Loading...
HomeMy WebLinkAbout2001-04-17; City Council; 16156; Carlsbad Boulevard Realignment ProjectCITY OF CARLSBAD - AGENDA BILL AB# !b i /5b T’TLE APPROVAL TO APPROPRIATE ADDITIONAL FUNDS 4/l 7/01 FOR THE CARLSBAD BOULEVARD MTG. REALIGNMENT PROJECT PD 99-l S/DWG 383-3 PROJECT NO. 36171 DEPT. ENG I RECOMMENDED ACTION: Adopt Resolution No. No/d/b approving appropriation of additional funds to cover the construction costs of installing enhanced raised median landscaping and improvements for the Carlsbad Boulevard Realignment Project, PD 99-19/Dwg. 383-3, Project No. 36171. ITEM EXPLANATION: Carlsbad Boulevard is currently being realigned and improved by SHEA HOMES, Inc. (SHEA), as part of a joint project with the City, pursuant to a reimbursement agreement approved by City Council on December 7, 1999, in accordance with Resolution No. 99-513, of Agenda Bill 15,522. The reimbursement agreement included a cost estimate of project preliminary design and construction costs. The cost estimate included preliminary costs for installing a fully improved landscape raised median along the full length of the project. The preliminary landscaping cost estimate was based on unit costs for a City standard landscaped raised median for arterial roadways. During landscape plan preparation, the standard raised median landscaping was revised to include additional landscaping elements to match landscaping enhancements that the developer is installing along their project frontage. These additional elements have increased the City’s share of installing the landscaped raised median by $132,671. Additionally, changes in line item costs, as part of the construction bid process for the project, have increased the City’s overall line item share by $214,744; and, construction change orders have increased the City’s share of project costs by $22,813. These additions, including a City Plan Check/Inspection credit and contingency, results in a total appropriation request of $360,000. This $360,000, appropriation may be reduced as indicated in Table ‘A,” below. enhanced raised median. Staff recommends that the raised median be installed as designed and that $360,000, be appropriated to cover project costs. The enhanced raised median was approved by the City’s Community Services/Parks Department and will match improvements being constructed on the east side of Carlsbad Boulevard within the project limits. I Page 2 of Agenda Bill No. / _L,lsl: ENVIRONMENTAL REVIEW: The proposed project was included in the Program EIR (EIR 96-10) prepared for the Poinsettia Properties Specific Plan, certified in January 1998. The Program EIR addressed subsequent discretionary approvals of the specific plan, including actions such as tentative maps, site development plans and coastal development permits. The proposed project is consistent with the land uses, design guidelines and facility improvements required in the specific plan. No new impacts are anticipated and no new mitigation measures are necessary, therefore, no further environmental review is required. Therefore, the project is exempt under Section 15182 of the California Environmental Quality Act. FISCAL IMPACT: Presently, City Council has appropriated $1 ,100,OOO in Gas Tax funds for the project, as indicated in the current Capital Improvement Program (Project No. 36171). To cover the City’s full reimbursement obligations, an additional appropriation of $360,000, is required, as indicated in Table “B,” below. Revised Estimated Cost $1,460,000 Additional Appropriation $360,000 The City is also competing for Regional Transportation Development Act (TDA) funds to help defer the public bicycle lane portion of the project, in the amount of $111,924. If the City is successful in obtaining these funds, then the above appropriation can be reduced accordingly. 1. 2. Location Map. Resolution No. @.$//h approving an appropriation of additional funds for the Carlsbad Boulevard Realignment Project, PD 99-lS/DWG 383-3, Project No. 36171. 2 NOT 16 SCALE LOCATION MAP I PROJECT NAME EXHIBIT CARLSBAD BOULEVARD l 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2o01-116 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING AN APPROPRIATION OF ADDITIONAL FUNDS FOR THE CARLSBAD BOULEVARD REALIGNMENT PROJECT, PD 99-lS/DWG 383-3 - PROJECT NO. 36171. WHEREAS, Shea Homes (Shea) and Fieldstone Communities (Fieldstone), in accordance with conditions of approval for their respective projects, have partnered with the City of Carlsbad to realign and improve Carlsbad Boulevard (Improvements) along their respective project frontages; and, WHEREAS, Shea previously agreed to take the lead on completing the Improvements for the Shea and Fieldstone frontages; and, WHEREAS, Shea and the City previously entered into a reimbursement agreement to complete certain improvements for the public benefit; and, WHEREAS, the previously approved reimbursement agreement included a preliminary cost estimate; and, WHEREAS, due to additional enhanced landscaping treatment for the Carlsbad Boulevard raised median, and construction bid cost estimates that show an increase to overall project line item costs; and, due to construction change orders, overall project cost estimates have increased; and, WHEREAS, to cover the City’s reimbursement obligations, including the State Park’s portion of the Carlsbad Boulevard/Poinsettia Lane/State Park’s entrance improvements, an additional appropriation of $360,000, from the General Fund is required. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct; 2. That City Council finds that it is in the best interest of the City of Carlsbad to maintain aesthetically pleasing, scenic roadways for citizens and guests of Carlsbad; 3. That to maintain this scenic roadway (Carlsbad Boulevard) it is necessary to install an enhanced landscaped raised median; 4. That to install this enhanced landscaped raised median, additional funding must be II appropriated to cover the construction costs for the median; Ill 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5. That the Finance Director is hereby authorired to transfer $360,000 from the Gas Tax Fund to the project account to wver said costs. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 17th day of April ,. 2001 by the following vote, to wit: AYES: c ouncil Members Kulchin, Finnila, Nygaard and Hall. NOES: None. ABSENT: Council Member Lewis $JkRAINE M. WOOD, w Clerk / ww