CITY OF CARLSBAD -AGENDA BILL
TITLE- --
STATUS OF PUBLIC OUTREACH PROGRAM FOR THE
VISTAKXRLSBAD INTERCEPTOR SEWER REACHES VCSB
THROUGH VCllA, PROJECT NO. 3182, THE SOUTH
CARLSBAD VILLAGE STORM DRAIN PROJECT NO. 3528 AND c1l-Y MGR.
PAVEMENT OVERLAY PROJECT NO. 3667
RECOMMENDED ACTION:
This is an informational item and therefore there is no staff recommendation at this time.
ITEM EXPLANATION:
PROJECT OVERVIEW
This project replaces segments of the VistaICarlsbad Interceptor Sewer, constructs the South
Carlsbad Village storm drain, and resurfaces streets along the project alignment. The alignment of
the pipelines and streets to be overlaid are shown on the attached Exhibits 1 and 2.
The Engineering Department and Katz and Associates, have developed a comprehensive Public
Outreach Program to inform the public about the need for this project and the anticipated impacts.
This proactive program will utilize a variety of media and personal outreach to inform residents and
businesses of the construction schedule, current and future traffic control patterns, and provide
easy and consistent access to the construction management team.
FISCAL IMPACT:
This is an informational item and there is no fiscal impact at this time.
ENVIRONMENTAL IMPACT:
This is an informational item only.
EXHIBITS:
Exhibit 1: Sewer and Storm Drain Alignment
Exhibit 2: Pavement Overlay Locations
SwERsoNRmE
b FREVAY CROSSING
LOCATIDN MAP
i&
i!4 ,o
B
$ t
-3
+A a! u I E
m~m~m~=t- PROPOSED STORM DRAIN
VISTA / CARLSBAD INTERCEPTER SEWER CONTRACT FIGURE
rND SOUTH CARLSBAD STDRM DRAIN PRDJECT #3182/3528 #’
LOCATION MAP
Project name :
PAVEMENT OVERLAY
CONTRACT FIGURE
#3667 #2
Ac?Lul#0,r2 3