Loading...
HomeMy WebLinkAbout2001-07-24; City Council; 16294; Traffic Signal @ Carlsbad Village Dr./Pontiac Dr.CITY OF CARLSBAD -AGENDA BILL I 1 Al3# h,a~l-\ TITLE: AUTHORIZATION TO ADVERTISE FOR BIDS FOR A TRAFFIC SIGNAL AT MTG. 7/24/O 1 CARLSBAD VILLAGE DRIVE AND PONTIAC DRIVE PROJECT NO. 3847-l DEPT. ENG DEPT. HD. CITY ATTY. 4& ’ CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. aool-da~ approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the Carlsbad Village Drive and Pontiac Drive Traffic Signal, Project No. 3847-l. ITEM EXPLANATION: Plans and specifications to install a traffic signal at the intersection of Carlsbad Village Drive and Pontiac Drive have been completed. This intersection meets Caltrans traffic signal warrants, was ranked #5 on the City of Carlsbad 2000 Traffic Signal Qualification List, and the project was included in the 1999/2000 Capital Improvement Program for construction. ENVIRONMENTAL REVIEW: This project is a Class 1 categorical exemption and is, therefore, exempt from the environmental review process under provisions of the California Environmental Quality Act (CEQA), Section 15301 (f). A Notice of Exemption will be issued by the Planning Director if this Authorization to Advertise is approved. FISCAL IMPACT: The funds needed to complete the project are $156,000. The project cost breakdown is as follows: Engineer’s Estimate for Construction $120,000 Inspection & Project Administration (15%) $18,000 Construction Contingencies (15%) $18,000 Total Project Cost $156,000 Amount Available $82,450 Additional Fundina Reauired $73.550 The original estimate for this project allocated $85,000 for design and construction. The design portion of the project is complete and, to date, funds in the amount of $82,450 are available for the remainder of the project. The Engineer’s Estimate is based on an analysis of recent bids for traffic signal construction. Due to an increase in construction activity, construction costs have risen significantly from what was originally appropriated for this project. Therefore staff is requesting an additional appropriation of $73,550 from the General Capital Construction Fund (GCC). EXHIBITS: 1. 2. Location Map. Resolution No. ga 1 -995 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the Carlsbad Village Drive and Pontiac Drive Traffic Signal, Project No. 3847-l and the additional appropriation of $73,550 from the General Capital Construction Fund (GCC). LOCATION MAP TRAFFIC SIGNAL NOT TO SCALE PROJECT NAME: PROJECT 3847-l EXHIBIT TRAFFIC SIGNAL AT CARLSBAD VILLAGE DRIVE AND PONTIAC DRIVE 1 1 2 3 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 RESOLUTION NO. 2001-225 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS AND THE APPROPRIATION OF ADDITIONAL FUNDS FOR THE CONSTRUCTION OF THE CARLSBAD VILLAGE DRIVE AND PONTIAC DRIVE TRAFFIC SIGNAL, PROJECT NO. 3847-l. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct a traffic signal at the intersection of Carlsbad Village Drive and Pontiac Drive, the “Project”; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental of the Project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, the Project was ranked fifth in the City of Carlsbad 2000 Traffic Signal Qualification List and included in the 1999/2000 Capital Improvement Program; and WHEREAS, the estimated cost for the Project is $156, 000 and only $82,450 is currently available; and WHEREAS, additional funds in the amount of $73,550 are required to cover the cost of the Project; and WHEREAS, additional funds in the amount of $73,550 are available in the General Capital Construction Fund (GCC). NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents as presented are hereby , 1 2 3 4 5 6 3. The City Clerk is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Carlsbad Village Drive and Pontiac Drive Traffic Signal, Project No. 3847-1, in accordance with the plans, specifications and contract documents referred to herein. 4. The Finance Director is hereby authorized to appropriate $73,550 from the General Capital Construction Fund (GCC) to the traffic signal project account. 7 8 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council 9 held on the 24th day of Julv , 2001 by the following vote, to wit: IO AYES: Council Members Lewis, Kulchin, Finnila, Nyqaard, and Hall. 11 12 13 14 15 4TTEST: 16 17 \ y7e&--Lh3”“c LOMAINE M. W (SEAL) 18 19 20 21 22 23 24 25 26 27 28