Monkeyflower
Coast Live Oak
Lemonade Berry
White Sage
Black Sage
Mexican Elderberry
San Diego Sunflower
Mojave Yucca
Artemisia californica
Ceanothus verrucosus
Encelia californica
Eriogonum fasciculatum
Eriophyllum confertiflorum
Eschscholzia californica
Heteromeles arbutifolia
Lotus scoparius
Lupinus bicolor
Malosma laurina
Mimulus cardinalis
Quercus agrifolia
Rhus integrijolia
Salvia apiana
Salvia mellifera
Sambucus mexicana
Viguiera laciniata
Yucca schidigera
P&D Consultants, Inc. 28 City of Carlsbad
P:UDMNUonc 19Wuter PlanUI9 master plaa.doc
Zone 19 Community Park Master Plan
P
C
r i
r r
r
r
r
r
r
I-
r
Section 8
Construction Phasing
The Zone 19 Community Park may be constructed in one phase, or it may be constructed in
two phases as described below:
Phase I: Construction of all park facilities except the Community Building. This consists of
grading and utilities for the entire site; construction of the drives, walkways, and parking
facilities; installation of all ball fields, play courts, and tot lot; installation of restrooms and
maintenance facility; installation of picnic facilities, benches, fences, lighting, planting, and
irrigation; and incorporation of the art component.
Phase II: Construction of the Community Building and associated adjacent terraces,
planting and irrigation, and related construction.
The timing of the implementation of the park facilities and the Community Building will be
addressed through the City’s Capital Improvement Program.
000
P&D Consultants, Inc. 29 City of Carlsbad
P:UDMlNVhe 19Wnrter PhU19 master plm.doc
C
Appendices
City of Carlsbad Zone 19
Community Park
r
A-l
P
c
-
C
P
Appendix A.1
Biological Resources Summary
A-2
P&D Environmental A Diuision ojP&D Con.whnts
r
C
P
c-
401 WEST “A” STREET, SUITE 2500
SAN DIEGO, CALIFORNIA 92101
6191232-4466
619/234-3022 FAX
www.pdconsultants.com
January 22,200l
Mr. Jason Martin
CITY OF CARLSBAD
1635 Faraday Avenue
Carlsbad, CA 92008
SUBJECT: BIOLOGICAL RESOURCE STUDY FOR ZONE 19 PARK SITE
Dear Jason,
A general biological resource survey was performed at the Carlsbad Park Site, located in the City
of Carlsbad, California. The purpose of this survey was to document existing biological
conditions on site, and to identify any sensitive biological resources that may constrain
development here.
Habitats mapped onsite include coast live oak woodland, scrub-oak-dominated maritime
chaparral, southern maritime chaparral, coastal sage scrub - disturbed, non-native grassland,
agriculture, ruderal, disturbed, landscaped, and developed. Potential jurisdictional waters exist at
the northern portion of the site, where topographical features convey water to a cement-lined
brow ditch which occurs along the northern property boundary.
The City of Carlsbad (City) Habitat Management Plan (HMP) requires some form of mitigation
for all of the habitats mapped within the project site (with the exception of landscaped and
developed). Mitigation for impacts to coast live oak woodland can only be achieved by in-kind
habitat creation (no net loss); scrub-oak-dominated maritime chaparral and southern maritime
chaparral would require in-kind replacement (i.e., offsite acquisition) at a ratio of 3: 1. Coastal
sage scrub - disturbed habitat (gnatcatcher - unoccupied in this case) would need to be replaced
at a ratio of 1: 1. Non-native grassland would require compensation at a ratio of 0.5: 1, and
disturbed/agricultural habitats could be mitigated through a fee charge.
Sensitive plants observed on the park site include De1 Mar manzanita (Arctostaphylos glandulosa
ssp. crasszjblia), Nuttall’s scrub oak (Quercus dumosa), summer holly (Comarostaphylos
diversifolia ssp. diversifolia), wart-stemmed ceanothus (Ceanothus verrucosus) and Palmer’s
goldenbush (Ericameria palmeri ssp. palmeri). De1 Mar manzanita is a federally endangered
species. All of the above (with the exception of Palmer’s goldenbush) are HMP Covered
Species.
f F?ADM~NIZO~C 19!bioletter.doc
C
r
C
-
Mr. Jason Martin January 22,200l
CITY OF CARLSBAD Page 2
A general biological resource survey was conducted on the property to characterize habitats and
document general existing conditions. Because of the limitations of this survey, it was not
intended to provide census information regarding potentially occurring sensitive plants and wildlife. The agricultural and disturbed habitats that dominate the site are unlikely to support
sensitive or rare plants or animals; however, the native chaparral habitats on site may provide
habitat for a suite of potentially occurring flora and fauna.
Based upon this biological resources mapping, P&D implemented a design that would avoid
potentially significant impacts to the sensitive resources. The preliminary design plan was
evaluated, and there are no direct impacts to any sensitive biological resources. However, P&D
recommends the following mitigation measures to avoid potential indirect impacts:
l Provide a physical barrier between the construction activities and the sensitive resources to
eliminate inadvertent impacts to off-site sensitive resources.
l Direct all runoff away from natural resources area.
l Provide a permanent physical barrier with signage (i.e., “No Trespassing”) around all
development that approaches native habitats to reduce human intrusion into biologically
sensitive areas.
l Design all lighting such that it is oriented to the active use areas and the sensitive resources
are shielded.
If you have any questions, please contact me.
Sincerely,
r
P&D ENVIRONMENTAL
Betty Dehoney
Director of Environmental Services
I- c: Gary Wood
Salvatore Zimmitti
PAADMlNZone 19\biolerter.doc
Appendix A.2
Preliminary Design Concept A
A-6
I
0 i
-
Appendix A.3
Preliminary Design Concept B
A-8
Appendix A.4
Public Input Summary
A-10
ZONE 19 PARK OPEN HOUSE SUMMARY
r
C
P
P
P
Attendees:
Comment Forms Received: 28
Carlsbad Residents: 28
How Did You Hear About the Open House?
Written Notice
HOA
Park Site Sign
15 Newspaper 6 1 Youth Group Notice 5 Q Neighbors 2
What Did You Like About Layout “A” (Community Center east side of park):
m Tot play area overlooks soccer field (2)
m Recreation space at the highest elevation (3)
. Good use of space and natural area
. Balance of ball fields and open space
n Traffic (people) flow
. Upper passive picnic area
What Did You Like About Layout “B” (Community Center west side of park):
n Picnic area is close to tot lot (2)
. Picnic area close to parking lot
fl Community building on the hill (3)
w Community use buildings within reasonable distance of parking
H Parking divided between park elements (2)
9 Traffic (people) flow
Suggested Additions: (3) = number of people who made the suggestion
Dogs allowed (4)
Area for unleashed dogs (2)
More trees
Tennis courts (3)
Locked gate access from developments (3)
Walking/running paths around park
Area for sand or grass volleyball courts
More fields
Consider this for swim complex
More soccer fields (2)
Place for school dances (2)
Area for skateboarding (3)
More picnic areas
Room for cultural activities
Baseball fields instead of softball
Nature trails (3)
Keep lights to a minimum