Loading...
HomeMy WebLinkAbout2001-03-27; City Council; 16129; Status Of Public Outreach Program For VistaMTG. 3/27/2001 DEPT. ENG CITY OF CARLSBAD -AGENDA BILL TITLE- -- STATUS OF PUBLIC OUTREACH PROGRAM FOR THE VISTAKXRLSBAD INTERCEPTOR SEWER REACHES VCSB THROUGH VCllA, PROJECT NO. 3182, THE SOUTH CARLSBAD VILLAGE STORM DRAIN PROJECT NO. 3528 AND c1l-Y MGR. PAVEMENT OVERLAY PROJECT NO. 3667 RECOMMENDED ACTION: This is an informational item and therefore there is no staff recommendation at this time. ITEM EXPLANATION: PROJECT OVERVIEW This project replaces segments of the VistaICarlsbad Interceptor Sewer, constructs the South Carlsbad Village storm drain, and resurfaces streets along the project alignment. The alignment of the pipelines and streets to be overlaid are shown on the attached Exhibits 1 and 2. The Engineering Department and Katz and Associates, have developed a comprehensive Public Outreach Program to inform the public about the need for this project and the anticipated impacts. This proactive program will utilize a variety of media and personal outreach to inform residents and businesses of the construction schedule, current and future traffic control patterns, and provide easy and consistent access to the construction management team. FISCAL IMPACT: This is an informational item and there is no fiscal impact at this time. ENVIRONMENTAL IMPACT: This is an informational item only. EXHIBITS: Exhibit 1: Sewer and Storm Drain Alignment Exhibit 2: Pavement Overlay Locations SwERsoNRmE b FREVAY CROSSING LOCATIDN MAP i& i!4 ,o B $ t -3 +A a! u I E m~m~m~=t- PROPOSED STORM DRAIN VISTA / CARLSBAD INTERCEPTER SEWER CONTRACT FIGURE rND SOUTH CARLSBAD STDRM DRAIN PRDJECT #3182/3528 #’ LOCATION MAP Project name : PAVEMENT OVERLAY CONTRACT FIGURE #3667 #2 Ac?Lul#0,r2 3